Plans and Goals for 2016
Board Members Employees
Calleguas MWD
• Water wholesaler
• 630,000 people
• 19 member purveyors
• ???? AF/year annual demand
Historical Deliveries
on pace to sell 76,000 AF this year
Provide the service area with a reliable supplemental supply of regional and locally developed water in an environmentally and economically responsible manner.
Mission Statement
State Water Project
San Luis Reservoir
Sacramento &Feather Rivers
Lake Oroville
Northern Sierra
Bay-Delta
5
5
Quail Lake
Pyramid Lake
Castaic Lake
West Branch
Castaic Lake
Jensen Filtration Plant
Santa Susana Tunnel
Calleguas Purveyors
Oxnard
Port Hueneme
Camarillo
Moorpark
SimiValley
Thousand Oaks
~99%~50%
Percentage of water supply which is imported
Our challenges…
1. Imported supplies are becoming less reliable
Colorado River System OversubscribedFish Protections Restricting SWP Flows
Climate Change Reducing Snowpack Population Increasing
2. Imported supplies are vulnerable to seismic activity
Number of times per century the shaking from earthquakes will exceed 20% of the force of gravity. Significant damage to older buildings will begin at this level.
So. Calif. Earthquake Center (SCEC)
0 1/3 1 2 3 4 >5
Calleguas Service Area
3. Calleguas’ local supplies (for use during outages) have constraints
Lake Bard
Las Posas Wellfield
LIMITED LAKE VOLUME FOR LONG OUTAGES
LIMITED PUMPING CAPACITY FOR LONG
OUTAGES
Plans for 2016 – Improve Water Supply Reliability
Salinity Management Pipeline & Purveyor Desalters
Las Posas ASR Project
Interconnections
Planning for the future
Las Posas Aquifer Storage and Recovery Project
Aquifer Storage and Recovery(ASR)
ASRWells
Imported Water
to customers
Las Posas ASR Project Existing Facilities
Los Angeles Ave.
Grandsen Pump Station Phase 2 construction to begin in early 2016
East/South Las Posas Aquifer Water Level Monitoring• Purpose:
• Quantify impact of Calleguas ASR on neighboring pumpers
• Provide field data to support basin modeling
• Probes monitor water levels continuously
• In 2016 easements will be acquired for additional Calleguas‐owned wells
East/South Las Posas Aquifer Modeling
• Purpose: improve understanding of• effects of Calleguas ASR on neighboring wells
• long term storage & production capacity
• Conceptual model nearly complete
• Numerical model to be completed in 2016 Preliminary
Draft
Las Posas Users Group Participation• Calleguas Goal: achieve sustainable basin management without conflict
• 2016 Activities• Work with pumpers to begin to implement an allocation proposal (subject to GMA approval)
• Participate in GMA’s stakeholder process to develop a Sustainable Groundwater Management Plan
• Complete a supplemental water supply alternatives analysis
Salinity Management Pipeline (SMP) and Purveyor Desalters
By providing a means of transporting salts to the ocean, the SMP…
Port Hueneme
Oxnard
Camarillo
Thousand Oaks
Moorpark Simi Valley
Somis
Increases water reliability by allowing brackish groundwater to be put to useReduces salinity in the aquifers by removing salt from the watershed
Who wants to build a desalter?
Municipal Agencies Cheaper than imported water
Diverse supplies improve reliability
Agriculture More expensive than current sources, but…
Aquifers getting more saline Choices are limited
Status of SMP Construction
Port Hueneme
Oxnard
Camarillo
Thousand Oaks
Moorpark Simi Valley
Somis
Complete
῀2018
῀2019῀20222016
PHWA Brackish Water Facility
Status of Dischargers
Port Hueneme Water Agency Brackish Water FacilityOperational: 1999Production Capacity: 4,000 AF/yr
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Status of Dischargers
Round Mountain Water Treatment Plant (Camrosa Water District)Operational: 2014Production Capacity: 900 AF/yr
Camrosa Wastewater Treatment Plant (Camrosa Water District)Connected to SMP: 2014
Cal State University Channel Islands
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Oxnard Advanced Water Purification Facility
Status of Dischargers
Temporary use of SMP to Wheel City of Oxnard Recycled Water to Growers on the Oxnard PlainOperational: ~2016Production Capacity: 5,000 AF/yr
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Oxnard Advanced Water Purification Facility
Growers in Need of Water
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Oxnard Advanced Water Purification Facility
Camarillo Water Reclamation Plant
Status of Desalters
Camarillo Wastewater Treatment Plant Connected to SMP: ~ 2016
Camarillo Springs Golf Course
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Oxnard Advanced Water Purification Facility
Camarillo Water Reclamation Plant
North Pleasant Valley Desalter
Status of Dischargers
North Pleasant Valley Desalter (Camarillo)Operational: ~2018Production Capacity: ~7,500 AF/yr
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Oxnard Advanced Water Purification Facility
Camarillo Water Reclamation Plant
North Pleasant Valley Desalter
Zone MWCDesalter
Status of Dischargers
Zone Mutual Water Company DesalterOperational: ~2017Capacity: ~2,400 AF/yr
L.A. Ave., Hwy 118
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Oxnard Advanced Water Purification Facility
Camarillo Water Reclamation Plant
North Pleasant Valley Desalter
Zone MWCDesalter
VCWWD Moorpark Desalter
Status of Dischargers
Moorpark Desalter (VCWWD No. 1)Operational: ~2018Capacity: up to 5,000 AF/yr
Possible well locations
PHWA Brackish Water Facility
Camrosa Round Mountain WTP
Camrosa Water Reclamation Facility
Oxnard Advanced Water Purification Facility
Camarillo Water Reclamation Plant
North Pleasant Valley Desalter
Zone MWCDesalter
VCWWD Moorpark Desalter
Santa RosaAg Desalter(s)
Camrosa Desalter
Hill Canyon and Conejo Valley Desalter(s)
Future: Potable reuse for Camarillo, Thousand Oaks, Moorpark, and/or Simi Valley Wastewater Plants
West Simi Valley Desalter
United Brackish Water Project
Las Posas AgDesalter(s)
Status of Dischargers
Interconnections
Interconnections for Supply Outages
Las Virgenes MWD
Crestview MWC
Camarillo
Calleguas pipes
Purveyor turnouts
Proposed desalter
Interconnections to Facilitate Desalters
Planning for future reliability
Seawater Desalination Feasibility Study (complete)• Pros
• Large volume for outages of imported water• Drought proof
• Cons• Permitting challenges• Cost – plant, connection pipes, ocean construction
Task for 2016: Evaluate what supply option(s) could meet our service area’s reliability needs in the most cost effective and environmentally responsible manner
StormwaterCapture
Storage in Another Agency’s Lake
Partnerships