Page 1: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Bioretention

Dave Briglio, P.E.MACTEC

Mike NovotneyCenter for Watershed Protection

Page 2: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Major Design Components Flow Regulation

– Diversion of only WQv to facility Pretreatment

– Trapping of coarse sediments to extend design life

Filter Bed and Filter Media– Primary treatment component of facility

Outflow/Overflow– Safe conveyance of all storms through facility

Page 3: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 4: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 5: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 6: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

General Feasibility

• Residential Subdivisions

• High Density / Ultra Urban Areas

(depending on land area requirements)

• Not for Regional Stormwater Control

Page 7: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Key Physical Considerations 5 acre maximum – 0.5 to 2 preferred Consumes 5% of impervious area draining to

site Minimum 5 feet of head normally necessary 2:1 length to width ratio except residential Bottom of facility 2’ above water table Hotspot concerns Normally off-line – on-line <0.5 acres and

stabilize to resist blowouts

Page 8: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Major Components

1. Diversion structure 2. Pre-treatment swale or

filter3. Ponding area

– 6” max. depth, 10’x20’ min

– Min. capture the WQv

4. Mulch layer5. Planting soil

– 2.5 to 4 feet in depth– Darcy’s law, k=0.5ft/day– 48 hr. drain time, 4’ deep

6. Filter fabric

7. Sand layer (optional)– 12-18” – < 15% silt/clay

8. Underdrain system – 6” perforated PVC– 10% of surface area

as rule of thumb

9. Overflow system– If necessary to handle

clogging or flow through

10. Vegetation

Page 9: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

DiversionDiversionPretreatmentPretreatment Ponding Ponding

Mulch LayerMulch Layer

Soil BedSoil Bed

Filter FabricFilter Fabric

Sand LayerSand Layer

UnderdrainUnderdrain

OverflowOverflow

VegetationVegetation

Page 10: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 11: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 12: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 13: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Copyright 2000, CWP

Page 14: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 15: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Component Functions

Diversion – captures design volume Grass strip – reduce velocity, filter larger

particles Ponding area – storage, settling Mulch layer – filtration, micro organisms Soil bed – filtration, adsorption sites Plants – biological uptake, stabilization,

aesthetics Sand layer - drainage, aerobic conditions Gravel and Drain Pipe – drainage,

overflow

Page 16: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Bioretention areas are typically “off-line”

On-LineOn-LineSystemSystem

Off-LineOff-LineSystemSystem

ControlControl

ControlControl

Flow Flow SplitterSplitter

Page 17: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Diversion Methods

1. Flow diversion structure

2. Inlet deflector

3. Slotted curb4. Deflector

weir

Page 18: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Planting Bed Soil

This is a critical design feature !!! Soil bed should be 2.5 – 4 feet in depth Soils should be sandy loam, loamy sand

or loam texture Clay content of 10-25% Organic content of 1.5-3% pH between 5.5 and 6.5 Infiltration rate must be >= 0.5 in/hr Typically “engineered” soils are best

Suggested planting Suggested planting bed “recipe” has been bed “recipe” has been

updated in CSS!updated in CSS!(Section 8.4.3)(Section 8.4.3)

Suggested planting Suggested planting bed “recipe” has been bed “recipe” has been

updated in CSS!updated in CSS!(Section 8.4.3)(Section 8.4.3)

Page 19: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Design Steps

1. Compute WQv and if applicable Cpv

2. Screen site3. Screen local

criteria4. Compute Qwq

5. Size diversion6. Size filtration area7. Set elevations

8. Design conveyances

9. Design pretreatment

10. Size underdrain11. Design overflow12. Prepare

landscape plan

Page 20: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

WQ Peak Flow1. Back out curve

number

2. Calculate unit peak discharge using SCS simplified peak figures

3. Calculate peak discharge as:

CN = 1000/[10 + 5P +10Qwv - 10(Qwv² + 1.25 QwvP)½]

Qwq = qu * A * Qwv

p. 2.1-30

Page 21: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Darcy’s Law

  AAff == (WQv) (d(WQv) (d

ff) / [ (k) (h) / [ (k) (hff + d + d

ff) (t) (tff)] )]

= 975 sq-ft per acre = 975 sq-ft per acre for minimum filter bed and 100% impervious surfacefor minimum filter bed and 100% impervious surface  

where:where:AAff == surface area of ponding area (ftsurface area of ponding area (ft22))

