May, 31.05.2018 Financial Foundation (in %) Sub- Structure (in %) Super- Structure (in %) Approach (in %) Cumulative 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 Muzaffarpur Consrtuction of H.L.R.C.C. Bridge in Jamin Mathiya Village near Ram Pratap Rai under Meenapur Block in the district of Muzaffarpur. (MMSNY) MMSNY Muzaffarpur 361.11 2784 (S) 25.03.2015 228.59 RCC/ 22.00 _ 01.10.2015 30.09.2016 0 100 0 100 0 100 5 90 0.00 172.56 June, 2018 Work in Progress. 2 Muzaffarpur Construction of H.L.R.C.C. Bridge in Kodariya under Meenapur Block in the district of Muzaffarpur (Nabard) Nabard Muzaffarpur 3300.00 11908(s) 09/11/2012 2362.12 RCC/ 325.00 _ Dec-12 06/15 12/14 0 100 0 100 0 100 0 80 182.94 2958.96 June, 2018 (Subject to LA) (i) Bridge Part completed. LA Issue for approach road. Kodariya Mauja- 1.67 acres Mursandi Mauja- 7.325 acres Govt. land- 0.38 acres. Total land- 8.995 acres Total Raiyat- 61 LPC received from DM, Muzaffapur has been futher sent to him vide our letter no 621(WE) dated 06.06.2018 as per direction of Revenue department for neccessary action. 3 Muzaffarpur Construction of H.L.R.C.C. Bridge across canal in Dighara Butler road in the district of Muzaffarpur. (Nabard) Nabard Muzaffarpur 310.17 34 (s) 02/01/2013 292.62 RCC/ 21.00 _ Feb-14 02/15 0 100 0 100 0 100 0 25 0.00 168.27 - Bridge part completed & Approach road under L/A issue which is under process by RCD, Muzaffarpur. A letter has been sent to Road division, 1 Muzaffarpur to take over chagre of the bridge. BIHAR RAJYA PUL NIRMAN NIGAM LTD. PROGRESS REPORT MONTH OF MAY, 2018 Format circulated vide Letter No. 4454(s) we dt. 30.03.2007 of R.C.D. Bihar Sl.No Division Name Of Work Head/ Sub Head Distirct Administrative Approval Remarks Type/ Length Of Bridge(M) Langth of Approach (in M) Date of Commencement Date Of Scheduled completion Achievement for the month / till Likely date of completion Physical

BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

  • Upload
    others

  • View
    15

  • Download
    1

Embed Size (px)

Citation preview

Page 1: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1

Muz

affa

rpur

Consrtuction of H.L.R.C.C.Bridge in Jamin Mathiya Villagenear Ram Pratap Rai underMeenapur Block in the district ofMuzaffarpur. (MMSNY)

MM

SNY

Muz

affa

rpur

361.

1127

84 (S

)25

.03.

2015

228.

59

RC

C/

22.0

0

_

01.1

0.20

15

30.

09.2

016

0100

0100

0100

590

0.00172.56

June

, 201

8

Work in Progress.

2

Muz

affa

rpur

Construction of H.L.R.C.C.Bridge in Kodariya underMeenapur Block in the district ofMuzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

.00

1190

8(s)

09/1

1/20

1223

62.1

2

RC

C/

325.

00

_

Dec

-12

06/1

5

12/1

4

0100

0100

0100

080

182.942958.96

June

, 201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed. LA Issue forapproach road.Kodariya Mauja- 1.67 acres Mursandi Mauja- 7.325 acresGovt. land- 0.38 acres.Total land- 8.995 acresTotal Raiyat- 61

LPC received from DM, Muzaffapurhas been futher sent to him vide ourletter no 621(WE) dated 06.06.2018 asper direction of Revenue department forneccessary action.

3

Muz

affa

rpur

Construction of H.L.R.C.C.Bridge across canal in DigharaButler road in the district ofMuzaffarpur. (Nabard)

Nab

ard

Muz

affa

rpur

310.

1734

(s)

02/0

1/20

1329

2.62

RC

C/

21.0

0

_

Feb-

14

02/1

5

0100

0100

0100

025

0.00168.27

-

Bridge part completed & Approachroad under L/A issue which is underprocess by RCD, Muzaffarpur. A letterhas been sent to Road division, 1Muzaffarpur to take over chagre of thebridge.

BIHAR RAJYA PUL NIRMAN NIGAM LTD.PROGRESS REPORT MONTH OF MAY, 2018

Format circulated vide Letter No. 4454(s) we dt. 30.03.2007 of R.C.D. Bihar

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

Page 2: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

4

Muz

affa

rpur

Construction of H.L.R.C.C.Bridge in Runni-Saidpur-Katra-Keowatsa road in km of 26.15thedistrict of Muzaffarpur. (Nabard) N

abar

d

Muz

affa

rpur

880.

7677

71(s

)26

/09/

2013

741.

42

RC

C/

96.0

0

_

Jan-

14

08/1

5

0100

0100

0100

090

0.00571.69 -

Under Departmental enquiry. Tender invited for another bridge in

D/S by RCD, Div-2, Muzaffarpur underL.W.E. Scheme.

5

Muz

affa

rpur

Construction of H.L.R.C.C.Bridge in Dr Jarnath MishraCollege in between Soda Godaunto Ahiyapur with approach road inthe district of Muzaffarpur.(Nabard)

Nab

ard

Muz

affa

rpur

4329

.61

7889

(s)

03/1

0/20

1331

07.1

0

RC

C/ 3

00.0

0

_

Feb-

14

16-F

eb 095

085

073

00

0.002315.04

06/2

018

(Sub

ject

to L

/A)

Work in Progress.Chaqmohabbat Mauja- 1.67 acres Nazirpur Mauja- 4.45 acresChandrawara Mauja- 9.04 acres Total Land- 16.01 acresTotal Raiyat- 22Reply of queries raised by Engineer inchief, RCD, Patna was sent but furtherinstructions regarding LPC has given,which is under process by DM,Muzaffarpur.

6

Muz

affa

rpur

Construction of H.L.R.C.C.Bridge in Athar Ghat over BhudhiGandak river under BochahaBlock in the district ofMuzaffapur. (Plan)

Plan

Muz

affa

rpur

3554

.81

1817

(s)

dt: 2

8/02

/201

428

15.5

9

RC

C/ 2

97.0

0

_

11/2

014

11/1

6

0100

10100

1070

230

0.001735.97

06/2

018

(Sub

ject

to L

/A)

Work in Progress.Athar banshman Mauja- 5.485 acres.Bishunpur Jagdish Mauja- 2.605 acres.Binda Mauja-10.615 acres.Total land- 18.705 acres.Total Raiyat- 66Reply of queries raised by Engineer inchief, RCD, Patna was sent but furtherinstructions regarding LPC has given,which is under process by DM,Muzaffarpur.

Page 3: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

7

Patn

a-1

Construction of H.L.R.C.C.Bridge, 3x16.50M and approachroad work in 4th Km. ofKhusrupur-Nagarnausa Road atNirmali chak Middle School ofKhusrupur Block, in the District ofPatna.

Nab

ard

Patn

a

Rs.

418.

98 L

akh

Lt. N

o.18

71 (S

) D

ated

03.

03.1

4 20

4.98

Lak

h

RC

C /

51.3

85M

120M

24.1

1.14

23.1

1.15 0

850

750

650

401.27

147.44 06/

18

For Approval/Permission of land acquition on perpetual lease letter has been sent to RCD vide letter no.80 dated-13.01.2018. A letter has been written to Patna D.M. for L.A. as pre new Perpetual Lease policy vide letter No.1334 (WE) dated-29.05.2018

8

Patn

a-1

Construction of Pontoon Bridge inriver Ganga between Danapur toPanapur Diyara (including opening& Resetting for 5 Years) in district Patna.

Plan

Patn

a

Rs.1

114.

99 L

akh

L.N

.-119

65(S

) dt

. 21.

12.2

017

Pont

oon

Brid

ge

-

06.0

2.20

18

5Yea

rs

Mai

nten

ance

)

- - - - 9.53145.01 -

After setting of Pipa set, open to trafficon 20.02.2018

9

Patn

a-1

Construction of Pontoon Bridge inriver Ganga between Gyaspur toKaladiyara Diyara (includingopening & Resetting for 5 Years)of Bakhtiyarpur Block in districtPatna.

Plan

Patn

a

Rs.5

82.2

3 La

cL.

N.-1

1964

(S)

dt. 2

1.12

.201

7

Pont

oon

Brid

ge

-

06.0

2.20

18

5Yea

rs

(Mai

nten

ance

)

- - - - 4.3866.98 -

After setting of Pipa set, open to trafficon 05.03.2018

10

Patn

a-1

Construction of H.L.R.C.C.Bridge 5x24.0m in Punpun Riverin 11th Km of Masaurhi-Naubatpur Pitmas Road in PatnaDistrict.

Plan

Patn

a

Rs.1

155.

00 L

acL.

N.-2

780(

S)

dt. 0

9.10

.201

7

R.C

.C.

Brid

ge/1

20m

- - - - - - - - - Tender disposal under process.

11

Patn

a-1

Construction of H.L.R.C.C.Bridge 5x24.0m in Punpun Riverin 11th Km of Masaurhi-Naubatpur Pitmas Road in PatnaDistrict.

Plan

Patn

a

Rs.1

155.

00 L

acL.

N.-2

780(

S)

dt. 0

9.10

.201

7

R.C

.C.

Brid

ge/1

20m

120M

25.0

4.20

18

26.0

1.20

19

- - - - - -

Work awarded to S.B. Engicon. Workorder issued on 25.04.2018 anddirection given to again to start thework Immediately.

Page 4: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

12

Patn

a-1 Construction of 2x10.37M size

Bridge over Canal to Simanchakjamal Siman Road in wardNo. 33 of Vaishali District M

MSN

Y

Vai

shal

i

Rs.1

69.0

4 La

kh

Lt. N

o.60

66 (S

) D

ated

08.

07.1

4R

s.129

.74

Lakh

RC

C /

22.0

M

'60M

21.

11.1

4

20.1

1.15 0

1000

1000

1000

900.00

106.70

Brid

ge C

ompl

eted

LA

issu

e in

app

roac

h ro

ad. Only 0.1375 Acre land is required Land

owner's concent is obtained forperpetual lease. Request has been maidby letter no.1876(WE) dated-21.09.2017. Feasibility report fromD.M. Vaishali has been obtained. D.M.Vaishali has been requested for furtheraction against new Perpetual LeasePolicy vide letter No.1336 (WE) dated-29.05.2018

13

Patn

a-1

Construction of Pontoon Bridge inriver Ganga between Kachidargahto Rustampur (Raghopur)(including opening & Resetting for5 Years) of Raghopur Block indistrict Vaishali.

Plan

Vai

shal

i

Rs.7

51.5

7 La

cL.

N.-1

1804

(S)

dt. 1

9.12

.201

7

Pont

oon

Brid

ge

06.0

2.20

18

5Yea

rs (M

aint

enan

ce)

- - - - - 37.93140.97 - After setting of Pipa set, open to traffic

on 15.02.2018

14

Patn

a-1

Construction of Pontoon Bridge inriver Ganga betweenChakosanghat to Jamindari Ghat(including opening & Resetting for5 Years) of Bidupur in districtVaishali.

Plan

Vai

shal

i

Rs.3

013.

65 L

acL.

N.-2

338(

S)

dt. 3

1.03

.201

6

Pont

oon

Brid

ge

06.0

2.20

18

5Yea

rs (M

aint

enan

ce)

- - - - - 7.1386.37 - After setting of Pipa set, open to traffic

on 15.04.2018

Page 5: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

15

Sita

mar

hi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

River Manderghat 24x24.75 m 2lane District of Sitamarhi. N

AB

AR

D

Sita

mar

hi

4730

06.0

6.20

1419

89.3

3

RC

C58

9.48

2100.00

Mar

-15

Mar

-16

05100

142.661343.94

June

, 201

8

1. GSB and WMM Works have been Completed, Approach road from Tariani Side (A2-Side) in 180M length along with newly construted Box Culvert (Culvert No.-1) has been washed on 14th of August 2017 caused by flood in River Bagmati. Due to the long Breach, traffic in this road has totaly disrupted.2. L.A. proposal is submitted to DM Sitamarhi.by SPE Ltter no.81(e) Dated-13.02.2015.3. Again L.A. proposal is submitted to DM Sitamarhi.by SPE Ltter no.97(e) Dated-06.02.2016 under LA rule -2013. 4. Requested for earlier disposal of LA by SPE Letter No. 299 (w/e) Dt. 19.05.2016 to DM Sitamarhi and SPE Letter No. 284 (w/e) Dt. 03.05.2016 to DM sheohar.

