Plans and Goals for 2016 

Board Members Employees

Page 2: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Calleguas MWD

• Water wholesaler

• 630,000 people

• 19 member purveyors

• ???? AF/year annual demand

Page 3: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Historical Deliveries

on pace to sell 76,000 AF this year

Page 4: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Provide the service area with a reliable supplemental supply of regional and locally developed water in an environmentally and economically responsible manner.

Mission Statement

Page 5: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

State Water Project

San Luis Reservoir

Sacramento &Feather Rivers

Lake Oroville

Northern Sierra

Bay-Delta

5

5

Quail Lake

Pyramid Lake

Castaic Lake

West Branch

Page 6: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Castaic Lake

Jensen Filtration Plant

Santa Susana Tunnel

Page 7: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Calleguas Purveyors

Page 8: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Oxnard

Port Hueneme

Camarillo

Moorpark

SimiValley

Thousand Oaks

~99%~50%

Percentage of water supply which is imported

Page 9: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Our challenges…

Page 10: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

1. Imported supplies are becoming less reliable

Colorado River System OversubscribedFish Protections Restricting SWP Flows

Climate Change Reducing Snowpack Population Increasing

Page 11: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

2. Imported supplies are vulnerable to seismic activity

Number of times per century the shaking from earthquakes will exceed 20% of the force of gravity. Significant damage to older buildings will begin at this level.

So. Calif. Earthquake Center (SCEC)

0 1/3 1 2 3 4 >5

Calleguas Service Area

Page 12: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

3. Calleguas’ local supplies (for use during outages) have constraints

Lake Bard

Las Posas Wellfield

LIMITED LAKE VOLUME FOR LONG OUTAGES

LIMITED PUMPING CAPACITY FOR LONG 

OUTAGES

Page 13: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Plans for 2016 – Improve Water Supply Reliability

Salinity Management Pipeline & Purveyor Desalters 

Las Posas ASR Project

Interconnections

Planning for the future

Page 14: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Las Posas Aquifer Storage and Recovery Project

Page 15: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif
Page 16: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Aquifer Storage and Recovery(ASR)

ASRWells

Imported Water

to customers

Page 17: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Las Posas ASR Project Existing Facilities

Los Angeles Ave.

Page 18: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Grandsen Pump Station Phase 2 construction to begin in early 2016 

Page 19: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

East/South Las Posas Aquifer Water Level Monitoring• Purpose:  

• Quantify impact of Calleguas ASR on neighboring pumpers

• Provide field data to support basin modeling

• Probes monitor water levels continuously 

• In 2016 easements will be acquired for additional Calleguas‐owned wells

Page 20: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

East/South Las Posas Aquifer Modeling

• Purpose:  improve understanding of• effects of Calleguas ASR on neighboring wells 

• long term storage & production capacity 

• Conceptual model nearly complete

• Numerical model to be completed in 2016 Preliminary 

Draft

Page 21: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Las Posas Users Group Participation• Calleguas Goal:  achieve sustainable basin management without conflict

• 2016 Activities• Work with pumpers to begin to implement an allocation proposal (subject to GMA approval)

• Participate in GMA’s stakeholder process to develop a Sustainable Groundwater Management Plan

• Complete a supplemental water supply alternatives analysis

Page 22: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Salinity Management Pipeline (SMP) and Purveyor Desalters

Page 23: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

By providing a means of transporting salts to the ocean, the SMP…

Port Hueneme

Oxnard

Camarillo

Thousand Oaks

Moorpark Simi Valley

Somis

Increases water reliability by allowing brackish groundwater to be put to useReduces salinity in the aquifers               by removing salt from the watershed

Page 24: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Who wants to build a desalter?

