PE Workshop for LS1 / 22 & 23 Nov. 2012 BIS and SMP activities during LS1 TE-MPE LS1 Workshop S. Gabourin on behalf of TE-MPE- EP

BIS and SMP activities during LS1

  • Upload
    wyatt

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

BIS and SMP activities during LS1. TE-MPE LS1 Workshop S. Gabourin on behalf of TE-MPE-EP. 1 – BIS and SMP : Change CPU Modules in VME systems (#11115, #11117 and #11119). Description of the activity - PowerPoint PPT Presentation

Citation preview

Page 1: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

BIS and SMP activities

during LS1TE-MPE LS1 Workshop

S. Gabourinon behalf of TE-MPE-EP

Page 2: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- For all VME systems, replace the RIO3 modules (LynxOS) by the MEN-A20 modules (Linux).

The latter are supplied by BE/CO- The VHDL firmware of the VME boards needs to be adapted to the MEN-A20- The FESA class has to be adapted- The VME systems crates are

- BIC installed around the LHC ring, in the Injection and Extraction regions and in the SPS ring (~40 front-ends have to be upgraded)

- SMP controllers installed in the CCR (2 front-ends)

1 – BIS and SMP : Change CPU Modules in VME systems (#11115, #11117 and

#11119)

SMP

2

Page 3: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Why during LS1?- LynxOS power PC are no longer supported by BE/CO

Risks / impact if not during LS1- Not enough spare to replace faulty RIO3 modules in operation- No support if any malfunction → Loss of monitoring

Time period- Before August 2013- 2 weeks for installation (4 CPU / day)

Manpower- Stéphane to replace the modules in the alcoves and check if the monitoring works- Contribution of MS section to adapt the FESA class

Contributions from the other groups- The MEN-A20 boards are provided by BE/CO group.

Potential showstoppers- Delay for supplying the MEN-A20 from BE/CO

1 – BIS and SMP : Change CPU Modules in VME systems (#11115, #11117 and

#11119)

3

Page 4: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

- The prototype module will be installed on spare fibers (1 or 2)- Several configurations can be implemented for monitoring (Raspberry PC, Python

interface…)

Why during LS1?- Some fibers optic show an important attenuation of optical budget since their installation

Risks / impact if not during LS1- Beam permit not correctly transmitted on the BIS loops → False Beam Dump

Time period- Before August 2013- 1 day for the installation

Manpower- Jonathan and Spyros (and MS?)

Contributions from the other groups- None

Potential showstoppers- None

2 – BIS : Install fiber optic monitoring for the Beam Permit Loops (#11124)

4

Description of the activity- Monitor the optical signals, and anticipate false dumps due to a decreasing of the optical

budget

Page 5: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- Upgrading of the CIBF units. They are mainly used for the SPS Extraction / LHC Injection

User Permits (Experiments and LBDS links). In total 38 pairs of CIBF are in operation- At least the CIBT board (used for monitor and test the CIBF) needs an upgrade.

Why during LS1?- Lack of monitoring- Not possible to remotely measure the optical power- Obsolescence of the components

Risks / impact if not during LS1- Diagnostics issues → Loss of availability- CIBF spare limited (due to obsolescence)

Time period- Before Feb 2014

Manpower- Stéphane- Contribution of MS (FESA and Java GUI follow-up)

3 – BIS : Replace the CIBF units (#11125)

5User system

CIBFu CIBFcOptical link

Page 6: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

User system

CIBFu CIBFcOptical link

Contributions from the other groups- None

Potential showstoppers- Depending on the design study, there will be

more impact on existing cards → Design a new CIBT and potentially a new CIBM

3 – BIS : Replace the CIBF units (#11125)

6

User system CIBU

Page 7: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- 3 BICs and about 25 CIBU links have to be installed and commissioned.

Why during LS1?- The installation has to follow the Linac4 schedule

Risks / impact if not during LS1- Stop the progress of Linac4 project

Time period- Before August 2013

Manpower- Christophe, Stéphane and Nicolas- MS: Instantiate FESA and BIS GUI for new FECs

Contributions from the other groups- All L4 equipment systems connected to the BIS

Potential showstoppers- The Linac4 planning

4 – BIS : Deploy a BIS for Linac4 (#11123)

7

Page 8: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- A Beam Interlock Controller needs to be moved from UJ56 to USC55

Why during LS1?- Radiation issue

Risks / impact if not during LS1- R2E problems after LS1

Time period- Before August 2013- Few days

Manpower- Christophe and Nicolas

Contributions from the other groups- EN/EL to install fibers in USC55

Potential showstoppers- None

5 – BIS : Move a BIC from UJ56 to USC55 (#11126)

8

Page 9: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- If a change has been made during LS1 on the users side, the concerned connection with the

BIS must be re-commissioned.

