May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1
Muz
affa
rpur
Consrtuction of H.L.R.C.C.Bridge in Jamin Mathiya Villagenear Ram Pratap Rai underMeenapur Block in the district ofMuzaffarpur. (MMSNY)
MM
SNY
Muz
affa
rpur
361.
1127
84 (S
)25
.03.
2015
228.
59
RC
C/
22.0
0
_
01.1
0.20
15
30.
09.2
016
0100
0100
0100
590
0.00172.56
June
, 201
8
Work in Progress.
2
Muz
affa
rpur
Construction of H.L.R.C.C.Bridge in Kodariya underMeenapur Block in the district ofMuzaffarpur (Nabard)
Nab
ard
Muz
affa
rpur
3300
.00
1190
8(s)
09/1
1/20
1223
62.1
2
RC
C/
325.
00
_
Dec
-12
06/1
5
12/1
4
0100
0100
0100
080
182.942958.96
June
, 201
8 (S
ubje
ct to
LA
)
(i) Bridge Part completed. LA Issue forapproach road.Kodariya Mauja- 1.67 acres Mursandi Mauja- 7.325 acresGovt. land- 0.38 acres.Total land- 8.995 acresTotal Raiyat- 61
LPC received from DM, Muzaffapurhas been futher sent to him vide ourletter no 621(WE) dated 06.06.2018 asper direction of Revenue department forneccessary action.
3
Muz
affa
rpur
Construction of H.L.R.C.C.Bridge across canal in DigharaButler road in the district ofMuzaffarpur. (Nabard)
Nab
ard
Muz
affa
rpur
310.
1734
(s)
02/0
1/20
1329
2.62
RC
C/
21.0
0
_
Feb-
14
02/1
5
0100
0100
0100
025
0.00168.27
-
Bridge part completed & Approachroad under L/A issue which is underprocess by RCD, Muzaffarpur. A letterhas been sent to Road division, 1Muzaffarpur to take over chagre of thebridge.
BIHAR RAJYA PUL NIRMAN NIGAM LTD.PROGRESS REPORT MONTH OF MAY, 2018
Format circulated vide Letter No. 4454(s) we dt. 30.03.2007 of R.C.D. Bihar
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
4
Muz
affa
rpur
Construction of H.L.R.C.C.Bridge in Runni-Saidpur-Katra-Keowatsa road in km of 26.15thedistrict of Muzaffarpur. (Nabard) N
abar
d
Muz
affa
rpur
880.
7677
71(s
)26
/09/
2013
741.
42
RC
C/
96.0
0
_
Jan-
14
08/1
5
0100
0100
0100
090
0.00571.69 -
Under Departmental enquiry. Tender invited for another bridge in
D/S by RCD, Div-2, Muzaffarpur underL.W.E. Scheme.
5
Muz
affa
rpur
Construction of H.L.R.C.C.Bridge in Dr Jarnath MishraCollege in between Soda Godaunto Ahiyapur with approach road inthe district of Muzaffarpur.(Nabard)
Nab
ard
Muz
affa
rpur
4329
.61
7889
(s)
03/1
0/20
1331
07.1
0
RC
C/ 3
00.0
0
_
Feb-
14
16-F
eb 095
085
073
00
0.002315.04
06/2
018
(Sub
ject
to L
/A)
Work in Progress.Chaqmohabbat Mauja- 1.67 acres Nazirpur Mauja- 4.45 acresChandrawara Mauja- 9.04 acres Total Land- 16.01 acresTotal Raiyat- 22Reply of queries raised by Engineer inchief, RCD, Patna was sent but furtherinstructions regarding LPC has given,which is under process by DM,Muzaffarpur.
6
Muz
affa
rpur
Construction of H.L.R.C.C.Bridge in Athar Ghat over BhudhiGandak river under BochahaBlock in the district ofMuzaffapur. (Plan)
Plan
Muz
affa
rpur
3554
.81
1817
(s)
dt: 2
8/02
/201
428
15.5
9
RC
C/ 2
97.0
0
_
11/2
014
11/1
6
0100
10100
1070
230
0.001735.97
06/2
018
(Sub
ject
to L
/A)
Work in Progress.Athar banshman Mauja- 5.485 acres.Bishunpur Jagdish Mauja- 2.605 acres.Binda Mauja-10.615 acres.Total land- 18.705 acres.Total Raiyat- 66Reply of queries raised by Engineer inchief, RCD, Patna was sent but furtherinstructions regarding LPC has given,which is under process by DM,Muzaffarpur.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
7
Patn
a-1
Construction of H.L.R.C.C.Bridge, 3x16.50M and approachroad work in 4th Km. ofKhusrupur-Nagarnausa Road atNirmali chak Middle School ofKhusrupur Block, in the District ofPatna.
Nab
ard
Patn
a
Rs.
418.
98 L
akh
Lt. N
o.18
71 (S
) D
ated
03.
03.1
4 20
4.98
Lak
h
RC
C /
51.3
85M
120M
24.1
1.14
23.1
1.15 0
850
750
650
401.27
147.44 06/
18
For Approval/Permission of land acquition on perpetual lease letter has been sent to RCD vide letter no.80 dated-13.01.2018. A letter has been written to Patna D.M. for L.A. as pre new Perpetual Lease policy vide letter No.1334 (WE) dated-29.05.2018
8
Patn
a-1
Construction of Pontoon Bridge inriver Ganga between Danapur toPanapur Diyara (including opening& Resetting for 5 Years) in district Patna.
Plan
Patn
a
Rs.1
114.
99 L
akh
L.N
.-119
65(S
) dt
. 21.
12.2
017
Pont
oon
Brid
ge
-
06.0
2.20
18
5Yea
rs
Mai
nten
ance
)
- - - - 9.53145.01 -
After setting of Pipa set, open to trafficon 20.02.2018
9
Patn
a-1
Construction of Pontoon Bridge inriver Ganga between Gyaspur toKaladiyara Diyara (includingopening & Resetting for 5 Years)of Bakhtiyarpur Block in districtPatna.
Plan
Patn
a
Rs.5
82.2
3 La
cL.
N.-1
1964
(S)
dt. 2
1.12
.201
7
Pont
oon
Brid
ge
-
06.0
2.20
18
5Yea
rs
(Mai
nten
ance
)
- - - - 4.3866.98 -
After setting of Pipa set, open to trafficon 05.03.2018
10
Patn
a-1
Construction of H.L.R.C.C.Bridge 5x24.0m in Punpun Riverin 11th Km of Masaurhi-Naubatpur Pitmas Road in PatnaDistrict.
Plan
Patn
a
Rs.1
155.
00 L
acL.
N.-2
780(
S)
dt. 0
9.10
.201
7
R.C
.C.
Brid
ge/1
20m
- - - - - - - - - Tender disposal under process.
11
Patn
a-1
Construction of H.L.R.C.C.Bridge 5x24.0m in Punpun Riverin 11th Km of Masaurhi-Naubatpur Pitmas Road in PatnaDistrict.
Plan
Patn
a
Rs.1
155.
00 L
acL.
N.-2
780(
S)
dt. 0
9.10
.201
7
R.C
.C.
Brid
ge/1
20m
120M
25.0
4.20
18
26.0
1.20
19
- - - - - -
Work awarded to S.B. Engicon. Workorder issued on 25.04.2018 anddirection given to again to start thework Immediately.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
12
Patn
a-1 Construction of 2x10.37M size
Bridge over Canal to Simanchakjamal Siman Road in wardNo. 33 of Vaishali District M
MSN
Y
Vai
shal
i
Rs.1
69.0
4 La
kh
Lt. N
o.60
66 (S
) D
ated
08.
07.1
4R
s.129
.74
Lakh
RC
C /
22.0
M
'60M
21.
11.1
4
20.1
1.15 0
1000
1000
1000
900.00
106.70
Brid
ge C
ompl
eted
LA
issu
e in
app
roac
h ro
ad. Only 0.1375 Acre land is required Land
owner's concent is obtained forperpetual lease. Request has been maidby letter no.1876(WE) dated-21.09.2017. Feasibility report fromD.M. Vaishali has been obtained. D.M.Vaishali has been requested for furtheraction against new Perpetual LeasePolicy vide letter No.1336 (WE) dated-29.05.2018
13
Patn
a-1
Construction of Pontoon Bridge inriver Ganga between Kachidargahto Rustampur (Raghopur)(including opening & Resetting for5 Years) of Raghopur Block indistrict Vaishali.
Plan
Vai
shal
i
Rs.7
51.5
7 La
cL.
N.-1
1804
(S)
dt. 1
9.12
.201
7
Pont
oon
Brid
ge
06.0
2.20
18
5Yea
rs (M
aint
enan
ce)
- - - - - 37.93140.97 - After setting of Pipa set, open to traffic
on 15.02.2018
14
Patn
a-1
Construction of Pontoon Bridge inriver Ganga betweenChakosanghat to Jamindari Ghat(including opening & Resetting for5 Years) of Bidupur in districtVaishali.
Plan
Vai
shal
i
Rs.3
013.
65 L
acL.
N.-2
338(
S)
dt. 3
1.03
.201
6
Pont
oon
Brid
ge
06.0
2.20
18
5Yea
rs (M
aint
enan
ce)
- - - - - 7.1386.37 - After setting of Pipa set, open to traffic
on 15.04.2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
15
Sita
mar
hi Construction of R.C.C H.L Bridge Approach Road in Bagmatti
River Manderghat 24x24.75 m 2lane District of Sitamarhi. N
AB
AR
D
Sita
mar
hi
4730
06.0
6.20
1419
89.3
3
RC
C58
9.48
2100.00
Mar
-15
Mar
-16
05100
142.661343.94
June
, 201
8
1. GSB and WMM Works have been Completed, Approach road from Tariani Side (A2-Side) in 180M length along with newly construted Box Culvert (Culvert No.-1) has been washed on 14th of August 2017 caused by flood in River Bagmati. Due to the long Breach, traffic in this road has totaly disrupted.2. L.A. proposal is submitted to DM Sitamarhi.by SPE Ltter no.81(e) Dated-13.02.2015.3. Again L.A. proposal is submitted to DM Sitamarhi.by SPE Ltter no.97(e) Dated-06.02.2016 under LA rule -2013. 4. Requested for earlier disposal of LA by SPE Letter No. 299 (w/e) Dt. 19.05.2016 to DM Sitamarhi and SPE Letter No. 284 (w/e) Dt. 03.05.2016 to DM sheohar.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
16
Sita
mar
hi Construction of R.C.C H.L Bridge Belsand-chhitauni-Tariyani Road in 2nd Km. 4x21.00M District of
Sitamarhi.
NA
BA
RD
/RID
F-18
(RC
D)
Sita
mar
hi
1012
510
.09.
2012
851.
46
RC
C84
.00
240.00
Dec
-12
Jun-
14 0100
0100
0100
00
0814.99
June
, 201
8
1. Bridge work has been completed.2. L.A proposal submitted to DM,Sitamarhi by SPELetter No. 79 (e) Dt. 04.02.2013 3. Rs.1,29,06,130.00 is submitted to LAO, Sitamarhi by SPE Letter no.-514 (e) 08.08.2013 against Total estimeted amount Rs. 2,45,87,784.00 and balance amount Rs. 1,16,81,564.00 is pending due to revised A/A (Awaited)4. Revised & corrected A/A proposal submitted to HQ by letter no. 440(e)
17
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Bahar-
Village to Kanauli Road under Indo-Nepal Border Road
(Chainage-132.400) 1x40.00m District of Sitamarhi. N
AB
AR
D /R
IDF-
18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1359
9.75
RC
C40
.00
800.00
Jan-
14
Jan-
16 0100
5100
60100
1550
29.49477.65
June
, 201
8
Concrete work in Girder is inprogress. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis not started .
18
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under
Indo-Nepal Border Road (Chainage-3.906) 1x25.00m
District of Sitamarhi.
NA
BA
RD
/RID
F-18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1341
8.98
413.
78
RC
C25
.00
350.00
Jan-
14
Jan-
16 0100
0100
0100
555
49.66356.70
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work isunder progress and is being done byExecutive Engineer, RCD, RoadDivision Sitamarhi. Work of ApproachRoad has been started on request to theformers after land is made available byRCD.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
19
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-11.011) 4x22.00m District of Sitamarhi.
NA
BA
RD
/RID
F-18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1393
2.23
RC
C88
.00
750.00
Jan-
14
Jan-
16 0100
0100
0100
575
0790.212
June
, 201
8
Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.
