Operation ‘Phase 2’
Parallel operation of 3 beamlines from 2017B
Machine tuning
User time
Preparation for user time
For promotion program/facility
Commissioning new Instruments
Not operated
Operation schedule: July 2018
BL1
BL1
BL1
BL1
BL1
BL1
BL3
BL2
30 31
BL2
BL3
2923 24 25 26 27 28
BL2
BL3
BL3
16 17 18 19 20 21 22
BL2
9 10 11 12 13 14
BL2
BL3
4 5 6 7 8
Wed Thu Fri Sat Sun
July, 2018A
Mon Tue
15
BL3
2 3
BL2
1
Operation ‘Phase 2’
• More user beamtimeOver 6,000 h in a year. Feasibility-check beamtime @BL2 (from 2017B)Trial for beamtime allocation on a single-shift (12 h)-a-day
basis @BL2 (from 2018B)
• Opportunities for promotion programs SACLA Basic Development Program SACLA Research Support Program for Graduate StudentsPromotion Program for Industrial Use of SACLA
• New photon source: 500-TW optical lasersOpen to users from 2018A
Beamlines Type of experiment Major instruments Remarks
BL1(40-150 eV)
Ion/electron spectroscopySX spectroscopyEllipsometryImaging
fs laserKB (~5 µm)Timing tool
Users are encouraged to use their own end-stations
BL2(4-15 keV)
Fixed-target PXSFXCDI/SAXSP&P with high power laser
KB (~1 µm)DAPHNIS (SFX)MAXIC-S/II (CDI)500 TW laser
Feasibility-check beamtime
BL3(4-15 keV)
P&P XRD, WAXS,SpectroscopyXPCSX-ray pump X-ray probe
fs laserTiming toolCRL, KB (~1 µm)300 exa (~0.1 µm)SDOPlatform for utilizing high-power ns laser
Double-pulse XFEL (~300 fs delay @ 10 keV)
Self-seeding (trial use)
X-ray polarization control
To BL2/BL3 users, the facility assigns BL2 or BL3 according to the type of experiment.
0
1000
2000
3000
4000
5000
6000
7000
FY2012 FY2013 FY2014 FY2015 FY2016 FY2017
BL2/3 user time
BL1 user time
In-house beamtime
Industrial use
Total operation time
Tim
e (h
)
Annual operation time
SX-FEL (BL1) user operation from 2016B
Parallel use of BL2&3 from 2017B
Total user time will reach 6000 h in FY2018.
Total user time
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
10
20
30
40
50
60
70
80
90
100
Submitted
Approved
Approved (overseas)
Approved ratio
User proposal statistics
• Increasing availability due to the multi-beamline operation.• >30% of accepted proposals are from overseas users (17B-18B).
Add SXFEL (BL1) Parallel use of BL2&3
0
10
20
30
40
50
60
70
80
90
2012 2013 2014 2015 2016 2017
SCSS
SACLA
Number of publications
http://xfel.riken.jp/eng/research/indexnne.html
Beamline layout & new capabilities
BL3
BL2
BL1
SCSS+ (~800 MeV, 60 Hz)
SACLA main linac(~8 GeV, 60 Hz)
OH2
OH1
EH1 EH2
EH3 EH4c
EH4b
EH4a
EH6
EH5 SR
LH
500 TW lasers
SACLA-SPring-8Experimental Facility
(Top view)
Fast kicker magnet
• BL1: Soft X-ray FEL (40 - 150 eV) • BL2: Hard X-ray FEL (4 - 15 keV)• BL3: Hard X-ray FEL (4 - 15 keV)
New nm-focus system “300exa” (2018A)
New end-station for high power ns laser (2018B)
HEDS station (2018A)
Split-and-delay optics (2018B)
Timing monitor for SX-FEL (2018B)
Detailed information is provided in posters. Nano-beam CDI
“MAXIC-S” (2018B)
Reflection-type self-seeding system (trial use in 2018B)
Report of review results
Suggestions on proposal selection
Proposal review system
Japan Synchrotron Radiation Research Institute (JASRI)
SACLA Selection Committee• 9 members from outside the facility
http://sacla.xfel.jp/?p=317
Users
SACLA Proposal Review Committee (PRC)• More than 20 members
1 chair >15 peer reviewers from outside
the facility 4 members from JASRI
Report on status of publications
SPring-8/SACLA Research Results Review Committee
Proposal Approval
• Information on proposal application (JASRI): http://sacla.xfel.jp/?lang=en
• SACLA portal HP (technical information, publications, etc.): http://xfel.riken.jp/
General information
• Two calls in a year.– May (Deadline in June) for Term B (Sept.-Feb.)– Oct. (Deadline in Nov.) for Term A (March-July)
• Two categories – General proposal (non-proprietary proposal)
• The project leaders are required to publish their research results.