Page 6: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

16

Sita

mar

hi Construction of R.C.C H.L Bridge Belsand-chhitauni-Tariyani Road in 2nd Km. 4x21.00M District of

Sitamarhi.

NA

BA

RD

/RID

F-18

(RC

D)

Sita

mar

hi

1012

510

.09.

2012

851.

46

RC

C84

.00

240.00

Dec

-12

Jun-

14 0100

0100

0100

00

0814.99

June

, 201

8

1. Bridge work has been completed.2. L.A proposal submitted to DM,Sitamarhi by SPELetter No. 79 (e) Dt. 04.02.2013 3. Rs.1,29,06,130.00 is submitted to LAO, Sitamarhi by SPE Letter no.-514 (e) 08.08.2013 against Total estimeted amount Rs. 2,45,87,784.00 and balance amount Rs. 1,16,81,564.00 is pending due to revised A/A (Awaited)4. Revised & corrected A/A proposal submitted to HQ by letter no. 440(e)

17

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Bahar-

Village to Kanauli Road under Indo-Nepal Border Road

(Chainage-132.400) 1x40.00m District of Sitamarhi. N

AB

AR

D /R

IDF-

18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1359

9.75

RC

C40

.00

800.00

Jan-

14

Jan-

16 0100

5100

60100

1550

29.49477.65

June

, 201

8

Concrete work in Girder is inprogress. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis not started .

18

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under

Indo-Nepal Border Road (Chainage-3.906) 1x25.00m

District of Sitamarhi.

NA

BA

RD

/RID

F-18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1341

8.98

413.

78

RC

C25

.00

350.00

Jan-

14

Jan-

16 0100

0100

0100

555

49.66356.70

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work isunder progress and is being done byExecutive Engineer, RCD, RoadDivision Sitamarhi. Work of ApproachRoad has been started on request to theformers after land is made available byRCD.

Page 7: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

19

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-11.011) 4x22.00m District of Sitamarhi.

NA

BA

RD

/RID

F-18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1393

2.23

RC

C88

.00

750.00

Jan-

14

Jan-

16 0100

0100

0100

575

0790.212

June

, 201

8

Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.

20

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-11.695) 3x18.00m District of Sitamarhi.

NA

BA

RD

/RID

F-18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1383

5.02

RC

C54

.00

975.00

Jan-

14

Jan-

16 0100

0100

0100

1080

0633.89

June

, 201

8

Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.

21

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-13.066) 2x25.00m District of Sitamarhi.

NA

BA

RD

/RID

F-18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1371

9.64

RC

C50

.00

900.00

Jan-

14

Jan-

16 0100

0100

0100

580

0595.17

June

, 201

8

Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.

Page 8: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

22

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-17.875)

1x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1320

7.99

RC

C30

.00

750.00

Jan-

14

Jan-

16 0100

0100

0100

595

0190.008

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

23

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-19.265) 2x18.00m District of Sitamarhi. N

AB

AR

D /R

IDF-

18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1357

3.34

RC

C36

.00

550.00

Jan-

14

Jan-

16 0100

0100

0100

1595

45.28554.79

June

, 201

8

Bridge construction work has beencompleted.Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

24

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-22.730) 1x22.00m District of Sitamarhi. N

AB

AR

D /R

IDF-

18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1358

1.57

RC

C22

.00

675.00Ja

n-14

Jan-

16 0100

0100

0100

1070

0399.61

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

25

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-23.843) 2x18.00m District of Sitamarhi.

NA

BA

RD

/RID

F-18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1353

5.54

RC

C22

.00

800.00

Jan-

14

Jan-

16 0100

0100

0100

595

0585.38

June

, 201

8

Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.

Page 9: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

26

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-26.487) 2x25.00m District of Sitamarhi. N

AB

AR

D /R

IDF-

18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1354

8.07

RC

C22

.00

350.00

Jan-

14

Jan-

16 0100

0100

0100

595

11.85518.06

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

27

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-26.675) 4x18.00m District of Sitamarhi. N

AB

AR

D /R

IDF-

18

(RC

D)

Sita

mar

hi

7209

09.0

9.20

1389

0.16

RC

C72

.00

350.00

Jan-

14

Jan-

16 0100

0100

0100

030

0696.89

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

28

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-35.737)

1x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1320

3.89

RC

C6.

00 1000.00Ja

n-14

Jan-

16 0100

0100

0100

1080

0118.91

June

, 201

8

Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.

29

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-45.166)

2x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1324

5.61

RC

C12

.00

1025.00

Jan-

14

Jan-

16 0100

0100

0100

2060

46.34140.37

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

Page 10: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

30

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-46.812)

2x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1324

2.93

RC

C72

.00

1075.00

Jan-

14

Jan-

16 0100

0100

0100

2080

36.07204.02

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

31

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-45.888)

2x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1324

6.06

RC

C12

.00

1025.00

Jan-

14

Jan-

16 0100

0100

0100

4080

23.27200.97

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

32

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-47.887)

2x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1323

0.54

RC

C12

.00

925.00Ja

n-14

Jan-

16 0100

0100

0100

2095

0207.581

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

33

Sita

mar

hi

Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya

Sonbarsa Road under Indo-Nepal Border Road (Chainage-48.720)

2x6.00m District of Sitamarhi. NA

BA

RD

/RID

F-18

(R

CD

)

Sita

mar

hi

7209

09.0

9.20

1322

2.48

RC

C60

.00

750.00

Jan-

14

Jan-

16 0100

0100

0100

1085

0188.60

June

, 201

8

Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.

Page 11: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

34

Sita

mar

hi Construction of R.C.C H.L Bridge Chandauli Ghat in Bagmati River

District of Sitamarhi. PLA

N

Sita

mar

hi

7394

(s)

10.0

8.20

1670

89.3

8

RC

C43

2.00

1100.00

Feb-

16

Apr

-19 567

00

00

00

81.991075.63 04 19

Foundation work in progress.Requesition for land acquisition hasbeen submitted to District LandAcquisition Officer Sitamarhi vide thisoffice letter No. 63 (Encl) Dated-27.01.2017

35

Nal

anda

Construction of HL RCC bridge 4x10.00m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district.

CR

F

Nal

anda

320.

8056

79 (S

)25

.06.

2015

R.C

.C40

.00

50+5

0=10

0

_ _ - - 0.007.09

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

Again Retender the scheme after getting information of availability of Govt. land for construction of diversion from district vide letter No.1348/ व॰, dt.-18.12.2017. Letter of Acceptance for the work has been issued in the favour of Agency on dated 23.03.2018 after success in tender, and directed to deposit additional performance security money.

Page 12: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

36

Nal

anda

construction of HL RCC bridge 9x24.75M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district. NARAYAN DAS CONSTRUCTION Mob. - 9431815725 / 9431815726

Plan

Lak

hisa

rai

Rs.3

068.

39Lt

-182

1(s)

dt-2

8/02

/201

4R

s.187

6.61

R.C

.C

253.

60M

368+

112=

480

08.1

1.20

14

07.1

1.20

16

00100

0099

0094

0040

1.5831497.06

Sept

embe

' 201

8 (S

ubje

ct to

L/A

and

des

ign

of a

ppro

ach

road

)

UNDER CONSTRUCTION:-A1 to P8 (Total 8) Deck Slab Completed. Reinforcement work of last 9th Deck completed. The Work of Deck Slab tried to execute on dated 30.03.2018 but 3 raiyats obstructed the work till registration and compansation. While they are not submitting required paper for registry. NIT Patna has been requested to design of approach road which is near by and parrelal to river. L.A. ISSUE:-Approach Road- 368+112 = 480m. & 2.5 Deck Slab. 26 (Published 18 raiyat) lease registration completed (1.0398 acre). 2 (two) Raiyats Deed are being prepared for lease registration after getting land share on dated 28.03.2018. 1(one) Raiyat is unable to submit land papers and no any obstructions by him. 3(three) Raiyats demand compasation of more land while their more land is not needed. For which the district

Page 13: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

37

Nal

anda

construction of HL RCC Bridge 12x24.75M on Harohar river near surjichak village at Pipriya Block IN Lakhisarai district . ( RAM KRIPAL SINGH CONSTRUCTION Mob.- 9810813322)

Plan

Lak

hisa

rai

Rs3

623.

75 L

t-71

93(S

)05

-08-

2015

(Rev

)Rs.2

841.

54

R.C

.C

304.

32M

525+

675=

1200

01.0

2.20

15

31.0

7.20

17

00100

0099

1060

0001

2.221712.37

Dec

embe

r' 2

018

(Sub

ject

to L

/A )

UNDER CONSTRUCTION. A1-P1, P1-P2, P2-P3, P4-P5, P5-P6, P6-P7 & P7-P8 (7 Nos) Deck Slab completed. P3-P4, P8-P9, & P11-A2 Deck slab in progress. L.A. ISSUE:- Effective : Approach Road :- 525 +675 = 1200 M & Bridge Portion. Only 3 (three) Raiyats (out of 33 Raiyat's consent) have submitted his documents and after verification deed is going to be prepared for registry. Rest Raiyats have not submitted their documents till date. All the matters put up before D.M. Lakhisarai and again sent proposal for regular land acquisition. MD, BRPNNL also written letter to DM in the light of SPE Nalanda's letter. Met with District Administration and got assurance to provide help if any, problem arise during construction.

38

Wor

ld B

ank

Construction of H.L. R.C.C. Bridge with its approach road in 1st K.m. of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.(Royal Infraconstru Ltd., Godrej Waterside Building, Tower No.-1, 4th Floor, No.-401 Plot No.-5, DP Block, Salt Lake, Sector-V, Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749.

1560

9/25

.07.

2014

37.5 260

27.0

2.20

16

26.0

2.20

18

0100

0100

0100

015

0.00558.25476

12/2

018

Page 14: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

39

Wor

ld B

ank

Construction of H.L. R.C.C. Bridge with its approach road in 6th K.m. of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.(Royal Infraconstru Ltd., Godrej Waterside Building, Tower No.-1, 4th Floor, No.-401 Plot No.-5, DP Block, Salt Lake, Sector-V, Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642.

7660

9/25

.07.

2014

37.5 240

27.0

2.20

16

26.0

2.20

18

0100

0100

1050

00

40

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 2nd K.M. of Karpoori Chowk - Patarghat Road in Palce of Old S.P. Bridge in the district of Madhepura.{Raj Construction, Meenapur, Salmari, Katihar-855113 (Bihar)}

WB

P Ph

ase-

2

Mad

hepu

ra

1417

.44

404/

28.0

5.20

14

99 320

07.1

2.20

16

06.1

2.20

18

1080

1540

00

00

83.28377632.18402

12/

2018

41

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 3rd K.M. of Panchgachhiya - Nauhatta Road in Palce of Old S.P. Bridge in the district of Saharsa.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

.28

404/

28.0

5.20

14

66 300

21.1

2.20

16

20.1

2.20

18

1080

1010

00

00

558.25476

12/2

018

0.00

12/

2018

Page 15: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

42

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 7th K.m of Panchgachhiya-Nauhatta road in Palce of damaged Old R.C.C Bridge in the district of Saharsa.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764.

6760

9/25

.07.

2014

50 300

21.1

2.20

16

20.1

2.20

18

515

00

00

00

43

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 7th K.m of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796.

0077

0/25

.09.

2014

50 250

08.1

1.20

16

07.1

1.20

18

15100

2525

00

00

44

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 7th K.m of Meha - Simar Ganpatganj Road in Palce of damaged Old S.P. Bridge in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958.

3140

4/28

.05.

2014

99 270

08.1

1.20

16

07.1

1.20

18

0100

0100

2030

00

0.00867.20598

12/

2018

0.001472.08606

11/

2018

Page 16: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

45

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in10th K.m in Khurhan-Parel-Ratwara-Kapasia road in thedistrict of Madhepura (Extendedpart of RCD road 0 to 15 k.m.) (Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851.

