    BILL OF QUANTITIES

    BILL NO. 2 : STRUCTURE WORKS

  • 8/10/2019 Bill 2.0 Structure

    2/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.1 : EARTH WORK

    Code Description Quantity Unit Rate Rupiahs

    EARTH WORK (ALL PROVISIONAL)

    (a) The unit rates include for excavation in any ground

    condition encountered. It is the responsibility of the

    tenderer to visit the site and judge for himself the

    nature of the material to be excavated.

    (b) For the purposes of the measurement of quantities

    in this Bill of Quantities it is assumed one cubic metre

    of material excavated forms one cubic metre of

    compacted fill. No allowance is made for bulking or

    shrinkage. Any allowance for bulking or shrinkage

    which the tenderer feels is necessary based on hisexperience and on his examination of the material to

    be excavated at the site shall be made in the unit rates

    on the tenderer's sole responsibility.

    (c) For the purposes of the measurement of this Bill of

    Quantities it is assumed the cut material is used in

    filling to make up levels. However, the actual method

    of construction is entirely at the discretion of the

    contractor, (Whichever construction method is chosen,

    the unit rates are deemed to include for all costs

    incurred)

    General

    A Survey & setting out 1 ls

    B Clearing & grubbing 7,661 m2

    C Topsoil stripping 7,661 m2

    Excavation

    D Excavation to form building platform 11,662 m3

    Soil disposal and backfilling

    E Filling using excavated material and including

    compaction in layers to trenches

    1,048 m3

    F Remove surplus excavated material from site 10,614 M3

    SUB BILL NO. 2.1 : EARTH WORK To Summary Bill 2.0 Rp.

    Bill 2 page 1

  • 8/10/2019 Bill 2.0 Structure

    3/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.2 : PILING

    Code Description Quantity Unit Rate Rupiahs

    PILING WORKS

    A Supply precast concrete piles for foundation

    Precast concrete piles 400 mm, L = 21m (12+9) 966 LM

    Precast concrete piles 500 m, L = 21m (12+9) 6,216 LM

    B Driving precast concrete piles for foundation

    Precast concrete piles 400 mm, L = 21m (12+9) 966 LM

    Precast concrete piles 500 m, L = 21m (12+9) 6,216 LM

    C Joint splices including welding to pile 400 mm

    To piles 400 mm 46 NosTo piles 500 mm 296 Nos

    D Dolly (provisional)

    Pile 400 mm, max 2m length Nos Rate only

    Pile 500 mm, max 2m length Nos Rate only

    F Cut off precast spun pile heads including integration of

    reinforcement into pilecaps, including cutting, bending

    rebar, filling top of pile and cleaning, and disposal off

    site

    To piles 400 mm 46 Nos

    To piles 500 mm 296 Nos

    G Pile testing

    PDA Test to pile 400 mm 1 NosPDA Test to pile 500 mm 3 Nos

    H Mobilization and demobilization 1 LS

    SUB BILL NO. 2.2 : PILING To Summary Bill 2.0 Rp.

    Bill 2 page 2

  • 8/10/2019 Bill 2.0 Structure

    4/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.3 : BASEMENT

    Code Description Quantity Unit Rate Rupiahs

    Excavation

    Note: The quantities given are the net volume,

    allowance for additional excavation and backfilling to

    provide working space shall be included in the unit

    rates

    A Excavation for basement commencing from existing

    ground level

    include Bill 2.1

    B Ditto for basement slab include Bill 2.1

    C Ditto for pile caps 465 m3

    D Ditto for tie beams 402 m3

    Soil disposal and backfilling

    E Remove surplus excavated material from site 867 m3

    F Backfilling including compaction in layers to trenches m3 Not Used

    Compacted sand bed

    G 100mm Thick compacted sand layer under basement

    slab

    4,848 m2

    H Ditto for pile caps m2 include basement slab

    I Ditto for tie beams m2 include basement slab

    Lean concrete

    J 50mm Thick blinding layer under basement slab 4,848 m2

    K Ditto for pile caps m2 include basement slab

    L Ditto for tie beams m2 include basement slab

    Dewatering

    M Allow for keeping the excavations free from water by

    pumping or other means until such time as the

    basement structure is complete

    1 ls

    To Collection Rp.

