Bill of Quantities and Prices
GROUP HOUSE
STARLIGHT ORPHAN SCHOOL
Situated 12 km out of Kiboga
AND ALL OTHER COUNTRYSIDE LOTS IN UGANDA
PREPARED BY: (and double checked by Volker Goebel / Dipl.-Ing.)
All prices based on detailed quotes from material market in Kampala
MR. BOTYO GEORGE MR. MUGASHO RICHARD
TEL: +256 755236528 TEL: +256 75490660
CONSTRUCTION MANAGER CIVIL ENGINEER
Page1-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
Detail section of concrete foundation plate
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
GROUP HOUSE FOR STARLIGHT ORPHAN SCHOOL, (12km out o f Kiboga)
BILL NO. 1 - GROUP HOUSE
ELEMENT NO. 1
S UBS TRUCTURE
A
EXCAVATION AND EARTHWORK Excavate top ve ge tative s oil to ave rage de pth n. e . 150mm, load, whe e l and de pos ite mate rial 50m away from s ite .
S M 154 2,200 338,800
B
ANTI-TERMITE PROTECTIONTre at s urface s of hardcore with ''Aldle x" or any othe r e qual and approve d antite rmite s olution.
LITRES 40 3,800 152,000
C STONE TOPPING 25mm machine crus he d aggre gate s m3 7 120,000 840,000
D
DAMP PROOFING 230mm(1000gauge )He s s ian bas e d bituminous fe lt damp proof cours e lappe d 150mm at joints be dde d in ce me nt s and mortar.
ROLL 1 170,000 170,000
E TRANS P ORT No. 1 20,000 20,000
1,520,800
1/1/1
TOTAL CARRIED TO COLLECTION
Page3-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
FOUNDATION PLATE CONCRETE -
F A142 BRC ROLL 1 800,000 800,000
G T12 bars (12m le ngth) for the foundation bas e s trips plus trans port
No. 34 29,000 986,000
H R8 diame te r s tyrups /rings No. 10 15,000 150,000
I Binding wire Kgs 17 5,000 85,000
J TRANS P ORT No. 1 50,000 50,000
K 50KG BAG CEMENT No. 80 31,000 2,480,000
L TRANS P ORT bags 80 3,000 240,000
M s pade s /trans port No. 5 20,000 100,000
N whe e lbarrows /trans port No. 3 200,000 600,000
O LAKE S AND m3 7 85,715 600,005
P WATER LITRES 2200 50 110,000
Q 250 LITRE wate r drums , trans port No. 3 100,000 300,000
O 1" machine crus he d good quality s tone aggre gate s m3 10.5 120,000 1,260,000
R concre te mixe r No. 2 600,000 1,200,000
S Fue l to run the e ngine s litre s 80 3,500 280,000
T trans portion of concre te mixe rs ite m 1 1,500,000 1,500,000
U vibrator and its poke r No. 1 70,000 70,000
V fue l for the vibrator litre s 5 3,500 17,500
10,828,505
1/1/3
TOTAL CARRIED TO COLLECTION
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
Fo rmwo rk to s ide s o f c o nc re te s lab plate -
U 4mx12''x1'' s awn s oftwood timbe r No. 10 15,000 150,000
V trus s e s and props of 3.5m e ach NO. 12 3,500 42,000
W Timbe r trans portation No. 1 70,000 70,000
262,000
1/1/3
TOTAL CARRIED TO COLLECT
Page4-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
zoominandfindout…thisisazoom-able.pdf
AMOUNT (Us h)
1,520,800
10,828,505
262,000
12,611,305
1/1/4
COLLECTIONS UMMARY ELEMENT NO. 1
Total carrie d forward from page …………………………........ 1/1/1
Total carrie d forward from page …………………………........ 1/1/3
Total carrie d forward from page …………………………........ 1/1/3
TOTAL CARRIED TO BILL SUMMARY
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
ELEMENT NO. 2
S UPERS TRUCTURE -
BRICK WORK
210mm thic k s o lid burnt c lay bric k walling ; jo inte d and be dde d in (1:4) c e me nt s and mo rtar re info rc e d with e xpande d me tal lathe at e ve ry alte rnate c o urs e .
BRICK WORK
A 210X10X10 clay bricks No. 215 9,500 2,042,500 B 5% was tage on bricks No. 215 475 102,125 C trans port pe r brick 120 10,000 1,200,000
mortar - D ce me nt bags 60 34,000 2,040,000
E s and m3 10.5 85,715 900,008
F wate r litre s 16150 50 807,500 7,092,133
1/2/4TOTAL CARRIED TO COLLECTION
Page5-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
AMOUNT (Us h)
7,092,133
7,092,133
1/2/5
SUMMARY ELEMENT NO. 2
COLLECTION
Total carried forward from page …………………………........ 1/2/4
TOTAL CARRIED TO BILL SUMMARY
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
ELEMENT NO. 3
ROOF S TRUCTURE ROOF CONS TRUCTION AND COVERINGS .
