18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. Pre-Mobilization On Location LONG COTTER PINS CREATE SNAG POINT SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-DLF-MIR-03 3 2 6 SUSPENDED LOADS ENTIRE CREW 3 3 9 REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER ACCOMPANYING EQUIPMENT. RIG CREW SERVICE TECH / RIG CREW DVN-DLF-MIR-03 3 2 6 FALLING OBJECTS ENTIRE CREW 5 3 15 PREMOBILIZATION CHECK LISTS (DVN-DLF-MIC-07); DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF SERVICE. SHOP FOREMAN SERVICE TECH DVN-DLF-MIC-07 4 2 8 BROKEN HYDRAULIC CONNECTIONS AND HOSES RIG CREW / SERVICE TECHS 3 4 12 INSPECT ALL HYDRAULIC HOSES VISUALLY FOR WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN, SEPARATION FROM HOSES, AND/OR LEAKS (DVN-HOS-MIP-02) SHOP FOREMAN RIG CREW / SERVICE TECH DVN-DLF-MIC- 07, DVN-HOS- MIP-07 3 2 6 SLING FAILURE CAN RESULT IN DROPPED EQUIPMENT AS IT IS BEING LIFTED ENTIRE CREW 5 2 10 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES. SHOP FOREMAN / TPI SERVICE TECH DVN-DLF-MIR-03 3 2 6 DUAL ARTICULATING LIFT FRAME (DALF) INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity Assessor's signature: ____________________________________________ 1 of 18

BHP-RISK ASSESSMENT - DALF R1

Embed Size (px)

Citation preview

Page 1: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

Pre-Mobilization On Location

LONG COTTER PINS CREATE SNAG

POINTSERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-DLF-MIR-03 3 2 6

SUSPENDED LOADS ENTIRE CREW 3 3 9

REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC

RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE

THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER

ACCOMPANYING EQUIPMENT.

RIG CREWSERVICE TECH /

RIG CREWDVN-DLF-MIR-03 3 2 6

FALLING OBJECTS ENTIRE CREW 5 3 15

PREMOBILIZATION CHECK LISTS (DVN-DLF-MIC-07); DEBRIS

CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER

PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE,

ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF

SERVICE.

SHOP

FOREMANSERVICE TECH DVN-DLF-MIC-07 4 2 8

BROKEN HYDRAULIC

CONNECTIONS AND HOSES

RIG CREW /

SERVICE TECHS3 4 12

INSPECT ALL HYDRAULIC HOSES VISUALLY FOR WORN, SPLIT,

CUT, CRACKED HOSES AND/OR LEAKS. INSPECT VISUALLY ALL

CONNECTION ENDS FOR CRACKS, WORN, SEPARATION FROM

HOSES, AND/OR LEAKS (DVN-HOS-MIP-02)

SHOP

FOREMAN

RIG CREW /

SERVICE TECH

DVN-DLF-MIC-

07, DVN-HOS-

MIP-07

3 2 6

SLING FAILURE CAN RESULT IN

DROPPED EQUIPMENT AS IT IS

BEING LIFTED

ENTIRE CREW 5 2 10NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL

INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES.

SHOP

FOREMAN /

TPI

SERVICE TECH DVN-DLF-MIR-03 3 2 6

DUAL ARTICULATING LIFT FRAME (DALF)

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

BAIL ASSEMBLY SPREADER SYSTEM (BASS)

Assessor's signature: ____________________________________________ 1 of 18

Page 2: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

LONG COTTER PINS CREATE SNAG

POINTSERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-BAS-MIR-03 3 2 6

SUSPENDED LOADS ENTIRE CREW 3 3 9

REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC

RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE

THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER

ACCOMPANYING EQUIPMENT

RIG CREWSERVICE TECH /

RIG CREWDVN-BAS-MIP-02 3 2 6

FALLING OBJECTS ENTIRE CREW 5 3 15

PREMOBILIZATION CHECK LISTS (DVN-BAL-PRD-04); DEBRIS

CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER

PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE,

ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF

SERVICE;

SHOP

FOREMANSERVICE TECH DVN-BAS-PRD-05 4 2 8

BROKEN HYDRAULIC

CONNECTIONS AND HOSES

RIG CREW /

SERVICE TECHS3 4 12

INSPECT ALL HYDRAULIC AND FUEL HOSES VISUALLY FOR

WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT

VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN,

SEPARATION FROM HOSES, AND/OR LEAKS. (DVN-HOS-MIP-

02)

SHOP

FOREMAN

RIG CREW /

SERVICE TECH

DVN-HPU-MIR-

02,DVN-HOS-

MIP-02

3 2 6

SLING FAILURE CAN RESULT IN

DROPPED EQUIPMENT AS IT IS

BEING LIFTED

ENTIRE CREW 5 2 10NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL

INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES

SHOP

FOREMAN /

TPI

SERVICE TECH BHP QCP REV. 3 4 2 8

BAIL ASSEMBLY SPREADER SYSTEM (BASS)