20
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-11.695) 3x18.00m District of Sitamarhi.
NA
BA
RD
/RID
F-18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1383
5.02
RC
C54
.00
975.00
Jan-
14
Jan-
16 0100
0100
0100
1080
0633.89
June
, 201
8
Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.
21
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-13.066) 2x25.00m District of Sitamarhi.
NA
BA
RD
/RID
F-18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1371
9.64
RC
C50
.00
900.00
Jan-
14
Jan-
16 0100
0100
0100
580
0595.17
June
, 201
8
Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
22
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-17.875)
1x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1320
7.99
RC
C30
.00
750.00
Jan-
14
Jan-
16 0100
0100
0100
595
0190.008
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
23
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-19.265) 2x18.00m District of Sitamarhi. N
AB
AR
D /R
IDF-
18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1357
3.34
RC
C36
.00
550.00
Jan-
14
Jan-
16 0100
0100
0100
1595
45.28554.79
June
, 201
8
Bridge construction work has beencompleted.Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
24
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-22.730) 1x22.00m District of Sitamarhi. N
AB
AR
D /R
IDF-
18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1358
1.57
RC
C22
.00
675.00Ja
n-14
Jan-
16 0100
0100
0100
1070
0399.61
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
25
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-23.843) 2x18.00m District of Sitamarhi.
NA
BA
RD
/RID
F-18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1353
5.54
RC
C22
.00
800.00
Jan-
14
Jan-
16 0100
0100
0100
595
0585.38
June
, 201
8
Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
26
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-26.487) 2x25.00m District of Sitamarhi. N
AB
AR
D /R
IDF-
18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1354
8.07
RC
C22
.00
350.00
Jan-
14
Jan-
16 0100
0100
0100
595
11.85518.06
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
27
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-26.675) 4x18.00m District of Sitamarhi. N
AB
AR
D /R
IDF-
18
(RC
D)
Sita
mar
hi
7209
09.0
9.20
1389
0.16
RC
C72
.00
350.00
Jan-
14
Jan-
16 0100
0100
0100
030
0696.89
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
28
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-35.737)
1x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1320
3.89
RC
C6.
00 1000.00Ja
n-14
Jan-
16 0100
0100
0100
1080
0118.91
June
, 201
8
Bridge construction work has beencompleted. information regardingcompletion of Land Acquisition workhas recived vide Executive EngneerRCD Road Division, Sitamarhi letterno-898 dt-24.05.2017. Work ofApproach Road is in progress.
29
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-45.166)
2x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1324
5.61
RC
C12
.00
1025.00
Jan-
14
Jan-
16 0100
0100
0100
2060
46.34140.37
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
30
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-46.812)
2x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1324
2.93
RC
C72
.00
1075.00
Jan-
14
Jan-
16 0100
0100
0100
2080
36.07204.02
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
31
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-45.888)
2x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1324
6.06
RC
C12
.00
1025.00
Jan-
14
Jan-
16 0100
0100
0100
4080
23.27200.97
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
32
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-47.887)
2x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1323
0.54
RC
C12
.00
925.00Ja
n-14
Jan-
16 0100
0100
0100
2095
0207.581
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
33
Sita
mar
hi
Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya
Sonbarsa Road under Indo-Nepal Border Road (Chainage-48.720)
2x6.00m District of Sitamarhi. NA
BA
RD
/RID
F-18
(R
CD
)
Sita
mar
hi
7209
09.0
9.20
1322
2.48
RC
C60
.00
750.00
Jan-
14
Jan-
16 0100
0100
0100
1085
0188.60
June
, 201
8
Bridge construction work has beencompleted. Land acquisition work hasbeen completed vide ExecutiveEngineer, RCD, Road DivisionSitamarhi`s Letter No-1503 Dated-04.09.2017. Work of Approach Roadis in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
34
Sita
mar
hi Construction of R.C.C H.L Bridge Chandauli Ghat in Bagmati River
District of Sitamarhi. PLA
N
Sita
mar
hi
7394
(s)
10.0
8.20
1670
89.3
8
RC
C43
2.00
1100.00
Feb-
16
Apr
-19 567
00
00
00
81.991075.63 04 19
Foundation work in progress.Requesition for land acquisition hasbeen submitted to District LandAcquisition Officer Sitamarhi vide thisoffice letter No. 63 (Encl) Dated-27.01.2017
35
Nal
anda
Construction of HL RCC bridge 4x10.00m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district.
CR
F
Nal
anda
320.
8056
79 (S
)25
.06.
2015
R.C
.C40
.00
50+5
0=10
0
_ _ - - 0.007.09
1 ye
ar (s
ubje
ct to
star
t the
wor
k)
Again Retender the scheme after getting information of availability of Govt. land for construction of diversion from district vide letter No.1348/ व॰, dt.-18.12.2017. Letter of Acceptance for the work has been issued in the favour of Agency on dated 23.03.2018 after success in tender, and directed to deposit additional performance security money.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
36
Nal
anda
construction of HL RCC bridge 9x24.75M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district. NARAYAN DAS CONSTRUCTION Mob. - 9431815725 / 9431815726
Plan
Lak
hisa
rai
Rs.3
068.
39Lt
-182
1(s)
dt-2
8/02
/201
4R
s.187
6.61
R.C
.C
253.
60M
368+
112=
480
08.1
1.20
14
07.1
1.20
16
00100
0099
0094
0040
1.5831497.06
Sept
embe
' 201
8 (S
ubje
ct to
L/A
and
des
ign
of a
ppro
ach
road
)
UNDER CONSTRUCTION:-A1 to P8 (Total 8) Deck Slab Completed. Reinforcement work of last 9th Deck completed. The Work of Deck Slab tried to execute on dated 30.03.2018 but 3 raiyats obstructed the work till registration and compansation. While they are not submitting required paper for registry. NIT Patna has been requested to design of approach road which is near by and parrelal to river. L.A. ISSUE:-Approach Road- 368+112 = 480m. & 2.5 Deck Slab. 26 (Published 18 raiyat) lease registration completed (1.0398 acre). 2 (two) Raiyats Deed are being prepared for lease registration after getting land share on dated 28.03.2018. 1(one) Raiyat is unable to submit land papers and no any obstructions by him. 3(three) Raiyats demand compasation of more land while their more land is not needed. For which the district
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
37
Nal
anda
construction of HL RCC Bridge 12x24.75M on Harohar river near surjichak village at Pipriya Block IN Lakhisarai district . ( RAM KRIPAL SINGH CONSTRUCTION Mob.- 9810813322)
Plan
Lak
hisa
rai
Rs3
623.
75 L
t-71
93(S
)05
-08-
2015
(Rev
)Rs.2
841.
54
R.C
.C
304.
32M
525+
675=
1200
01.0
2.20
15
31.0
7.20
17
00100
0099
1060
0001
2.221712.37
Dec
embe
r' 2
018
(Sub
ject
to L
/A )
UNDER CONSTRUCTION. A1-P1, P1-P2, P2-P3, P4-P5, P5-P6, P6-P7 & P7-P8 (7 Nos) Deck Slab completed. P3-P4, P8-P9, & P11-A2 Deck slab in progress. L.A. ISSUE:- Effective : Approach Road :- 525 +675 = 1200 M & Bridge Portion. Only 3 (three) Raiyats (out of 33 Raiyat's consent) have submitted his documents and after verification deed is going to be prepared for registry. Rest Raiyats have not submitted their documents till date. All the matters put up before D.M. Lakhisarai and again sent proposal for regular land acquisition. MD, BRPNNL also written letter to DM in the light of SPE Nalanda's letter. Met with District Administration and got assurance to provide help if any, problem arise during construction.
38
Wor
ld B
ank
Construction of H.L. R.C.C. Bridge with its approach road in 1st K.m. of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.(Royal Infraconstru Ltd., Godrej Waterside Building, Tower No.-1, 4th Floor, No.-401 Plot No.-5, DP Block, Salt Lake, Sector-V, Kolkata-700091)
WB
P Ph
ase-
2
Supa
ul
749.
1560
9/25
.07.
2014
37.5 260
27.0
2.20
16
26.0
2.20
18
0100
0100
0100
015
0.00558.25476
12/2
018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
39
Wor
ld B
ank
Construction of H.L. R.C.C. Bridge with its approach road in 6th K.m. of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.(Royal Infraconstru Ltd., Godrej Waterside Building, Tower No.-1, 4th Floor, No.-401 Plot No.-5, DP Block, Salt Lake, Sector-V, Kolkata-700091)
WB
P Ph
ase-
2
Supa
ul
642.
7660
9/25
.07.
2014
37.5 240
27.0
2.20
16
26.0
2.20
18
0100
0100
1050
00
40
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 2nd K.M. of Karpoori Chowk - Patarghat Road in Palce of Old S.P. Bridge in the district of Madhepura.{Raj Construction, Meenapur, Salmari, Katihar-855113 (Bihar)}
WB
P Ph
ase-
2
Mad
hepu
ra
1417
.44
404/
28.0
5.20
14
99 320
07.1
2.20
16
06.1
2.20
18
1080
1540
00
00
83.28377632.18402
12/
2018
41
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 3rd K.M. of Panchgachhiya - Nauhatta Road in Palce of Old S.P. Bridge in the district of Saharsa.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Saha
rsa
1018
.28
404/
28.0
5.20
14
66 300
21.1
2.20
16
20.1
2.20
18
1080
1010
00
00
558.25476
12/2
018
0.00
12/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
42
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 7th K.m of Panchgachhiya-Nauhatta road in Palce of damaged Old R.C.C Bridge in the district of Saharsa.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Saha
rsa
764.
6760
9/25
.07.
2014
50 300
21.1
2.20
16
20.1
2.20
18
515
00
00
00
43
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 7th K.m of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Supa
ul
796.
0077
0/25
.09.
2014
50 250
08.1
1.20
16
07.1
1.20
18
15100
2525
00
00
44
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 7th K.m of Meha - Simar Ganpatganj Road in Palce of damaged Old S.P. Bridge in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Supa
ul
958.
3140
4/28
.05.
2014
99 270
08.1
1.20
16
07.1
1.20
18
0100
0100
2030
00
0.00867.20598
12/
2018
0.001472.08606
11/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
45
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in10th K.m in Khurhan-Parel-Ratwara-Kapasia road in thedistrict of Madhepura (Extendedpart of RCD road 0 to 15 k.m.) (Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001)
WB
P Ph
ase-
2
Mad
hepu
ra
851.
6740
4/28
.05.
2014
100 320
07.1
2.20
16
06.1
1.20
18
0100
1090
2020
00
46
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in5th K.m of Alamnagar-Budhma-Mali road in the district ofMadhepura.(Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001)
WB
P Ph
ase-
2
Mad
hepu
ra
595.
8040
4/28
.05.
2014
42 320
07.1
2.20
16
06.1
1.20
18
0100
085
010
00
47
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in5th K.m of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwa road in Place of SPBridge in the district of Saharsa.{Shiv Kishore Construction Pvt.Ltd., At-Saidnagar, OppositePetrol Pump, Laheriasarai,Darbhanga-846001 (Bihar)}
WB
P Ph
ase-
2
Saha
rsa
1257
.84
404/
28.0
5.20
14
99 320
27.0
2.20
16
26.0
2.20
18
0100
0100
1560
00
58.75707744.15900
12/2
018
0.00539.99733
11/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
48
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in11th K.m of Chandradei-Bangama-Matiyari-Mogra road in thedistrict of Araria.{Nirman Engicons Pvt. Ltd., At+ P.O.- Mohanpur, District-Begusarai (Bihar)-851131}
WB
P Ph
ase-
2
Ara
ria
857.
6140
4/28
.05.
2014
105 495
27.0
2.20
16
26.0
8.20
17
0100
0100
05
010
0.00353.24772
0
6/20
18
49
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Supa
ul
663.
3640
4/28
.05.
2014
50 250
13.1
2.20
16
12.1
2.20
18
530
00
00
00
50
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Supa
ul
706.
1740
4/28
.05.
2014
50 200
13.1
2.20
16
12.1
2.20
180
1000
1001015
00
105.10250873.94314
12/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
51
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura. (Extended part of RCD road 0 to 15 k.m.)(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Mad
hepu
ra
1732
.66
404/
28.0
5.20
14
198 380
08.1
1.20
16
07.1
1.20
18
0100
090
1535
00
90.660971933.08994
11/
2018
52
Wor
ld B
ank
Construction of H.L, R.C.C Bridge in 3rd K.M. of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa.