    Bill 2 page 3

  • 8/10/2019 Bill 2.0 Structure

    5/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.3 : BASEMENT

    Code Description Quantity Unit Rate Rupiahs

    Termite treatment as specified

    A Apply anti termite to excavated surface area 1 ls

    Vibrated reinforced concrete K-350

    B Pile caps 394 m3

    C Tie beams 181 m3

    D Basement slab 1,071 m3

    E Basement wall (RW) 253 m3

    F Pit lift 21 m3

    G Suspended ramp slab 16 m3

    H Suspended ramp beam 5 m3

    I Suspended basement roof slab (ground slab) 566 m3

    J Suspended basement roof beams (ground floor

    beams)

    300 m3

    K Columns (from basement to ground floor) 122 m3

    To Collection Rp.

    Bill 2 page 4

  • 8/10/2019 Bill 2.0 Structure

    6/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.3 : BASEMENT

    Code Description Quantity Unit Rate Rupiahs

    Bar reinforcement; deformed high tensile BJTD-40,including bending, cutting to length and supplying and

    installing all tying wire, accessories and consumable

    A General reinforcing bars in pile caps; 22mm diameter 8,748 kg

    B Ditto; 19mm diameter 34,666 kg

    C Ditto; 16mm diameter 3,551 kg

    D Ditto; 13mm diameter 3,345 kg

    E General reinforcing bars in tie beams; 22mm diameter 20,651 kg

    F Ditto; 19mm diameter 7,292 kg

    G Ditto; 13mm diameter 2,294 kg

    H Stirrups in tie beams 10 mm diameter 7,710 kg

    I General reinforcing bars in basement slabs; 12mm

    diameter

    106,214 kg

    J Ditto; 10mm diameter 23,554 kg

    K General reinforcing bars in basement walls; 13mm

    diameter

    14,555 kg

    L Ditto; 10mm diameter 26,055 kg

    M General reinforcing bars in pit lift; 13mm diameter 2,696 kg

    N General reinforcing bars in ramp slabs; 10mm

    diameter

    1,234 kg

    O General reinforcing bars in ramp beams; 19mm

    diameter

    791 kg

    P Stirrups in ramp beams 10 mm diameter 231 kg

    To Collection Rp.

    Bill 2 page 5

  • 8/10/2019 Bill 2.0 Structure

    7/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.3 : BASEMENT

    Code Description Quantity Unit Rate Rupiahs

    Bar reinforcement; deformed high tensile BJTD-40,including bending, cutting to length and supplying and

    installing all tying wire, accessories and consumable

    (Cont'd)

    A General reinforcing bars in suspended basement roof

    slabs (ground floor slab); 10mm diameter

    49,848 kg

    B General reinforcing bars in suspended basement roof

    beams (ground floor beam); 22mm diameter

    28,234 kg

    C Ditto; 19mm diameter 10,630 kg

    D Ditto; 16mm diameter 1,764 kg

    E Ditto; 13mm diameter 4 kg

    F Stirrups in suspended basement roof beams (ground

    floor beam); 13 mm diameter 25 kg

    G Ditto; 10mm diameter 19,286 kg

    H General reinforcing bars in columns; 25mm diameter 4,622 kg

    I Ditto; 22mm diameter 30,098 kg

    J Ditto; 19mm diameter 2,474 kg

    K Stirrups and ties in columns 13 mm diameter 3,044 kg

    L Ditto; 10mm diameter 11,462 kg

    To Collection Rp.

    Bill 2 page 6

  • 8/10/2019 Bill 2.0 Structure

    8/23

  • 8/10/2019 Bill 2.0 Structure

    9/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.3 : BASEMENT

    Code Description Quantity Unit Rate Rupiahs

    COLLECTION

    Page 3 Rp.

    Page 4 Rp.

    Page 5 Rp.

    Page 6 Rp.

    Page 7 Rp.

    SUB BILL NO. 2.3 : BASEMENT To Summary Bill 2.0 Rp.

