Bodipalem Bridge

Embed Size (px)

Citation preview

  • 8/18/2019 Bodipalem Bridge

    1/155

    Photographs

    Bridge Location

    Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350

    (onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*

  • 8/18/2019 Bodipalem Bridge

    2/155

    .pe!i!ation Report to a!!ompan% the ,stimate

    ,stimate mount 1 Rs* 275*00 "akhs

    Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*

      7he desi$ns #or construction o# low level cause wa6 &V 8 (%3m were approvedvide Memo 9o% 132(3:00D;,):D"E

  • 8/18/2019 Bodipalem Bridge

    3/155

    21) ,rovidin$ 1 mm dia 5" pipes #or weep holes at 1% M ":"

    22) Suppl6in$ and 4xin$ o# "< draina$e spouts

  • 8/18/2019 Bodipalem Bridge

    4/155

    23) ,lain cement concrete 013() #or levelin$ course under "" pavement

    2&) Vibrated cement concrete M3' $rade #or "" pavement

    2') ,rovidin$ 2'%&mm Mastic ,ad

    2() *ormin$ shoulders with barrowed use#ul selected earth

    2) *ormin$ embankment with borrowed use#ul earth #or "" pavement2-)

    3) ,rovidin$= la6in$ Rein#orced cement concrete .ume pipes o# ( mm Dia%= 9,3 c

    Road .afet%1-

    1)

    2)

    3)

    &)

    iversion of anal and ross unds 1-

    1) Earthwork excavation in soils upto SDR b6 mechanical means

    2) *ormin$ embankment with Side earth b6 mechanical means upto SDR

    ". provisions1-

    1) ,rovision towards V57 'F

    2) ,rovision towards Gualit6 "ontrol char$es H1F3) ,rovision towards ,rice 5dIustment H &%2'F

    &) ,rovision towards e''x''x( mm and 12cm hi$h

    ,rovidin$ and installation o# delineators0 Road wa6

  • 8/18/2019 Bodipalem Bridge

    5/155

    G,4,R" .R

    . 46 I, 684

    9 2:&30)50

    Sub 7otal 2:&30)50

    "*. Provisions 1-

    9 ,rovision towards V57 'F 9&29533

    2 ,rovision towards Gualit6 "ontrol char$es H1F 2:&3073 ,rovision towards ,rice 5dIustment H &%2'F 920:303

    & ,rovision towards

  • 8/18/2019 Bodipalem Bridge

    6/155

    RIG, ,I", 8 .R ,.I,

    4ame of #ork1-

    %9o% Description o#

  • 8/18/2019 Bodipalem Bridge

    7/155

    2

    nder Ra#t 1 x 1 2%++ 13%& %1' '(%&

    2 x 1 +% 3%1 %1 &%-(

    2 x 1 1'% 2%3 %1 (%-

    2 x 1 2(% 2%3 %1 11%-(

    2 x 1 1% 1%& %1 2%+

    2 x 1 3% 1% %1 %(

    2 x 1 (% 1% %1 1%2

    :&*&)

    +&% '1+3%

    cum

    3

    ,lain cement concrete 013() nominal mix in #oundation with crushed stonea$$re$ate & mm nominal si>e mechanicall6 mixed= placed in #oundation andcompacted b6 vibration includin$ curin$ complete as per MoR7;. Speci4cation21 0&th Revision) for "evelling !ourse Belo# raft and #ing #alls

    od6 walls on 5side9onvented level portion

    od6 walls on Sside9onvented level portion

    od6 walls on Sside9onvented level Rampportion

    od6 walls on Sside9onvented level Rampportion

    "ross walls on Sside9onvented level Rampportion

    "ross walls on Sside9onvented level Rampportion

    'iBrated !ement !on!rete 20 Grade on!rete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es

    #or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forfootings of Butments and PiersC Raft !ut-oD #alls *

  • 8/18/2019 Bodipalem Bridge

    8/155

    sa6 &+&% ((&+%

    cum

    &

    R5*7 *oundation 1 x 1 2%++ 0 13%& ) 1% 33%'-

    33%'-

    sa6 3&% 2-%

    cum

    '

    *or 5butments 2 x 1 12%-' 0 % N 2%' ) (%-( 2++%&2

    2

    *or ,ier 2 x 1 13% 0 %( N 1%& ) (%-( 1-'%&&

    2

    *or cut waters 2 x 1   Π   0 %(O2 N 1%&O2) (%-( 13%+

    & x 2

    2 x 1 +% %++ 2% 2+

    2 x 1 1'% %+ 1%&' 33%12'