6740

4/28

.05.

2014

100 320

07.1

2.20

16

06.1

1.20

18

0100

1090

2020

00

46

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in5th K.m of Alamnagar-Budhma-Mali road in the district ofMadhepura.(Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595.

8040

4/28

.05.

2014

42 320

07.1

2.20

16

06.1

1.20

18

0100

085

010

00

47

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in5th K.m of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwa road in Place of SPBridge in the district of Saharsa.{Shiv Kishore Construction Pvt.Ltd., At-Saidnagar, OppositePetrol Pump, Laheriasarai,Darbhanga-846001 (Bihar)}

WB

P Ph

ase-

2

Saha

rsa

1257

.84

404/

28.0

5.20

14

99 320

27.0

2.20

16

26.0

2.20

18

0100

0100

1560

00

58.75707744.15900

12/2

018

0.00539.99733

11/

2018

Page 17: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

48

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in11th K.m of Chandradei-Bangama-Matiyari-Mogra road in thedistrict of Araria.{Nirman Engicons Pvt. Ltd., At+ P.O.- Mohanpur, District-Begusarai (Bihar)-851131}

WB

P Ph

ase-

2

Ara

ria

857.

6140

4/28

.05.

2014

105 495

27.0

2.20

16

26.0

8.20

17

0100

0100

05

010

0.00353.24772

0

6/20

18

49

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663.

3640

4/28

.05.

2014

50 250

13.1

2.20

16

12.1

2.20

18

530

00

00

00

50

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706.

1740

4/28

.05.

2014

50 200

13.1

2.20

16

12.1

2.20

180

1000

1001015

00

105.10250873.94314

12/

2018

Page 18: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

51

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura. (Extended part of RCD road 0 to 15 k.m.)(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

.66

404/

28.0

5.20

14

198 380

08.1

1.20

16

07.1

1.20

18

0100

090

1535

00

90.660971933.08994

11/

2018

52

Wor

ld B

ank

Construction of H.L, R.C.C Bridge in 3rd K.M. of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa.

WB

P Ph

ase-

2

Saha

rsa

1031

.43

404/

28.0

5.20

14

112 - 0

000

00

00

0.000.00

0

53

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in16th K.M. of Kadava-SonouliRoad in Purnia District.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750.

4640

4/28

.05.

2014

84 416

27.0

2.20

16

26.0

2.20

180

1000

1005

1000

20

54

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in18th K.M. of Kadava - SonouliRoad in Purnia District.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655.

9240

4/28

.05.

2014

75 250

27.0

2.20

16

26.0

2.20

18

0100

0100

5100

020

0.00800.00685

12/

2018

Page 19: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

55

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in5th K.M. of Jokihat - Dalmalpurroad in the district of Araria.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689.

8940

4/28

.05.

2014

63 380

27.0

2.20

16

26.0

5.20

17

0100

0100

0100

525

0.00325.32598

12/2

018

56

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 1st K.M. of Parsarma-chinkni road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088) W

BP

Phas

e-2

Supa

ul

531.

8840

4/28

.05.

2014

33 200

12.0

8.20

17

11.0

8.20

19

55

00

00

00

57

Wor

ld B

ank

Construction of H.L, R.C.C Bridge in 4th K.M. of Perserma-Chikni road in Palce of damaged Old S.P. Bridge (on Khardaha Dhar) in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088) W

BP

Phas

e-2

Supa

ul

550.

6640

4/28

.05.

2014

50 200

12.0

8.20

17

11.0

8.20

19

030

00

00

00

200.58872625.58000

08/

2019

Page 20: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

58

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 4th K.M. of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old R.C.C. Bridge in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792.

7460

9/25

.07.

2014

56 250

12.0

8.20

17

11.0

8.20

19

535

00

00

00

59

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in13th Km (2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road inbetween Rudho-Mandal Tola andPandit Tola in the district ofMadhepura. (Extended part ofRCD road 0 to 15 k.m.){Brij Construction Pvt. Ltd.,House No.-26, NageshwarColony, Kavi Raman Path,Boring Road, Patna-800001(Bihar)}

WB

P Ph

ase-

2

Mad

hepu

ra

1084

.08

404/

28.0

5.20

14

84 300

13.1

2.20

16

12.1

2.20

18

0100

1090

1015

00

54.80854713.03935

12/

2018

Page 21: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

60

Wor

ld B

ank

Construction of H.L, R.C.CBridge in 11th K.M. ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the districtof Saharsa.(Devraha Construction Pvt.Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

.71

404/

28.0

5.20

14

99 1700

29.0

9.20

16

29.0

9.20

18

0100

0100

510

3050

0.00682.28650

09

/201

8

61

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in4th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk roadin the District of Purnea.{Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}

WB

P Ph

ase-

2

Purn

ia

685.

3340

4/28

.05.

2014

50 475

27.0

2.20

16

26.0

2.20

18

0100

0100

55

00

62

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in25th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road(at Balia Ghat) in the District ofPurnea.{Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}

WB

P Ph

ase-

2

Purn

ia

608.

4540

4/28

.05.

2014

50 475

27.0

2.20

16

26.0

2.20

18

15100

1010

00

00

0.00445.46041

09/

2018

Page 22: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

63

Wor

ld B

ank

Construction of H.L, R.C.CBridge in 3rd Km of Nasir ChowkBelwa Mazgama-Mongara road inthe district of Araria.(Braj Kishore Roy, Village-Kamrgama, Post-TiraJatmalpur, P.S-Kalyanpur,District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612.

6440

4/28

.05.

2014

63 380

02.0

3.20

16

01.0

6.20

17

00

00

00

00

0.000.00

64

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 3rd K.M. of Supaul Station to Bariya Manch in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943.

4740

4/28

.05.

2014

50 350

27.0

2.20

16

26.0

2.20

18

0100

0100

1070

05

65

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 3rd K.M. Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387.

2940

4/28

.05.

2014

33 160

27.0

2.20

16

26.0

2.20

18

560

00

00

00

0.00651.04999 Ju

n-18

Page 23: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

66

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road inChandradei-Kamaldha-Paratharoad along Laliahi Dhar in 2nd Kmin the district of Araria.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509.

9540

4/28

.05.

2014

21 350

27.0

2.20

16

26.0

5.20

17

0100

0100

0100

070

0.0078.93873

12/2

018

67

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in15th Km in Khurhan-Parel-Ratwara-Kapasia road on LaliyaDhar in the district of Madhepura.(Extended part of RCD road 0 to15 k.m.){M/s Sri Ram Enterprises, 2ndFloor, Sri ram Tower,M.P.D.Road, Naya Bazar,Bhagalpur-812002 (Bihar)}

WB

P Ph

ase-

2

Mad

hepu

ra

1274

.29

404/

28.0

5.20

14

132 320

13.0

9.20

17

12.0

9.20

19

1085

00

00

00

0.00724.08435

09/

2019

68

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in15th K.M. of Ranginiya-SonbarsaRoad in Palce of Old S.P. Bridgein the district of Saharsa.(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088) W

BP

Phas

e-2

Saha

rsa

1549

.36

404/

28.0

5.20

14

132 300

29.0

6.20

17

28.0

6.20

19

515

00

00

00

0.00173.41800

06/

2019

Page 24: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

69

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in5th K.M. of Chhatapur-Girdharpu-Chunni road in the district ofSupaul.(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

.26

404/

28.0

5.20

14

165 300

14.0

2.20

17

13.0

2.20

19

1585

00

00

00

135.006261430.94543

02/

2019

70

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 2nd K.M. of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

.25

404/

28.0

5.20

14

175 300

27.0

2.20

16

26.0

2.20

18

0100

0100

595

2060

0.001068.62033

12/2

018

71

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in11th K.M. of Sonbarsa-GwalparaRoad in Palce of Old S.P. Bridgein the District of Saharsa.(M/s Jai Mata Di Construction,Shri Krishnapuri (South),Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768.

9540

4/28

.05.

2014

66 320

06.1

2.20

16

05.1

2.20

18

10100

2530

00

00

Page 25: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

72

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in17th K.M. of Sonebarsa-Gwalpararoad (1st Cutting) in the district ofSaharsa.(M/s Jai Mata Di Construction,Shri Krishnapuri (South),Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

.57

609/

25.0

7.20

14

112 1550

06.1

2.20

16

05.1

2.20

18

0100

10100

6060

1040

73

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in17th K.M. of Sonebarsa-Gwalpararoad (2nd Cutting) in the districtof Saharsa.(M/s Jai Mata Di Construction,Shri Krishnapuri (South),Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

.77

609/

25.0

7.20

14

56 300

06.1

2.20

16

05.1

2.20

18

0100

10100

4060

1040

74

Wor

ld B

ank

Construction of H.L, R.C.C Bridge with its approach road in 6th K.M. of Balua - Baysi Road in Palce of Murli Branch Cannal in the district of Supaul.(Haque Construction Co., Sarai Syed Ali, Muzaffarpur-842001)

WB

P Ph

ase-

2

Supa

ul

503.

3560

9/25

.07.

2014

66 400

27.0

2.20

16

26.0

5.20

17

0100

0100

0100

2080

73.53929452.35160

08/2

018

0.001995.80818

12/

2018

Page 26: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

75

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in9th K.M. of Shaur-Patarghat Roadin Palce of Shitalpatti Old S.P.Bridge in the district of Saharsa.

WB

P Ph

ase-

2

Saha

rsa

1265

.51

404/

28.0

5.20

14

99 - 00

00

00

00

0.000.00

76

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in8th K.M. of Simri-Bakhtiyarpur-Salkhua road in Place of damagedOld S.P. Bridge in the district ofSaharsa.(M/s Trimurti Engicons andTraders Pvt. Ltd., C/o SrikantChoudhary, Tatma Toli,Rajaban, Near Chath Pokhar,Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

.00

609/

25.0

7.20

14

37.5 1000

15.0

4.20

17

14.1

0.20

18

10100

4040

00

55

59.39417263.20137

10/

2018

77

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road in14th K.M. of Chaudhara-Amha-Lokha-Saharsa road in Place ofdamaged Old R.C.C Bridge in thedistrict of Saharsa.(Sincon Infrastructure Pvt. Ltd.,S.K Puri, LG-1 & 2, MajesticPlaza, West Boring Canal Road,Patna-800001)

WB

P Ph

ase-

2

Saha

rsa

870.

0060

9/25

.07.

2014

56 350

27.0

2.20

16

26.0

8.20

17

575

00

00

00

0.00252.07801

12/2

018

Page 27: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

78

Wor

ld B

ank

Construction of H.L. R.C.C.Bridge with its approach road in3rd K.m of Belgachhi-Chandpur toRouniya-Kanharia road in thedistrict of Purnia.{Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}

WB

P Ph

ase-

2

Purn

ia

443.

2240

4/28

.05.

2014

21 335

27.0

2.20

16

26.0

5.20

17

0100

0100

0100

050

0.00185.32945

12/2

018

79

Wor

ld B

ank

Construction R.C.C. Bridge withits approach road in Dubhari-Chakla Ghat to Kosi Embankmentroad (Near Spur) on 57.20 R.D. ofKosi Embankment in the districtof Supaul. {Vishwanath Sharma, Vill. +P.O.- Rahua, P.S.-Rosera,District- Samastipur-848210(Bihar)}

WB

P Ph

ase-

2

Supa

ul

1530

.91

404/

28.0

5.20

14

175 350

17.1

0.20

16

16.1

0.20

18

0100

25100

1040

00

0.00933.27375

10/

2018

80

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul. {Shiv Kishore Construction, At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}

WB

P Ph

ase-

2

Supa

ul

1151

.28

770/

25.0

9.20

14

100 300

27.0

2.20

16

26.0

2.20

18

0100

0100

080

00

12/2

018

Page 28: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

81

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of Supaul.{Shiv Kishore Construction, At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}

WB

P Ph

ase-

2

Supa

ul

1150

.91

770/

25.0

9.20

14

100 300

27.0

2.20

16

26.0

2.20

18

0100

0100

080

00

82

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Marne river near primary school Gordh Ratho to Koni village road in Marona South Panchyat in the District of Supaul.(M/s Ghanshyam Lall, Simrahi Bazaar, Post:-Raghopur, Dist-Supaul-852111)

WB

P Ph

ase-

2

Supa

ul

756.