WQWQvv = = water quality volume (or total volume to be captured)water quality volume (or total volume to be captured)

ddff == filter bed depth (4 feet minimum)filter bed depth (4 feet minimum)

k k == coefficient of permeability of filter media (ft/day)coefficient of permeability of filter media (ft/day) (use 0.5 ft/day for silt-loam)(use 0.5 ft/day for silt-loam)

hhff == average height of water above filter bed (ft)average height of water above filter bed (ft)

(3 inches, which is half of the 6-inch ponding depth)(3 inches, which is half of the 6-inch ponding depth)ttff == design filter bed drain time (days)design filter bed drain time (days)

(2.0 days or 48 hours is recommended maximum)(2.0 days or 48 hours is recommended maximum)

Page 22: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

An example of bioretention design

Taken from Appendix D2

Page 23: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Base DataLocation: Atlanta, GASite Area = 3.0 acImpervious Area = 1.9 ac; 63.3%Rv = 0.05 + (63.3) (0.009) = 0.62

Soils Type “C”

Hydrologic Data  Pre PostCN 70 88tc .39 .20

Page 24: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Lets skip the rest of the flow volumes Lets skip the rest of the flow volumes since we already know how to do thatsince we already know how to do that

Page 25: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 2. Determine if the development

site and conditions are appropriate for

the use of a bioretention area.

Step 3. Confirm local design criteria

  WQv

  Cpv

Qp-25

  Safe passage of Qp-100

Page 26: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 4. Compute WQv peak discharge (if offline facility) See section 2.1.7  

Step 5. Size flow diversion structure (if needed) See section 3.1.3

Not needed for this site – direct runoff sized for 25-year storm of 19 cfs 

Page 27: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 6. Determine size of bioretention

filter area  Af = (WQv) (df) / [ (k) (hf + df) (tf)]  Where:Af = surface area of filter bed (ft2)df = filter bed depth (ft)k = coefficient of permeability of filter media (ft/day)hf = average height of water above filter bed (ft)tf = design filter bed drain time (days) (48 hours is recommended) Af = (8,102 ft3)(5’) / [(0.5’/day) (0.25’ + 5’) (2 days)] (With k = 0.5'/day, hf = 0.25’, tf = 2 days) Af = 7,716 sq ft

Page 28: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 7. Set design elevations and dimensions of facility  

Step 8. Design conveyance to facility only for off-line facilities 

Page 29: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 30: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 31: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 9. Design pretreatment  

Pretreat with a grass channel. For a 3.0 acre drainage area, 63% imperviousness, and slope less than 2.0%, provide a 90' grass channel at 1.5% slope. The value from Table 2 is 30' for a one acre drainage area.

  Parameter <= 33% Impervious

Between 34% & 66% Impervious

>= 67% Impervious

Notes

Slope <= 2% >= 2% <= 2% >= 2% <= 2% >= 2% Max slope = 4%

Grassed channel min. length (feet)

25 40 30 45 35 50 Assumes a 2’ wide bottom

width

Page 32: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 10. Size underdrain area  

 

Base underdrain area on 10% of the A10% of the Aff or 772 sq ft. Use 6" perforated plastic pipes surrounded by a three-foot-wide gravel bed, 10' on center (o.c.):

This is a rule of thumb !This is a rule of thumb !

Page 33: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection
Page 34: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Step 11. Design overflow  

 

 

Size overflow weir to pass the 25-year event with 6" of head, using the weir equation.  Q = CLh3/2

 Where C = 2.65 (smooth crested grass weir)Q = 19.0 cfsh = 6“

L = Q / [(C) (h3/2)] or (19.0 cfs) / [(2.65) (.5)1.5] = 20.3' (say 20')

Page 35: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Overflow Weir

Overflow Weir

Page 36: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Overflow Drain

Overflow Drain

Page 37: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Coastal Challenges…

See Handouts for LID Practices…See Handouts for LID Practices…Challenges Associated with Using Bioretention Areas in Coastal GA

Site Characteristi

c

How it Influences the Use

of Bioretention AreasPotential Solutions

Poorly drained soils, such as hydrologic soil group C and D soils

Reduces the ability of bioretention areas to reduce stormwater runoff volumes and pollutant loads on development and redevelopment sites.

Use underdrained bioretention areas to manage stormwater runoff in these areas.Use additional low impact development and stormwater management practices to supplement the stormwater management benefits provided by underdrained bioretention areas.