A galvanis e d Angle bracke ts 100x100x100mm s he e t me tal 1.5mm
42 10,000 420,000
B galvanis e d Angle bracke ts 200x100x100 mm s he e t me tal 1.5mm No. 50 10,000 500,000
C s 8 plas tic dwe ls (100pcs pe r box) No. 1 10,000 10,000
D 75mm wood s cre ws No. 250 100 25,000
55mm brick s cre ws No. 250 100 25,000
E trans port trip 1 10,000 10,000
F 4.000x5''x2'' pine wood s awn timbe r P cs 33 15,000 495,000
G 4.000x9.5"x1'' pine wood s awn timbe r P cs 30 32,000 960,000
2,445,000
1/3/5
TOTAL CARRIED TO COLLECT
Page8-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
Roof c ove ring -
H
26gauge pre -painte d s upe r e co profile d galvanize droofing s he e ts : 75mm s ide lap and 150mm e nd lap
m 60 18,009 1,080,540
I26gauge trans pare nt s upe r e co profile d pvcroofing s he e ts : 75mm s ide lap and 150mm e nd lap
m 18 106,949 1,925,082
J s pe cial s e lf drilling s cre ws to fix to woode n s tructure pcs 230 593 136,390
K drilling machine and ge ne rator hire pe r day No. 3 250,000 750,000
L trans port trips 1 450,000 450,000
M
225mm x 25mm We ll s e as one d and tre ate d wood fas cia /barge board comple te with painting in thre e coats of s upe rglos s oil paint.
LM 120 25,000 3,000,000
7,342,012
1/3/9
TOTAL CARRIED TO COLLECT
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
RAIN WATER DIS POS AL UPVC rain wate r pipe s and fitting s as 'Marle y' o r o the re qual and appro ve d
N112mm dia UP VC half round gutte r fixe d with pvc bracke tss cre we d onto fas cia board.
LM 9 28,000 252,000
O 112mm dia UP VC gutte r outle t. No. 2 15,000 30,000
P S toppe d e nd No. 2 20,000 40,000
Q 75 mm diame te r he avy duty UP VC down pipe fixe d to walls with pvc bracke ts LM 2 24,000 48,000
R 75mm UP VC s wan ne ck. No. 2 15,000 30,000
S 75mm hors e s hoe e nd. No. 2 15,000 30,000
430,000
1/3/9
TOTAL CARRIED TO COLLECT
Page9-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
roofwatercollection/tank…
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
rain water harves ting tank Cons truct mas onry tank bas e of 2,300mm diameter x1,000mm high to receive 5,000l tank meas ured s eparately;in 200mm thick brick walling, 100mm thick concrete bas eincluding all neces s ary excavations and dis pos al of earth.
-
-
T bricks No. 350 215 75,250
U trans port pe r brick 350 160 56,000
V ce me nt bags 4 34,000 136,000
W s and m3 3.5 85,715 300,003
5000ltr circular P VC tank as cre s t tank including tap and drain
No. 1 2,700,000 2,700,000
3,267,253
- 1/3/10
AMOUNT (Us h)
2,445,000
7,342,012
430,000
3,267,253
13,484,265
1/3/10
To tal c arrie d fo rward fro m pag e …………………………........ 1/3/10
TOTAL CARRIED TO BILL S UMMARY
TOTAL CARRIED TO COLLECT
COLLECTION
S UMMARY ELEMENT NO. 3
To tal c arrie d fo rward fro m pag e …………………………........ 1/3/5
To tal c arrie d fo rward fro m pag e …………………………........ 1/3/9
To tal c arrie d fo rward fro m pag e …………………………........ 1/3/9
Page11-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
ELEMENT No . 4
INTERNAL FINIS HES .