Assessor's signature: ____________________________________________ 2 of 18

Page 3: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

SUSPENDED LOADS ENTIRE CREW 3 3 9

REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC

RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE

THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER

ACCOMPANYING EQUIPMENT

SHOP

FOREMAN

SERVICE TECH /

RIG CREW

DVN-DLF-MIP-

02; JSA3 2 6

FALLING OBJECTS ENTIRE CREW 5 3 15

DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE

COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE

SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED,

I.E. OUT OF SERVICE;

SHOP

FOREMANSERVICE TECH JSA; HSE COORD. 5 2 10

LOAD SHIFT IN EQUIPMENT

BASKET - CAN CAUSE EQUIPMENT

DAMAGES, LEAKS, POTENTIAL

ENERGY

SERVICE TECHS 3 4 12

ENSURE LOAD IS SECURED IN BASKET; HAVE MSDS ON ALL

CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE;

THIRD PARTY REVIEW OF LOAD OUT; SECURE ITEMS WITH

STRAPS;

SHOP

FOREMAN

SERVICE TECH /

RIG CREW

MSDS;TECH

COMPETENCY

RECORD

3 2 6

SLING FAILURE CAN RESULT IN

DROPPED EQUIPMENT AS IT IS

BEING LIFTED

ENTIRE CREW 5 2 10NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL

INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES

SHOP

FOREMAN /

TPI

SERVICE TECH BHP QCP REV. 3 4 2 8

EQUIPMENT BASKET (BAILS, ELEVATORS, CONTROL PANEL,

HOSES)

Assessor's signature: ____________________________________________ 3 of 18

Page 4: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

LONG COTTER PINS CREATE SNAG

POINTSERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE

SHOP

FOREMANSERVICE TECH

DVN-HPU-MIR-

023 2 6

SUSPENDED LOADS ENTIRE CREW 3 3 9

REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC

RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE

THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER

ACCOMPANYING EQUIPMENT

SHOP

FOREMAN

SERVICE TECH /

RIG CREW

DVN-HPU-MIR-

023 2 6

FALLING OBJECTS ENTIRE CREW 5 3 15

PREMOBILIZATION CHECK LISTS (DVN-HPU-PRD-06); DEBRIS

CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER

PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE,

ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF

SERVICE;

SHOP

FOREMANSERVICE TECH

DVN-HPU-PRD-

065 2 10

(IF APPLICABLE) LOAD SHIFT HPU

SKID - CAN CAUSE EQUIPMENT

DAMAGES, HYDRAULIC FLUID

LEAKS FROM HOSES.

SERVICE TECHS 3 4 12

ENSURE LOAD IS SECURED IN BASKET AND THREAD CAPS ARE

SECURED; HAVE MSDS ON ALL CHEMICALS FOR QUICK AND

PROPER CLEAN UP RESPONSE; THIRD PARTY REVIEW OF

LOAD OUT; NOV DEVIN PREMOB CHECK LIST(DVN-HPU-PRD-

06); SECURE ITEMS WITH STRAPS;

SHOP

FOREMAN

SERVICE TECH /

RIG CREW

DVN-HPU-PRD-

063 2 6

SLING FAILURE CAN RESULT IN

DROPPED EQUIPMENT AS IT IS

BEING LIFTED

ENTIRE CREW 5 2 10NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL

INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES

SHOP

FOREMAN /

TPI

SERVICE TECH BHP QCP REV.3 4 2 8

BROKEN HYDRAULIC

CONNECTIONS AND HOSES

RIG CREW /

SERVICE TECHS3 4 12

INSPECT ALL HYDRAULIC AND FUEL HOSES VISUALLY FOR

WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT

VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN,

SEPARATION FROM HOSES, AND/OR LEAKS. (DVN-HOS-MIP-

02)

SHOP

FOREMAN

RIG CREW /

SERVICE TECH

DVN-HPU-MIR-

02, DVN-HOS-

MIP-02

3 2 6

HYDRAULIC POWER UNIT (HPU)

Assessor's signature: ____________________________________________ 4 of 18

Page 5: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREW JSA 4 1 4

CAUGHT BETWEEN SUSPENDED

LOADS AND STRUCTURES

SERVICE TECHS

AND RIG CREW5 3 15

HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE

OBJECTS; HAND AND BODY POSITIONINGENTIRE CREW

SERVICE TECH /

RIG CREW

DVN-DLF-MIR-

03; JSA5 2 10

LATCHING ELEVATORS -

POTENTIAL USE OF INCORRECT

ELEVATORS

SERVICE TECHS

AND RIG CREW4 4 16

HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY

PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;

UNDERSTANDING TOP DRIVE; NOV DEVIN CONFIRMATION

OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC

TONNAGE ELEVATORS; NOV/DEVIN PREMOB CHECKLIST;

COMPETENCY TRANING

SERVICE TECH SERVICE TECH DVN-DLF-MIP-

02; JSA4 3 12

USING SKATE OR CRANE TO LATCH

BAILS (TOP DRIVE AND/OR BAIL

PINS)

SERVICE TECHS

AND RIG CREW3 3 9

LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION

WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS

BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE

RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

DVN-DLF-MIP-

02; JSA2 3 6

PINCH POINTS - LATCHING

ELEVATORS, BAILS, MAKING UP

BAIL PINS; RIG UP MINI TRACK

SERVICE TECHS

AND RIG CREW5 4 20

JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED

EQUIPMENT; PROPER HAND AND BODY POSITIONING;

IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50

LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI

TRACK PLACEMENT IN CTLF;

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

DVN-DLF-MIP-

02; JSA5 3 15

PUNCTURE POINTS ON HYDRAULIC

POWER UNIT HYDRAULIC AND

FUEL TANKS - NO ENCLOSED CAGE

SERVICE TECHS 4 2 8

UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;

DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS

OBSTRUCTIONS; MSDS

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

DVN-HPU-PRD-

06; BHP QCP

REV. 3

4 1 4

2. LIFT EQUIPMENT FROM DECK TO DERRICK (RIG

UP/EQUIPMENT PLACEMENT)

DUAL ARTICULATING LIFT FRAME (DALF)

Assessor's signature: ____________________________________________ 5 of 18

Page 6: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

ENTIRE CREW ENTIRE CREW JSA 2 2 4

STORED PRESSURE IN HYDRAULIC

OR AIR LINES - CAN CAUSE

RUPTURES, SPILLS, IMPACT TO

PERSONNEL

ENTIRE CREW 3 3 9

HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB

TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS

INSTALLED; MSDS

ENTIRE CREW ENTIRE CREW

DVN-DLF-MIP-

02;DVN-HOS-

MIP-02 JSA

3 2 6

INSTABILITY OF DALF FROM TOP

DISCONNECTING SLINGS FROM

CRANE

SERVICE TECH

AND RIG CREW3 2 6 JSA; PROCEDUAL REVIEW

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

DVN-DLF-MIP-

02; JSA3 1 3

HOSE ENTANGLEMENT SERVICE TECH 3 2 6

DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO

KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES

ARE NOT SNAGGED PRIOR TO LIFTING

SERVICE TECH SERVICE TECHDVN-HOS-MIP-

02;JSA2 1 2

DUAL ARTICULATING LIFT FRAME (DALF) (Cont.)

Assessor's signature: ____________________________________________ 6 of 18

Page 7: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREWJSA; BHP QCP

Rev.34 1 4

CAUGHT BETWEEN SUSPENDED

LOADS AND STRUCTURES

SERVICE TECHS

AND RIG CREW5 3 15

HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE

OBJECTS; HAND AND BODY POSITIONINGENTIRE CREW

SERVICE TECH /

RIG CREWJSA 5 2 10

LATCHING ELEVATORS -

POTENTIAL USE OF INCORRECT

ELEVATORS (IF APPLICABLE)

SERVICE TECHS

AND RIG CREW4 4 16

HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY

PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;

UNDERSTANDING TOP DRIVE; NOV/DEVIN CONFIRMATION

OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC

TONNAGE ELEVATORS; NOV/DEVIN PREMOB CHECKLIST;

COMPETENCY TRAINING

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

JSA; DVN-ELE-

MIP-014 3 12

USING SKATE OR CRANE TO LATCH

BAILS (TOP DRIVE AND/OR BAIL

PINS)

SERVICE TECHS

AND RIG CREW3 3 9

LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION

WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS

BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE

RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

JSA; BHP QCP

Rev.33 3 9

PINCH POINTS - LATCHING

ELEVATORS, BAILS, MAKING UP

BAIL PINS; RIG UP MINI TRACK

SERVICE TECHS

AND RIG CREW5 4 20

JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED

EQUIPMENT; PROPER HAND AND BODY POSITIONING;

IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50

LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI

TRACK PLACEMENT IN CTLF;

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

JSA; DVN-BAL-

MIP-015 3 15

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4

STORED PRESSURE IN HYDRAULIC

OR AIR LINES - CAN CAUSE

RUPTURES, SPILLS, IMPACT TO

PERSONNEL

ENTIRE CREW 3 3 9

HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB

TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS

INSTALLED; MSDS

ENTIRE CREW ENTIRE CREW

MSDS; DVN-BAS-

IOP-01; DVN-

HOS-MIP-02

3 2 6

HOSE ENTAGLEMENT SERVICE TECH 3 2 6

DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO

KINKS IN LINE PRIOR TO APPLYING PRESSURE (DVN-HOS-MIP-

02); ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING

SERVICE TECH SERVICE TECH

JSA; DVN-BAS-

IOP-01;DVN-HOS-

MIP-02

2 1 3

BAIL ASSEMBLY SPREADER SYSTEM (BASS)

Assessor's signature: ____________________________________________ 7 of 18

Page 8: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREW JSA 4 1 4

CAUGHT BETWEEN SUSPENDED

LOADS AND STRUCTURES

SERVICE TECHS

AND RIG CREW5 3 15

HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE

OBJECTS; HAND AND BODY POSITIONING

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREWJSA 5 2 10

LATCHING ELEVATORS -

POTENTIAL USE OF INCORRECT

ELEVATORS

SERVICE TECHS

AND RIG CREW4 4 16

HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY

PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;

UNDERSTANDING TOP DRIVE; NOV DEVIN CONFIRMATION

OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC

SERVICE TECHSERVICE TECH /

RIG CREW

JSA; DVN-ELE-

MIP-014 3 12

USING SKATE OR CRANE TO LATCH

BAILS (TOP DRIVE AND/OR BAIL

PINS)

