7
p/n 060-C391-204 Corning Cable Systems Standard Recommended Procedure (SRP) 060-C391-204 Issue 7, October 2005 Page 1 of 7 C(G)-391 High Density Connector Right-Hand Mounted, Stubless Unit 1. General 1.1 This document is a basic guide for installing the Corning Cable Systems C(G)391 High Density Connector. It applies only to C(G)-391 Connectors that do not have a cable stub, are mounted on right- hand side of the frame vertical mounting bar, and are frame grounded. 1.2 The C(G)-391 central office connector has been designed to meet or exceed Bellcore Specification TR-EOP-000164. 1.3 This document is being reissued to remove a tool reference. Figure 1 Test Field Jumper Field Primary Fanning Strip Secondary Fanning Strip Frame Mounting Bracket Protector Field (Left Side) Table of Contents 1. General ........................................................ 1 2. Installation Steps .......................................... 2 3. Step 1—Temporary Mounting ................... 2 4. Step 2—Installing Cable Stub ..................... 3 5. Step 3— Grounding .................................... 4 6. Step 4—Splicing Cable Stub ....................... 4 7. Step 5—Final Mounting .............................. 4 8. Step 6—Marking and Jumpering ................ 5 9. Step 7—Inserting Protector Modules ......... 6 10. Step 8—Testing ........................................... 7

Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Embed Size (px)

DESCRIPTION

COOK ENERGIA E TELECOMUNICAÇÕES LTDA, www.cookenergia.com, (55) 021 2609-4196, 9387-1021 - Bloco terminal protetor tipo 391, super compacto, menor que o Bloco tipo 318, com a vantagem de ser equipado com campo de testes frontal oferecendo ganho de pares nas verticais dos DGs de centrais públicas e privadas. Padrão em algumas centrais Petrobras e armários em gabinetes externos. Oferece pelo menos 200 pares a mais se comparado com Bloco tipo 303 e pelo menos 100 pares a mais se comparado com Blocos 310 e 318 por vertical. Esta quantidade pode ser multiplicada por 5 a considerar que nos DGS de centro se configuram pelo menos 5 verticais. Distribuidor no Brasil Cook Energia e Telecom, www.cookenergia.com, (55) 21 2609-4196, 9387-1021 .

Citation preview

Page 1: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

p/n 060-C391-204

Corning Cable SystemsStandard Recommended Procedure (SRP) 060-C391-204

Issue 7, October 2005Page 1 of 7

C(G)-391 High Density Connector Right-Hand Mounted, Stubless Unit

1. General1.1 This document is a basic guide for installingthe Corning Cable Systems C(G)391 High DensityConnector. It applies only to C(G)-391 Connectorsthat do not have a cable stub, are mounted on right-hand side of the frame vertical mounting bar, andare frame grounded.

1.2 The C(G)-391 central office connector hasbeen designed to meet or exceed BellcoreSpecification TR-EOP-000164.

1.3 This document is being reissued to remove atool reference.

Figure 1

Test Field

Jumper Field

PrimaryFanning Strip

SecondaryFanning Strip

FrameMountingBracket

Protector Field(Left Side)

Table of Contents

1. General ........................................................12. Installation Steps..........................................23. Step 1—Temporary Mounting ................... 24. Step 2—Installing Cable Stub .....................35. Step 3— Grounding .................................... 46. Step 4—Splicing Cable Stub .......................47. Step 5—Final Mounting ..............................48. Step 6—Marking and Jumpering ................59. Step 7—Inserting Protector Modules .........610. Step 8—Testing ...........................................7

Page 2: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Page 2 SRP 060-C391-204 Issue 7

2. Installation StepsInstallation consists of eight sequential steps:

1. Temporary Mounting2. Installing Cable Stub3. Final Mounting4. Grounding5. Splicing Cable Stub6. Marking and Jumpering7. Inserting Protector Units8. Testing

3. Step 1—Temporary MountingThe C(G)-391 Connector comes with a temporaryfield stubbing kit that provides working access forfield installation of the cable stub (Figure 2).

3.1 Position field stubbing bracket on left side ofC(G)-391 Connector mounting bracket. Insert screw(provided with field stubbing bracket) through slotin C(G)-391 Connector mounting bracket and holein field stubbing bracket.

3.2 Insert two no.12 screws (provided with C(G)-391 mounting bracket) through slots in fieldstubbing bracket. Mount field stubbing bracket toright-hand side of frame vertical mounting bar.

Frame VerticalConnectorMounting Bar

TemporaryFieldStubbingBracket

Figure 2

C-391MountingBracket

Page 3: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Page 3SRP 060-C391-204Issue 7

4. Step 2—Installing Cable StubFollow local practices for installing the cable stub.

4.1 Remove back cover from C(G)-391 connector(Figure 3).

Figure 3

Figure 4

Figure 5

Remove Screws

4.2 Feed 10-pair group of cable stub wiresthrough each of the ten vertical fanning holes(Figure 4).

4.3 Dress each 10-pair group of wires toappropriate row of OSP terminals (Figure 5).

4.4 Wire-wrap each pair of wires to respectiveterminal pins.

4.5 Replace back cover after all OSP terminalconnections have been made.

10 9 8 7 6

5 4 3 2 1

100 99 98 97 96

95 94 93 92 91

5 4 3 2 1

CO TipOSP Tip

OSP Ring

CO Ring

Page 4: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Page 4 SRP 060-C391-204 Issue 7

5. Step 3— GroundingThe C(G)-391 connector is designed for framegrounding, Follow local practices and procedures tocomplete grounding.