1177

0/25

.09.

2014

50 300

27.0

2.20

16

26.0

2.20

18

0100

0100

0100

080

83

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach over Marne river near Sikhariya-Khushyali village road in the in the District of Supaul.(M/s Ghanshyam Lall, Simrahi Bazaar, Post:-Raghopur, Dist-Supaul-852111)

WB

P Ph

ase-

2

Supa

ul

934.

2477

0/25

.09.

2014

75 350

27.0

2.20

16

26.0

2.20

18

0100

0100

0100

080

0.001586.89995

12/2

018

0.00945.56050

06/2

018

Page 29: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

84

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul.(Balram Singh, S/o Late Surendra Nath Singh, At+Post-Patory (Panchgachiya), District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859.

4377

0/25

.09.

2014

75 300

27.0

2.20

16

26.0

2.20

18

0100

0100

2035

00

85

Wor

ld B

ank

Construction of H.L. R.C.C. Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul.(Balram Singh, S/o Late Surendra Nath Singh, At+Post-Patory (Panchgachiya), District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729.

5177

0/25

.09.

2014

50 300

27.0

2.20

16

26.0

2.20

18

085

5050

00

00

0.00667.68238

07/2

019

Page 30: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

86

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul. (Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

.78

770/

25.0

9.20

14

100 350

15.0

2.20

17

14.0

2.20

19

025

00

00

00

87

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul.(Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867.

7777

0/25

.09.

2014

75 350

15.0

2.20

17

14.0

2.20

19

055

00

00

00

88

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 62.6 R.D of Kosi Embankment in the District of Supaul.(Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705.

9077

0/25

.09.

2014

50 500

27.0

2.20

16

26.0

5.20

17

0100

0100

5100

050

0.00376.87251

12/2

018

0.00365.15311

02/

2019

Page 31: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

89

Wor

ld B

ank

Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of Supaul.{Mukesh Kumar Singh, At-Ekderwa Masuria, P.O.-Maker, Saran-841215 (Bihar)}

WB

P Ph

ase-

2

Supa

ul

1317

.24

935/

23.1

2.20

14

125 350

29.0

9.20

16

29.0

9.20

18

0100

0100

0100

090

9.97884999.28951

09/

2018

90

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road inalong Kakurwa Dhar in 24th Kmof Chandradei-Bangama-paktola-Matiary-Mongra road in thedistrict of Araria.{Nirman Engicons Pvt. Ltd., At+ P.O.- Mohanpur, District-Begusarai (Bihar)-851131}

WB

P Ph

ase-

2

Ara

ria

757.

7640

4/28

.05.

2014

75 100

27.0

2.20

16

26.0

8.20

17

060

00

00

00

28.65448301.77851

06/2

019

Page 32: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

91

Wor

ld B

ank

Construction of H.L, R.C.CBridge with its approach road inKhurhan-Parel-Ratwara-Kapasiaroad Ratwara-Bazar to South IronScrew Pile Bridge(3x37.5M) fromEast in Madhepura District. (Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

.00

436/

2015

09.0

7.20

15

112.

5

350

27.0

2.20

16

26.0

2.20

18

0100

090

1090

5050

132.212091451.11024

12/

2018

92

GA

YA

Construction of H.L.R.C.C.17x21.75m Bridge includingapproach road and protectionwork over river Muhane betweenSilaunjua-Bataspur village inBodhGaya Block of Gaya Districtunder NABARD Scheme.(Ajay Engicon Pvt. Ltd.,Aurangabad (Bihar).

Nab

ard

RW

D

GA

YA

1127

.86

1128

Dt.

05-0

3-20

12 o

f R.W

.D.

983.

95

RC

C38

0.00 A1 Side-60 M

A2 Side-100 M 15

.03.

13

14.0

9.14 0

1000

1000

1000

8020.19

960.20

July

, 201

8 Bridge work completed & ApproachRoad work in progress. S.I.A.Completed. Process under Section-11in progress.

93

GA

YA

Construction of H.L.R.C.C.22x21.75m Bridge includingapproach road and protectionwork over Falgu river in Sripur-Keni Road in Gaya District underNABARD Scheme.(M/s Rakesh Construction PvtLtd.,9431303918)

Nab

ard

RW

D

GA

YA

2835

.09

2493

dt.

31-1

0-20

14 o

f R.W

.D.

2292

.48

RC

C49

2.00

A1 Side-280 M

A2 Side-280 M 06

.01.

2015

05.0

1.20

17

0100

0100

0100

1050

58.482372.93

June

, 201

8

Bridge work completed & ApproachRoad work in progress. Work startedlate because of court case.Work washampered due to attack on labours byanti social element.

Page 33: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

94

GA

YA

Construction of H.L.R.C.C. BoxCell 4x16.00m Bridge includingapproach road and protectionwork in Dumariya to Belaghati(Jharkhand Border) via Kacher at7th K.M. in Gaya District underPLAN Scheme. (Haque Construction Co.,9431223551)

Plan

GA

YA

532.

2211

464

(S)

28.1

1.20

1447

0.41

RC

C66

.00 A1 Side-40 M

A2 Side-65 M

27-0

5-20

15

26-0

8-20

16

0100

0100

0100

1080

86.17329.41

June

, 201

8 Bridge work Completed. ApproachRoad Work in Progress. Work startedvery late because of naxal problem.

95

GA

YA

Construction of H.L.R.C.C.4x16.00m Bridge includingapproach road and protectionwork in 2ND K.M. of Domuhan-Cherki Road (K.M. 0 to K.M.0.93) in Gaya District underPLAN Scheme. (R.A.S. Enterprises, 9199245601)

Plan

GA

YA

363.

9210

885

(S)

14

.11.

2014

of R

.C.D

.

RC

C64

.84

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

595

3550

00

71.93202.93

Nov

embe

r, 2

018

Work Started. Rock found.Confirmatory boring done. Redesignapproved and work in progress.

96

GA

YA

Construction of H.L.R.C.C.3x14.00m Bridge includingapproach road and protectionwork in Dhangai Bazar to B.B.Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 3560M in Gaya District under PLANScheme. (M/s. Laxman Kumar)

Plan

GA

YA

664.

9111

539

(S)

01.1

2.20

14 o

f R.C

.D.

RC

C11

1.60

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

30100

020

00

0.005.80

July

, 201

9

Work in Progress.

Page 34: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

97

GA

YA

Construction of H.L.R.C.C.3x14.00m Bridge includingapproach road and protectionwork in Dhangai Bazar to B.B.Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 4545M in Gaya District under PLANScheme. (Shree Tirupati Balaji Enterprises,9470664329)

Plan

GA

YA

450.

6211

539

(S)

01.1

2.20

14 o

f R.C

.D.

RC

C43

.84

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

520

00

00

00

0.001.51

Dec

embe

r, 2

018

Work in Progress.

98

GA

YA

Construction of H.L.R.C.C.3x14.00m Bridge includingapproach road and protectionwork in Dhangai Bazar to B.B.Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 13970M in Gaya District under PLANScheme. (M/s. JAY SHANKAR RAY,Muzaffarpur)

Plan

GA

YA

429.

7311

539

(S)

01.1

2.20

14 o

f R.C

.D.

RC

C55

.84 A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

050

520

00

00

0.001.13

Dec

embe

r, 2

018

Work in Progress.

99

GA

YA

Construction of H.L.R.C.C.3x21.00m Bridge includingapproach road and protectionwork in Bhalua to Paharpur Road(K.M. 0 to K.M. 26.325) inChainage 600 M in Gaya Districtunder PLAN Scheme. (Ramiya Construction Pvt. Ltd.,Gaya)

Plan

GA

YA

556.

2811

466

(S)

28.1

1.20

14 o

f R.C

.D.

RC

C64

.84

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

00

00

00

00

0.000.80

Dec

embe

r, 2

018

N.O.C. received from Forest Deptt.Work in Progress.

Page 35: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

100

GA

YA

Construction of H.L.R.C.C.20x21.75m Bridge includingapproach road and protectionwork over Morhar River atChitabkhurd village in AmasBlock in Gaya District underPLAN Scheme.(R.A.S. Enterprises, 9199245601)

Plan

GA

YA

1994

.33

8317

(S)

01.0

9.20

1513

84.4

8

RC

C43

2

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

10100

590

1055

00

185.881264.12

Dec

embe

r, 2

018

Bridge work in progress. Work washampered due to naxal attack.

101

GA

YA

Construction of H.L.R.C.C.9x21.00m Bridge includingapproach road and protectionwork over Morhar River BetweenChitabkala and Gendabag villagein Sherghati Block in GayaDistrict.

Plan

GA

YA

1610

.87

353

(S)

01.0

2.20

18

RC

C19

4.40

A1 Side-150 M

A2 Side-150 M

----

---

----

---

------- ------- ------- ------- 0.000.50

Febr

uary

, 202

0

Work in Progress.

102

GA

YA

Construction of H.L.R.C.C.5x18.75m Bridge includingapproach road and protectionwork over Punpun River betweenBhagwatipur - Kusre village inArwal District under NABARDScheme.

(R.A.S. Enterprises, 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569.

290

7135

(S) D

t.05

-09-

2013

49

2.67

RC

C97

.00

A1 Side-150 M

A2 Side-150 M 10

.12.

13

10.0

6.15 0

1000

1000

1000

250.00

399.86

-

Bridge work completed. Separateestimate for L.A. and approachconstruction work submitted for Rs.820.00 lacs.

Page 36: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

103

GA

YA

Construction of H.L.R.C.C.Bridge including approach roadand protection work in 16th K.M.of Varun-Daudnagar Road inAurangabad District under PLANScheme.

(R.A.S. Enterprises, 9199245601)

Plan

AU

RA

NG

AB

AD

650.

00/3

43

73 (S

) dt.

26.0

3.20

10

RC

C57

.00

A1 Side-100 M

A2 Side-200 M

07/2

011

03/2

012

0100

0100

0100

1590

0.00182.53

June

, 201

8 Bridge work completed. Compensationamount deposited in court. Approachroad work in progress.

104

GA

YA

Construction of Retaining wall &addional lane approach road fornewely Constructed H.L. R.C.C.Bridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x120.00 M).

Non

Pla

n

JEH

AN

AB

AD

249.

84

217(

S) d

t.04

-01-

2012

of R

.C.D

., Pa

tna.

RC

C12

0.00

------

----

--

----

-- 00

00

00

00

0.0026.85

July

, 201

8 Bridge & approach road completed.Award declared in old LA Act.Payment to raiyat in process.

105

GA

YA

Construction of H.L. R.C.C.Bridger Over Kauw river in samtaBigha - Dhasadih at Sambhalbigha-Semaradih in SasaramBlock in the District of Rohtasunder MMSNY.(Brajesh Kumar Singh)

MM

SNY

Roh

tas

214.

50

1949

(S) d

t. 04

-03-

2014

of R

.C.D

., Pa

tna.

RC

C22

.40 A1 Side-75 M

A2 Side-75 M

11-0

5-20

15

10-0

5-20

16

0100

0100

00

00

0.0094.16

June

, 201

8

Work in Progress. Contractor debarredfor delay. Notice for rescind issued

106

GA

YA

Construction of H.L. R.C.C.Bridge over Falgu Dharmawatiriver in 2nd K.M. of Mahuli toLahuara road in Rohtas DistrictUnder MMSNY

MM

SNY

Roh

tas

197.

33

1498

3(S)

dt.

28-1

2-20

07 o

f R

.C.D

., Pa

tna.

----

- A1 Side-00 MA2 Side-250

M

----

-

----

- 0100

0100

0100

050 ----- -

One side approach connected. Anotherside R.W.D. road is about 250 M away.Revised estimate including LA cost issubmitted for Rs.-195.00 lacs.

Page 37: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

107

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24.750 M), M/S Jay shankar rai,9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

17/1

0/20

1335

39.5

5

RC

C/2

97.0

0

250+520M

03/2

014

03/1

6

0100

099

079

05

0.001776.34

06/

2018

Project in L/A

108

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 31.032 km in the district of Purvi champaran Package No- 7 (1 x 40 M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

521.

69

RC

C/4

0.00

105+95M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

1060

020

0.00374.11

12/

2018

Work in progress.

109

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 31.768 km in the district of Purvi champaran Package No- 7 (1 x 15M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

199.