SERVICE TECHS

AND RIG CREW3 3 9

LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION

WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS

BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE

RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

JSA; BHP QCP

Rev.33 2 6

PINCH POINTS - LATCHING

ELEVATORS, BAILS, MAKING UP

BAIL PINS; RIG UP MINI TRACK

SERVICE TECHS

AND RIG CREW5 4 20

JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED

EQUIPMENT; PROPER HAND AND BODY POSITIONING;

IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50

LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI

TRACK PLACEMENT IN CTLF;

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

JSA; DVN-BAL-

MIP-015 3 15

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4

BAILS

Assessor's signature: ____________________________________________ 8 of 18

Page 9: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREW JSA 4 1 4

CAUGHT BETWEEN SUSPENDED

LOADS AND STRUCTURES

SERVICE TECHS

AND RIG CREW5 3 15

HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE

OBJECTS; HAND AND BODY POSITIONINGENTIRE CREW ENTIRE CREW JSA 5 2 10

(IF APPLICABLE) LATCHING

ELEVATORS - POTENTIAL USE OF

INCORRECT ELEVATORS

SERVICE TECHS

AND RIG CREW4 4 16

HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY

PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;

UNDERSTANDING TOP DRIVE; NOV/DEVIN CONFIRMATION

OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC

TONNAGE ELEVATORS; NOV DEVIN PREMOB CHECKLIST;

COMPETENCY TRANING

SERVICE TECHSERVICE TECH /

RIG CREW

JSA; DVN-ELE-

MIP-014 3 12

USING SKATE OR CRANE TO LATCH

BAILS (TOP DRIVE AND/OR BAIL

PINS)

SERVICE TECHS

AND RIG CREW3 3 9

LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION

WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS

BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE

RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)

SERVICE TECHSERVICE TECH /

RIG CREW

JSA; BHP QCP

Rev.33 2 6

PINCH POINTS - LATCHING

ELEVATORS, BAILS, MAKING UP

BAIL PINS; RIG UP MINI TRACK

SERVICE TECHS

AND RIG CREW5 4 20

JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED

EQUIPMENT; PROPER HAND AND BODY POSITIONING;

IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50

LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI

TRACK PLACEMENT IN CTLF;

SERVICE TECHSERVICE TECH /

RIG CREW

JSA; DVN-ELE-

MIP-015 3 15

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4

ELEVATORS

Assessor's signature: ____________________________________________ 9 of 18

Page 10: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREW JSA 4 1 4

CAUGHT BETWEEN SUSPENDED

LOADS AND STRUCTURES

SERVICE TECHS

AND RIG CREW5 3 15

HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE

OBJECTS; HAND AND BODY POSITIONINGENTIRE CREW ENTIRE CREW JSA 5 2 10

PUNCTURE POINTS ON HYDRAULIC

POWER UNIT HYDRAULIC AND

FUEL TANKS - NO INCLOSED CAGE

SERVICE TECHS 4 2 8

UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;

DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS

OBSTRUCTIONS; MSDS

SERVICE TECHSERVICE TECH /

RIG CREW

JSA; DVN-HPU-

MIR-024 1 4

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

SERVICE TECHSERVICE TECH /

RIG CREW

JSA; BHP QCP

Rev.32 2 4

STORED PRESSURE IN HYDRALIC

OR AIR LINES - CAN CAUSE

RUPTURES, SPILLS, IMPACT TO

PERSONNEL

ENTIRE CREW 3 3 9

HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB

TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS

INSTALLED; MSDS

SERVICE TECH ENTIRE CREW

JSA; DVN-HPU-

MIR-02;DVN-

HOS-MIP-02

3 2 6

HOSE ENTAGLEMENT SERVICE TECH 3 2 6

DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO

KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES

ARE NOT SNAGGED PRIOR TO LIFTING

SERVICE TECH SERVICE TECH

JSA; DVN-HPU-

SOP-05;DVN-

HOS-MIP-02

2 1 2

CONTROL PANELS

Assessor's signature: ____________________________________________ 10 of 18

Page 11: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREW JSA 4 1 4

PUNCTURE POINTS ON HYDRAULIC

POWER UNIT HYDRAULIC AND

FUEL TANKS - NO INCLOSED CAGE

SERVICE TECHS 4 2 8

UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;

DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS

OBSTRUCTIONS; MSDS

SERVICE TECH SERVICE TECH JSA 4 1 4

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

ENTIRE CREW ENTIRE CREWJSA; BHP QCP

Rev.32 2 6

STORED PRESSURE IN HYDRALIC

OR AIR LINES - CAN CAUSE

RUPTURES, SPILLS, IMPACT TO

PERSONNEL

ENTIRE CREW 3 3 9

HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB

TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS

INSTALLED; MSDS

ENTIRE CREW ENTIRE CREW

JSA; DVN-HPU-

MIR-02;DVN-

HOS-MIP-

02;MSDS

3 2 2

HOSE ENTAGLEMENT SERVICE TECH 3 2 6

DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO

KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES

ARE NOT SNAGGED PRIOR TO LIFTING

SERVICE TECH SERVICE TECH

JSA; DVN-HPU-

SOP-05;DVN-

HOS-MIP-02

2 1 4

HOSES

Assessor's signature: ____________________________________________ 11 of 18

Page 12: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

STRUCK BY ENTIRE CREW 4 3 12

LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR

LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK

LAYOUT

ENTIRE CREW ENTIRE CREW JSA; 4 1 10

CAUGHT BETWEEN SUSPENDED

LOADS AND STRUCTURES

SERVICE TECHS

AND RIG CREW5 3 15

HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE

OBJECTS; HAND AND BODY POSITIONINGENTIRE CREW ENTIRE CREW JSA 5 2 10

USING SKATE OR CRANE TO LATCH

BAILS (TOP DRIVE AND/OR BAIL

PINS)

SERVICE TECHS

AND RIG CREW3 3 9

LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION

WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS

BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE

RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)

SERVICE TECHSERVICE TECH /

RIG CREWJSA 3 2 6

PUNCTURE POINTS ON HYDRAULIC

POWER UNIT HYDRAULIC AND

FUEL TANKS - NO ENCLOSED CAGE

SERVICE TECHS 4 2 8

UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;

DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS

OBSTRUCTIONS; MSDS

SERVICE TECH SERVICE TECHJSA; DVN-HPU-

SOP-054 1 4

TRIP HAZARDS ON DECK - CAUSE

ABRASIONS, SPRAINSENTIRE CREW 3 3 9

SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER

HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE

COORDINATOR

ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 6

STORED PRESSURE IN HYDRALIC

OR AIR LINES - CAN CAUSE

RUPTURES, SPILLS, IMPACT TO

ENTIRE CREW 3 3 9

HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB

TESTING; ADHERING TO HOSE SHELF LIFE (DVN-HOS-MIP-

O2); WHIPCHECKS INSTALLED; MSDS

ENTIRE CREW ENTIRE CREW

JSA; DVN-HPU-

MIR-02;DVN-

HOS-MIP-02;

3 2 2

HOSE ENTAGLEMENT SERVICE TECH 3 2 6

DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO

KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES

ARE NOT SNAGGED PRIOR TO LIFTING

SERVICE TECH SERVICE TECH

JSA; DVN-HPU-

SOP-05;DVN-

HOS-MIP-02

2 1 2

HYDRAULIC POWER UNIT (HPU)

Assessor's signature: ____________________________________________ 12 of 18

Page 13: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

DALF HOIST FUNCTION

HYDRAULIC LINE CONNECTION

FAILURE, HOIST LINE CERTIFICATE

SERVICE TECH 4 3 12

MIR#;NOV DEVIN/OPERATOR SPECFIC QUALITY PLAN; WHIP

CHECKS;PREMOBILIZATION CHECK LIST; PREMOB FUNCTION

TEST LIST; 2 YEAR FULL MAINTENANCE

ENTIRE CREW ENTIRE CREWJSA; DVN-CLF-

MIR-033 2 6

DALF ARTICULATION - PULLING

TOP PINS (TOP PINS ARE NOT

LOAD BEARING), SLING

"STINGERS" FOR ARTICULATION;

OPENING ELEVATOR DOOR

SERVICE TECHS

AND RIG CREW5 4 20

JSA;PROCEDURAL REVIEW;EQUIPMENT REVIEW; NOV/DEVIN

COMPETENCY TRAINING.ENTIRE CREW

SERVICE TECH /

RIG CREW

JSA; DVN-CLF-

MIR-035 2 10

DALF WIRELINE HANG OFF -

UNDERRATED DEAD MAN PAD EYE

SERVICE TECHS

AND RIG CREW5 3 15

NOV/DEVIN PROCEDURE;NOVDEVIN DATA BOOK AND

ANALYSIS FOR DEAD MAN PAD EYE.SERVICE TECH SERVICE TECH

JSA; DVN-CLF-

MIR-035 1 5

DROPPED OBJECTS WHEN

PERSONNEL IN MAN ENTIRE CREW 4 3 12

LANYARDS FOR TOOLS, TOOL BAG ATTACHED TO TECH WITH

CARABINER;ENTIRE CREW ENTIRE CREW

JSA; DVN-CLF-

MIR-034 1 4

PRESSURIZED EQUIPMENT -

POTENTIAL ENERGY, HOSE

CONNECTIONS, VALVES

ENTIRE CREW 4 2 8

HOSE MANAGEMENT;WHIPCHECKS INSTALLED;PRESSURE

TESTED PRIOR TO USE;JSA (DVN-HOS-MIP-02); PREMOB

PRESSURE TESTING PROCEDURE;NOV/DEVIN COMPETENCY

TRAINING

ENTIRE CREW ENTIRE CREW

JSA; DVN-CLF-

MIR-03;DVN-

HOS-MIP-02

4 1 4

HOIST FAILURE SERVICE TECH 3 2 6TWO YEARS FULL MAINTENANCE;FUNCTION

TEST;NOV/DEVIN PROCEDURESERVICE TECH SERVICE TECH

COM-SHO-SMP-

142 1 2

DUAL ARTIFICIAL LIFT FRAME (DALF)

3. OPERATION/FUNCTION

Assessor's signature: ____________________________________________ 13 of 18

Page 14: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

ELEVATOR DOORS OPEN AND

CLOSE. PINCH POINT-LATCHING.