    Bill 2 page 8

  • 8/10/2019 Bill 2.0 Structure

    10/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.4 : HOTEL

    Code Description Quantity Unit Rate Rupiahs

    Vibrated reinforced concrete K-350

    A Column 414 m3 -

    B Suspended beam 840 m3 -

    C Suspended slab 1,375 m3 -

    D Suspended swimming pool slab (2nd floor) 26 m3 -

    E Suspended swimming pool wall (2nd floor) 19 m3 -

    F Suspended hot water bath slab (2nd floor) 3 m3 -

    G Suspended hot water bath wall (2nd floor) 2 m3 -

    H Suspended lift separator beam (BL) 15 m3 -

    Bar reinforcement; deformed high tensile BJTD-40,

    including bending, cutting to length and supplying and

    installing all tying wire, accessories and consumable

    I General reinforcing bars in columns; 25mm diameter 5,547 kg -

    J Ditto; 22mm diameter 71,679 kg -

    K Ditto; 19mm diameter 10,750 kg -

    L Stirrups and ties in columns 13 mm diameter 1,881 kg -

    M Ditto; 10mm diameter 43,936 kg -

    N General reinforcing bars in suspended beams; 22mm

    diameter

    44,713 kg -

    O Ditto; 19mm diameter 70,504 kg -

    P Ditto; 16mm diameter 42 kg -

    QDitto; 13mm diameter 2,812 kg -

    R Stirrups and ties in suspended beams 13 mm diameter3,513 kg

    -

    S Ditto; 10mm diameter 58,013 kg -

    To Collection Rp.

    Bill 2 page 9

  • 8/10/2019 Bill 2.0 Structure

    11/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.4 : HOTEL

    Code Description Quantity Unit Rate Rupiahs

    Bar reinforcement; deformed high tensile BJTD-40,

    including bending, cutting to length and supplying and

    installing all tying wire, accessories and consumable

    (cont'd)

    A General reinforcing bars in suspended slabs; 10mm

    diameter

    126,543 kg -

    B General reinforcing bars in swimming pool slabs;

    13mm diameter

    3,364 kg

    C General reinforcing bars in swimming pool walls;

    13mm diameter

    1,406 kg

    D Ditto; 10mm diameter 571 kg -

    E General reinforcing bars in hot water bath slabs;

    10mm diameter

    280 kg

    F General reinforcing bars in hot water bath walls; 10mm

    diameter

    295 kg

    G General reinforcing bars in lift separator beams; 19mm

    diameter

    3,427 kg -

    H Stirrups and ties in lift separator beams 10 mm

    diameter

    820 kg -

    Formwork

    I To sides of columns 3,063 m2 -

    J To sides of supended beams 5,512 m2 -

    K To soffit of supended slabs 11,187 m2 -

    L To edges of suspended slab 120~150mm high 2,287 m -

    M To soffit of swimming pool supended slabs 128 m2 -

    N

    To sides of swimming pool walls 149 m2-

    To Collection Rp.

    Bill 2 page 10

  • 8/10/2019 Bill 2.0 Structure

    12/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.4 : HOTEL

    Code Description Quantity Unit Rate Rupiahs

    Formwork (cont;d)

    A To soffit of hot water bath supended slabs 18 m2

    B To sides of hot water bath walls 27 m2

    C To sides and soffit of lift separator beams 202 m2 -

    Supply and install approved waterproofing system in

    accordance with the manufactures instructions as

    specified

    D To swimming pool slab 128 m2 -

    E To swimming pool wall 75 m2 -

    F To hot water bath slab 18 m2 -

    G To hot water bath wall 14 m2 -

    30 mm thick protective cement and sand (1:5) screed

    laid to falls over waterproof membrane as specified

    H To swimming pool slab 128 m2 -

    I To swimming pool wall 75 m2 -

    J To hot water bath slab 18 m2 -

    K To hot water bath wall 14 m2 -

    Waterstop

    L Water stop to swimming pool dan hot water bath 71 m -

    To Collection Rp.

    Bill 2 page 11

  • 8/10/2019 Bill 2.0 Structure

    13/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.4 : HOTEL

    Code Description Quantity Unit Rate Rupiahs

    COLLECTION

    Page 9 Rp.

    Page 10 Rp.

    Page 11 Rp.

    SUB BILL NO. 2.4 : HOTEL To Summary Bill 2.0 Rp.