WB
P Ph
ase-
2
Saha
rsa
1031
.43
404/
28.0
5.20
14
112 - 0
000
00
00
0.000.00
0
53
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in16th K.M. of Kadava-SonouliRoad in Purnia District.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Purn
ia
750.
4640
4/28
.05.
2014
84 416
27.0
2.20
16
26.0
2.20
180
1000
1005
1000
20
54
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in18th K.M. of Kadava - SonouliRoad in Purnia District.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Purn
ia
655.
9240
4/28
.05.
2014
75 250
27.0
2.20
16
26.0
2.20
18
0100
0100
5100
020
0.00800.00685
12/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
55
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in5th K.M. of Jokihat - Dalmalpurroad in the district of Araria.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Ara
ria
689.
8940
4/28
.05.
2014
63 380
27.0
2.20
16
26.0
5.20
17
0100
0100
0100
525
0.00325.32598
12/2
018
56
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 1st K.M. of Parsarma-chinkni road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088) W
BP
Phas
e-2
Supa
ul
531.
8840
4/28
.05.
2014
33 200
12.0
8.20
17
11.0
8.20
19
55
00
00
00
57
Wor
ld B
ank
Construction of H.L, R.C.C Bridge in 4th K.M. of Perserma-Chikni road in Palce of damaged Old S.P. Bridge (on Khardaha Dhar) in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088) W
BP
Phas
e-2
Supa
ul
550.
6640
4/28
.05.
2014
50 200
12.0
8.20
17
11.0
8.20
19
030
00
00
00
200.58872625.58000
08/
2019
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
58
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 4th K.M. of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old R.C.C. Bridge in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Supa
ul
792.
7460
9/25
.07.
2014
56 250
12.0
8.20
17
11.0
8.20
19
535
00
00
00
59
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in13th Km (2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road inbetween Rudho-Mandal Tola andPandit Tola in the district ofMadhepura. (Extended part ofRCD road 0 to 15 k.m.){Brij Construction Pvt. Ltd.,House No.-26, NageshwarColony, Kavi Raman Path,Boring Road, Patna-800001(Bihar)}
WB
P Ph
ase-
2
Mad
hepu
ra
1084
.08
404/
28.0
5.20
14
84 300
13.1
2.20
16
12.1
2.20
18
0100
1090
1015
00
54.80854713.03935
12/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
60
Wor
ld B
ank
Construction of H.L, R.C.CBridge in 11th K.M. ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the districtof Saharsa.(Devraha Construction Pvt.Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)
WB
P Ph
ase-
2
Saha
rsa
1632
.71
404/
28.0
5.20
14
99 1700
29.0
9.20
16
29.0
9.20
18
0100
0100
510
3050
0.00682.28650
09
/201
8
61
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in4th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk roadin the District of Purnea.{Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}
WB
P Ph
ase-
2
Purn
ia
685.
3340
4/28
.05.
2014
50 475
27.0
2.20
16
26.0
2.20
18
0100
0100
55
00
62
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in25th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road(at Balia Ghat) in the District ofPurnea.{Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}
WB
P Ph
ase-
2
Purn
ia
608.
4540
4/28
.05.
2014
50 475
27.0
2.20
16
26.0
2.20
18
15100
1010
00
00
0.00445.46041
09/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
63
Wor
ld B
ank
Construction of H.L, R.C.CBridge in 3rd Km of Nasir ChowkBelwa Mazgama-Mongara road inthe district of Araria.(Braj Kishore Roy, Village-Kamrgama, Post-TiraJatmalpur, P.S-Kalyanpur,District-Samastipur-847301)
WB
P Ph
ase-
2
Ara
ria
612.
6440
4/28
.05.
2014
63 380
02.0
3.20
16
01.0
6.20
17
00
00
00
00
0.000.00
64
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 3rd K.M. of Supaul Station to Bariya Manch in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Supa
ul
943.
4740
4/28
.05.
2014
50 350
27.0
2.20
16
26.0
2.20
18
0100
0100
1070
05
65
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 3rd K.M. Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Supa
ul
387.
2940
4/28
.05.
2014
33 160
27.0
2.20
16
26.0
2.20
18
560
00
00
00
0.00651.04999 Ju
n-18
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
66
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road inChandradei-Kamaldha-Paratharoad along Laliahi Dhar in 2nd Kmin the district of Araria.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Ara
ria
509.
9540
4/28
.05.
2014
21 350
27.0
2.20
16
26.0
5.20
17
0100
0100
0100
070
0.0078.93873
12/2
018
67
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in15th Km in Khurhan-Parel-Ratwara-Kapasia road on LaliyaDhar in the district of Madhepura.(Extended part of RCD road 0 to15 k.m.){M/s Sri Ram Enterprises, 2ndFloor, Sri ram Tower,M.P.D.Road, Naya Bazar,Bhagalpur-812002 (Bihar)}
WB
P Ph
ase-
2
Mad
hepu
ra
1274
.29
404/
28.0
5.20
14
132 320
13.0
9.20
17
12.0
9.20
19
1085
00
00
00
0.00724.08435
09/
2019
68
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in15th K.M. of Ranginiya-SonbarsaRoad in Palce of Old S.P. Bridgein the district of Saharsa.(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088) W
BP
Phas
e-2
Saha
rsa
1549
.36
404/
28.0
5.20
14
132 300
29.0
6.20
17
28.0
6.20
19
515
00
00
00
0.00173.41800
06/
2019
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
69
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in5th K.M. of Chhatapur-Girdharpu-Chunni road in the district ofSupaul.(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Supa
ul
1988
.26
404/
28.0
5.20
14
165 300
14.0
2.20
17
13.0
2.20
19
1585
00
00
00
135.006261430.94543
02/
2019
70
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 2nd K.M. of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)
WB
P Ph
ase-
2
Supa
ul
1645
.25
404/
28.0
5.20
14
175 300
27.0
2.20
16
26.0
2.20
18
0100
0100
595
2060
0.001068.62033
12/2
018
71
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in11th K.M. of Sonbarsa-GwalparaRoad in Palce of Old S.P. Bridgein the District of Saharsa.(M/s Jai Mata Di Construction,Shri Krishnapuri (South),Begusarai (Bihar)-851101)
WB
P Ph
ase-
2
Saha
rsa
768.
9540
4/28
.05.
2014
66 320
06.1
2.20
16
05.1
2.20
18
10100
2530
00
00
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
72
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in17th K.M. of Sonebarsa-Gwalpararoad (1st Cutting) in the district ofSaharsa.(M/s Jai Mata Di Construction,Shri Krishnapuri (South),Begusarai (Bihar)-851101)
WB
P Ph
ase-
2
Saha
rsa
1565
.57
609/
25.0
7.20
14
112 1550
06.1
2.20
16
05.1
2.20
18
0100
10100
6060
1040
73
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in17th K.M. of Sonebarsa-Gwalpararoad (2nd Cutting) in the districtof Saharsa.(M/s Jai Mata Di Construction,Shri Krishnapuri (South),Begusarai (Bihar)-851101)
WB
P Ph
ase-
2
Saha
rsa
1001
.77
609/
25.0
7.20
14
56 300
06.1
2.20
16
05.1
2.20
18
0100
10100
4060
1040
74
Wor
ld B
ank
Construction of H.L, R.C.C Bridge with its approach road in 6th K.M. of Balua - Baysi Road in Palce of Murli Branch Cannal in the district of Supaul.(Haque Construction Co., Sarai Syed Ali, Muzaffarpur-842001)
WB
P Ph
ase-
2
Supa
ul
503.
3560
9/25
.07.
2014
66 400
27.0
2.20
16
26.0
5.20
17
0100
0100
0100
2080
73.53929452.35160
08/2
018
0.001995.80818
12/
2018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
75
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in9th K.M. of Shaur-Patarghat Roadin Palce of Shitalpatti Old S.P.Bridge in the district of Saharsa.
WB
P Ph
ase-
2
Saha
rsa
1265
.51
404/
28.0
5.20
14
99 - 00
00
00
00
0.000.00
76
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in8th K.M. of Simri-Bakhtiyarpur-Salkhua road in Place of damagedOld S.P. Bridge in the district ofSaharsa.(M/s Trimurti Engicons andTraders Pvt. Ltd., C/o SrikantChoudhary, Tatma Toli,Rajaban, Near Chath Pokhar,Purnea-854301)
WB
P Ph
ase-
2
Saha
rsa
1015
.00
609/
25.0
7.20
14
37.5 1000
15.0
4.20
17
14.1
0.20
18
10100
4040
00
55
59.39417263.20137
10/
2018
77
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road in14th K.M. of Chaudhara-Amha-Lokha-Saharsa road in Place ofdamaged Old R.C.C Bridge in thedistrict of Saharsa.(Sincon Infrastructure Pvt. Ltd.,S.K Puri, LG-1 & 2, MajesticPlaza, West Boring Canal Road,Patna-800001)
WB
P Ph
ase-
2
Saha
rsa
870.
0060
9/25
.07.
2014
56 350
27.0
2.20
16
26.0
8.20
17
575
00
00
00
0.00252.07801
12/2
018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
78
Wor
ld B
ank
Construction of H.L. R.C.C.Bridge with its approach road in3rd K.m of Belgachhi-Chandpur toRouniya-Kanharia road in thedistrict of Purnia.{Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}
WB
P Ph
ase-
2
Purn
ia
443.
2240
4/28
.05.
2014
21 335
27.0
2.20
16
26.0
5.20
17
0100
0100
0100
050
0.00185.32945
12/2
018
79
Wor
ld B
ank
Construction R.C.C. Bridge withits approach road in Dubhari-Chakla Ghat to Kosi Embankmentroad (Near Spur) on 57.20 R.D. ofKosi Embankment in the districtof Supaul. {Vishwanath Sharma, Vill. +P.O.- Rahua, P.S.-Rosera,District- Samastipur-848210(Bihar)}
WB
P Ph
ase-
2
Supa
ul
1530
.91
404/
28.0
5.20
14
175 350
17.1
0.20
16
16.1
0.20
18
0100
25100
1040
00
0.00933.27375
10/
2018
80
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul. {Shiv Kishore Construction, At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}
WB
P Ph
ase-
2
Supa
ul
1151
.28
770/
25.0
9.20
14
100 300
27.0
2.20
16
26.0
2.20
18
0100
0100
080
00
12/2
018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
81
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of Supaul.{Shiv Kishore Construction, At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}
WB
P Ph
ase-
2
Supa
ul
1150
.91
770/
25.0
9.20
14
100 300
27.0
2.20
16
26.0
2.20
18
0100
0100
080
00
82
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Marne river near primary school Gordh Ratho to Koni village road in Marona South Panchyat in the District of Supaul.(M/s Ghanshyam Lall, Simrahi Bazaar, Post:-Raghopur, Dist-Supaul-852111)
WB
P Ph
ase-
2
Supa
ul
756.
1177
0/25
.09.
2014
50 300
27.0
2.20
16
26.0
2.20
18
0100
0100
0100
080
83
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach over Marne river near Sikhariya-Khushyali village road in the in the District of Supaul.(M/s Ghanshyam Lall, Simrahi Bazaar, Post:-Raghopur, Dist-Supaul-852111)
WB
P Ph
ase-
2
Supa
ul
934.
2477
0/25
.09.
2014
75 350
27.0
2.20
16
26.0
2.20
18
0100
0100
0100
080
0.001586.89995
12/2
018
0.00945.56050
06/2
018
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
84
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul.(Balram Singh, S/o Late Surendra Nath Singh, At+Post-Patory (Panchgachiya), District-Saharsa-852124)
WB
P Ph
ase-
2
Supa
ul
859.
4377
0/25
.09.
2014
75 300
27.0
2.20
16
26.0
2.20
18
0100
0100
2035
00
85
Wor
ld B
ank
Construction of H.L. R.C.C. Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul.(Balram Singh, S/o Late Surendra Nath Singh, At+Post-Patory (Panchgachiya), District-Saharsa-852124)
WB
P Ph
ase-
2
Supa
ul
729.
5177
0/25
.09.
2014
50 300
27.0
2.20
16
26.0
2.20
18
085
5050
00
00
0.00667.68238
07/2
019
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
86
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul. (Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)
WB
P Ph
ase-
2
Supa
ul
1172
.78
770/
25.0
9.20
14
100 350
15.0
2.20
17
14.0
2.20
19
025
00
00
00
87
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul.(Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)
WB
P Ph
ase-
2
Supa
ul
867.