WALL FINIS HES
15mm thick Inte rnal plas te r to the walls 1:3/c:s mortar
S M 164 -
A 50kg ce me nt bags No. 28 34,000 952,000
B 25kg lime bags No. 9 25,000 225,000
C lake s and + trans ort m3 3.5 85,715 300,003
PAINTING - Apply two c o ats o f appro ve d paint
D 1s t coating prime r litre s 60 3,750 225,000
E 2rd coating s ilve r vine l litre s 60 13,000 780,000
F s and pape r P 120 LM 30 3,000 90,000
G white ce me nt fille r bags 1 75,000 75,000
H mas ting tape No. 3 5,000 15,000
2,662,003
1/4/13
TOTAL CARRIED TO COLLECT
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
Final painting o f windo ws and do o rs
I s upe r glos s white tins (4 litre s ) 2 60,000 120,000
J white s pirit litre s 5 10,000 50,000
K Rolle rs P cs 2 15,000 30,000
L Brus he s P cs (1mm) 1 30,000 30,000
Skirting (250mmhighx50mmthic k plas ter s kirting) to lowe r internal part o f the walls
-
M le ad oxide wate r e muls ion paint tins 4 60,000 240,000
N wate r litre s 200 50 10,000
O
480,000 1/4/13
CARRIED TO COLLECTION
Page12-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
AMOUNT (Us h)
2,662,003
480,000
3,142,003
1/4/14
COLLECTION
SUMMARY ELEMENT NO. 4
Total carried forward from page …………………………........ 1/4/13
13Total carried forward from page …………………………..1/4/13TOTAL CARRIED TO COLLECT
Page13-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
ITEM DESCRIPTION UNIT QTY RATE(Us h) AMOUNT(Us h)
ELEMENT No.5
FITTINGS
AENERGY EFFICENT FIREWOOD STOVE OR ITS EQUIVALENT
LUMPSUM1 1,464,000 1,464,000
B Six s itter dinning table/ 6 chiors + trans port lumpsum 1 370,000 370,000
Cwooden kitchen platform with s ink
lumpsum 1 900,000 900,000
Douts ide front s itters with s tyroper blocks + trans port
NO. 2 1,400,000 2,800,000
E s leeping platform + trans portlumpsum 2 600,000 1,200,000
6,734,000
1/5/15TOTAL CARRIED TO BILL S UMMARY
Page14-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
ITEM DES CRIPTION UNIT QTY RATE AMOUNTELEMENT No .6LABOUR
1 S UBS TRUCTURE
A EARTH WORKS
2 S TONE TOPPINGS KILLED(1) HRS 8 3,125 25,000 UNS KILLED (3) HRS 24 1,875 45,000
3 CONCRETING - A S KILLED(4) HRS 32 3,125 100,000 B UNS KILLED(7) HRS 56 1,875 105,000
4 WATER TANK BAS EA unskilled(4 No.) HRS 62 1,875 116,250 B S KILLED(2No.) HRS 32 3,125 100,000
5 S UPERS TRUCTURE (4DAYS ) - BRICK WORK (165 S .M) -
A S KILLED(8 No.) HRS 256 3,125 800,000 B UNS KILLED(5 No.) HRS 160 1,875 300,000
- 6 PLAS TER WORK (164 S .M)/3DAYS -
A S KILLED(4 No.) HRS 96 3,125 300,000 B UNS KILLED (5No.) HRS 120 1,875 225,000
7 FITTINGS
A S KILLED LUMP S UM 1 726,400 726,400
8 Allowfor plas ter work arround openings (1 day) - A skilled (5 No.) HRS 40 3,125 125,000 B unskilled(4 No.) HRS 32 1,875 60,000
- 9 floor s creed -
A skilled(4No.) HRS 32 3,125 100,000 B unskilled(3 No.) HRS 24 1,875 45,000
- 10 WINDOW FIXING(7 ) -
A S KILLED(2) HRS 16 4,375 70,000 B S EMI S KILLED(2) HRS 16 3,500 56,000
- 11 DOOR FIXING -
A S KILLED(2) HRS 16 4,375 70,000 -
12 PAINTING - A windows and doors S M 8.5 6,700 56,950 B labour(to pa int the ine rna l wa lls ) S M 165 6,700 1,105,500
13 ROOFING -
A skilled (5 No.) HRS 120 4,000 480,000
S EMI S KILLED (3 No.) HRS 120 3,500 420,000
14 EXTRA OVER -
Atra ining of concre te founda tion, and tra ining of brick laying and buying of ma te ria ls and doing paper works HRS 250 3,000 750,000
B ADDITIONAL TIME FOR FINIS HING WORK IN TIME HRS 250 3,000 750,000
6,931,100
1/6/16
TOTAL CARRIED TO S UMMARY
Page15-BOQGroupHousebyMGKBbuildingcontractorsLtd.Uganda
PREPARED BY: (and double checked by Volker Goebel / Dipl.-Ing.)
All prices based on detail quotes of material market in Kampala / Uganda
MR. BOTYO GEORGE MR. MUGASHO RICHARD
TEL: +256 755236528 TEL: +256 75490660
SIGN: SIGN:
CONSTRUCTION MANAGER CIVIL ENGINEER
DATE: 02/08/2017 DATE: 02/08/2017
mainsponsorofStarlightGroupHouse–DavidP.Amrein
ITEM AMOUNT (Us h)
PAGE
11/1/4
12,611,305
2 1/2/5 7,092,1333 1/3/10 13,484,2654 1/4/14 3,142,0035 1/5/15 6,734,0006 1/6/16 6,931,100
49,994,805
8,999,064.81
4,999,480.45
63,993,3501/17
ELEMENT NO. 5 (FITTINGS)
ELEMENT NO. 4 (INTERNAL FINISHES)
GRANDTOTAL
PROPOSED GROUP HOUSE FOR STARLIGHT ORPHAN SCHOOLDESCRIPTION
AddRisksandgains10%
AddVAT18%
SUB-TOTAL1
ELEMENT NO. 6 (LABOUR)
BILL ELEMENT
ELEMENT NO. 1 (SUBSTRUCTURE)
ELEMENT NO. 2 (SUPERSTRUCTURE)
ELEMENT NO. 3 (ROOF)