9
footer 1 CONSULTING BNSC’s contribution to the GCOS Job Assessment Forms Lucie Viciano ESYS With QinetiQ Wednesday 10 th May 2006 CEOS-WGISS 21 Budapest

BNSC’s contribution to the GCOS Job Assessment Forms

Embed Size (px)

DESCRIPTION

BNSC’s contribution to the GCOS Job Assessment Forms. Lucie Viciano ESYS With QinetiQ Wednesday 10 th May 2006 CEOS-WGISS 21 Budapest. BNSC taking a UK position. Status Initial assessment is in progress Discussion/inputs from this meeting Completion of forms from UK perspective - PowerPoint PPT Presentation

Citation preview

Page 1: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 1CONSULTING

BNSC’s contribution to the GCOS Job Assessment Forms

Lucie Viciano

ESYS

With QinetiQ

Wednesday 10th May 2006

CEOS-WGISS 21 Budapest

Page 2: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 2CONSULTING

BNSC taking a UK position

Status– Initial assessment is in progress– Discussion/inputs from this meeting– Completion of forms from UK perspective– Assess the responsibilities for actions.

Scoping– BNSC and partners for JAFs (see next slide)– Cross-cutting issues not yet completed from UK.

Page 3: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 4CONSULTING space for science, enterprise and environment

The BNSC Partnership and StakeholdersStimulating increased

productivity by promoting the use of space in government,

science and commerce

BNSC: Connecting together the space interests across Government into the National Strategic Plan

NERCNERC

FCOFCO

DEFRADEFRAPPARCPPARC

DTIDTI

Met OfficeMet Office

DfTDfT

MODMOD

OSIOSI

CCLRCCCLRC

EPSRCEPSRC

HOHO

UK space industry

UK commerce

UK scientists

DfESDfES Othergovernment

users ofspace

Developing innovative space systems, to deliver sustainable improvement in quality of life

Enhancing the UK’s standing in astronomy, planetary and environmental sciences

Page 4: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 5CONSULTING

Issues identified

Focus on issues pertaining to data processing, archiving and interoperability of sensors.

Other issues: dataset continuity, satellite instrument operationalisation…

Main issues for Atmosphere ECVs:– Products are inadequate and need new product generation– data need to be re-processed

Main issues for Oceans ECVs:– Continuity

Main issues for Terrestrial ECVs:– Record continuity– Cal/Val– Product generation, coverage…

Page 5: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 6CONSULTING

Issues:Atmosphere ECV

 

Win

d

Te

mp

Va

po

ur

Clo

ud

Pre

cip’

ER

B

Ozo

ne

Re

an

alysis

Ae

roso

l

Co

2…

Up

pe

r w

ind

Coverage √                    

Re-processing

√     √ √   √ √     √

Accuracy record

  √   

√ √          

Product inadequacy & developing new/homogenous products/record

  √ √ √ √       √ √  

Instrument specificity

          √          

Cal/Val           √          

Continuity             √     √ √

Page 6: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 7CONSULTING

Issues:Ocean ECV

  Sea iceSea level SST

Ocean colour

Sea state

Reanalysis

Ocean salinity

Coverage              

Re-processing     √        

Accuracy record   √          

Product inadequacy & developing new/homogenous products/record

√     √

 

√ ?  

Instrument specificity (interop')

    (√)   √    

Cal/Val         √   √

Continuity √ √ √ √ √ √ ? √

Page 7: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 8CONSULTING

Issues:Terrestrial ECV

  LakesGlaciers…

Snow Cover

Albedo

Land cover

fAPAR LAI Biomass Fire

Soil moisture

Coverage √ √ (√) √       √ (√)  

Re-processing   pre-pro'

reanalysi

s

√            

Accuracy √     √ √          

Record accessibility

√ √ √ 

√   √      

Record Continuity/archiving

 

√ √ √ √ √   √ √

Product inadequacy & developing new/homogenous products/record

action to improve pd

√ √   operationalisation not in

place

operationalisation not in

place

√, budg

et constraint

s

     

Instrument interop'/Sensor adequacy

√ √ (√)   √   (√)      

Cal/Val √ √ √ √       √ √  

Page 8: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 10CONSULTING

Next steps

Prioritising/Discussion of key issues Review the priority issues in the UK context Complete the JAFs Discuss the way forward with BNSC and its partners.

Synthesis– Feedback on the proposed method

Page 9: BNSC’s contribution to the  GCOS Job Assessment Forms

footer 11CONSULTING

Thoughts?