BNSC’s contribution to the GCOS Job Assessment Forms. Lucie Viciano ESYS With QinetiQ Wednesday 10 th May 2006 CEOS-WGISS 21 Budapest. BNSC taking a UK position. Status Initial assessment is in progress Discussion/inputs from this meeting Completion of forms from UK perspective - PowerPoint PPT Presentation
Citation preview
footer 1CONSULTING
BNSC’s contribution to the GCOS Job Assessment Forms
Lucie Viciano
ESYS
With QinetiQ
Wednesday 10th May 2006
CEOS-WGISS 21 Budapest
footer 2CONSULTING
BNSC taking a UK position
Status– Initial assessment is in progress– Discussion/inputs from this meeting– Completion of forms from UK perspective– Assess the responsibilities for actions.
Scoping– BNSC and partners for JAFs (see next slide)– Cross-cutting issues not yet completed from UK.
footer 4CONSULTING space for science, enterprise and environment
The BNSC Partnership and StakeholdersStimulating increased
productivity by promoting the use of space in government,
science and commerce
BNSC: Connecting together the space interests across Government into the National Strategic Plan
NERCNERC
FCOFCO
DEFRADEFRAPPARCPPARC
DTIDTI
Met OfficeMet Office
DfTDfT
MODMOD
OSIOSI
CCLRCCCLRC
EPSRCEPSRC
HOHO
UK space industry
UK commerce
UK scientists
DfESDfES Othergovernment
users ofspace
Developing innovative space systems, to deliver sustainable improvement in quality of life
Enhancing the UK’s standing in astronomy, planetary and environmental sciences
footer 5CONSULTING
Issues identified
Focus on issues pertaining to data processing, archiving and interoperability of sensors.
Other issues: dataset continuity, satellite instrument operationalisation…
Main issues for Atmosphere ECVs:– Products are inadequate and need new product generation– data need to be re-processed
Main issues for Oceans ECVs:– Continuity
Main issues for Terrestrial ECVs:– Record continuity– Cal/Val– Product generation, coverage…
footer 6CONSULTING
Issues:Atmosphere ECV
Win
d
Te
mp
’
Va
po
ur
Clo
ud
Pre
cip’
ER
B
Ozo
ne
Re
an
alysis
Ae
roso
l
Co
2…
Up
pe
r w
ind
Coverage √
Re-processing
√ √ √ √ √ √
Accuracy record
√
√ √
Product inadequacy & developing new/homogenous products/record
√ √ √ √ √ √
Instrument specificity
√
Cal/Val √
Continuity √ √ √
footer 7CONSULTING
Issues:Ocean ECV
Sea iceSea level SST
Ocean colour
Sea state
Reanalysis
Ocean salinity
Coverage
Re-processing √
Accuracy record √
Product inadequacy & developing new/homogenous products/record
√ √
√ ?
Instrument specificity (interop')
(√) √
Cal/Val √ √
Continuity √ √ √ √ √ √ ? √
footer 8CONSULTING
Issues:Terrestrial ECV
LakesGlaciers…
Snow Cover
Albedo
Land cover
fAPAR LAI Biomass Fire
Soil moisture
Coverage √ √ (√) √ √ (√)
Re-processing pre-pro'
reanalysi
s
√
Accuracy √ √ √
Record accessibility
√ √ √
√ √
Record Continuity/archiving
√
√ √ √ √ √ √ √
Product inadequacy & developing new/homogenous products/record
action to improve pd
√ √ operationalisation not in
place
operationalisation not in
place
√, budg
et constraint
s
Instrument interop'/Sensor adequacy
√ √ (√) √ (√)
Cal/Val √ √ √ √ √ √
footer 10CONSULTING
Next steps
Prioritising/Discussion of key issues Review the priority issues in the UK context Complete the JAFs Discuss the way forward with BNSC and its partners.
Synthesis– Feedback on the proposed method
footer 11CONSULTING
Thoughts?