FIT TEST ON LIFT SUB WHEN

APPLICABLE

SERVICE TECH 5 4 20

JSA-PROCEDURAL REVIEW- FULL BODY INSPECTION TPI, PER

BHP. PROPER HAND AND BODY POSITIONING;IMPACT

GLOVES;TWO PERSONNEL FOR LIFTS OVER 50 LBS.

SERVICE TECH SERVICE TECH DEV-ELE-MAS-04 5 3 15

SEIZED ELEVATOR (WILL NOT

OPEN)

SERVICE TECH

AND RIG CREW3 2 6 MIR; PROCEDURE REVIEW SERVICE TECH

SERVICE TECH /

RIG CREWDVN-ELE-MIR-02 3 1 3

INCORRECT ELEVATOR ENTIRE CREW 4 2 8 FIT TEST;DATA BOOK CHECKSSHOP

FOREMANSERVICE TECH

BHP QCP;

TPI,DVN-ELE-MIR-

02

4 1 4

DROPPED OBJECTS WHEN

PERSONNEL IN MAN

BASKET/RIDING BELT

ENTIRE CREW 4 3 12LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH

WITH CARABINER; ENTIRE CREW ENTIRE CREW DVN-ELE-MIR-02 3 3 9

BASS HOIST FUNCTION -

HYDRAULIC LINE CONNECTION

FAILURE, CONTROL PANEL

FAILURE, HOIST LINE CERTIFICATE

SERVICE TECH 4 3 12

NOV DEVIN/OPERATOR SPECIFIC QUALITY PLAN; WHIP

CHECKS; PREMOBILIZATION CHECK LIST; PREMOB FUNCTION

TEST LIST;

SHOP

FOREMAN

SERVICE TECH /

RIG CREW

BHP QCP REV.3;

DVN-BAS-IOP-013 2 6

BASS WIRELINE HANG OFF -

UNDERRATED DEAD MAN PAD EYE

SERVICE TECH

AND RIG CREW5 3 15

NOV/DEVIN PROCEDURE; NOV/DEVIN DATA BOOK AND

ANALYSIS FOR DEAD MAN PAD EYE;

SHOP

FOREMANSERVICE TECH

DVN-BAS-IOP-01,

MTR5 1 5

DROPPED OBJECTS WHEN

PERSONNEL IN MAN

BASKET/RIDING BELT

ENTIRE CREW 4 3 12LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH

WITH CARABINER; ENTIRE CREW ENTIRE CREW JSA 4 1 4

PRESSURIZED EQUIPMENT -

POTENTIAL ENERGY, HOSE

CONNECTIONS, VALVES

ENTIRE CREW 4 2 8

HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE

TESTED PRIOR TO USE (DVN-HOS-MIP-02); JSA; PREMOB

PRESSURE TESTING PROCEDURE; NOV/DEVIN COMPETENCY

TRAINING

ENTIRE CREW ENTIRE CREW

JSA; DVN-BAS-

IOP-01;DVN-HOS-

MIP-02

4 1 4

ELEVATORS

BAIL ASSEMBLY SPREADER SYSTEM (BASS)

Assessor's signature: ____________________________________________ 14 of 18

Page 15: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

BASS AND DALF HOIST FUNCTION -

HYDRAULIC LINE CONNECTION

FAILURE, CONTROL PANEL

FAILURE, HOIST LINE CERTIFICATE

SERVICE TECH 4 3 12

NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; WHIP

CHECKS; PREMOBILIZATION CHECKLIST; PREMOB FUNCTION

TEST LIST;

SHOP

FOREMANSERVICE TECH

BHO QCP REV.3;

DVN-BAS-IOP-013 2 6

HYDRAULIC POWER

UNITS/CONTROL PANEL - SPILLS,

NONRESPONSIVE UNIT; HOSE

CONNECTIONS

SERVICE TECH 3 3 9

WHIP CHECKS; DEVIN CREATED TROUBLE SHOOTING GUIDE;

DEVIN PREMOB CHECKLIST; SPARE COMPONENTS ON

LOCATION

SHOP

FOREMANSERVICE TECH

JSA; DVN-HPU-

MIR-02, MSDS3 2 6

DROPPED OBJECTS WHEN

PERSONNEL IN MAN

BASKET/RIDING BELT (DALF OR

BASS RIG-UP)

ENTIRE CREW 4 3 12LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH

WITH CARABINER; ENTIRE CREW ENTIRE CREW JSA; 4 1 4

PRESSURIZED EQUIPMENT -

POTENTIAL ENERGY, HOSE

CONNECTIONS, VALVES

ENTIRE CREW 4 2 8

HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE

TESTED PRIOR TO USE; JSA; PREMOB PRESSURE TESTING

PROCEDURE; NOV DEVIN COMPETENCY TRAINING

ENTIRE CREW ENTIRE CREW

JSA; DVN-BAS-

IOP-01;DVN-HOS-

MIP-02

4 1 4

HYDRAULIC POWER

UNITS/CONTROL PANEL - SPILLS,

NONRESPONSIVE UNIT; HOSE

CONNECTIONS

SERVICE TECH 3 3 9

WHIP CHECKS; NOV/DEVIN CREATED TROUBLE SHOOTING

GUIDE; NOV/DEVIN PREMOB CHECKLIST; SPARE

COMPONENTS ON LOCATION

SERVICE TECH SERVICE TECHJSA; DVN-HPU-

MIR-02, MSDS3 2 8

STARTING/OPERATING HYDRAULIC

POWER UNIT - HAND PLACEMENT;