– Proprietary proposal• Beamtime fee: 1,098,000 JPY/2 hours
(1,647,000 JPY/2 hours for Time-Designated Proposal)
Contact: About application procedures:
[email protected] (SACLA Users Office)Technical queries:
[email protected] (SACLA beamline staff)
Review process
• Peer review by external PRC members– Each proposal is rated by 5 reviewers.
– Scientific/technological importance is evaluated.
– The reviewers rate each proposal independently and submit comments for the discussion of PRC.
– Each proposal is ranked based on the average score of the reviewers.
• Technical feasibility and safety are evaluated by JASRI members of PRC.
• SACLA PRC members discuss the priority of proposals based on the reviewers’ results.– Acceptable proposals are selected according to the
the available beam time of each beamline.
After obtaining approval of your proposal
• Contact beamline scientists:[email protected]
• Provide information as early as possible: – Practical (not only conceptual) information for setting up your
experiment.– Final plan should be provided at least 6 weeks prior to your
beamtime.
• Make enough preparation:– Especially for experiments that need exotic setup/bring-in
apparatus.– If necessary, apply for feasibility-check beamtime.
• Do experiment:– Users are encouraged to operate instruments by themselves.– User-friendly platforms and program interface (ExpCotrolAPI) are
available (see Posters)
Typical schedule for preparation by the facility staff
• Final experimental plan: ~6 weeks in advance of beamtime.
• Final schedule and conditions: ~3 weeks in advance.
Week 1 2 3 4 5 6 7
Beamtime
Review on schedule
Discussion with users
Layout designReview on layout
Installation to hutch
Final plan Fix a final schedule and conditions
Building a setup
Scheduling for beamtime
Well-planned preparation is a key to successful.
Overview of hard x-ray beamlines (BL2/3) at SACLA XFEL R&D Division (RIKEN) & XFEL Utilization Division (JASRI)
Injector Atmosphere Detector Optical laser
Viscous carrier Liquid-jet (GDVN)Mix-and-jetDroplet
AirHe (~90%)He (anaerobic)
MPCCD Phase I (60 Hz)MPCCD Phase III (30 Hz)MX300HS (10 Hz, 2x2 mode)
OPO (ns)YAG (ns)CPA (fs, BL3)OPA (fs, BL3)
Diverse application platform for hard X-ray diffraction in SACLA (DAPHNIS)
Laser 1
Laser 2 Sample
XFEL
For pump-probe measurement
DAPHNIS with helium chamber
Experimental platforms
Multi-beamline operation
Beamline layout & experimental instruments (see also Posters 3-11)
Proposal review & preparation for experiment
From 2018
FY2011 2012 2013 2014 2015 2016 2017 2018
Construction Phase 1 (development & establishment) Phase 2
MAXIC-II for P&P
Prototype
Advanced functions
Platform
DAPHNIS
MAXIC
MAXIC-SNano-beam
TR-DAPHNIS for P&P
User operation
→XES/XAS/WAX
Multi-purpose chambers