    Bill 2 page 12

  • 8/10/2019 Bill 2.0 Structure

    14/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.5 : APARTMENT

    Code Description Quantity Unit Rate Rupiahs

    Vibrated reinforced concrete K-350

    A Column 261 m3 -

    B Suspended beam 554 m3 -

    C Suspended slab 1,016 m3 -

    D Suspended lift separator beam (BL) 14 m3 -

    Bar reinforcement; deformed high tensile BJTD-40,

    including bending, cutting to length and supplying and

    installing all tying wire, accessories and consumable

    E General reinforcing bars in columns; 22mm diameter 51,525 kg -

    F Ditto; 19mm diameter 4,012 kg -

    G Ditto; 13mm diameter 121 kg -

    H Stirrups and ties in columns 10 mm diameter 29,112 kg -

    I General reinforcing bars in suspended beams; 22mm

    diameter

    73,162 kg -

    J Ditto; 19mm diameter 12,997 kg -

    K Ditto; 16mm diameter 597 kg -

    L Ditto; 13mm diameter 1,143 kg -

    M Stirrups and ties in suspended beams 13 mm diameter 1,592 kg -

    N Ditto; 10mm diameter 39,562 kg -

    O General reinforcing bars in suspended slabs; 10mm

    diameter

    93,412 kg -

    P

    General reinforcing bars in lift separator beams; 19mmdiameter 2,926 kg-

    Q Stirrups and ties in lift separator beams 10 mm

    diameter

    726 kg -

    To Collection Rp. 0

    Bill 2 page 13

  • 8/10/2019 Bill 2.0 Structure

    15/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.5 : APARTMENT

    Code Description Quantity Unit Rate Rupiahs

    Formwork

    A To sides of columns 1,896 m2 -

    B To sides of supended beams 3,730 m2 -

    C To soffit of supended slabs 8,454 m2 -

    D To edges of suspended slab 120~150mm high 1,187 m -

    E To sides and soffit of lift separator beams 176 m2 -

    To Collection Rp. 0

    Bill 2 page 14

  • 8/10/2019 Bill 2.0 Structure

    16/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.5 : APARTMENT

    Code Description Quantity Unit Rate Rupiahs

    COLLECTION

    Page 13 Rp. 0

    Page 14 Rp. 0

    SUB BILL NO. 2.5 : APARTMENT -To Summary Bill 2.0 Rp.

    Bill 2 page 15

  • 8/10/2019 Bill 2.0 Structure

    17/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.6 : STAIRS

    Code Description Quantity Unit Rate Rupiahs

    Vibrated reinforced concrete K.350

    A Staircase and landing slabs 42 M3 -

    B Stair beam 3 M3 -

    Formworks

    C Soffit of landing 84 M2 -

    D Sloping soffit of staircases 129 M2 -

    E Raking sides of stair over 300 mm but not exceeding

    350 mm high including cutting to profile of treads andrisers

    215 LM -

    F To riser over 150 mm but not exceeding 200 mm high 432 LM -

    G Side and soffit stair beam 41 M2

    Reinforcement Works

    H General reinforcing bars in staircase and landing;

    13mm diameter

    26,829 KG -

    I General reinforcing bars in staircase and landing;

    10mm diameter

    1,772 KG -

    J General reinforcing bars in stair beam; 16mm diameter 631 KG -

    K Stirrups in stair beam; 10mm diameter 166 KG -

    SUB BILL NO. 2.6 : STAIRS -To Summary Bill 2.0 Rp.