HEAT FROM EXHAUST;

SERVICE TECH 4 3 12NOV/DEVIN COMPETENCY TRAINING; INCORPORATE MESH

GUARD BEHIND SWINGING DOORSERVICE TECH SERVICE TECH

TECH COMPETENCY

RECORDS4 2 8

LOW FUEL LEVEL SERVICE TECH 2 3 6 PREMOB; PRETOWERSHOP

FOREMANSERVICE TECH

DVN-HPU-MIR-

022 2 4

PRESSURIZED EQUIPMENT -

POTENTIAL ENERGY, HOSE

CONNECTIONS, VALVES

ENTIRE CREW 4 2 8

HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE

TESTED PRIOR TO USE (DVN-HOS-MIP-02); JSA; PREMOB

PRESSURE TESTING PROCEDURE; NOV DEVIN COMPETENCY

TRAINING

ENTIRE CREW ENTIRE CREWJSA; DVN-BAS-

IOP-014 1 4

HOSES

HYDRAULIC POWER UNIT (HPU)

Assessor's signature: ____________________________________________ 15 of 18

Page 16: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

HAPHAZARD RIG DOWN DALF -

FALLING OF OBJECTS, HOSE

PRESSURE, DROPPED OBJECTS

SERVICE TECH

AND RIG CREW4 3 12

NOV/DEVIN PROCEDURE; JSA; STANDARD PPE; RELEIVE HOSE

PRESSURE;

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

DVN-DLF-MIR-

03;DVN-HOS-

MIP-02;JSA

4 2 5

INCORRECT PLACEMENT OF DALF

ON SHIPPING STANDS (IF MINI

TRACK IS INSTALLED)

SERVICE TECH

AND RIG CREW5 2 10

CAUTION TAPE ON PINCH POINT AREAS; PROPER HAND

PLACEMENT; PREDETERMINED DISTANCE FOR STANDS;

MARKINGS ON DALF FOR PLACEMENT; PEC CORE FOR HAND

SAFETY

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREWJSA; HSE COORD. 5 1 6

INCORRECT EQUIPMENT

PLACEMENT IN BASKETSERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH

SERVICE TECH /

RIG CREWDVN-DLF-MIR-03 3 2 4

HAND PLACEMENT; BACK

LOADING FRAME TO STANDS (IF

APPLICABLE)

SERVICE TECH

AND RIG CREW5 4 20 TRAINING;JSA;TIGER STRIPPING TAPE IN HAND AREA

SERVICE TECH

/ RIG CREWENTIRE CREW

TRAINING DOC;

JSA; HSE

COORD.;DVN-

ADM-RA-01

5 2 10

BACK LOAD TO BOAT - SLING AND

SHACKLE CONNECTIVITYENTIRE CREW 4 3 12

VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER

PINSENTIRE CREW ENTIRE CREW DVN-DLF-MIR-03 4 1 4

DUAL ARTICULATING LIFT FRAME (DALF)

RIG DOWN/BACK LOAD TO BOAT

Assessor's signature: ____________________________________________ 16 of 18

Page 17: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

INCORRECT EQUIPMENT

PLACEMENT IN BASKETSERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH

SERVICE TECH /

RIG CREWDVN-BAS-MIR-03 3 2 4

HAND PLACEMENT; BACK

LOADING FRAME TO STANDS (IF

APPLICABLE)

SERVICE TECH

AND RIG CREW5 3 15 PROPER TRAINING ON MOCK RIG UPS SERVICE TECH

SERVICE TECH /

RIG CREW

DVN-BAS-MIR-

03;DVN-ADM-RA-

01

5 2 10

BACK LOAD TO BOAT - SLING AND

SHACKLE CONNECTIVITYENTIRE CREW 4 3 12

VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER

PINSENTIRE CREW ENTIRE CREW DVN-BAS-MIR-03 4 1 4

SUSPENDED LOADS ENTIRE CREW 3 3 9

REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC

RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE

THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER

ACCOMPANYING EQUIPMENT

ENTIRE CREW ENTIRE CREWDVN-DLF-MIP-

02; JSA3 2 6

FALLING OBJECTS ENTIRE CREW 5 3 15

DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE

COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE

SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED,

I.E. OUT OF SERVICE;

ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 5 2 10

LOAD SHIFT IN EQUIPMENT

BASKET - CAN CAUSE EQUIPMENT

DAMAGES, LEAKS, POTENTIAL

ENERGY

SERVICE TECHS 3 4 12

ENSURE LOAD IS SECURED IN BASKET; HAVE MSDS ON ALL

CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE;

THIRD PARTY REVIEW OF LOAD OUT; SECURE ITEMS WITH

STRAPS;