6. Step 4—Splicing Cable StubCable stub wiring uses standard cable wire colorcodes. Match stub pairs and follow local practicesfor splicing.

7. Step 5—Final Mounting7.1 After cable stub installation (Step 2), removefield stubbing bracket.

Figure 6

7.2 The C(G)-391 Connector mounting brackethas two slotted mounting holes and a half-hole ateach end. Insert no.12 screws (provided) throughone mounting hole and one half-hole, or throughtwo slotted mounting holes, and secure the C(G)-391 mounting bracket to the left-hand side of framevertical mounting bar (Figure 6).

NOTE: Mounting hole patterns may differ at the topand bottom of some tall, conventional main distributingframes’ vertical mounting bars. A special mountingbracket may be used to facilitate mounting the C(G)-391Connector in these applications (Figure 6 inset).

SpecialMountingBracket

Overhead View

FrameVerticalMountingBar

C(G)-391Mounted OnRight HandSide Of Frame

Half-Hole

Half-Hole

SlottedMountingHoles

Page 5: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Page 5SRP 060-C391-204Issue 7

8. Step 6—Marking and JumperingJumper terminals consist of 20 rows of wire-wrapterminal pins. Each row of five terminals isidentified by a number for easy pair identification(Figure 7).

8.1 Use appropriate stenciling kit to mark cableand pair numbers. Mark cable ID near “CA” area attop of connector; mark ID near “PR” area at bottomof connector.

8.2 Insert two pairs of jumper wires intosecondary fanning strip slot (pairs one and two intop slot).

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

00

1 to 5

6 to 10

11 to 15

16 to 20

21 to 25

26 to 30

31 to 35

36 to 40

41 to 45

46 to 50

51 to 55

56 to 60

61 to 65

66 to 70

71 to 75

76 to 80

81 to 85

86 to 90

91 to 95

96 to 100

Rear of C(G)-391 ConnectorFront of C(G)-391 Connector

Jumpering Order

1stpair

2ndpair

3rdpair

4thpair

5thpair

Top Slot(5 pair in each slot)

Jumper Wires

Secondary Fanning StripPrimary

Fanning StripJumperTerminal Field

CA

PR

Figure 7

8.3 Feed jumper wires into primary fanning strip.Bring first jumper wire pair forward, and wire wrapjumper wires to terminal pins.

8.4 Dress each wire along bottom of appropriaterow of terminal pins.

8.5 Repeat steps above for remaining jumperpairs.

8.6 Dress wire slack to rear of C(G)-391connector. Jumper pairs should run neatly fromterminal field across connector backplane.

Page 6: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Page 6 SRP 060-C391-204 Issue 7

9. Step 7—Inserting ProtectorModulesThe protector field is located on the left side of theC(G)-391 Connector. Numbers at the top and rightside of the protector field identify wire pairs. Theprotector field is keyed so that protector modulescan only be installed one way (Figure 8).

NOTE: Use appropriate test set to check protectormodules for tip and ring continuity and ground.

Figure 8

9.1 Insert protector modules to “detent” positionduring installation (Figure 8 inset). Detent positionprotects OSP pairs, but keeps OSP pairsdisconnected from Central Office (CO) equipment.

9.2 After installation steps have been completed,push each protector unit into its fully insertedposition. This connects CO pairs to OSP pairs.

Page 7: Bloco Proteção Cook C391 , (55) 021 2609-4196, 9387-1021

Page 7SRP 060-C391-204Issue 7

Corning Cable Systems reserves the right to improve, enhance and modify the features and specificationsof Corning Cable Systems’ products without prior notification. Discovering Beyond Imagination is atrademark of Corning Incorporated. All other trademarks are the properties of their respective owners.Corning Cable Systems is ISO 9001 certified.© 2000, 2005 Corning Cable Systems. All rights reserved. Published in the USA.p/n 060-C391-204 / October 2005

Customer Service—US or Canada: 1-800-743-2671International: +1-828-901-5000Fax: +1-828-325-5060

Corning Cable Systems LLC, PO Box 489, Hickory, NC 28603-0489 USA

http://www.corning.com/cablesystems

10. Step 8—Testing

Figure 9

The C(G)-391 test field consists of 100 pairs ofgold-plated contacts. Test points are connecteddirectly to OSP cable with separate connections fortip and ring of each pair. Test field terminals arenumbered to show beginning and end of each row offive terminals (Figure 9).

• 1,5

• 6,10

• 11,15 (through....)

• 96,00 (100)

Use Corning NT8G99AA Single-pair test cordor A0354444 100-pair test connector to testconnections.

NOTE: The C(G)-391 is also designed to be usedwith AT&T model P2FM single-pair test cord, andAT-8987 T-test connector.

Tip and RingContacts (TipOver Ring) Test Shoe

MountingHoles