7777
0/25
.09.
2014
75 350
15.0
2.20
17
14.0
2.20
19
055
00
00
00
88
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 62.6 R.D of Kosi Embankment in the District of Supaul.(Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)
WB
P Ph
ase-
2
Supa
ul
705.
9077
0/25
.09.
2014
50 500
27.0
2.20
16
26.0
5.20
17
0100
0100
5100
050
0.00376.87251
12/2
018
0.00365.15311
02/
2019
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
89
Wor
ld B
ank
Construction of H.L., R.C.C. Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of Supaul.{Mukesh Kumar Singh, At-Ekderwa Masuria, P.O.-Maker, Saran-841215 (Bihar)}
WB
P Ph
ase-
2
Supa
ul
1317
.24
935/
23.1
2.20
14
125 350
29.0
9.20
16
29.0
9.20
18
0100
0100
0100
090
9.97884999.28951
09/
2018
90
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road inalong Kakurwa Dhar in 24th Kmof Chandradei-Bangama-paktola-Matiary-Mongra road in thedistrict of Araria.{Nirman Engicons Pvt. Ltd., At+ P.O.- Mohanpur, District-Begusarai (Bihar)-851131}
WB
P Ph
ase-
2
Ara
ria
757.
7640
4/28
.05.
2014
75 100
27.0
2.20
16
26.0
8.20
17
060
00
00
00
28.65448301.77851
06/2
019
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
91
Wor
ld B
ank
Construction of H.L, R.C.CBridge with its approach road inKhurhan-Parel-Ratwara-Kapasiaroad Ratwara-Bazar to South IronScrew Pile Bridge(3x37.5M) fromEast in Madhepura District. (Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)
WB
P Ph
ase-
2
Mad
hepu
ra
1433
.00
436/
2015
09.0
7.20
15
112.
5
350
27.0
2.20
16
26.0
2.20
18
0100
090
1090
5050
132.212091451.11024
12/
2018
92
GA
YA
Construction of H.L.R.C.C.17x21.75m Bridge includingapproach road and protectionwork over river Muhane betweenSilaunjua-Bataspur village inBodhGaya Block of Gaya Districtunder NABARD Scheme.(Ajay Engicon Pvt. Ltd.,Aurangabad (Bihar).
Nab
ard
RW
D
GA
YA
1127
.86
1128
Dt.
05-0
3-20
12 o
f R.W
.D.
983.
95
RC
C38
0.00 A1 Side-60 M
A2 Side-100 M 15
.03.
13
14.0
9.14 0
1000
1000
1000
8020.19
960.20
July
, 201
8 Bridge work completed & ApproachRoad work in progress. S.I.A.Completed. Process under Section-11in progress.
93
GA
YA
Construction of H.L.R.C.C.22x21.75m Bridge includingapproach road and protectionwork over Falgu river in Sripur-Keni Road in Gaya District underNABARD Scheme.(M/s Rakesh Construction PvtLtd.,9431303918)
Nab
ard
RW
D
GA
YA
2835
.09
2493
dt.
31-1
0-20
14 o
f R.W
.D.
2292
.48
RC
C49
2.00
A1 Side-280 M
A2 Side-280 M 06
.01.
2015
05.0
1.20
17
0100
0100
0100
1050
58.482372.93
June
, 201
8
Bridge work completed & ApproachRoad work in progress. Work startedlate because of court case.Work washampered due to attack on labours byanti social element.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
94
GA
YA
Construction of H.L.R.C.C. BoxCell 4x16.00m Bridge includingapproach road and protectionwork in Dumariya to Belaghati(Jharkhand Border) via Kacher at7th K.M. in Gaya District underPLAN Scheme. (Haque Construction Co.,9431223551)
Plan
GA
YA
532.
2211
464
(S)
28.1
1.20
1447
0.41
RC
C66
.00 A1 Side-40 M
A2 Side-65 M
27-0
5-20
15
26-0
8-20
16
0100
0100
0100
1080
86.17329.41
June
, 201
8 Bridge work Completed. ApproachRoad Work in Progress. Work startedvery late because of naxal problem.
95
GA
YA
Construction of H.L.R.C.C.4x16.00m Bridge includingapproach road and protectionwork in 2ND K.M. of Domuhan-Cherki Road (K.M. 0 to K.M.0.93) in Gaya District underPLAN Scheme. (R.A.S. Enterprises, 9199245601)
Plan
GA
YA
363.
9210
885
(S)
14
.11.
2014
of R
.C.D
.
RC
C64
.84
A1 Side-100 M
A2 Side-100 M 18
-02-
2016
17-0
8-20
17
0100
595
3550
00
71.93202.93
Nov
embe
r, 2
018
Work Started. Rock found.Confirmatory boring done. Redesignapproved and work in progress.
96
GA
YA
Construction of H.L.R.C.C.3x14.00m Bridge includingapproach road and protectionwork in Dhangai Bazar to B.B.Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 3560M in Gaya District under PLANScheme. (M/s. Laxman Kumar)
Plan
GA
YA
664.
9111
539
(S)
01.1
2.20
14 o
f R.C
.D.
RC
C11
1.60
A1 Side-100 M
A2 Side-100 M 12
-01-
2018
11-0
7-20
19
0100
30100
020
00
0.005.80
July
, 201
9
Work in Progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
97
GA
YA
Construction of H.L.R.C.C.3x14.00m Bridge includingapproach road and protectionwork in Dhangai Bazar to B.B.Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 4545M in Gaya District under PLANScheme. (Shree Tirupati Balaji Enterprises,9470664329)
Plan
GA
YA
450.
6211
539
(S)
01.1
2.20
14 o
f R.C
.D.
RC
C43
.84
A1 Side-100 M
A2 Side-100 M 18
-02-
2016
17-0
5-20
17
520
00
00
00
0.001.51
Dec
embe
r, 2
018
Work in Progress.
98
GA
YA
Construction of H.L.R.C.C.3x14.00m Bridge includingapproach road and protectionwork in Dhangai Bazar to B.B.Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 13970M in Gaya District under PLANScheme. (M/s. JAY SHANKAR RAY,Muzaffarpur)
Plan
GA
YA
429.
7311
539
(S)
01.1
2.20
14 o
f R.C
.D.
RC
C55
.84 A1 Side-88 M
A2 Side-106 M 26
-12-
2016
25-0
3-20
18
050
520
00
00
0.001.13
Dec
embe
r, 2
018
Work in Progress.
99
GA
YA
Construction of H.L.R.C.C.3x21.00m Bridge includingapproach road and protectionwork in Bhalua to Paharpur Road(K.M. 0 to K.M. 26.325) inChainage 600 M in Gaya Districtunder PLAN Scheme. (Ramiya Construction Pvt. Ltd.,Gaya)
Plan
GA
YA
556.
2811
466
(S)
28.1
1.20
14 o
f R.C
.D.
RC
C64
.84
A1 Side-100 M
A2 Side-100 M 18
-02-
2016
17-0
8-20
17
00
00
00
00
0.000.80
Dec
embe
r, 2
018
N.O.C. received from Forest Deptt.Work in Progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
100
GA
YA
Construction of H.L.R.C.C.20x21.75m Bridge includingapproach road and protectionwork over Morhar River atChitabkhurd village in AmasBlock in Gaya District underPLAN Scheme.(R.A.S. Enterprises, 9199245601)
Plan
GA
YA
1994
.33
8317
(S)
01.0
9.20
1513
84.4
8
RC
C43
2
A1 Side-100 M
A2 Side-100 M 22
-04-
2016
21-0
4-20
18
10100
590
1055
00
185.881264.12
Dec
embe
r, 2
018
Bridge work in progress. Work washampered due to naxal attack.
101
GA
YA
Construction of H.L.R.C.C.9x21.00m Bridge includingapproach road and protectionwork over Morhar River BetweenChitabkala and Gendabag villagein Sherghati Block in GayaDistrict.
Plan
GA
YA
1610
.87
353
(S)
01.0
2.20
18
RC
C19
4.40
A1 Side-150 M
A2 Side-150 M
----
---
----
---
------- ------- ------- ------- 0.000.50
Febr
uary
, 202
0
Work in Progress.
102
GA
YA
Construction of H.L.R.C.C.5x18.75m Bridge includingapproach road and protectionwork over Punpun River betweenBhagwatipur - Kusre village inArwal District under NABARDScheme.
(R.A.S. Enterprises, 9199245601)
Nab
ard
(RC
D)
A
RW
AL
569.
290
7135
(S) D
t.05
-09-
2013
49
2.67
RC
C97
.00
A1 Side-150 M
A2 Side-150 M 10
.12.
13
10.0
6.15 0
1000
1000
1000
250.00
399.86
-
Bridge work completed. Separateestimate for L.A. and approachconstruction work submitted for Rs.820.00 lacs.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
103
GA
YA
Construction of H.L.R.C.C.Bridge including approach roadand protection work in 16th K.M.of Varun-Daudnagar Road inAurangabad District under PLANScheme.
(R.A.S. Enterprises, 9199245601)
Plan
AU
RA
NG
AB
AD
650.
00/3
43
73 (S
) dt.
26.0
3.20
10
RC
C57
.00
A1 Side-100 M
A2 Side-200 M
07/2
011
03/2
012
0100
0100
0100
1590
0.00182.53
June
, 201
8 Bridge work completed. Compensationamount deposited in court. Approachroad work in progress.
104
GA
YA
Construction of Retaining wall &addional lane approach road fornewely Constructed H.L. R.C.C.Bridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x120.00 M).
Non
Pla
n
JEH
AN
AB
AD
249.
84
217(
S) d
t.04
-01-
2012
of R
.C.D
., Pa
tna.
RC
C12
0.00
------
----
--
----
-- 00
00
00
00
0.0026.85
July
, 201
8 Bridge & approach road completed.Award declared in old LA Act.Payment to raiyat in process.
105
GA
YA
Construction of H.L. R.C.C.Bridger Over Kauw river in samtaBigha - Dhasadih at Sambhalbigha-Semaradih in SasaramBlock in the District of Rohtasunder MMSNY.(Brajesh Kumar Singh)
MM
SNY
Roh
tas
214.
50
1949
(S) d
t. 04
-03-
2014
of R
.C.D
., Pa
tna.
RC
C22
.40 A1 Side-75 M
A2 Side-75 M
11-0
5-20
15
10-0
5-20
16
0100
0100
00
00
0.0094.16
June
, 201
8
Work in Progress. Contractor debarredfor delay. Notice for rescind issued
106
GA
YA
Construction of H.L. R.C.C.Bridge over Falgu Dharmawatiriver in 2nd K.M. of Mahuli toLahuara road in Rohtas DistrictUnder MMSNY
MM
SNY
Roh
tas
197.
33
1498
3(S)
dt.
28-1
2-20
07 o
f R
.C.D
., Pa
tna.
----
- A1 Side-00 MA2 Side-250
M
----
-
----
- 0100
0100
0100
050 ----- -
One side approach connected. Anotherside R.W.D. road is about 250 M away.Revised estimate including LA cost issubmitted for Rs.-195.00 lacs.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
107
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24.750 M), M/S Jay shankar rai,9934867236 N
AB
AR
D
East
Cha
mpa
ran
8079
(s)
17/1
0/20
1335
39.5
5
RC
C/2
97.0
0
250+520M
03/2
014
03/1
6
0100
099
079
05
0.001776.34
06/
2018
Project in L/A
108
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 31.032 km in the district of Purvi champaran Package No- 7 (1 x 40 M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
521.
69
RC
C/4
0.00
105+95M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
1060
020
0.00374.11
12/
2018
Work in progress.
109
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 31.768 km in the district of Purvi champaran Package No- 7 (1 x 15M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
199.
33
RC
C/1
5.00
95+85M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
095
080
0.00124.11
12/
2018
Work in progress.
110
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 32.875 km in the district of Purvi champaran Package No- 7 (2 x 35M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
849.
03
RC
C/6
0.00
160+140M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
535
040
32.55590.64
12/
2018
Work in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
111
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 33.900 km in the district of Purvi champaran Package No- 7 (1 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
398.
24
RC
C/3
0.00
90+110M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
3090
010
26.36268.76
12/
2018
Work in progress.
112
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 35.650 km in the district of Purvi champaran Package No- 7 (2 x 35M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
802.