SERVICE TECH

/ RIG CREW

SERVICE TECH /

RIG CREW

MSDS; TECH

COMPETENCY

RECORD

3 2 6

HAND PLACEMENT; BACK

LOADING FRAME TO STANDS (IF

APPLICABLE)

SERVICE TECH

AND RIG CREW5 3 15 PROPER TRAINING SERVICE TECH

SERVICE TECH /

RIG CREW

MSDS; TECH

COMPETENCY

RECORD;DVN-ADM-

RA-01

4 2 8

SLING FAILURE CAN RESULT IN

DROPPED EQUIPMENT AS IT IS

BEING LIFTED

ENTIRE CREW 5 2 10NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL

INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLESENTIRE CREW ENTIRE CREW BHP QCP REV.3 5 2 10

EQUIPMENT BASKET (BAILS, ELEVATORS, CONTROL PANEL,

HOSES)

BAIL ASSEMBLY SPREADER SYSTEM

Assessor's signature: ____________________________________________ 17 of 18

Page 18: BHP-RISK ASSESSMENT - DALF R1

TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:

Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK

Describe all hazards identified and

their effects for each task (from

Hazard ID checklist and based on

observations and experience).

Note: Additional hazards may be

caused by interaction with other work

Name personnel at

risk.

From matrix,

identify severity

with no controls

in place for each

hazard.

From matrix, identify

likelihood with no controls

in place for each hazard.

Classify risk

rating from

matrix for

each hazard

Describe fully all controls applicable for each hazard eg if PPE is

used as a control, it must be specifically described.

If a control can only be verified by documentation then it must be

available.

All controls must be valid in that they reduce severity, likelihood or

both.

Indicate what

document or

procedure that

shall be used to

mitigate the

hazard.

From matrix

identify severity

with controls in

place for each

hazard.

From matrix, identify

likelihood with

controls in place for

each hazard.

Classify risk rating

from matrix for

each hazard.

INITIAL RISK

Risk

RatingList all Controls Required

Reference

DocumentResponsible Party

1. LIFTING EQUIPMENT FROM BOAT TO RIG

Separate the job into individual tasks and record in sequence

Define the person or party

who will be handling the

situation as stated should a

Hazard / Risk occur.

Likelihood of

Occurrence Risk Rating

Job Steps

RESIDUAL RISK

COM-OPE-SOP-17

CONTROLS

Hazard Description Population at

Risk

Hazard

Severity

Likelihood of

Occurrence

HAZARD

Hazard

Severity

INCORRECT EQUIPMENT

PLACEMENT IN BASKETSERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH SERVICE TECH

DVN-HPU-PRD-

063 2 4

FUEL LEVELS TO HIGH CAUSING

SPILLS - NO CAPS ON

CONNECTIONS

SERVICE TECH 4 3 12

VISUAL CHECKS FOR PROPER FILL; MSDS ON ALL CHEMICALS

FOR QUICK RESPONSE AND CLEAN UP RESPONSE; VISUAL

INSPECT FOR ALL CAP CONNECTIONS

SERVICE TECHSERVICE TECH /

RIG CREW

DVN-HPU-PRD-

064 2 8

BACK LOAD TO BOAT - SLING AND

SHACKLE CONNECTIVITYENTIRE CREW 4 3 12

VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER

PINSENTIRE CREW ENTIRE CREW

DVN-HPU-PRD-

064 1 4

DVN-DLF-MIC-O7

DVN-DLF-MIR-03

DVN-HOS-MIP-07

DVN-BAS-MIR-03

DVN-BAS-MIP-02

DVN-BAS-PRD-05

DVN-HPU-MIR-02

DVN-BAL-PSD-04

DVN-DLF-MIP-02

DVN-HPU-PRD-06

DVN-ELE-MIP-01

DVN-BAS-IOP-01

DVN-BAL-MIP-01

DVN-HPU-SOP-05

DVN-CLF-MIR-03

COM-SHO-SMP-14

DVN-ELE-MAS-04

DVN-ELE-MIR-02

DVN-ADM-RA-01

Elevator Maintenance, Inspection and Repair

Risk Assessment Training Record

Bail Link Maintenance and Inspection Procedure

Hydraulic Power Unit Standard Operating Procedure

Coil Tubing Lift Frame Maintenance, Inspection and Repair

Disassembly/Reassembly of DALF

Elevator Master Survey

Bail Link Pre Dispatch

DALF Test and Maintenace Procedure

Hydraulic Power Unit Pre Dispatch

Elevator Maintenance, and Inspcetion Procedure

Bail Assembly Spreader System Installation and Operation Procedure

Hose Maintenance and Inspection Procedure

Bail Assembly Spreader System Maintenance and Inspection Procedure

Bail Assembly Spreader System Pre Dispatch

Bail Assembly Spreader System Maintenance, Inspection, and Repair

Hydraulic Power Unit Maintenance, Inspection and Repair

Procedural References Description

Dual Articulating Lift Frame Maintenance and Inspection Checklist

DALF Maintenance and Fuction Test Checklist

HYDRAULIC POWER UNIT (HPU)

Assessor's signature: ____________________________________________ 18 of 18