33

RC

C/1

5.00

95+85M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

095

080

0.00124.11

12/

2018

Work in progress.

110

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 32.875 km in the district of Purvi champaran Package No- 7 (2 x 35M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

849.

03

RC

C/6

0.00

160+140M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

535

040

32.55590.64

12/

2018

Work in progress.

Page 38: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

111

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 33.900 km in the district of Purvi champaran Package No- 7 (1 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

398.

24

RC

C/3

0.00

90+110M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

3090

010

26.36268.76

12/

2018

Work in progress.

112

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 35.650 km in the district of Purvi champaran Package No- 7 (2 x 35M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

802.

94

RC

C/7

0.00

105+95M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

2050

015

32.48679.11

12/

2018

Work in progress.

113

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 36.858 km in the district of Purvi champaran Package No- 7 (2 x 25M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

545.

23

RC

C/5

0.00

95+105M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

095

2050

14.42479.80

12/

2018

Work in progress.

114

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 40.772 km in the district of Purvi champaran Package No- 7 (2 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

693.

30

RC

C/6

0.00

100+100M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

050

012

0.00491.64

12/

2018

Work in progress.

Page 39: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

115

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 41.258 km in the district of Purvi champaran Package No- 7 (1 x 40M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

506.

39

RC

C/4

0.00

90+110M

02/2

014

12/2

018

06/1

7

05/1

6

0100

0100

2550

020

0.00349.09

12/

2018

Work in progress.

116

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 44.047 km in the district of Purvi champaran Package No-8 (2 x 40M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

840.

93

RC

C/8

0.00

140+150M

10/2

013

06/2

018

03/1

7

01/1

6

0100

0100

095

1070

0.00660.31

06/

2018

Work in progress.

117

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 47.315 km in the district of Purvi champaran Package No- 8 (3 x 8M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

284.

57

RC

C/2

4.00

85+105M10

/201

3

06/2

018

03/1

7

01/1

6

0100

0100

095

1595

0.00193.08

06/

2018

Work in progress.

118

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 50.190 km in the district of Purvi champaran Package No-8 (1 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

403.

07

RC

C/3

0.00

95+105M

10/2

013

06/2

018

03/1

7

01/1

6

0100

0100

095

2095

0.00437.16

06/

2018

Work in progress.

Page 40: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

119

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 67.710 km in the district of Purvi champaran Package No- 8 (4 x 35M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

1506

.26

RC

C/1

40.0

0

150+150M

10/2

013

06/2

018

03/1

7

01/1

6

0100

0100

095

2090

49.281329.50

06/

2018

Work in progress.

120

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 70.680 km in the district of Purvi champaran Package No- 9 (2 x 40M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

894.

88

RC

C/8

0.00

80+80M

10/2

013

06/2

018

03/1

7

01/1

6

0100

0100

595

1060

0.00718.28

06/

2018

Work in progress.

121

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 74.557 km in the district of Purvi champaran Package No- 9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

409.

79

RC

C/3

0.00

50+50M10

/201

3

06/2

018

06/1

7

04/1

6

0100

0100

095

0100

0.00398.22

06/

2018

Work in progress.

122

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 74.775 km in the district of Purvi champaran Package No- 9 (1 x 15M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

214.

72

RC

C/1

5.00

80+80M

10/2

013

06/2

018

06/1

7

04/1

6

0100

0100

095

095

0.00135.53

06/

2018

Work in progress.

Page 41: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

123

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 75.240 km in the district of Purvi champaran Package No- 9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

431.

61

RC

C/3

0.00

60+60M

10/2

013

06/2

018

06/1

7

04/1

6

0100

0100

095

030

0.00398.74

06/

2018

Work in progress.

124

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 77.735 km in the district of Purvi champaran Package No-9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

445.

62

RC

C/3

0.00

80+80M

10/2

013

06/2

018

06/1

7

04/1

6

0100

0100

1050

1025

0.00405.84

06/

2018

Work in progress.

125

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 81.150 km in the district of Purvi champaran Package No- 9 (2 x 3M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

63.7

6

RC

C/6

.00

45.5+45.5M10

/201

3

06/2

018

06/1

7

04/1

6

0100

0100

095

090

0.0025.52

06/

2018

Work in progress.

126

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 82.180 km in the district of Purvi champaran Package No- 9(2 x 3M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

106.

67

RC

C/6

.00

106+106M

10/2

013

06/2

018

06/1

7

04/1

6

0100

0100

0100

080

0.0089.16

06/

2018

Work in progress.

Page 42: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

127

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 84.665 km in the district of Purvi champaran Package No- 9 (2 x 30M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

679.

50

RC

C/6

0.00

80+80M

10/2

013

06/2

018

06/1

7

04/1

6

0100

0100

095

080

0.00588.72

06/

2018

Work in progress.

128

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 87.670km in the district of Purvi champaran Package No- 9(2 x 3M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

69.5

4

RC

C/6

.00

53.55+53.55M

10/2

013

06/2

018

06/1

7

04/1

6

0100

0100

095

5090

0.0057.30

06/

2018

Work in progress.

129

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 89.210 km in the district of Purvi champaran Package No- 10 (2 x 3M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

69.6

1

RC

C/6

.00

50+50M11

/201

3

06/2

018

03/1

7

10/1

5

0100

0100

095

2595

0.0036.46

06/

2018 Work in progress.

130

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 93.150 km in the district of Purvi champaran Package No-10(2 x 5M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

81.3

4

RC

C/1

0.00

46.525+46.525M

11/2

013

06/2

018

03/1

7

10/1

5

0100

0100

095

1595

11.6041.44

06/

2018

LA issues

Page 43: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

131

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 105.640 km in the district of Purvi champaran Package No-10 (3 x 8M),Barhonia engicor Pvt ltd,9431269809

NA

BA

RD

/ Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

293.

66

RC

C/2

4.00

170+108M

11/2

013

06/2

018

07/1

7

10/1

5

00

00

00

00

0.0013.11

06/2

018 NOC not to be taken .Villagers

demanding alignment change

132

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 107.935 km in the district of Purvi champaran Package No-10 (1 x 20M),Barhonia engicor Pvt ltd,9431269809 N

AB

AR

D/ I

ndo-

Nep

al

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

403.

49

RC

C/2

0.00

100+100M

11/2

013

06/2

018

07/1

7

10/1

5

0100

0100

095

0100

0.00351.01

06/

2018

Work in progress.

133

Spec

ial w

orks

div

isio

n ch

akia

Construction of HLRCC bridge in Indo -Nepal border road at channage 108.078 km in the district of Purvi champaran Package No-10 (1 x 20M),Barhonia engicor Pvt ltd,9431269809 N

AB

AR

D/ I

ndo-

Nep

al

East

Cha

mpa

ran

7209

(s)w

e09

/09/

2013

423.

56

RC

C/2

0.00

100+100M11

/201

3

06/2

018

03/1

7

10/1

5

0100

0100

095

0100

0.00404.60

06/

2018

Work in progress.

134

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition ,approach road and protection work near naiyam gram at pachphutiya ghat in Bagmati river (7x24.75 m) Hari Construction & Associate Pvt. Ltd., Begusarai, RWD.

BD

F

Dar

bhan

ga

1816

(s)

28/0

2/20

1423

19.1

9

RC

C/1

77.5

6

410M

03/2

014

03/1

6

0100

0100

0100

025

0.001257.27

06/

2018 Land Acquisition in progress. SIA

Work completed.

Page 44: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

135

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition ,approach road and protection work in the 18th k.m of baliya- kakodha -dewana-rajkherwar -jhanjharpur road(upto NH-57 in drabhanga distrcit(12x24.75 m)Shiv Kishore Construction Pvt. Ltd.,9431858543 RCD

PLA

N

Dar

bhan

ga

6219

(s)

09/0

7/20

1540

48.7

0

RC

C/3

04.3

6

1130M

09/2

015

05/1

8

096

690

075

060

60.722172.39

06/

2018

Section-19 is in progress.

136

Dar

bhan

ga

costruction of HLRCC bridge near chandanpatti village (2 x 18.75 m).M/S Sanjay Kumar Singh, 9470624199 RWD

MM

SNY

/ Pha

se -

IV (2

013-

14)

Dar

bhan

ga

7584

(s)

11/0

8/20

1435

3.18

RC

C/3

8.76

210M

12/2

014

09/2

014

03/1

6

12/1

5

0100

0100

0100

095

0.00190.79

06/

2018

Work completed and traffic started.

137

Dar

bhan

ga

Construction of HLRCC bridge at angar ghat in the budhi gandak river (10x24.75 m) Braj Kishor Rai,9430800861 RWD

NA

BA

RD

/ RID

F-17

(R

CD

)

Sam

astip

ur

1583

(s)

09/0

2/20

1220

96.7

2

RC

C/2

53.6

4

780M03

/201

2

07/1

4

03/1

4

0100

0100

0100

080

0.001465.60

06/

2018

Rs. 227.86 Lacs has been Depositedto DLAO Samastipur vide letter No487 dated 06.06.2015 but LAproposal returned by DLAOSamastipur for Perpetual lease.

138

Dar

bhan

ga

Construction of HLRCC bridge at kakar ghat in rosra morwara road in kareh river(16x24.75 m) Shiv Kishore Construction Pvt. Ltd.,9431858543 RWD

NA

BA

RD

/ RID

F-17

(R

CD

)

Sam

astip

ur

7802

(s)

13/0

7/20

1230

09.4

2

RC

C/4

05.8

0

650M

12/2

012

03/1

5

12/1

4

0100

0100

0100

085

0.002991.56

06/

2018

SIA work is in progress.

Page 45: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

139

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition ,approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x24.00 m)Ram Kripal Singh Constructon Pvt Ltd., RCD

PLA

N

Sam

astip

ur

7171

(s)

05/0

8/20

1568

13.4

0

RC

C/5

16.6

4

1500M

08/2

015

10/1

8

062

039

014

00

0.001711.08

10/

2018 SIA work is in progress.

PH done on 04.04.2018.

140

Dar

bhan

ga

costruction of HLRCC bridge in NH-28 through chand chourdih to pathan tol before river under ujiyarpur block (2x14.50).Sri Rajesh Kumar,94308343626 RWD

MM

SNY

/ Pha

se -

IV (2

013-

14)

Sam

astip

ur

7370

(s)

06/0

8/20

1420

4.59

RC

C/3

0.26

65M

09/2

014

09/1

5

0100

0100

0100

080

0.00151.03

06/

2018 GSB work has been completed and

traffic started.

141

Dar

bhan

ga

costruction of HLRCC bridge in near proposed bypass road of hasanpur bazar at marachi ujagar of virpur bramhsthan in hasanpur block(3x18.75 m) Praveez Khan

MM

SNY

/ Pha

se -

IV

(201

3-14

)

Sam

astip

ur

9340

(s)

24/0

9/20

1440

0.94

RC

C/5

8.12

130M01

/201

511

/201

4

04/1

6

02/1

6

0100

0100

0100

070

29.16226.40

06/

2018

Work in progress

142

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition ,approach road and protection work in tilyuga river between dwalak village and janki nagar tola under madhepur block in the district of madhubani (5x18.75 m)Shreem Construction,9470627503 RWD

BD

F

mad

huba

ni

1867

(s)

03/0

3/20

1499

5.74

RC

C/9

6.84

290M

06/2

015

10/2

014

04/1

7

04/1

6

492

0060

060

010

0.00446.26

06/

2018

Work in progress

Page 46: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

143

Dar

bhan

ga

Construction of five no.of lock gate in the road between jhaveri chowk and bhutaha chowk in chainage from 17.645 km to 25.19 km in madhubani district.Brajendra Kr. Buildress Pvt.Ltd,0612-2276467,9431063085 RCD N

AB

AR

D/ R

IDF-

19 (R

CD

)

mad

huba

ni

4553

(E) 1

5.07

.201

542

79.1

8

RC

C/1

24.0

0

250M

10/2

015

10/2

013

10/1

7

10/1

5

898

888

1580

525

0.002970.90

06/

2018

Work in progress

144

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition ,approach road and protection work near jhanjharpur at old NH-57 in kamala balan river in madhubani distrcit(9x24.00 m)Tushar Construction Company, Gaziabad., RCD

PLA

N

mad

huba

ni

6220

(s)

09/0

7/20

1541

97.0

5

RC

C/2

21.4

41620M

09/2

015

05/1

8

767

00

00

00

130.03851.61

10/

2018

SIA work is in progress.