94
RC
C/7
0.00
105+95M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
2050
015
32.48679.11
12/
2018
Work in progress.
113
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 36.858 km in the district of Purvi champaran Package No- 7 (2 x 25M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
545.
23
RC
C/5
0.00
95+105M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
095
2050
14.42479.80
12/
2018
Work in progress.
114
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 40.772 km in the district of Purvi champaran Package No- 7 (2 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
693.
30
RC
C/6
0.00
100+100M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
050
012
0.00491.64
12/
2018
Work in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
115
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 41.258 km in the district of Purvi champaran Package No- 7 (1 x 40M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
506.
39
RC
C/4
0.00
90+110M
02/2
014
12/2
018
06/1
7
05/1
6
0100
0100
2550
020
0.00349.09
12/
2018
Work in progress.
116
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 44.047 km in the district of Purvi champaran Package No-8 (2 x 40M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
840.
93
RC
C/8
0.00
140+150M
10/2
013
06/2
018
03/1
7
01/1
6
0100
0100
095
1070
0.00660.31
06/
2018
Work in progress.
117
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 47.315 km in the district of Purvi champaran Package No- 8 (3 x 8M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
284.
57
RC
C/2
4.00
85+105M10
/201
3
06/2
018
03/1
7
01/1
6
0100
0100
095
1595
0.00193.08
06/
2018
Work in progress.
118
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 50.190 km in the district of Purvi champaran Package No-8 (1 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
403.
07
RC
C/3
0.00
95+105M
10/2
013
06/2
018
03/1
7
01/1
6
0100
0100
095
2095
0.00437.16
06/
2018
Work in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
119
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 67.710 km in the district of Purvi champaran Package No- 8 (4 x 35M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
1506
.26
RC
C/1
40.0
0
150+150M
10/2
013
06/2
018
03/1
7
01/1
6
0100
0100
095
2090
49.281329.50
06/
2018
Work in progress.
120
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 70.680 km in the district of Purvi champaran Package No- 9 (2 x 40M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
894.
88
RC
C/8
0.00
80+80M
10/2
013
06/2
018
03/1
7
01/1
6
0100
0100
595
1060
0.00718.28
06/
2018
Work in progress.
121
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 74.557 km in the district of Purvi champaran Package No- 9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
409.
79
RC
C/3
0.00
50+50M10
/201
3
06/2
018
06/1
7
04/1
6
0100
0100
095
0100
0.00398.22
06/
2018
Work in progress.
122
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 74.775 km in the district of Purvi champaran Package No- 9 (1 x 15M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
214.
72
RC
C/1
5.00
80+80M
10/2
013
06/2
018
06/1
7
04/1
6
0100
0100
095
095
0.00135.53
06/
2018
Work in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
123
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 75.240 km in the district of Purvi champaran Package No- 9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
431.
61
RC
C/3
0.00
60+60M
10/2
013
06/2
018
06/1
7
04/1
6
0100
0100
095
030
0.00398.74
06/
2018
Work in progress.
124
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 77.735 km in the district of Purvi champaran Package No-9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
445.
62
RC
C/3
0.00
80+80M
10/2
013
06/2
018
06/1
7
04/1
6
0100
0100
1050
1025
0.00405.84
06/
2018
Work in progress.
125
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 81.150 km in the district of Purvi champaran Package No- 9 (2 x 3M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
63.7
6
RC
C/6
.00
45.5+45.5M10
/201
3
06/2
018
06/1
7
04/1
6
0100
0100
095
090
0.0025.52
06/
2018
Work in progress.
126
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 82.180 km in the district of Purvi champaran Package No- 9(2 x 3M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
106.
67
RC
C/6
.00
106+106M
10/2
013
06/2
018
06/1
7
04/1
6
0100
0100
0100
080
0.0089.16
06/
2018
Work in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
127
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 84.665 km in the district of Purvi champaran Package No- 9 (2 x 30M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
679.
50
RC
C/6
0.00
80+80M
10/2
013
06/2
018
06/1
7
04/1
6
0100
0100
095
080
0.00588.72
06/
2018
Work in progress.
128
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 87.670km in the district of Purvi champaran Package No- 9(2 x 3M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
69.5
4
RC
C/6
.00
53.55+53.55M
10/2
013
06/2
018
06/1
7
04/1
6
0100
0100
095
5090
0.0057.30
06/
2018
Work in progress.
129
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 89.210 km in the district of Purvi champaran Package No- 10 (2 x 3M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
69.6
1
RC
C/6
.00
50+50M11
/201
3
06/2
018
03/1
7
10/1
5
0100
0100
095
2595
0.0036.46
06/
2018 Work in progress.
130
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 93.150 km in the district of Purvi champaran Package No-10(2 x 5M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
81.3
4
RC
C/1
0.00
46.525+46.525M
11/2
013
06/2
018
03/1
7
10/1
5
0100
0100
095
1595
11.6041.44
06/
2018
LA issues
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
131
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 105.640 km in the district of Purvi champaran Package No-10 (3 x 8M),Barhonia engicor Pvt ltd,9431269809
NA
BA
RD
/ Ind
o-N
epal
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
293.
66
RC
C/2
4.00
170+108M
11/2
013
06/2
018
07/1
7
10/1
5
00
00
00
00
0.0013.11
06/2
018 NOC not to be taken .Villagers
demanding alignment change
132
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 107.935 km in the district of Purvi champaran Package No-10 (1 x 20M),Barhonia engicor Pvt ltd,9431269809 N
AB
AR
D/ I
ndo-
Nep
al
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
403.
49
RC
C/2
0.00
100+100M
11/2
013
06/2
018
07/1
7
10/1
5
0100
0100
095
0100
0.00351.01
06/
2018
Work in progress.
133
Spec
ial w
orks
div
isio
n ch
akia
Construction of HLRCC bridge in Indo -Nepal border road at channage 108.078 km in the district of Purvi champaran Package No-10 (1 x 20M),Barhonia engicor Pvt ltd,9431269809 N
AB
AR
D/ I
ndo-
Nep
al
East
Cha
mpa
ran
7209
(s)w
e09
/09/
2013
423.
56
RC
C/2
0.00
100+100M11
/201
3
06/2
018
03/1
7
10/1
5
0100
0100
095
0100
0.00404.60
06/
2018
Work in progress.
134
Dar
bhan
ga
Construction of HLRCC bridge with Land acquisition ,approach road and protection work near naiyam gram at pachphutiya ghat in Bagmati river (7x24.75 m) Hari Construction & Associate Pvt. Ltd., Begusarai, RWD.
BD
F
Dar
bhan
ga
1816
(s)
28/0
2/20
1423
19.1
9
RC
C/1
77.5
6
410M
03/2
014
03/1
6
0100
0100
0100
025
0.001257.27
06/
2018 Land Acquisition in progress. SIA
Work completed.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
135
Dar
bhan
ga
Construction of HLRCC bridge with Land acquisition ,approach road and protection work in the 18th k.m of baliya- kakodha -dewana-rajkherwar -jhanjharpur road(upto NH-57 in drabhanga distrcit(12x24.75 m)Shiv Kishore Construction Pvt. Ltd.,9431858543 RCD
PLA
N
Dar
bhan
ga
6219
(s)
09/0
7/20
1540
48.7
0
RC
C/3
04.3
6
1130M
09/2
015
05/1
8
096
690
075
060
60.722172.39
06/
2018
Section-19 is in progress.
136
Dar
bhan
ga
costruction of HLRCC bridge near chandanpatti village (2 x 18.75 m).M/S Sanjay Kumar Singh, 9470624199 RWD
MM
SNY
/ Pha
se -
IV (2
013-
14)
Dar
bhan
ga
7584
(s)
11/0
8/20
1435
3.18
RC
C/3
8.76
210M
12/2
014
09/2
014
03/1
6
12/1
5
0100
0100
0100
095
0.00190.79
06/
2018
Work completed and traffic started.
137
Dar
bhan
ga
Construction of HLRCC bridge at angar ghat in the budhi gandak river (10x24.75 m) Braj Kishor Rai,9430800861 RWD
NA
BA
RD
/ RID
F-17
(R
CD
)
Sam
astip
ur
1583
(s)
09/0
2/20
1220
96.7
2
RC
C/2
53.6
4
780M03
/201
2
07/1
4
03/1
4
0100
0100
0100
080
0.001465.60
06/
2018
Rs. 227.86 Lacs has been Depositedto DLAO Samastipur vide letter No487 dated 06.06.2015 but LAproposal returned by DLAOSamastipur for Perpetual lease.
138
Dar
bhan
ga
Construction of HLRCC bridge at kakar ghat in rosra morwara road in kareh river(16x24.75 m) Shiv Kishore Construction Pvt. Ltd.,9431858543 RWD
NA
BA
RD
/ RID
F-17
(R
CD
)
Sam
astip
ur
7802
(s)
13/0
7/20
1230
09.4
2
RC
C/4
05.8
0
650M
12/2
012
03/1
5
12/1
4
0100
0100
0100
085
0.002991.56
06/
2018
SIA work is in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
139
Dar
bhan
ga
Construction of HLRCC bridge with Land acquisition ,approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x24.00 m)Ram Kripal Singh Constructon Pvt Ltd., RCD
PLA
N
Sam
astip
ur
7171
(s)
05/0
8/20
1568
13.4
0
RC
C/5
16.6
4
1500M
08/2
015
10/1
8
062
039
014
00
0.001711.08
10/
2018 SIA work is in progress.
PH done on 04.04.2018.
140
Dar
bhan
ga
costruction of HLRCC bridge in NH-28 through chand chourdih to pathan tol before river under ujiyarpur block (2x14.50).Sri Rajesh Kumar,94308343626 RWD
MM
SNY
/ Pha
se -
IV (2
013-
14)
Sam
astip
ur
7370
(s)
06/0
8/20
1420
4.59
RC
C/3
0.26
65M
09/2
014
09/1
5
0100
0100
0100
080
0.00151.03
06/
2018 GSB work has been completed and
traffic started.
141
Dar
bhan
ga
costruction of HLRCC bridge in near proposed bypass road of hasanpur bazar at marachi ujagar of virpur bramhsthan in hasanpur block(3x18.75 m) Praveez Khan
MM
SNY
/ Pha
se -
IV
(201
3-14
)
Sam
astip
ur
9340
(s)
24/0
9/20
1440
0.94
RC
C/5
8.12
130M01
/201
511
/201
4
04/1
6
02/1
6
0100
0100
0100
070
29.16226.40
06/
2018
Work in progress
142
Dar
bhan
ga
Construction of HLRCC bridge with Land acquisition ,approach road and protection work in tilyuga river between dwalak village and janki nagar tola under madhepur block in the district of madhubani (5x18.75 m)Shreem Construction,9470627503 RWD
BD
F
mad
huba
ni
1867
(s)
03/0
3/20
1499
5.74
RC
C/9
6.84
290M
06/2
015
10/2
014
04/1
7
04/1
6
492
0060
060
010
0.00446.26
06/
2018
Work in progress
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
143
Dar
bhan
ga
Construction of five no.of lock gate in the road between jhaveri chowk and bhutaha chowk in chainage from 17.645 km to 25.19 km in madhubani district.Brajendra Kr. Buildress Pvt.Ltd,0612-2276467,9431063085 RCD N
AB
AR
D/ R
IDF-
19 (R
CD
)
mad
huba
ni
4553
(E) 1
5.07
.201
542
79.1
8
RC
C/1
24.0
0
250M
10/2
015
10/2
013
10/1
7
10/1
5
898
888
1580
525
0.002970.90
06/
2018
Work in progress
144
Dar
bhan
ga
Construction of HLRCC bridge with Land acquisition ,approach road and protection work near jhanjharpur at old NH-57 in kamala balan river in madhubani distrcit(9x24.00 m)Tushar Construction Company, Gaziabad., RCD
PLA
N
mad
huba
ni
6220
(s)
09/0
7/20
1541
97.0
5
RC
C/2
21.4
41620M
09/2
015
05/1
8
767
00
00
00
130.03851.61
10/
2018
SIA work is in progress.
145
Dar
bhan
ga
Construction of HL RCC bridge in Rampatti-Batlohia Road in 5th KM (5x16.00M) in the District of Madhubani.
PLA
N
mad
huba
ni
2496
(s)
18.0
3.20
1886
5.71
RC
C/8
0.00
04.1
2.20
17
03.0
6.20
19
2555
00
00
00
214.28214.28
03.0
6.20
19
Work in progress.