    Bill 2 page 16

  • 8/10/2019 Bill 2.0 Structure

    18/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

    Code Description Quantity Unit Rate Rupiahs

    2.7.1 GROUND WATER TANK

    Excavation

    Note: The quantities given are the net volume, allowance for

    additional excavation and backfilling to provide working space shall

    be included in the unit rates

    A Excavation commencing from existing level 340 M3 -

    Soil disposal and backfilling

    B Remove surplus excavated material from site 340 M3 -

    Compacted sand bed

    C 100mm Thick compacted sand layer under slab 100 m2 -

    Lean Concrete

    D 50mm thk lean concrete under slab 100 M2 -

    Vibrated reinforced concrete K.350

    E Ground slab 25 M3 -

    F Wall 79 M3 -

    G Suspended slab 16 M3 -

    H Suspended Beam 0.3 M3 -

    Formworks

    I Edges of ground slab 250mm high 85 LM -

    J Sides of wall 788 M2 -

    K Soffit of suspended slab 106 M2 -

    L Edges of suspended slab 150mm high 95 LM -

    M Sides of suspended beam 4 M2 -

    To Collection Rp. -

    Bill 2 page 17

  • 8/10/2019 Bill 2.0 Structure

    19/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

    Code Description Quantity Unit Rate Rupiahs

    2.7.1 GROUND WATER TANK (CONT'D)

    Reinforcement Works

    A General reinforcing bars in ground slab, 13 mm

    diameter

    2,504 KG -

    B General reinforcing bars in wall, 13 mm diameter 8,523 KG -

    C Ditto; 10mm diameter 1,906 KG -

    D General reinforcing bars in suspended slab, 10 mm

    diameter

    2,731 KG -

    E Ditto; 10mm diameter 1,963 KG -

    F General reinforcing bars in beam, 16 mm diameter 51 KG -

    G Stirrups and links in beam, 10 mm diameter 25 KG -

    Supply and install approved waterproofing system in

    accordance with the manufactures instructions as

    specified

    H To GWT slab 206 m2 -

    I To GWT wall 426 m2 -

    30 mm thick protective cement and sand (1:5) screed

    laid to falls over waterproof membrane as specified

    J To GWT slab 206 m2 -

    K To GWT wall 426 m2 -

    Waterstop

    L Water stop 95 m -

    To Collection Rp. -

    Bill 2 page 18

  • 8/10/2019 Bill 2.0 Structure

    20/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

    Code Description Quantity Unit Rate Rupiahs

    COLLECTION

    Page 15 Rp. -

    Page 16 Rp. -

    2.7.1 GROUND WATER TANK To Summary Bill 2.7 Rp. -

    Bill 2 page 19

  • 8/10/2019 Bill 2.0 Structure

    21/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

    Code Description Quantity Unit Rate Rupiahs

    -2.7.2 POND

    Vibrated reinforced concrete K-350

    A Suspended pond slab (ground floor) 26 m3 -

    B Suspended pond wall (ground floor) 5 m3 -

    Bar reinforcement; deformed high tensile BJTD-40,

    including bending, cutting to length and supplying and

    installing all tying wire, accessories and consumable

    C General reinforcing bars in pond slabs; 10mmdiameter

    2,184 kg -

    D General reinforcing bars in pond walls; 13mm diameter 409 kg -

    E Ditto; 10mm diameter 285 kg -

    Formwork

    F To soffit of pond supended slabs 168 m2 -

    G To sides of pond walls 62 m2 -

    Supply and install approved waterproofing system in

    accordance with the manufactures instructions as

    specified

    H To pond slab 168 m2 -

    I To pond wall 31 m2 -

    30 mm thick protective cement and sand (1:5) screed

    laid to falls over waterproof membrane as specified

    J To pond slab 168 m2 -

    K To pond wall 31 m2 -

    2.7.2 POND To Summary Bill 2.7 Rp. -

    Bill 2 page 20

  • 8/10/2019 Bill 2.0 Structure

    22/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

    Code Description Quantity Unit Rate Rupiahs

    SUMMARY

    2.7.1 GROUND WATER TANK Rp. -

    2.7.2 POND Rp. -

    SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS -To Summary Bill 2.0 Rp.

    Bill 2 page 21

  • 8/10/2019 Bill 2.0 Structure

    23/23

    GMI Hotel Condominium Project

    Kota Deltamas

    BILL NO. 2 : STRUCTURE WORKS

    SUMMARY

    (Rp)

    SUMMARY

    SUB BILL NO. 2.1 : EARTH WORK Rp.

    SUB BILL NO. 2.2 : PILING Rp.

    SUB BILL NO. 2.3 : BASEMENT Rp.

    SUB BILL NO. 2.4 : HOTEL Rp.

    SUB BILL NO. 2.5 : APARTMENT Rp.

    SUB BILL NO. 2.6 : STAIRS Rp.

    SUB BILL NO. 2.7 : GROUND WATER TANK AND

    PONDS

    Rp.

    BILL NO. 2 : STRUCTURE WORKS To Final Summary

    TotalCode Description