145

Dar

bhan

ga

Construction of HL RCC bridge in Rampatti-Batlohia Road in 5th KM (5x16.00M) in the District of Madhubani.

PLA

N

mad

huba

ni

2496

(s)

18.0

3.20

1886

5.71

RC

C/8

0.00

04.1

2.20

17

03.0

6.20

19

2555

00

00

00

214.28214.28

03.0

6.20

19

Work in progress.

146

Dar

bhan

ga

Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x21.75M) in the District of Samastipur

PLA

N

Sam

astip

ur

1207

7 (s

)27

.12.

2017

879.

10

RC

C/1

08.7

5

11.0

4.20

18

10.1

0.20

19

010

00

00

00

0.000.00

10.1

0.20

19

Work in progress.

147

Dar

bhan

ga costruction of HLRCC bridge at damla ghat in bisfi block (3x21.75 m) Sri Krishna Kant Thakur,9430897941 RWD M

MSN

Y/ P

hase

- I

V (2

013-

14)

Mad

huba

ni

8291

(s)

01/0

9/20

1447

0.47

RC

C/6

7.12

330M

10/2

014

09/2

014

01/1

6

12/1

5

0100

0100

0100

050

0.00369.77

06/

2018

L.A. in progress.

Page 47: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

148

Dar

bhan

ga

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x21.75 m)Mansa Engicom Pvt. Ltd.,9431060060 RWD

MM

SNY

/ Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

23/0

6/20

1065

8.72

RC

C/1

34.2

0

225M

May

-10

03/1

2

11/1

1

0100

0100

0100

010

0.00840.57

06/

2018

Section-19 has been completed.

149

Arah Construction of H.L. RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt. Ltd., 9431012004

MMSNY Bhojpur

Rs.

372.

63 L

ac76

55 (S

) dt.

11.0

8.20

14

RC

C67

.08 200.00

28.0

1.16

27.0

4.17 0

1003

980797

0545

0.00187.14

06/

2018

3/3 Deck Slab Casted . 3/3 wearing coat casted. Railing work under progress. Earth filling in approach is in progressExpected D.O.C- June, 2018

150

Kat

ihar

Construction of 2x30m Size ofH.L. R.C.C. bridge at (VelbwaRiver) Mieerganj Railwaycrossing to Dhabeli RoadChainage 30.75 of Indo-NepalBorder Road in the District ofAraria.Baba Const.

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Ara

ria

2160

(s)

14/0

3/20

1357

0.80

509.

41

RC

C/

60.0

0

370.0004

/201

3

06/1

4

0100

0100

060

00

0.00180.63

06/

2018 L/A problem. L/A will be done by RCD

Araria. Second Span work is inProgress. Work is slow due to L.A.

151

Kat

ihar

Construction of 27x30m Size ofH.L. R.C.C. bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 50.80 ofIndo-Nepal Border Road in theDistrict of Araria.D2S Infra Structures Pvt. Ltd.

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Ara

ria

2160

(s)

14/0

3/20

1375

95.0

753

44.0

1

RC

C/

810.

00

1690.00

07/2

013

07/1

6

0100

0100

0100

095

0.006610.29

06/

2018 Bridge work completed road BT work

completed.. L/A will be done by RCDAraria. 70m remaning in approach road.

Page 48: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

152

Kat

ihar

Construction of 7x21.75M Bridgeover Paharia Ghat of Bakra Riverin Kursakanta to Teera Road ofDom Sadak Road in the District ofAraria.M/S Raj Construction

Nab

ard

RW

D

Ara

ria

rwd

2547

24/0

8/20

1173

0.00

RC

C/

157.

00

360.00

02/2

012

12/2

019

0100

090

070

00

121.14680.95

12/

2019

Work in Progress.

153

Kat

ihar

Const. of 11x18.75m H.L.R.C.CBridge over Parmar river onDiyari Ghat in between Dumariyato Diyari in the district of ArariaBraj Kishor Construction.

Plan

Ara

ria

7081

(s)

30.0

7.20

1542

44.2

0

RC

C20

6.25

3107.00

03.

01.2

016

02.

01.2

018

0100

0100

0100

082

178.181418.57

06/

2018 Bridge work completed. Approach

work is in Progress.

154

Kat

ihar

Construction of H.L. R.C.C.Bridge on Ganjan Ghat in BarsoiNeemtala Chowk to Dakaita PujaRoad via Beghour Hat to KatiharDistrict.Raj Construction

Nab

ard

RW

D

Kat

ihar

920

11/0

6/20

1316

91.5

111

81.7

5

RC

C/

201.

00

365.00

10/2

013

07/1

5

0100

0100

0100

090

0.001543.39

06/

2018 Bridge work completed.SDBC work is

remaning due to L/A Problem.

155

Kat

ihar

Construction of H.L. R.C.C.bridge in 10th Km of BarsoiBanbhui-Dhachana Road ofKatihar District.Shankar Sharma

Nab

ard

Kat

ihar

9585

(s)

13/1

2/20

1319

65.6

5

RC

C/

194.

00

415.00

03/2

014

03/1

6

0100

0100

0100

060

0.001760.20

06/

2018 Bridge work completed.L.A Problem.

LA is under Process.

Page 49: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

156

Kis

anga

nj

Construction of 2x16.50m R.C.C.Bridge over Kathliya KochparaDhar in Kishanganj Block in theDistrict of Kishanganj.Star Construction. M

MSN

Y

Kis

anga

nj

6868

(s)

23/0

7/20

1426

1.53

244.

33

RC

C/

33.0

0

185.00

10/2

014

10/2

015

0100

0100

0100

050

0.00166.91 06/2018

Bridge Work completed. GSB work isin Progress. E/W completed.

157

Kis

anga

nj

Construction of H.L. R.C.C.Bridge Koul River in Jurail LauchRod of RWD Road in the Districtof Kisanganj.Navin Chandra Sarkar, Katihar N

abar

d R

WD

Kis

anga

nj 2005

30/0

6/20

1129

34.7

252

05.9

701

/01/

2018

RC

C/

430.

00

-

02/2

012

03/2

018

02/1

4

09/1

9 020

00

00

055

490.913540.12

Due to Increase of Span. Work is inProgress.

158

Kis

anga

nj

Construction of 37x30m H.L.R.C.C. Bridge on River BurhiKanki of Indo Nepal Border Roadin the District of Kisanganj at Ch-109.65S.P. Singla Pvt. Ltd.

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

09/0

9/20

1366

54.9

4

RC

C/

1110

.00

537.00

10/2

013

07/1

6

0100

0100

0100

020

0.006525.03

06/

2018 Bridge work completed. E/W- 70%

both side. L/A Problem RCD done byKishanganj. L.A is under Process.

159

Kis

anga

nj

Construction of 2x30m H.L.R.C.C. Bridge on River PahariLocal Nala of Indo Nepal BorderRoad in the District of Kisanganjat Ch- 151.00Bhartiya Infrastructure Pvt.Ltd. N

abar

d In

do N

epal

(R

IDF-

XIX

)

Kis

anga

nj

1807

(s)

06/0

3/20

1342

1.14

309.

52

RC

C/6

8.44

270.00

06/2

013

09/1

4

0100

0100

0100

00

0.00254.20

06/

2018

Bridge Work completed. S.I.A iscompleted towards Purena End. Katiharend S.I.A is not completed. DM Katihar has written a Letter to ChandraguptaInstitution.

Page 50: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

160

Kis

anga

nj

Construction of 3x30m H.L.R.C.C. Bridge on River BurhiKanki of Indo Nepal Border Roadin the District of Kisanganj at Ch-113.640S.P. Singla Pvt. Ltd.

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

09/0

9/20

1372

4.71

650.

49

RC

C/

90.0

0

300.00

10/2

013

04/1

6

0100

0100

0100

015

0.00547.05

06/

2018 Bridge work completed. E/W- 70%

both side.. L/A Problem RCD done byKishanganj. L.A is under Process.

161

Kis

anga

nj

Construction of 2x30m H.L.R.C.C. Bridge on River Surbhithaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 123.00S.P. Singla Pvt. Ltd.

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

09/0

9/20

1365

0.85

507.

64

RC

C/

60.0

0

260.00

10/2

013

04/1

6

0100

0100

0100

020

0.00405.07

06/

2018 Bridge work completed. E/W- 50%

both side. . L/A Problem RCD done byKishanganj. L.A is under Process.

162

Kis

anga

nj

Construction of 14x30m H.L.R.C.C. Bridge on River maichi ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch-124.00S.P. Singla Pvt. Ltd.

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

09/0

9/20

1337

29.1

725

97.5

8

RC

C/

420.

00

246.0010

/201

3

04/1

6

0100

0100

0100

00

0.002330.22

06/

2018 Bridge work completed. . L/A Problem

RCD done by Kishanganj. L.A is underProcess.

163

Kis

anga

nj

Construction of 2x30m H.L.R.C.C. Bridge on River SurbhithaLocal Nala of Indo Nepal BorderRoad in the District of Kisanganjat Ch- 146.850Bhartiya Infrastructure Pvt.Ltd. N

abar

d In

do N

epal

(R

IDF-

XIX

)

Kis

anga

nj

7209

(s)

09/0

9/20

1359

3.60

444.

15

RC

C/

61.2

2

320.00

10/2

013

07/1

5

0100

0100

0100

070

0.00279.65

06/

2018

Bridge work completed. work inprogress. Approach, E/W and GSBcompleted both side. . L/A ProblemRCD done by Kishanganj. L.A is underProcess.

Page 51: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

164

Kis

anga

nj

Construction of 2x30m H.L.R.C.C. Bridge on River LocalNala of Indo Nepal Border Roadin the District of Kisanganj at Ch-149.00Bhartiya Infrastructure Pvt.Ltd. N

abar

d In

do N

epal

(R

IDF-

XIX

)

Kis

anga

nj

7209

(s)

09/0

9/20

1369

1.73

422.

26

RC

C/

60.0

0

380.00

10/2

013

07/1

5

0100

0100

0100

05

0.00276.28

06/

2018

Bridge work completed. L.A is underRCD Kishanganj. . L/A Problem RCDdone by Kishanganj. L.A is underProcess.

165

Kat

ihar

Construction of 3x18.75m spanH.L. R.C.C. Bridge over NasiTola Dhar of Damaily Panchayatunder Dhamdha Block in theDistrict of Purnea. Baba Construction.

Nab

ard

Purn

ia

1806

(s)

05/0

3/20

1342

8.56

307.

02

RC

C/5

8.08

270.00

04/2

013

07/1

4

0100

0100

0100

075

0.00249.56

06/

2018

Bridge work completed. LA AmountRs. 2101640.00 vide 02.09.2016 hassubmitted to DM Purnea. L/A is underProcess. LA under Permanent.

166

Kat

ihar

Construction of 4x22.00m spanH.L. R.C.C. Bridge over RetvaRiver in P.W.D. Nehru Chowk toDharamganj Road of ArariaDistrict.S.K. Construction

MM

SNY

Ara

ria

6776

(s)

21/0

7/20

1441

5.22

326.

00

RC

C/6

8.00

295.00

10/2

014

10/1

5

095

070

040

00

0.00139.95

06/

2018

MD Pul Nigam Lt. No. 3172 Dt.30.10.2017 revised span arrangementEstimate has submitted to RCD Patna.Revised Estimate is under Progress atRCD head quarter.

167

Kat

ihar

Construction of 2x24.75m of H.L.R.C.C. Bridge over maria ghat atKhawaspur Suman Tola in Kismatpanchayat of Araria District.S.K. Construction, Araria. M

MSN

Y

Ara

ria

9343

(s)

24/0

9/20

1433

4.76

302.

53

RC

C/5

1.00

120.00

03/2

015

03/1

6

0100

0100

0100

595

0.00206.22

06/

2018

Bridge Work completed.

Page 52: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

168

Kat

ihar

Construction of 3x21.75m spanR.C.C. Bridge over Dhiwha(Chakka) dhar in front of Yogipurin farhi to kanholi Road ofNarpatganj block in the District ofAraria District.Pankaj Kumar

MM

SNY

Ara

ria

9346

(s)

24/0

8/20

1233

1.94

338.