146
Dar
bhan
ga
Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x21.75M) in the District of Samastipur
PLA
N
Sam
astip
ur
1207
7 (s
)27
.12.
2017
879.
10
RC
C/1
08.7
5
11.0
4.20
18
10.1
0.20
19
010
00
00
00
0.000.00
10.1
0.20
19
Work in progress.
147
Dar
bhan
ga costruction of HLRCC bridge at damla ghat in bisfi block (3x21.75 m) Sri Krishna Kant Thakur,9430897941 RWD M
MSN
Y/ P
hase
- I
V (2
013-
14)
Mad
huba
ni
8291
(s)
01/0
9/20
1447
0.47
RC
C/6
7.12
330M
10/2
014
09/2
014
01/1
6
12/1
5
0100
0100
0100
050
0.00369.77
06/
2018
L.A. in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
148
Dar
bhan
ga
costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x21.75 m)Mansa Engicom Pvt. Ltd.,9431060060 RWD
MM
SNY
/ Pha
se -
II (2
009-
10)
Beg
usar
ai
9410
(s)
23/0
6/20
1065
8.72
RC
C/1
34.2
0
225M
May
-10
03/1
2
11/1
1
0100
0100
0100
010
0.00840.57
06/
2018
Section-19 has been completed.
149
Arah Construction of H.L. RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt. Ltd., 9431012004
MMSNY Bhojpur
Rs.
372.
63 L
ac76
55 (S
) dt.
11.0
8.20
14
RC
C67
.08 200.00
28.0
1.16
27.0
4.17 0
1003
980797
0545
0.00187.14
06/
2018
3/3 Deck Slab Casted . 3/3 wearing coat casted. Railing work under progress. Earth filling in approach is in progressExpected D.O.C- June, 2018
150
Kat
ihar
Construction of 2x30m Size ofH.L. R.C.C. bridge at (VelbwaRiver) Mieerganj Railwaycrossing to Dhabeli RoadChainage 30.75 of Indo-NepalBorder Road in the District ofAraria.Baba Const.
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Ara
ria
2160
(s)
14/0
3/20
1357
0.80
509.
41
RC
C/
60.0
0
370.0004
/201
3
06/1
4
0100
0100
060
00
0.00180.63
06/
2018 L/A problem. L/A will be done by RCD
Araria. Second Span work is inProgress. Work is slow due to L.A.
151
Kat
ihar
Construction of 27x30m Size ofH.L. R.C.C. bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 50.80 ofIndo-Nepal Border Road in theDistrict of Araria.D2S Infra Structures Pvt. Ltd.
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Ara
ria
2160
(s)
14/0
3/20
1375
95.0
753
44.0
1
RC
C/
810.
00
1690.00
07/2
013
07/1
6
0100
0100
0100
095
0.006610.29
06/
2018 Bridge work completed road BT work
completed.. L/A will be done by RCDAraria. 70m remaning in approach road.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
152
Kat
ihar
Construction of 7x21.75M Bridgeover Paharia Ghat of Bakra Riverin Kursakanta to Teera Road ofDom Sadak Road in the District ofAraria.M/S Raj Construction
Nab
ard
RW
D
Ara
ria
rwd
2547
24/0
8/20
1173
0.00
RC
C/
157.
00
360.00
02/2
012
12/2
019
0100
090
070
00
121.14680.95
12/
2019
Work in Progress.
153
Kat
ihar
Const. of 11x18.75m H.L.R.C.CBridge over Parmar river onDiyari Ghat in between Dumariyato Diyari in the district of ArariaBraj Kishor Construction.
Plan
Ara
ria
7081
(s)
30.0
7.20
1542
44.2
0
RC
C20
6.25
3107.00
03.
01.2
016
02.
01.2
018
0100
0100
0100
082
178.181418.57
06/
2018 Bridge work completed. Approach
work is in Progress.
154
Kat
ihar
Construction of H.L. R.C.C.Bridge on Ganjan Ghat in BarsoiNeemtala Chowk to Dakaita PujaRoad via Beghour Hat to KatiharDistrict.Raj Construction
Nab
ard
RW
D
Kat
ihar
920
11/0
6/20
1316
91.5
111
81.7
5
RC
C/
201.
00
365.00
10/2
013
07/1
5
0100
0100
0100
090
0.001543.39
06/
2018 Bridge work completed.SDBC work is
remaning due to L/A Problem.
155
Kat
ihar
Construction of H.L. R.C.C.bridge in 10th Km of BarsoiBanbhui-Dhachana Road ofKatihar District.Shankar Sharma
Nab
ard
Kat
ihar
9585
(s)
13/1
2/20
1319
65.6
5
RC
C/
194.
00
415.00
03/2
014
03/1
6
0100
0100
0100
060
0.001760.20
06/
2018 Bridge work completed.L.A Problem.
LA is under Process.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
156
Kis
anga
nj
Construction of 2x16.50m R.C.C.Bridge over Kathliya KochparaDhar in Kishanganj Block in theDistrict of Kishanganj.Star Construction. M
MSN
Y
Kis
anga
nj
6868
(s)
23/0
7/20
1426
1.53
244.
33
RC
C/
33.0
0
185.00
10/2
014
10/2
015
0100
0100
0100
050
0.00166.91 06/2018
Bridge Work completed. GSB work isin Progress. E/W completed.
157
Kis
anga
nj
Construction of H.L. R.C.C.Bridge Koul River in Jurail LauchRod of RWD Road in the Districtof Kisanganj.Navin Chandra Sarkar, Katihar N
abar
d R
WD
Kis
anga
nj 2005
30/0
6/20
1129
34.7
252
05.9
701
/01/
2018
RC
C/
430.
00
-
02/2
012
03/2
018
02/1
4
09/1
9 020
00
00
055
490.913540.12
Due to Increase of Span. Work is inProgress.
158
Kis
anga
nj
Construction of 37x30m H.L.R.C.C. Bridge on River BurhiKanki of Indo Nepal Border Roadin the District of Kisanganj at Ch-109.65S.P. Singla Pvt. Ltd.
Nab
ard
Indo
Nep
al (
RID
F-X
IX)
Kis
anga
nj
7209
(s)
09/0
9/20
1366
54.9
4
RC
C/
1110
.00
537.00
10/2
013
07/1
6
0100
0100
0100
020
0.006525.03
06/
2018 Bridge work completed. E/W- 70%
both side. L/A Problem RCD done byKishanganj. L.A is under Process.
159
Kis
anga
nj
Construction of 2x30m H.L.R.C.C. Bridge on River PahariLocal Nala of Indo Nepal BorderRoad in the District of Kisanganjat Ch- 151.00Bhartiya Infrastructure Pvt.Ltd. N
abar
d In
do N
epal
(R
IDF-
XIX
)
Kis
anga
nj
1807
(s)
06/0
3/20
1342
1.14
309.
52
RC
C/6
8.44
270.00
06/2
013
09/1
4
0100
0100
0100
00
0.00254.20
06/
2018
Bridge Work completed. S.I.A iscompleted towards Purena End. Katiharend S.I.A is not completed. DM Katihar has written a Letter to ChandraguptaInstitution.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
160
Kis
anga
nj
Construction of 3x30m H.L.R.C.C. Bridge on River BurhiKanki of Indo Nepal Border Roadin the District of Kisanganj at Ch-113.640S.P. Singla Pvt. Ltd.
Nab
ard
Indo
Nep
al (
RID
F-X
IX)
Kis
anga
nj
7209
(s)
09/0
9/20
1372
4.71
650.
49
RC
C/
90.0
0
300.00
10/2
013
04/1
6
0100
0100
0100
015
0.00547.05
06/
2018 Bridge work completed. E/W- 70%
both side.. L/A Problem RCD done byKishanganj. L.A is under Process.
161
Kis
anga
nj
Construction of 2x30m H.L.R.C.C. Bridge on River Surbhithaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 123.00S.P. Singla Pvt. Ltd.
Nab
ard
Indo
Nep
al (
RID
F-X
IX)
Kis
anga
nj
7209
(s)
09/0
9/20
1365
0.85
507.
64
RC
C/
60.0
0
260.00
10/2
013
04/1
6
0100
0100
0100
020
0.00405.07
06/
2018 Bridge work completed. E/W- 50%
both side. . L/A Problem RCD done byKishanganj. L.A is under Process.
162
Kis
anga
nj
Construction of 14x30m H.L.R.C.C. Bridge on River maichi ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch-124.00S.P. Singla Pvt. Ltd.
Nab
ard
Indo
Nep
al (
RID
F-X
IX)
Kis
anga
nj
7209
(s)
09/0
9/20
1337
29.1
725
97.5
8
RC
C/
420.
00
246.0010
/201
3
04/1
6
0100
0100
0100
00
0.002330.22
06/
2018 Bridge work completed. . L/A Problem
RCD done by Kishanganj. L.A is underProcess.
163
Kis
anga
nj
Construction of 2x30m H.L.R.C.C. Bridge on River SurbhithaLocal Nala of Indo Nepal BorderRoad in the District of Kisanganjat Ch- 146.850Bhartiya Infrastructure Pvt.Ltd. N
abar
d In
do N
epal
(R
IDF-
XIX
)
Kis
anga
nj
7209
(s)
09/0
9/20
1359
3.60
444.
15
RC
C/
61.2
2
320.00
10/2
013
07/1
5
0100
0100
0100
070
0.00279.65
06/
2018
Bridge work completed. work inprogress. Approach, E/W and GSBcompleted both side. . L/A ProblemRCD done by Kishanganj. L.A is underProcess.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
164
Kis
anga
nj
Construction of 2x30m H.L.R.C.C. Bridge on River LocalNala of Indo Nepal Border Roadin the District of Kisanganj at Ch-149.00Bhartiya Infrastructure Pvt.Ltd. N
abar
d In
do N
epal
(R
IDF-
XIX
)
Kis
anga
nj
7209
(s)
09/0
9/20
1369
1.73
422.
26
RC
C/
60.0
0
380.00
10/2
013
07/1
5
0100
0100
0100
05
0.00276.28
06/
2018
Bridge work completed. L.A is underRCD Kishanganj. . L/A Problem RCDdone by Kishanganj. L.A is underProcess.
165
Kat
ihar
Construction of 3x18.75m spanH.L. R.C.C. Bridge over NasiTola Dhar of Damaily Panchayatunder Dhamdha Block in theDistrict of Purnea. Baba Construction.
Nab
ard
Purn
ia
1806
(s)
05/0
3/20
1342
8.56
307.
02
RC
C/5
8.08
270.00
04/2
013
07/1
4
0100
0100
0100
075
0.00249.56
06/
2018
Bridge work completed. LA AmountRs. 2101640.00 vide 02.09.2016 hassubmitted to DM Purnea. L/A is underProcess. LA under Permanent.
166
Kat
ihar
Construction of 4x22.00m spanH.L. R.C.C. Bridge over RetvaRiver in P.W.D. Nehru Chowk toDharamganj Road of ArariaDistrict.S.K. Construction
MM
SNY
Ara
ria
6776
(s)
21/0
7/20
1441
5.22
326.
00
RC
C/6
8.00
295.00
10/2
014
10/1
5
095
070
040
00
0.00139.95
06/
2018
MD Pul Nigam Lt. No. 3172 Dt.30.10.2017 revised span arrangementEstimate has submitted to RCD Patna.Revised Estimate is under Progress atRCD head quarter.
167
Kat
ihar
Construction of 2x24.75m of H.L.R.C.C. Bridge over maria ghat atKhawaspur Suman Tola in Kismatpanchayat of Araria District.S.K. Construction, Araria. M
MSN
Y
Ara
ria
9343
(s)
24/0
9/20
1433
4.76
302.
53
RC
C/5
1.00
120.00
03/2
015
03/1
6
0100
0100
0100
595
0.00206.22
06/
2018
Bridge Work completed.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
168
Kat
ihar
Construction of 3x21.75m spanR.C.C. Bridge over Dhiwha(Chakka) dhar in front of Yogipurin farhi to kanholi Road ofNarpatganj block in the District ofAraria District.Pankaj Kumar
MM
SNY
Ara
ria
9346
(s)
24/0
8/20
1233
1.94
338.
76
RC
C/6
5.00
320.00
12/2
012
02/1
4
3100
2080
00
00
0.00162.23
06/2
018
Work in Progress.
