Blue H Engineering Nico C.F. Bolleman

Offshore Wind EnergySeminar Stavanger April 17, 2013

Offshore Wind Floating

Foundations the competitive technology

1

Page 2: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Blue H EngineeringBlue H Engineering BV, fully owned by Business Creation Wind Energy AG, is the technology developer and design engineer for TLP based floating foundations.

Having an expert team with capacities in: hydrodynamics, aerodynamics, marine contracting, offshore structural design & engineering and related certification works and procurement and project management.

Active and available for floating foundation design and engineering applications, such as: o offshore wind o offshore power transformer stations o offshore oil and gas rigs o hydrogen generation and storage at sea

2

Page 3: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Blue H floating wind deep-water foundation

3

Since 2004 has the previous Blue H group been active in the development of the TLP concept for floating wind, as well as in the development of offshore floating wind farms, originally started for deployment in the Mediterranean Sea.

Blue H Engineering has been driving its product design process to secure a market acceptable return on investment, in specific for low wind sites at sea as well as for harsh North Sea and Ocean environments for wind turbine capacities over 5MW.

The for series manufacturing designed offshore wind TLP is the most stable (for turbine with large rotor diameters), robust and economical attractive foundation model for deep-water (>50m) applications .

Page 4: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Blue H design concepts and product development

4

Page 5: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

TLP based Floating Foundation System for 5-7 MW WT

Commercially available WT

5-7 MW

Tower

Hull

Arms

Tethers(synthetic

rope)

Submergible gravity anchors

orSuction anchor

Fists

Access platform

Dynamic Power Cable

Page 6: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

TLP based Floating Foundation System for 5-7 MW WT

Hullø16m x 12m*

Fistsø4.6x7.5m*

(PCD 50 -100m)*

Dep

th 5

0 –

>

300 m

* depending on final selected wind turbine and the local site metocean conditions

Masses (Weights in metric tons) *o WT 350 T (NREL - 5 MW)o Tower 250 To Platform 750 T (hull 435 T, arm 85 T, fists 65 T, auxiliary equipment 165 T) o Displacement 3600 Tons

Hu

b h

eig

ht

90 m

*

Page 7: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Blue H Engineering TLP foundation benefits for Offshore Wind

Functional • Maximum stability for floating wind turbine and so max

energy yield generated from wind, transferred to the rotor• Secured limiting the tilting angle and the accelerations of the

turbine nacelle• Proven oil & gas exploration technology (deep water TLP’s)• Designed for cost efficient series manufacturing• No seabed preparation• Anchor design tailored to the seabed (solid sand, mud, rock)• Tsunami resistant• No transition piece (as on fixed mono-pile foundations) • Simple and robust system• Small foot print (fishery)

7

Page 8: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Blue H Engineering TLP foundation Benefits for Offshore Wind

Assembly at yard• Including the turbine installation, pre-commissioning, connecting the tethers and anchors• Draught at yard harbor < 10m

Transport and installation• No use of expensive installation vessels; towing out by tug-boat

only• Large weather window: transportation (Hs 3m) and installation

(Hs 2m) max 1 installation day needed• Small crew needed as all components pre-assembled at yard• Use of detachable stabilizers (ø10x15m)* during transportation and installation only• No use of divers• No hammering or piling

8

Page 9: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Blue H Engineering TLP foundation benefits for Offshore Wind

Maintenance• Inspective and preventive maintenance within the wind turbine sequence• Return shipment for major repair

Decommissioning• Complete decommissioning as a reversed installation and

transportation process, this includes removal of anchors.

9

Page 10: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Offshore wind farm CAPEX comparison Blue H Engineering TLP to Jackets

Results Analysis and Review GL GH for 5MW units

10

Page 11: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Cost of Energy from offshore wind farm with Blue H Engineering TLP foundations

11

Includes:• Price inflation• Power delivered onshore• Decommissioning not included• Based on 500 MW wind farm with commercial available 5MW

offshore wind turbines, at 100m sea depth, at 120 km off shore and an average wind speed of 10 m/s.

Page 12: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Offshore Floating Wind

Market potential

• According Garrad Hassan 6,000GW floating wind is technically, marketwise and economically feasible

• End of 2011 offshore 3.8GW installed, 5.2GW under construction and 18GW for offshore wind projects has been consented (source: EWEA Offshore wind industry key report 2011)

• Further off shore and moving to deeper waters (>50m) is recognized as the next growth industry in wind requiring floating solutions (source: EWEA Offshore wind industry key report 2011)

12

Page 13: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Offshore Floating Wind

Next steps for Blue H Engineering

• Complete the Generic 5 MW Model (2013 – 2014): Proof of the innovation “self installing TLP” and its

qualification (QTR). Document wave tank scale testing, and design

verification

• Design and engineer, manufacture, install and test the full scale 5 MW Demonstrator (2014 and 2015)

• Commercial business ( 2016 onwards)

13

Page 14: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Offshore Floating Wind

Opportunity• delivering low cost of sustainable energy,

green jobs, large export business, environmental friendly

• Excellent IRR for investors horizon 3 – 4 years• Construction of 350 MW offshore wind farm before

the year 2020 and more to come.

14

Page 15: Blue H Engineering Nico C.F. Bolleman Offshore Wind Energy Seminar Stavanger April 17, 2013 Offshore Wind Floating Foundations the competitive technology

Offshore Floating Wind

Feel free to join the development• Have an strong position when the commercial business starts.• Perform product industrialization with strategic partner.• Take a part in the supply chain for part of the 6.000 GW potential for

deep-water offshore wind.• Co-operations with Research and Technology Institutes and Industrial

Partners

Thanks for the attention

Nico C.F. [email protected] phone +31651621123