Site Visits

Handling Engineering Group 3

Visit Schedule - January 14th

January 14th-15th 2014

 

Bonfanti / Meloni+

J.P. Granchelli / H. Lourenço / R. Rinaldesi

Brunnhuber / Brun-Mech+

O. Boettcher / G. Roche / A. Kertesz

14.30 – 16.00 PR712 in building SD4 PR68, PR76 and PR82 in Meyrin

16.30 – 18.00 PR68, PR76 and PR82 in Meyrin PR712 in building SD4

Handling Engineering Group 4

Visit Schedule - January 14th

January 14th-15th 2014

Crane PR Building Location / extent of visit Installation type

A PR712 SD4Surface hall, access on cranes for inspection

Building with space constraints

C PR68 167Surface hall, no access on crane foreseen

Building without space constraints

B PR76 201Surface hall, no access on crane foreseen

Building with space constraints

E PR82 168Surface hall, no access on crane foreseen

Building with space constraints

Handling Engineering Group 5

Visit Schedule - January 15th

January 14th-15th 2014

 

Bonfanti / Meloni+

J.P. Granchelli / H. Lourenço / R. Rinaldesi

Brunnhuber / Brun-Mech+

O. Boettcher / A. Kertesz / G. Roche

9.00 – 10.00 PR720 in cavern UX85 PR725 in building SX8

10.30 – 11.30 PR725 in building SX8 PR720 in cavern UX85

Handling Engineering Group 6

Visit Schedule - January 15th

January 14th-15th 2014

Crane PR Building Location / extent of visit Installation type

D PR720 UX85Cavern crane, no access on crane foreseen

Underground areas

F PR725 SX8Surface hall, access on cranes for inspection

Building without space constraints

Handling Engineering Group 7

Hazards• Access to railways and cranes at ~10 from

the ground

• Underground areas

• Access to radiation areas

January 14th-15th 2014

Handling Engineering Group 8

Measures• Personal Protective Equipment: safety

shoes, helmet• Fall-arrest harness (with lanyard)• Dosimeters (escort only)• All visitors shall be authorized by their

employer to work in height and use a harness

• All visitors shall be authorized by their employer to work in radioactive areas

January 14th-15th 2014