169
Kat
ihar
Construction of 4x21.75m spanR.C.C. Bridge over Adiwashi Tolain Dumariya to Rampur Road ofPalasi Panchayat in the District ofAraria District.Pankaj Kumar
MM
SNY
Ara
ria
9348
(s)
24/0
8/20
1241
0.65
390.
01
RC
C/8
7.00
320.00
12/2
012
02/1
4
0100
0100
1080
00
18.10312.42
06/2
018
Work in Progress.
170
Kat
ihar
Construction of 3x21.75m spanR.C.C. Bridge over Jahanpur Ghatin the District of Araria District.Pankaj Kumar M
MSN
Y
Ara
ria
9272
(s)
23/0
8/20
1242
0.66
357.
38
RC
C/7
0.00
320.00
10/2
012
01/1
4
0100
65100
00
00
14.93237.64
06/2
018
Work in Progress.
171
Kat
ihar
Construction of 2x12.50m spanR.C.C. Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrict.Ashwani Kr. Singh, Katihar.
MM
SNY
Kat
ihar
1026
5(s)
13/0
9/20
1225
1.64
155.
56
RC
C/3
0.00
420.00
12/2
012
12/1
3
0100
0100
0100
00
0.00162.39
06/
2018
Bridge work completed. l/a problem.
172
Kis
anga
nj
Construction of 2x30m H.L.R.C.C. Bridge on River PahariLocal Nala of Indo Nepal BorderRoad in the District of Kisanganjat Ch- 151.00Bhartiya Infrastructure Pvt.Ltd. N
abar
d In
do N
epal
(R
IDF-
XIX
)
Kis
anga
nj
7209
(s)
09/0
9/20
1355
5.63
423.
59
RC
C/
60.0
0
420.00
10/2
013
07/1
5
0100
0100
0100
05
0.00248.75
06/
2018 Bridge work completed. . L/A Problem
RCD done by Kishanganj. L.A is underProcess.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
173
Kat
ihar
Construction of 3x16.50m H.L.R.C.C. Bridge including approachRoad in 3rd Km. of Saifganj Roadin the District of Araria.Shivdani Engineers Patna. N
on P
lan
Ara
ria
1435
3(S)
28.1
2.20
1131
7.22
RC
C/5
0.00
200.00
06/
2012
06/
2013 0
1000
1000
1000
400.00
187.03
06/
2018
Bridge Work completed. PerpesualLease LA is under Process. Feasibilityreport send to Engineer in chief forApproval through Dy. Chief Engineervide this Office Letter No. 110 (WE)Dt. 27.01.2018 & M.D. Lt. No.-BRPNN/2084 (we) NBC Dt.25.11.2016.
174
Kat
ihar
Construction of 6X24.00m H.L.R.C.C. Bridge over Bakra river at1st km. of Udahat Tekni roadunder PLAN in the District ofAraria.Tirupatin Balajee Earth WorkPvt. Ltd.
Plan
Ara
ria
1293
(s)
16.0
2.20
1722
11.7
3
RC
C14
7.85
300.00
01.
01.2
018
01.0
1.20
20
510
00
00
00
96.1296.12
01.0
1.20
20
Work in Progress.
175
Kat
ihar
Construction of 6X21.75mH.L.R.C.C Bridge at Kundi Tolain Mohna Chandpur Panchayat ofBarari Block of Katihar District.Vishundev Yadav M
MK
VY
Kat
ihar
1454
(s)
21/0
3/20
1718
00.0
0
RC
C
134.
28
11/
2017
11/2
019
530
00
00
00
0.00173.83
11/2
019
Work in Progress.
176
Kat
ihar
Construction of of H.L. RCCbridge (3X18.75 m) in 3rd km. ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road underFDR in the District ofAraria.SHIV CHANDRA KUMKAR
FDR
Ara
ria
577.
4246
(S)
02.0
1.20
18
58.0
8
250.00
05/2
013
04/1
5
00
00
00
00
0.000.00
12/
2017
Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
177
Kat
ihar
Construction of of H.L. RCCbridge (3X18.75 m) in 2nd km. ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road underFDR in the District Araria.SHIV CHANDRA KUMKAR
FDR
Ara
ria
573.
7245
(S)
02.0
1.20
18
58.0
8
428.00
05/2
013
04/1
5
00
00
00
00
0.000.00
04/
2018
Work Started.
178
Kat
ihar
Construction of of H.L. RCCbridge (3X16.00 m) in (SH-99)9th km. of Baisi-Amour-Bahadurganj road in the Districtof Purnea.RAJKISHOR SINGH
FDR
Purn
ia
739.
0041
(S)
02.0
1.20
18
49.8
3
140.00
05/2
013
07/1
5
00
00
00
00
0.000.00
04/
2018
Work Started.
179
Kat
ihar
Construction of of H.L. RCCbridge (3X16.50 m) in 9th km. ofKali Mandir to Baraily road in theDistrict of Purnea.SHANKAR SHARMA
FDR
Purn
ia
723.
7643
(S)
02.0
1.20
18
51.3
3
390.00
05/2
013
04/1
5
00
00
00
00
0.000.00
04/
2018
Work Started.
180
Kat
ihar
Construction of RCC HL bridge(8x18.00m) including approachroad, diversion and protectionwork in the place of 10th km ofJokihat-Dalmalpur-Gerua road inthe district of Purnia.SHANKAR SHARMA &BAIJNATH SHARMA (J.V.)
FDR
Purn
ia
1185
.00
1384
(S)
02.0
1.20
18
148.
88
1690.00
07/2
013
07/1
6
00
00
00
00
0.000.00
05/
2018
Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
181
Kat
ihar
Construction of Balance work ofH.L. RCC bridge (4x21.00 m) in9th km of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA
FDR
Purn
ia
1196
.00
44(S
)02
.01.
2018
86.4
4
360.00
02/2
012
12/2
019
00
00
00
00
0.000.00
12/
2019
Work Started.
182
Kat
ihar
Construction of H.L. RCC bridge(3x16.50 M) in 2nd Km. of Ekhua mahmadodia-Bareli-Duboli roadin the district of Purnea.BAIJNATH SHARMA
FDR
Purn
ia
619.
2442
(S)
02.0
1.20
18
51.3
3
3107.00
03.
01.2
016
02.
01.2
018
00
00
00
00
0.000.00
06/
2018
Work Started.
183
Kat
ihar
Construction of H.L. RCC bridge (3X16.50 M) in the 7th km of Ekba-Mahammodia-Dubouli road in the district of Purnia.M/S SHAILESH KUMAR
FDR
Purn
ia
552.
1729
6 (S
)10
.01.
2018
51.3
3
_
03
/201
1
03
/201
2
00
00
00
00
0.000.00 Work Started.
184
Kat
ihar
Construction of H.L. RCC bridge (3X16.50 M) in the 9th km of Belgachhi PWD road via Nitendra-Machharhatta-Geria road in the district of Purnia.HAQUE CONSTRUCTION
FDR
Purn
ia
729.
4529
5 (S
)10
.01.
2018
51.3
3
_
01/2
008
06/2
009
00
00
00
00
0.000.00 Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
185
Kat
ihar
Construction of RCC HL bridge (4x16.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 6th km of Jokihat-Dalmalpur-Garua road in the district of Purnea.RAJ KISHOR SINGH
FDR
Purn
ia
877.
5368
3 (S
)19
.01.
2018
66.4
4
_
9/20
10
2/20
12 00
00
00
00
0.000.00 Work Started.
186
Kat
ihar
Construction of RCC HL bridge (2X24.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 29th km of Biasi-Amor-Bahadurganj road(SH-99) in the district of Purnea.HAQUE CONSTRUCTION
FDR
Purn
ia
794.
7569
0 (S
)19
.01.
2018
49.2
2
_
04/2
013
07/1
4 00
00
00
00
0.000.00 Work Started.
187
Kat
ihar
Construction of H.L. RCC bridge (5X16.00 M) in Belauri-Shivganj-Salmari Bazar 19th km. of (2nd Cutting) in the district of Katihar.GOKUL HITECH INFRA PVT. LTD.
FDR
Kat
ihar
866.
8829
3(S)
10.0
1.20
18
83.0
5
_
05/
2012
08/
2013 0
000
00
00
0.000.00 Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
188
Kat
ihar
Construction of H.L. RCC bridge (3X16.00 M) in Belauri-Shivganj-Salmari Bazar 19th km. of (1st Cutting) in the district of Katihar.BABAN KUMAR SINGH
FDR
Kat
ihar
639.
7329
4(S)
10.0
1.20
18
49.8
3
_
7/20
12
7/20
14 00
00
00
00
0.000.00 Work Started.
189
Kat
ihar
Construction of RCC HL bridge(2X16.50 m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 3rd km ofAajamnagar link road in thedistrict of Katihar.M/S JAI SHIVCONSTRUCTION
FDR
Kat
ihar
387.
2769
3(S)
19.0
1.20
18
34.2
2
320.00
10/2
013
07/1
5
00
00
00
00
0.000.00
05/
2018
Work Started.
190
Kat
ihar
Construction of RCC HL bridge(2x16.00 m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 42th km ofKatihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in thedistrict of Katihar.M/S SHAILESH KUMAR
FDR
Kat
ihar
458.
7248
0(S)
15.0
1.20
18
49.2
2
380.00
10/2
013
07/1
5
00
00
00
00
0.000.00
05/
2018
Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
191
Kat
ihar
Construction of RCC HL bridge(2x18.00 m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 35th km ofKatihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in thedistrict of Katihar.BIPIN KUMAR SINGH
FDR
Kat
ihar
459.
5648
1(S)
15.0
1.20
18
37.2
2
420.00
10/2
013
07/1
5
00
00
00
00
0.000.00
05/
2018
Work Started.
192
Kis
anga
nj
Construction of 6X24.75MH.L.R.C.C Bridge in 11th km. ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj District.Shiv Kishore Construction.
Plan
Kis
anga
nj
1292
(s)
18/0
2/20
1720
85.0
0
RC
C
147.
78
01/
2018
01/2
020
55
00
00
00 0
01/2
020
Work in Progress.
193
Kis
anga
nj
Construction of RCC HL bridge(3x16.00m) including approachroad, diversion and protectionwork in place of 9th km ofMastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta roadin the district of Kishanganj.BIDYANAND GUPTA
FDR
Kis
anga
nj
570.
9112
072
(S)
27.1
2.20
17
49.8
3
03/2
018
06/1
9
5 0 0 0 0.00 Work Started.
194
Kis
anga
nj
Construction of of H.L. RCCbridge (4X16.00 m) in 11th km. ofBahadurganj-Tedhagach road inthe District of Kishanganj.BINOD KUMAR SINGH
FDR
Kis
anga
nj
786.
0012
073
(S)
27.1
2.20
17
66.4
4
03/2
018
09/1
9
20 0 0 0103.97
0.00Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
195
Kis
anga
nj
Construction of of H.L. RCCbridge (3X16.00 m) in 9th km. ofBahadurganj-Tedhagach road inthe District of Kishanganj.BIPIN KUMAR SINGH
FDR
Kis
anga
nj
690.
4312
090
(S)
27.1
2.20
17
49.8
3
04/2
018
07/1
9
30 0 0 0191.84
0.00Work Started.
196
Kis
anga
nj
Construction of of H.L. RCCbridge (5X16.00 m) in 6th km. ofKishanganj-Bahadurganj roadunder FDR in the DistrictKishanganj.BALRAM SINGH
FDR
Kis
anga
nj
791.
4447
(S)
02.0
1.20
18
83.0
5
03/2
018
09/1
9
0 0 0 0 0.00 Work Started.
197
Kis
anga
nj
Construction of RCC HL bridge(2x16.00m) including approachroad, diversion and protectionwork in place of damaged byflood in 2017 in the 13th km ofMastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta roadin the district of Kishanganj.TIRUPATI BALAJEE EARTHWORK PVT. LTD.
FDR
Kis
anga
nj
442.