Why during LS1?- The commissioning has to be done before the machines restart

Risks / impact if not during LS1- Problem receiving user permits → Problem for Machine Protection

Time period- Before August 2014

Manpower- Christophe and Spyros

Contributions from the other groups- All equipment systems who will make changes

Potential showstoppers- Late information about the modification of a user system- It implies the participation of people from each user system

6 – BIS : Re-commission CIBU users who will make change during LS1 (#11126)

9

Page 10: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- Individual System Test for the BIS and SMP system prior to beam operation- It regroups pre-operational checks and automatic CIBU tests

Why during LS1?- The tests have to be defined and performed before the machines restart

Risks / impact if not during LS1- Malfunction of BIS or SMP (with all the consequences)

Time period- Before August 2014

Manpower- Stéphane and Christophe- Review and transmit specs to MS

Contributions from the other groups- None

Potential showstoppers- BIS new hardware / new VHDL / new FESA class…

7 – BIS and SMP : Individual Test Systems (#11658 and #11659)

10

Page 11: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- Connect the LHC BIS to the LBDS re-triggering system (so called 3rd channel).- This channel is directly connected to the LBDS to provoke asynchronous dump in case the

TSU doesn’t trigger the expected synchronous beam dump- It implies a new CIBG card (Beam Permit Loop Generator)- The CIBG 3rd channel should reach a high availability level

Why during LS1?- It has to be done for the restart of the LHC

Risks / impact if not during LS1- Beam potentially not dumped → Pb for Machine Protection

Time period- Before August 2014

Manpower- Stéphane- MS: Follow-up for FESA, Java GUI and PM data integration

Collaboration for the other groups- TE-ABT

Potential showstoppers- None

8 – BIS Collaboration : LBDS improvement (#12054)

11

Dumping S

Beam permit loops

Asynchronous

Page 12: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Description of the activity- Specify the functionalities and hardware for the BIS version2- It will be developed between LS1 and LS2, and installed during LS2

Why during LS1?- Dedicate enough time for a well defined specification

Risks / impact if not during LS1- Delay on the BIS2 project

Time period- none

Manpower- Stéphane

Contributions from the other groups- None

Potential showstoppers- None

9 – BIS : Specification of BIS v2

12

Page 13: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Summary

Activity Risks if not during LS1

Deadline Manpower Contribution

1 - BIS and SMP: Change CPU Modules in VME systems

High August 2013 Stéphane BE-COMS section

2 - BIS : Install fiber optic monitoring for the Beam Permit Loops

Medium August 2013 JonathanSpyros

-

3 - BIS : Replace the CIBF units Medium Feb 2014 Stéphane MS section

4 - BIS : Deploy a BIS for Linac4 High August 2013 ChristopheStéphaneNicolas

L4 equipment systemsconnected to the BISMS section

5 - BIS : Move a BIC from UJ56 to USC55

Medium August 2013 ChristopheNicolas

EN-EL

6 - BIS : Re-commission CIBU users who will make change during LS1

High August 2014 ChristopheSpyros

User equipment systemswho make changes

7 - BIS and SMP : Individual Test Systems

High August 2014 ChristopheStéphane

MS section

8 - BIS Collaboration : LBDS improvement

High August 2014 Stéphane TE-ABTMS section

9 - BIS : Specification of BIS v2 Medium - Stéphane -

Thanks ! 13

Page 14: BIS and SMP activities during LS1

MP

E W

ork

sh

op

for

LS

1 /

2

2 &

23

Nov.

20

12

Spare Slides

Page 15: BIS and SMP activities during LS1

15

Linac4 Masterplan

Ready for 50 MeV protons as

backup to Linac2

Ready for H-

Revised 2012/16 Masterplan, approved by the LMC on 27.6.2012

Connection of Linac4 to the PS Booster during LS2 (2017/18)

Start high-energy commissioning (12

MeV)

1 year reliability

run

End high-energy

commissioning (160 MeV)

Page 16: BIS and SMP activities during LS1

Proposed new plan – LS1 details16

LS1

After LS1 (July-Dec 2014):Closing line for protons Commissioning to 100MeV

Note that the 2014 plan can be modulated depending on the actual situation with LS1

2014:Commissioning DTL1 (12 MeV)Commisioning DTL2&3 (50 MeV)

2013:3 MeV testsClosing RF structures

Page 17: BIS and SMP activities during LS1

17