Municipal Agencies Cheaper than imported water

Diverse supplies improve reliability 

Agriculture More expensive than current sources, but…

Aquifers getting more saline Choices are limited

Page 25: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Status of SMP Construction

Port Hueneme

Oxnard

Camarillo

Thousand Oaks

Moorpark Simi Valley

Somis

Complete

῀2018

῀2019῀20222016

Page 26: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Status of Dischargers

Page 27: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Port Hueneme Water Agency Brackish Water FacilityOperational:  1999Production Capacity: 4,000 AF/yr

Page 28: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Status of Dischargers

Page 29: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Round Mountain Water Treatment Plant (Camrosa Water District)Operational:  2014Production Capacity: 900 AF/yr

Page 30: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Camrosa Wastewater Treatment Plant (Camrosa Water District)Connected to SMP:  2014

Cal State University Channel Islands

Page 31: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Oxnard Advanced Water Purification Facility

Status of Dischargers

Page 32: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Temporary use of SMP to Wheel City of Oxnard Recycled Water to Growers on the Oxnard PlainOperational: ~2016Production Capacity: 5,000 AF/yr

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Oxnard Advanced Water Purification Facility

Growers in Need of Water

Page 33: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Oxnard Advanced Water Purification Facility

Camarillo Water Reclamation Plant

Status of Desalters

Page 34: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Camarillo Wastewater Treatment Plant Connected to SMP: ~ 2016

Camarillo Springs Golf Course

Page 35: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Oxnard Advanced Water Purification Facility

Camarillo Water Reclamation Plant

North Pleasant Valley Desalter

Status of Dischargers

Page 36: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

North Pleasant Valley Desalter (Camarillo)Operational:  ~2018Production Capacity: ~7,500 AF/yr

Page 37: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Oxnard Advanced Water Purification Facility

Camarillo Water Reclamation Plant

North Pleasant Valley Desalter

Zone MWCDesalter

Status of Dischargers

Page 38: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Zone Mutual Water Company DesalterOperational:  ~2017Capacity: ~2,400 AF/yr

L.A. Ave., Hwy 118

Page 39: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Oxnard Advanced Water Purification Facility

Camarillo Water Reclamation Plant

North Pleasant Valley Desalter

Zone MWCDesalter

VCWWD Moorpark Desalter

Status of Dischargers

Page 40: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Moorpark Desalter (VCWWD No. 1)Operational:  ~2018Capacity:  up to 5,000 AF/yr

Possible well locations

Page 41: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

PHWA Brackish Water Facility

Camrosa Round Mountain WTP

Camrosa Water Reclamation Facility

Oxnard Advanced Water Purification Facility

Camarillo Water Reclamation Plant

North Pleasant Valley Desalter

Zone MWCDesalter

VCWWD Moorpark Desalter

Santa RosaAg Desalter(s)

Camrosa  Desalter

Hill Canyon and Conejo Valley Desalter(s)

Future:  Potable reuse for Camarillo, Thousand Oaks, Moorpark, and/or Simi Valley Wastewater Plants

West Simi Valley Desalter

United Brackish Water Project

Las Posas AgDesalter(s)

Status of Dischargers

Page 42: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Interconnections

Page 43: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Interconnections for Supply Outages

Las Virgenes MWD

Crestview MWC

Page 44: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Camarillo

Calleguas pipes

Purveyor turnouts

Proposed desalter

Interconnections to Facilitate Desalters

Page 45: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Planning for future reliability

Page 46: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Seawater Desalination Feasibility Study (complete)• Pros

• Large volume for outages of imported water• Drought proof

• Cons• Permitting challenges• Cost – plant, connection pipes, ocean construction

Page 47: Board Members Employees - Ventura Countywcvc.ventura.org/documents/PDF/AWAVC_CMWD_GM Update_Nov-… · Signi ficant damage to older buildi ngs will begin at this level. So. Calif

Task for 2016:  Evaluate what supply option(s) could meet our service area’s reliability needs in the most cost effective and environmentally responsible manner

StormwaterCapture

Storage in Another Agency’s Lake

Partnerships