7311
968
(S)
21.1
2.20
17
33.2
2
03/2
018
06/1
9
0 0 0 0 0.00 Work Started.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
198
Bha
galp
ur
Construction of H.L. RCC Bridge 14x18.75 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)M/s Ganesh Ram Dokania, Dokania Market, Aliganj, BankaMob.no. 9931130066
Nab
ard
Bha
galp
ur
2296
.08
2501
(s)
25/0
3/20
1313
22.3
0
RC
C/ 2
51.6
8
A1 side -650 m
A2 side-400 m
(Jharkhand)
24/0
5/13
24/0
5/15 00
10000
10000
1000000
0.001507.34
06/
2018
Bhagalpur(i) Section 11 notified on letter No. 107 dt-30.03.18(ii) Land Acquisition-4.33 AccreGodda (Jharkhand)(i) RCD- Bihar Lt.no. 2244 (s) dt. 09.03.2017 to RWD Ranchi (Jharkhand) (ii) Land Acquisition- 9.45 Accre
199
Bha
galp
ur
Constriction of H. L. R.C.C. Bridge 12X24.75m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)M/s Naraindas Construction Pvt. Ltd., Binodpur, Katihar Mob.no. 9431815725, 9431815726
Nab
ard
Bha
galp
ur
2460
.57
2502
(s)
25/0
3/20
1320
35.8
3
RC
C/ 3
04.3
6
A1 side -260m
A2 side-225 m + 125 m Branch
road
10/9
/201
3
10/8
/201
5
00100
00100
00100
0070
0.002377.62
06/
2018 (i) Section 11 notified on letter No. 03
(P) LA dt- 10.03.2018(ii) L.A. -7.52 Accre.
200
Bha
galp
ur
Construction of H.L.R.C.C Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district. ( Balance Work )Balkrishna Bhalotia Const. Pvt.Ltd., Jamui Bazar, Jamui. Mob.no. 9431234037
Plan
Jam
ui
965.
291
1195
7(s)
12/0
8/20
10
RC
C/
335.
4 273 m
26/
10/2
016
15 M
onth
s
0098
0098
0575
0080
0.00371.98
05/
2018
(i) Foundation - 12/13 (ii) Sub Structure - 12/13 (iii) Sup. Structure - 9/12(iv) P8-P9 - Girder Completed, Deck Slab in Progress(v) P7 - Foundation in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
201
Bha
galp
ur
Construction of ROB Bariyarpur in Lieu of LC No. 15BT at km 347/10-12 Between Bariyarpur, Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN. ( Balance Work ) Bhabesh Mishra Construction Pvt. Ltd. Nayachak, Near Budhia Kali Asthan, Isakchak, Bhagalpur. Mob.no. 9470627503
RO
B
Mun
ger
2727
.00
143(
s) d
t. 05
.01.
2007
1041
.00
RC
C/
354 A1 side -
269 m A2 side-
156 m
15.0
1.20
16
14.0
7.20
17
00100
00100
2590
0535
58.893439.44
05/
2018
(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress.(v)RE wall - in progress. (vi) Slip road & Drainage work both sides in progress
202
Bha
galp
ur
Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 16.50 m M/s Hardev Const. Pvt. Ltd., Station Road, B, Deoghar (Jharkhand) Mob.no. 9006024148
MM
SNY
Bha
galp
ur
344.
40Lt
.no.
830
0 (s
) dt.
01.0
9.20
1525
8.15
Hig
hlev
el B
ridge
/68
.44
m
A1 side - 100 m
A2 side-110 m
15.0
2.20
16
14.0
5.20
17
00100
00100
00100
0575
0.00227.37
06/
2018 (i) Appraoch with (connectivity) in
progress(ii) Protection work in Progress
203
Bha
galp
ur
Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 21.75 m M/s Hardev Const. Pvt. Ltd., Station Road, B, Deoghar (Jharkhand) Mob.no. 9006024148
MM
SNY
Bhag
alpu
r
979.
58 L
t. no
. 829
6 (s
) dt
. 01.
09.2
015
727.
22
Hig
hlev
el B
ridge
/15
6.52
A1 side - 110 m
A2 side - 110 m
24.0
2.20
16
23.0
8.20
17
0787
5575
2828
0000
0.00386.15
06/
2018 (i) Foundation - 7/8
(ii) Sub Structure - 6/8(iii) Super Structure - 2/7
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
204
Bha
galp
ur
Abstract Cost Detail Estimate for Re-etting, Repairing, Dissmentalling, maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia & Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia & Dholbajja bazar Year 2017-21-22
Plan
Bhag
alpu
r
1179
4(s)
19/1
2/20
1739
4.75
0
28 S
ets
12.0
2.20
18
27.0
2.20
18
- - - -0.00
45.29(i) Re- Setting work completed.(ii) अबागमन चालू |
205
Bha
galp
ur
Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damageS.P. Bridge in the District ofBhagalpur
Plan
Bhag
alpu
r
3133
(s)
31.0
3.20
1749
6.92
64m 200
15.0
2.20
18
14.0
5.20
19
1060
00
00
00
00
14.0
5.20
19 (i) Foundation - 3/5(ii) Sub Structure - 0/5(iii) Super Structure - 0/4
206
Wes
t Cha
mpa
ran Construction of 7x25M size
Bridge in Madanpur-Bhangha Road in Chainage 43.400 Km Pakage No. 03
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Wes
t Cha
mpa
ran
2160
(S)
dt. 1
4.03
.201
314
02.9
110
13.7
1
RC
C/
175 0+0
11/
2016
07/
2018 5
555
1000
00
59.34253.59 Ju
l-18
Work in Progress
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
207
Wes
t Cha
mpa
ran Construction of Bridge at
Gerkahiya in Madanpur-Bhangha Road in Chainage 75.734Km Pakage No. 05 (New 78.775KM)
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Wes
t Cha
mpa
ran
2160
(S)
dt. 1
4.03
.201
316
4913
92.1
6
RC
C/
210 0+0
09.1
0.13
30.0
4.15 095
085
085
050
0.001296.26
31.1
0.20
18
Work Stopped by Villagers due to L.A.
208
Wes
t Cha
mpa
ran Construction of Bridge at Birha in
Madanpur-Bhangha Road in Chainage 72.703Km Pakage No. 05 (New 74.5540KM)
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Wes
t Cha
mpa
ran
2160
(S)
dt. 1
4.03
.201
356
0.73
411.
18
RC
C/
40 0+0
09.1
0.13
30.0
4.16 0
000
00
00
0.0017.13
31.1
0.20
18
Work Stopped by Villagers due to L.A.
209
Wes
t Cha
mpa
ran Construction of 4x7.20x3.755M
Size Bridge at Chainage 5.714Km in Bhangha-Bhutaha Road Pakage No. 05
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Wes
t Cha
mpa
ran
2160
(S)
dt. 1
4.03
.201
327
6.78
186.
64
RC
C/
29 50+50
09.1
0.13
30.0
4.16 0
1000
1005
1000
100.00
203.05
31.1
0.20
18
Work in Progress
210
Wes
t Cha
mpa
ran
Construction of H.L. R.C.C. 2x30.00 mtr. In the district of West Champaran under Indo-Nepal Border Ch. 5.819 km. Near Inerwa Bazar.
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Wes
t Cha
mpa
ran
5590
(s)
dt. 2
7.06
.201
799
0.97
0.00
R.C
.C.
- - 0 0 1010
00
00
00
00
-
Aworded work may be Started
211
Wes
t Cha
mpa
ran Construction of 1x20.00M Size
Bridge at Chainage 18.460Km in Bhangha-Bhutaha Road Pakage No. 06
Nab
ard
Indo
Nep
al (
RID
F-X
VII
I)
Wes
t Cha
mpa
ran
2160
(S)
dt. 1
4.03
.201
341
3.14
223.
32
RC
C/
20 320+72
31.0
7.13
31.1
0.15 0
1000
1000
10000
0.00211.97
30.0
6.20
18
Bridge Completed. Approach Road work Stopped by Villagers due to L.A.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
212
Wes
t Cha
mpa
ran Construction of 5x24.75M R.C.C.
brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road. N
abar
d
Wes
t Cha
mpa
ran
2370
(S)
dt. 1
4.03
.201
219
27.0
963
8.15
RC
C/
127 1440+900
13.0
9.12
12.0
9.14 0100
0100
0100
067
0.001288.07
03/
2018
The D.M., West Champaran, Bettiah has requsted by memo no. 3, 6, and 7/L.A. dt. 30.11.2017 to the director Land aquisition, Bihar, Patna for relaxation from S.I.A. Total area of Land to be aequired in 4.685 acre
213
Wes
t Cha
mpa
ran Construction of 5x24.75M R.C.C.
brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road. N
abar
d
Wes
t Cha
mpa
ran
2211
(S)
dt. 2
7.02
.201
219
98.2
1700
.68
RC
C/
127 2558.362+1
54.768
24.0
1.13
23.0
7.14 0
1000
1000
1000
550.00
936.73
03/
2018
The D.M., West Champaran, Bettiah has requsted by memo no. 3, 6, and 7/L.A. dt. 30.11.2017 to the director Land aquisition, Bihar, Patna for relaxation from S.I.A. Total area of Land to be aequired in 6.32 acre
214
Wes
t Cha
mpa
ran Construction of RCC Bridge over
Sikarhana River in 6th Km of bagaha-Semara Road in West Champaran District. Pl
an
Wes
t Cha
mpa
ran
2989
(S)
dt. 3
1.03
.201
516
10.6
90.
00
RC
C/
96 150+150
08.0
9.20
15
07.0
3.20
17
5100
20100
2080
3060
32.371092.57
31.0
7.20
18
Work in Progress
215
Wes
t C
ham
para
n
Construction of H.L. R.C.C. Bridge (4x21-75 m) on 7th km. of Balther - Narkatiyaganj Road over Kartaha River. N
abar
d
Wes
t Cha
mpa
ran
179
dt. 1
6.01
.201
771
6.61
Lac
R.C
.C.
-
19.0
2.20
18
18.0
8.20
19
4550 - - - 100.00 - Work in Progress
216
SAH
AR
SA
Constraction of HL RCC Bridge over Canal at Baildour in south of Choutham Basa(Banni Basa) village in Kasnagar Panchayat under MMSNY in saharsa distt.
MM
SNY
SAH
AR
SA
6771
(s)
dt. 2
1.07
.14
200.
7120
0.71
RC
C25
.00 100-100M
Both Side
Jan.
201
6
Jan.
- 17
0100
0100
0100
050
0.00165.02
06/2
018 Bridge Work completed. Approach
Road in progress.
May, 31.05.2018
Financial
Foundat
ion
(in %
)Sub-
Str
uct
ure
(in %
)Super
- Str
uct
ure
(in %
)Appro
ach
(in %
)
Cum
ula
tive
Sl.N
o
Div
isio
n
Nam
e O
f W
ork
Hea
d/
Sub H
ead
Dis
tirc
t
Adm
inis
trat
ive
Appro
val
Rem
arks
Typ
e/Le
ngth
Of
Bri
dge(
M)
Langth
of
Appro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
fSch
edule
d
com
ple
tion
Achievement for the month / till
Like
ly d
ate
of
com
ple
tionPhysical
217
SAH
AR
SA
Constraction of HL RCC Bridge on tilyuga River in 1st KM of Lalminia-simraha road under Plan Head Marouna block in supaul distt.
Plan
SUPA
UL
3007
(S)
dt
31.
03.1
513
59.6
3
RC
C96
.00 100-100M
Both Side
Dec
-201
5
Dec
embe
r-2
017 0
1001095
1085
2560
0.00441.99
'06/
2018
Work in Progress
218
Kha
gari
a
Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district.
Plan
Kha
garia
Rs.
1520
1262
2(S)
date
d14
.11.
06R
CC
39
6.00
m
505m
Mar
-07
June
-09
0100
0100
0100
045
0.002573.45
a. LA process have been completed but real possession of land at the site for approach road could not be possible till date.b. 7 no. of land owners out of total 27 land owners have received compensation amount from District Land Acquisition office. Rest land owner have declined to take compansation amount demanding alternate land for the land under acquisition.c. This office vide letter no. 234 dated 15.05.2016, 266 dated 27.05.2015, 346 dated 13.05.2016, 623 dated 07.09.2016, 146 dated 31.01.2017, 349 dated 08.03.2017, 532 dated 08.04.2017, 1202 dated 15.07.2017 and 1380 dated 11.08.2017 have been requested DLAO for real possession of the land and the copy of the same here also submitted to DM, Khagaria.c. MD BRPNNL vide his letter no. 77 dated 02.02.2016, 468 dated 04.08.2016, and 892 dated 24.11.2017 have remined for section of Revised estimate for the project.d. Year of completion of Bridge Construction : 2010-11e. DLAO Khagaria had released land possession form on 23.09.2013 but real possession or land could not be possible.