Page 38: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Coastal Challenges…

See Handouts for LID Practices…See Handouts for LID Practices…Challenges Associated with Using Bioretention Areas in Coastal GA

Site Characteristi

c

How it Influences the Use

of Bioretention AreasPotential Solutions

Well drained soils, such as hydrologic soil group A and B soils

Enhances the ability of bioretention areas to reduce stormwater runoff rates, volumes and pollutant loads, but may allow stormwater pollutants to reach water supply aquifers with greater ease.

Use liners and underdrains to capture and treat stormwater runoff at stormwater hotspot facilities and in areas with groundwater recharge.In areas w/o groundwater recharge, use non-underdrained bioretention areas and infiltration practices (Section 8.4.5)

Page 39: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Coastal Challenges…

See Handouts for LID Practices…See Handouts for LID Practices…Challenges Associated with Using Bioretention Areas in Coastal GA

Site Characteristi

c

How it Influences the Use

of Bioretention AreasPotential Solutions

Flat terrain May cause stormwater runoff to pond in the bioretention area for extended periods of time.

Ensure that the underlying native soils will allow area to drain within 48 hours of the end of a rainfall event to prevent the formation of nuisance ponding conditions.

Page 40: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Coastal Challenges…

See Handouts for LID Practices…See Handouts for LID Practices…Challenges Associated with Using Bioretention Areas in Coastal GA

Site Characteristi

c

How it Influences the Use

of Bioretention AreasPotential Solutions

Shallow water table

May cause stormwater runoff to pond in the bioretention area for extended periods of time.

Ensure distance from the bottom of the bioretention area to the top of the water table is at least 2 feet.Reduce the depth of the planting bed…Use stormwater ponds (Section 8.4.1), stormwater wetlands (Section 8.4.2) and wet swales (Section 8.4.6), instead…

Page 41: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

Coastal Challenges…

See Handouts for LID Practices…See Handouts for LID Practices…Challenges Associated with Using Bioretention Areas in Coastal GA

Site Characteristi

c

How it Influences the Use

of Bioretention AreasPotential Solutions

Tidally-influenced drainage system

May prevent stormwater runoff from moving through the bioretention area, particularly during high tide.

Page 42: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

CSS Design Credits

7.4 Better Site Planning Techniques

7.5 Better Site Design Techniques

7.6 LID Practice

8.4 General Application BMPs

Page 43: Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

CSS Design CreditsTable 6.5: How Stormwater Management Practices Can Be Used to Help Satisfy the Stormwater Management Criteria

Stormwater Management Practice

Stormwater RunoffReduction

Water Quality Protection

Aquatic Resource Protection

Overbank Flood Protection

Extreme Flood Protection

General Application Practices

Stormwater Ponds

“Credit”:None

“Credit”:Assume that a stormwater pond provides an 80% reduction in TSS loads, a 30% reduction in TN loads and a 70% reduction in bacteria loads.

“Credit”:A stormwater pond can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).

“Credit”:A stormwater pond can be designed to attenuate the overbank peak discharge (Qp25) on a development site.

“Credit”:A stormwater pond can be designed to attenuate the extreme peak discharge (Qp100) on a development site.

Stormwater Wetlands

“Credit”:None

“Credit”:Assume that a stormwater wetland provides an 80% reduction in TSS loads, a 30% reduction in TN loads and a 70% reduction in bacteria loads.

“Credit”:A stormwater wetland can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).

“Credit”:A stormwater wetland can be designed to attenuate the overbank peak discharge (Qp25) on a development site.

“Credit”:A stormwater wetland can be designed to attenuate the extreme peak discharge (Qp100) on a development site.

Bioretention Areas, No Underdrain

“Credit”:Subtract 100% of the storage volume provided by a non-underdrained bioretention area from the runoff reduction volume (RRv) conveyed through the bioretention area.

“Credit”:Assume that a bioretention area provides an 80% reduction in TSS loads, an 80% reduction in TN loads and a 90% reduction in bacteria loads.

“Credit”:Although uncommon, on some development sites, a bioretention area can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).

“Credit”:Although uncommon, on some development sites, a bioretention area can be designed to attenuate the overbank peak discharge (Qp25).

“Credit”:Although uncommon, on some development sites, a bioretention area can be designed to attenuate the extreme peak discharge (Qp100).