76

RC

C/6

5.00

320.00

12/2

012

02/1

4

3100

2080

00

00

0.00162.23

06/2

018

Work in Progress.

169

Kat

ihar

Construction of 4x21.75m spanR.C.C. Bridge over Adiwashi Tolain Dumariya to Rampur Road ofPalasi Panchayat in the District ofAraria District.Pankaj Kumar

MM

SNY

Ara

ria

9348

(s)

24/0

8/20

1241

0.65

390.

01

RC

C/8

7.00

320.00

12/2

012

02/1

4

0100

0100

1080

00

18.10312.42

06/2

018

Work in Progress.

170

Kat

ihar

Construction of 3x21.75m spanR.C.C. Bridge over Jahanpur Ghatin the District of Araria District.Pankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

23/0

8/20

1242

0.66

357.

38

RC

C/7

0.00

320.00

10/2

012

01/1

4

0100

65100

00

00

14.93237.64

06/2

018

Work in Progress.

171

Kat

ihar

Construction of 2x12.50m spanR.C.C. Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrict.Ashwani Kr. Singh, Katihar.

MM

SNY

Kat

ihar

1026

5(s)

13/0

9/20

1225

1.64

155.

56

RC

C/3

0.00

420.00

12/2

012

12/1

3

0100

0100

0100

00

0.00162.39

06/

2018

Bridge work completed. l/a problem.

172

Kis

anga

nj

Construction of 2x30m H.L.R.C.C. Bridge on River PahariLocal Nala of Indo Nepal BorderRoad in the District of Kisanganjat Ch- 151.00Bhartiya Infrastructure Pvt.Ltd. N

abar

d In

do N

epal

(R

IDF-

XIX

)

Kis

anga

nj

7209

(s)

09/0

9/20

1355

5.63

423.

59

RC

C/

60.0

0

420.00

10/2

013

07/1

5

0100

0100

0100

05

0.00248.75

06/

2018 Bridge work completed. . L/A Problem

RCD done by Kishanganj. L.A is underProcess.

Page 53: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

173

Kat

ihar

Construction of 3x16.50m H.L.R.C.C. Bridge including approachRoad in 3rd Km. of Saifganj Roadin the District of Araria.Shivdani Engineers Patna. N

on P

lan

Ara

ria

1435

3(S)

28.1

2.20

1131

7.22

RC

C/5

0.00

200.00

06/

2012

06/

2013 0

1000

1000

1000

400.00

187.03

06/

2018

Bridge Work completed. PerpesualLease LA is under Process. Feasibilityreport send to Engineer in chief forApproval through Dy. Chief Engineervide this Office Letter No. 110 (WE)Dt. 27.01.2018 & M.D. Lt. No.-BRPNN/2084 (we) NBC Dt.25.11.2016.

174

Kat

ihar

Construction of 6X24.00m H.L.R.C.C. Bridge over Bakra river at1st km. of Udahat Tekni roadunder PLAN in the District ofAraria.Tirupatin Balajee Earth WorkPvt. Ltd.

Plan

Ara

ria

1293

(s)

16.0

2.20

1722

11.7

3

RC

C14

7.85

300.00

01.

01.2

018

01.0

1.20

20

510

00

00

00

96.1296.12

01.0

1.20

20

Work in Progress.

175

Kat

ihar

Construction of 6X21.75mH.L.R.C.C Bridge at Kundi Tolain Mohna Chandpur Panchayat ofBarari Block of Katihar District.Vishundev Yadav M

MK

VY

Kat

ihar

1454

(s)

21/0

3/20

1718

00.0

0

RC

C

134.

28

11/

2017

11/2

019

530

00

00

00

0.00173.83

11/2

019

Work in Progress.

176

Kat

ihar

Construction of of H.L. RCCbridge (3X18.75 m) in 3rd km. ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road underFDR in the District ofAraria.SHIV CHANDRA KUMKAR

FDR

Ara

ria

577.

4246

(S)

02.0

1.20

18

58.0

8

250.00

05/2

013

04/1

5

00

00

00

00

0.000.00

12/

2017

Work Started.

Page 54: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

177

Kat

ihar

Construction of of H.L. RCCbridge (3X18.75 m) in 2nd km. ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road underFDR in the District Araria.SHIV CHANDRA KUMKAR

FDR

Ara

ria

573.

7245

(S)

02.0

1.20

18

58.0

8

428.00

05/2

013

04/1

5

00

00

00

00

0.000.00

04/

2018

Work Started.

178

Kat

ihar

Construction of of H.L. RCCbridge (3X16.00 m) in (SH-99)9th km. of Baisi-Amour-Bahadurganj road in the Districtof Purnea.RAJKISHOR SINGH

FDR

Purn

ia

739.

0041

(S)

02.0

1.20

18

49.8

3

140.00

05/2

013

07/1

5

00

00

00

00

0.000.00

04/

2018

Work Started.

179

Kat

ihar

Construction of of H.L. RCCbridge (3X16.50 m) in 9th km. ofKali Mandir to Baraily road in theDistrict of Purnea.SHANKAR SHARMA

FDR

Purn

ia

723.

7643

(S)

02.0

1.20

18

51.3

3

390.00

05/2

013

04/1

5

00

00

00

00

0.000.00

04/

2018

Work Started.

180

Kat

ihar

Construction of RCC HL bridge(8x18.00m) including approachroad, diversion and protectionwork in the place of 10th km ofJokihat-Dalmalpur-Gerua road inthe district of Purnia.SHANKAR SHARMA &BAIJNATH SHARMA (J.V.)

FDR

Purn

ia

1185

.00

1384

(S)

02.0

1.20

18

148.

88

1690.00

07/2

013

07/1

6

00

00

00

00

0.000.00

05/

2018

Work Started.

Page 55: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

181

Kat

ihar

Construction of Balance work ofH.L. RCC bridge (4x21.00 m) in9th km of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

.00

44(S

)02

.01.

2018

86.4

4

360.00

02/2

012

12/2

019

00

00

00

00

0.000.00

12/

2019

Work Started.

182

Kat

ihar

Construction of H.L. RCC bridge(3x16.50 M) in 2nd Km. of Ekhua mahmadodia-Bareli-Duboli roadin the district of Purnea.BAIJNATH SHARMA

FDR

Purn

ia

619.

2442

(S)

02.0

1.20

18

51.3

3

3107.00

03.

01.2

016

02.

01.2

018

00

00

00

00

0.000.00

06/

2018

Work Started.

183

Kat

ihar

Construction of H.L. RCC bridge (3X16.50 M) in the 7th km of Ekba-Mahammodia-Dubouli road in the district of Purnia.M/S SHAILESH KUMAR

FDR

Purn

ia

552.

1729

6 (S

)10

.01.

2018

51.3

3

_

03

/201

1

03

/201

2

00

00

00

00

0.000.00 Work Started.

184

Kat

ihar

Construction of H.L. RCC bridge (3X16.50 M) in the 9th km of Belgachhi PWD road via Nitendra-Machharhatta-Geria road in the district of Purnia.HAQUE CONSTRUCTION

FDR

Purn

ia

729.

4529

5 (S

)10

.01.

2018

51.3

3

_

01/2

008

06/2

009

00

00

00

00

0.000.00 Work Started.

Page 56: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

185

Kat

ihar

Construction of RCC HL bridge (4x16.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 6th km of Jokihat-Dalmalpur-Garua road in the district of Purnea.RAJ KISHOR SINGH

FDR

Purn

ia

877.

5368

3 (S

)19

.01.

2018

66.4

4

_

9/20

10

2/20

12 00

00

00

00

0.000.00 Work Started.

186

Kat

ihar

Construction of RCC HL bridge (2X24.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 29th km of Biasi-Amor-Bahadurganj road(SH-99) in the district of Purnea.HAQUE CONSTRUCTION

FDR

Purn

ia

794.

7569

0 (S

)19

.01.

2018

49.2

2

_

04/2

013

07/1

4 00

00

00

00

0.000.00 Work Started.

187

Kat

ihar

Construction of H.L. RCC bridge (5X16.00 M) in Belauri-Shivganj-Salmari Bazar 19th km. of (2nd Cutting) in the district of Katihar.GOKUL HITECH INFRA PVT. LTD.

FDR

Kat

ihar

866.

8829

3(S)

10.0

1.20

18

83.0

5

_

05/

2012

08/

2013 0

000

00

00

0.000.00 Work Started.

Page 57: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

188

Kat

ihar

Construction of H.L. RCC bridge (3X16.00 M) in Belauri-Shivganj-Salmari Bazar 19th km. of (1st Cutting) in the district of Katihar.BABAN KUMAR SINGH

FDR

Kat

ihar

639.

7329

4(S)

10.0

1.20

18

49.8

3

_

7/20

12

7/20

14 00

00

00

00

0.000.00 Work Started.

189

Kat

ihar

Construction of RCC HL bridge(2X16.50 m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 3rd km ofAajamnagar link road in thedistrict of Katihar.M/S JAI SHIVCONSTRUCTION

FDR

Kat

ihar

387.

2769

3(S)

19.0

1.20

18

34.2

2

320.00

10/2

013

07/1

5

00

00

00

00

0.000.00

05/

2018

Work Started.

190

Kat

ihar

Construction of RCC HL bridge(2x16.00 m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 42th km ofKatihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in thedistrict of Katihar.M/S SHAILESH KUMAR

FDR

Kat

ihar

458.

7248

0(S)

15.0

1.20

18

49.2

2

380.00

10/2

013

07/1

5

00

00

00

00

0.000.00

05/

2018

Work Started.

Page 58: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

191

Kat

ihar

Construction of RCC HL bridge(2x18.00 m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 35th km ofKatihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in thedistrict of Katihar.BIPIN KUMAR SINGH

FDR

Kat

ihar

459.

5648

1(S)

15.0

1.20

18

37.2

2

420.00

10/2

013

07/1

5

00

00

00

00

0.000.00

05/

2018

Work Started.

192

Kis

anga

nj

Construction of 6X24.75MH.L.R.C.C Bridge in 11th km. ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj District.Shiv Kishore Construction.

Plan

Kis

anga

nj

1292

(s)

18/0

2/20

1720

85.0

0

RC

C

147.

78

01/

2018

01/2

020

55

00

00

00 0

01/2

020

Work in Progress.

193

Kis

anga

nj

Construction of RCC HL bridge(3x16.00m) including approachroad, diversion and protectionwork in place of 9th km ofMastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta roadin the district of Kishanganj.BIDYANAND GUPTA

FDR

Kis

anga

nj

570.

9112

072

(S)

27.1

2.20

17

49.8

3

03/2

018

06/1

9

5 0 0 0 0.00 Work Started.

194

Kis

anga

nj

Construction of of H.L. RCCbridge (4X16.00 m) in 11th km. ofBahadurganj-Tedhagach road inthe District of Kishanganj.BINOD KUMAR SINGH

FDR

Kis

anga

nj

786.

0012

073

(S)

27.1

2.20

17

66.4

4

03/2

018

09/1

9

20 0 0 0103.97

0.00Work Started.

Page 59: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

195

Kis

anga

nj

Construction of of H.L. RCCbridge (3X16.00 m) in 9th km. ofBahadurganj-Tedhagach road inthe District of Kishanganj.BIPIN KUMAR SINGH

FDR

Kis

anga

nj

690.

4312

090

(S)

27.1

2.20

17

49.8

3

04/2

018

07/1

9

30 0 0 0191.84

0.00Work Started.

196

Kis

anga

nj

Construction of of H.L. RCCbridge (5X16.00 m) in 6th km. ofKishanganj-Bahadurganj roadunder FDR in the DistrictKishanganj.BALRAM SINGH

FDR

Kis

anga

nj

791.

4447

(S)

02.0

1.20

18

83.0

5

03/2

018

09/1

9

0 0 0 0 0.00 Work Started.

197

Kis

anga

nj

Construction of RCC HL bridge(2x16.00m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 13th km ofMastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta roadin the district of Kishanganj.TIRUPATI BALAJEE EARTHWORK PVT. LTD.

FDR

Kis

anga

nj

442.

7311

968

(S)

21.1

2.20

17

33.2

2

03/2

018

06/1

9

0 0 0 0 0.00 Work Started.

Page 60: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

198

Bha

galp

ur

Construction of H.L. RCC Bridge 14x18.75 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)M/s Ganesh Ram Dokania, Dokania Market, Aliganj, BankaMob.no. 9931130066

Nab

ard

Bha

galp

ur

2296

.08

2501

(s)

25/0

3/20

1313

22.3

0

RC

C/ 2

51.6

8

A1 side -650 m

A2 side-400 m

(Jharkhand)

24/0

5/13

24/0

5/15 00

10000

10000

1000000

0.001507.34

06/

2018

Bhagalpur(i) Section 11 notified on letter No. 107 dt-30.03.18(ii) Land Acquisition-4.33 AccreGodda (Jharkhand)(i) RCD- Bihar Lt.no. 2244 (s) dt. 09.03.2017 to RWD Ranchi (Jharkhand) (ii) Land Acquisition- 9.45 Accre

199

Bha

galp

ur

Constriction of H. L. R.C.C. Bridge 12X24.75m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)M/s Naraindas Construction Pvt. Ltd., Binodpur, Katihar Mob.no. 9431815725, 9431815726

Nab

ard

Bha

galp

ur

2460

.57

2502

(s)

25/0

3/20

1320

35.8

3

RC

C/ 3

04.3

6

A1 side -260m

A2 side-225 m + 125 m Branch

road

10/9

/201

3

10/8

/201

5

00100

00100

00100

0070

0.002377.62

06/

2018 (i) Section 11 notified on letter No. 03

(P) LA dt- 10.03.2018(ii) L.A. -7.52 Accre.

200

Bha

galp

ur

Construction of H.L.R.C.C Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district. ( Balance Work )Balkrishna Bhalotia Const. Pvt.Ltd., Jamui Bazar, Jamui. Mob.no. 9431234037

Plan

Jam

ui

965.

291

1195

7(s)

12/0

8/20

10

RC

C/

335.

4 273 m

26/

10/2

016

15 M

onth

s

0098

0098

0575

0080

0.00371.98

05/

2018

(i) Foundation - 12/13 (ii) Sub Structure - 12/13 (iii) Sup. Structure - 9/12(iv) P8-P9 - Girder Completed, Deck Slab in Progress(v) P7 - Foundation in progress.

Page 61: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

201

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No. 15BT at km 347/10-12 Between Bariyarpur, Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN. ( Balance Work ) Bhabesh Mishra Construction Pvt. Ltd. Nayachak, Near Budhia Kali Asthan, Isakchak, Bhagalpur. Mob.no. 9470627503

RO

B

Mun

ger

2727

.00

143(

s) d

t. 05

.01.

2007

1041

.00

RC

C/

354 A1 side -

269 m A2 side-

156 m

15.0

1.20

16

14.0

7.20

17

00100

00100

2590

0535

58.893439.44

05/

2018

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress.(v)RE wall - in progress. (vi) Slip road & Drainage work both sides in progress

202

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 16.50 m M/s Hardev Const. Pvt. Ltd., Station Road, B, Deoghar (Jharkhand) Mob.no. 9006024148

MM

SNY

Bha

galp

ur

344.

40Lt

.no.

830

0 (s

) dt.

01.0

9.20

1525

8.15

Hig

hlev

el B

ridge

/68

.44

m

A1 side - 100 m

A2 side-110 m

15.0

2.20

16

14.0

5.20

17

00100

00100

00100

0575

0.00227.37

06/

2018 (i) Appraoch with (connectivity) in

progress(ii) Protection work in Progress

203

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 21.75 m M/s Hardev Const. Pvt. Ltd., Station Road, B, Deoghar (Jharkhand) Mob.no. 9006024148

MM

SNY

Bhag

alpu

r

979.

58 L

t. no

. 829

6 (s

) dt

. 01.

09.2

015

727.

22

Hig

hlev

el B

ridge

/15

6.52

A1 side - 110 m

A2 side - 110 m

24.0

2.20

16

23.0

8.20

17

0787

5575

2828

0000

0.00386.15

06/

2018 (i) Foundation - 7/8

(ii) Sub Structure - 6/8(iii) Super Structure - 2/7

Page 62: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

204

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting, Repairing, Dissmentalling, maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia & Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia & Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

19/1

2/20

1739

4.75

0

28 S

ets

12.0

2.20

18

27.0

2.20

18

- - - -0.00

45.29(i) Re- Setting work completed.(ii) अबागमन चालू |

205

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damageS.P. Bridge in the District ofBhagalpur

Plan

Bhag

alpu

r

3133

(s)

31.0

3.20

1749

6.92

64m 200

15.0

2.20

18

14.0

5.20

19

1060

00

00

00

00

14.0

5.20

19 (i) Foundation - 3/5(ii) Sub Structure - 0/5(iii) Super Structure - 0/4

206

Wes

t Cha

mpa

ran Construction of 7x25M size

Bridge in Madanpur-Bhangha Road in Chainage 43.400 Km Pakage No. 03

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt. 1

4.03

.201

314

02.9

110

13.7

1

RC

C/

175 0+0

11/

2016

07/

2018 5

555

1000

00

59.34253.59 Ju

l-18

Work in Progress

Page 63: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

207

Wes

t Cha

mpa

ran Construction of Bridge at

Gerkahiya in Madanpur-Bhangha Road in Chainage 75.734Km Pakage No. 05 (New 78.775KM)

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt. 1

4.03

.201

316

4913

92.1

6

RC

C/

210 0+0

09.1

0.13

30.0

4.15 095

085

085

050

0.001296.26

31.1

0.20

18

Work Stopped by Villagers due to L.A.

208

Wes

t Cha

mpa

ran Construction of Bridge at Birha in

Madanpur-Bhangha Road in Chainage 72.703Km Pakage No. 05 (New 74.5540KM)

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt. 1

4.03

.201

356

0.73

411.

18

RC

C/

40 0+0

09.1

0.13

30.0

4.16 0

000

00

00

0.0017.13

31.1

0.20

18

Work Stopped by Villagers due to L.A.

209

Wes

t Cha

mpa

ran Construction of 4x7.20x3.755M

Size Bridge at Chainage 5.714Km in Bhangha-Bhutaha Road Pakage No. 05

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt. 1

4.03

.201

327

6.78

186.

64

RC

C/

29 50+50

09.1

0.13

30.0

4.16 0

1000

1005

1000

100.00

203.05

31.1

0.20

18

Work in Progress

210

Wes

t Cha

mpa

ran

Construction of H.L. R.C.C. 2x30.00 mtr. In the district of West Champaran under Indo-Nepal Border Ch. 5.819 km. Near Inerwa Bazar.

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt. 2

7.06

.201

799

0.97

0.00

R.C

.C.

- - 0 0 1010

00

00

00

00

-

Aworded work may be Started

211

Wes

t Cha

mpa

ran Construction of 1x20.00M Size

Bridge at Chainage 18.460Km in Bhangha-Bhutaha Road Pakage No. 06

Nab

ard

Indo

Nep

al (

RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt. 1

4.03

.201

341

3.14

223.

32

RC

C/

20 320+72

31.0

7.13

31.1

0.15 0

1000

1000

10000

0.00211.97

30.0

6.20

18

Bridge Completed. Approach Road work Stopped by Villagers due to L.A.

Page 64: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

212

Wes

t Cha

mpa

ran Construction of 5x24.75M R.C.C.

brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road. N

abar

d

Wes

t Cha

mpa

ran

2370

(S)

dt. 1

4.03

.201

219

27.0

963

8.15

RC

C/

127 1440+900

13.0

9.12

12.0

9.14 0100

0100

0100

067

0.001288.07

03/

2018

The D.M., West Champaran, Bettiah has requsted by memo no. 3, 6, and 7/L.A. dt. 30.11.2017 to the director Land aquisition, Bihar, Patna for relaxation from S.I.A. Total area of Land to be aequired in 4.685 acre

213

Wes

t Cha

mpa

ran Construction of 5x24.75M R.C.C.

brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road. N

abar

d

Wes

t Cha

mpa

ran

2211

(S)

dt. 2

7.02

.201

219

98.2

1700

.68

RC

C/

127 2558.362+1

54.768

24.0

1.13

23.0

7.14 0

1000

1000

1000

550.00

936.73

03/

2018

The D.M., West Champaran, Bettiah has requsted by memo no. 3, 6, and 7/L.A. dt. 30.11.2017 to the director Land aquisition, Bihar, Patna for relaxation from S.I.A. Total area of Land to be aequired in 6.32 acre

214

Wes

t Cha

mpa

ran Construction of RCC Bridge over

Sikarhana River in 6th Km of bagaha-Semara Road in West Champaran District. Pl

an

Wes

t Cha

mpa

ran

2989

(S)

dt. 3

1.03

.201

516

10.6

90.

00

RC

C/

96 150+150

08.0

9.20

15

07.0

3.20

17

5100

20100

2080

3060

32.371092.57

31.0

7.20

18

Work in Progress

215

Wes

t C

ham

para

n

Construction of H.L. R.C.C. Bridge (4x21-75 m) on 7th km. of Balther - Narkatiyaganj Road over Kartaha River. N

abar

d

Wes

t Cha

mpa

ran

179

dt. 1

6.01

.201

771

6.61

Lac

R.C

.C.

-

19.0

2.20

18

18.0

8.20

19

4550 - - - 100.00 - Work in Progress

216

SAH

AR

SA

Constraction of HL RCC Bridge over Canal at Baildour in south of Choutham Basa(Banni Basa) village in Kasnagar Panchayat under MMSNY in saharsa distt.

MM

SNY

SAH

AR

SA

6771

(s)

dt. 2

1.07

.14

200.

7120

0.71

RC

C25

.00 100-100M

Both Side

Jan.

201

6

Jan.

- 17

0100

0100

0100

050

0.00165.02

06/2

018 Bridge Work completed. Approach

Road in progress.

Page 65: BIHAR RAJYA PUL NIRMAN NIGAM LTD ... - brpnn.bih.nic.inbrpnn.bih.nic.in/Reports/Other than Mega-31-05-2018.pdf · 15 Sitamarhi Construction of R.C.C H.L Bridge Approach Road in Bagmatti

May, 31.05.2018

Financial

Foundat

ion

(in %

)Sub-

Str

uct

ure

(in %

)Super

- Str

uct

ure

(in %

)Appro

ach

(in %

)

Cum

ula

tive

Sl.N

o

Div

isio

n

Nam

e O

f W

ork

Hea

d/

Sub H

ead

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Rem

arks

Typ

e/Le

ngth

Of

Bri

dge(

M)

Langth

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month / till

Like

ly d

ate

of

com

ple

tionPhysical

217

SAH

AR

SA

Constraction of HL RCC Bridge on tilyuga River in 1st KM of Lalminia-simraha road under Plan Head Marouna block in supaul distt.

Plan

SUPA

UL

3007

(S)

dt

31.

03.1

513

59.6

3

RC

C96

.00 100-100M

Both Side

Dec

-201

5

Dec

embe

r-2

017 0

1001095

1085

2560

0.00441.99

'06/

2018

Work in Progress

218

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district.

Plan

Kha

garia

Rs.

1520

1262

2(S)

date

d14

.11.

06R

CC

39

6.00

m

505m

Mar

-07

June

-09

0100

0100

0100

045

0.002573.45

a. LA process have been completed but real possession of land at the site for approach road could not be possible till date.b. 7 no. of land owners out of total 27 land owners have received compensation amount from District Land Acquisition office. Rest land owner have declined to take compansation amount demanding alternate land for the land under acquisition.c. This office vide letter no. 234 dated 15.05.2016, 266 dated 27.05.2015, 346 dated 13.05.2016, 623 dated 07.09.2016, 146 dated 31.01.2017, 349 dated 08.03.2017, 532 dated 08.04.2017, 1202 dated 15.07.2017 and 1380 dated 11.08.2017 have been requested DLAO for real possession of the land and the copy of the same here also submitted to DM, Khagaria.c. MD BRPNNL vide his letter no. 77 dated 02.02.2016, 468 dated 04.08.2016, and 892 dated 24.11.2017 have remined for section of Revised estimate for the project.d. Year of completion of Bridge Construction : 2010-11e. DLAO Khagaria had released land possession form on 23.09.2013 but real possession or land could not be possible.