    'iBrated !ement !on!rete 25 Grade on!rete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$

    cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forRaft*

    'iBrated !ement !on!rete 20 Grade "oncrete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$= la6in$ in position="ompactin$= Vibratin$ and curin$ includin$all other incidental and all other operational char$es o# 7;, reAuired etc%=complete as per MoR7;. Speci4cation 1'=1= 22 0&th Revision) for .uB

    stru!ture of aButmentsC piers and #ing #alls*

    od6 walls on 5side

    9onvented level portion

    od6 walls on Sside9onvented level portion

    od6 walls on Sside9 d l l R

  • 8/18/2019 Bodipalem Bridge

    9/155

    do cut waters 2 x 1 %3 %3+

    1(%3

    97*00 -'1%

    cum

    3 x 1 +%& per Span 2&2%22

    sa6 2&3% +1%

    cum

    +

    2 x 1 3%+ 11% %1' 12%'&

    92*5&

    13% '+'%

    cum

    -

    Π:& 0 %- )2

    *urnishin$ and placin$ rein#orced cement concrete VR"" M 2' $rade as per

    approved drawin$s and technical speci4cations as per MoR7;. speci4cation1'=1(=1 0&th revision ) and as per M%C%S% DR! 9o SD:12 excludin$ costo# steel and #abrication char$es #or VR"" M2' Super structure o# deck slabs

    *or deck slabs 5s perStandard Dr$% SD:12

    m3

    ,lain cement concrete M 1' !rade "oncrete usin$ &mm = 2mm and 1mm si>e.! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and4ne a$$re$ate con#ormin$ to table 12) includin$ cost=sei$nora$e andconve6ance o# all materials to site and all labour char$es #or machinemixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$ includin$ all otherincidental and all other operational char$es o# 7;, reAuired etc%= complete as perMoR7;. Speci4cation 1'=1= 21 0&th Revision) #or ?evellin$ coursebelow a roach slab%

    ?evellin$ course belowapproach slab%

    V%R%"%"% M3 $rade concrete usin$ 2mm and 1mm si>e SS' .! crushedstone a$$re$ate includin$ cost and conve6ance o# all materials to site=

    sei$niora$e char$es=labour char$es #or machine mixin$=la6in$=compactin$=curin$etc=includin$ all other incidental and operational char$es=7;, char$esetc=complete but excludin$ cost o# steel and its #abrication char$es= as per MoR7;.Speci4cations 1'=1=2&0&th Revision) #or pproa!h .laB%

  • 8/18/2019 Bodipalem Bridge

    10/155

    3 x 1 PPP k$s per Span 1&&(-

    5pproach slab 1 x 1 2' +' k$s:cum 2131%+

    @earin$ coat 1 x 1 PPP ( k$s:cum 1+21%+

    PPP

    9:*50

    or sa6 1-% '2&'%

    M%7

    12

    1 x 1 1(%3 1 k$s:cum 1(2%

    2 x 1 k$s 1&%

    2 x 1 k$s 1&%

    1 x 1 2 k$s 2%

    1 x 1 3' k$s 3'%

     

    revision) and as per

  • 8/18/2019 Bodipalem Bridge

    11/155

    Ra#t 1 x 1 33%'- ' k$s:cum PPP

    2 x 1 2 k$s &%

    3 x 1 & k$s 12%

    1 x 1 3' k$s 3'%

    1 x 1 ' k$s '%

    1 x 1 - k$s -%

    1 x 1 2 k$s 2%

    1 x 1 12' k$s 12'%PPP

    22*3)

    23% PPP

    M%7

    1&

    5pproaches 2 x 3 %' 3%

    PRE*Q J$s%

    % PPP

    M%7

    Skin rein#orcement #orabutmentsSkin rein#orcement #orpiers

    od6 walls on 5side9onvented level portionod6 walls on Sside9onvented level portion 9onvented level Rampportion 9onvented level Rampportion  9onvented level Ramp

    portion

    ,rovidin$ ncoated Mild Steel bars 0 *e2' ) o# dierent diameters= wrou$ht andput up bars o# all diameters includin$ cost and conve6ance o# steel to site and all

    labour char$es #or #abrication o# rein#orcement includin$ cuttin$= bendin$=bindin$ rods= t6in$ $rills= placin$ them in position etc%= complete includin$ costand conve6ance o# bindin$ wire and all handlin$ char$es and operationalchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or allR%"%" items #or 4nished item o# work as per standard drawin$s= as per thedirections o# the En$ineerin"har$e and as per MoR7;. speci4cation 1(;22 &th Revision and as er

  • 8/18/2019 Bodipalem Bridge

    12/155

    cum

     

    1

    Guadrants & x 1 1%( %1' 1%((

    90*))

    11% 1-+%

    or sa6 cum

    1+

    *or Auadrants & x 1 1%( %3 21%31

    29*39

    22% 23&-%cum

    1-

     7oe walls & x 1 (%'1 %( %( -%2

    ;*72

    or sa6 1% 1'+%

    cum

    2

    ,rovidin$ and la6in$ 4lter material with $ravel underneath pitchin$ in slopesincludin$ cost and conve6ance o# materials to site includin$ labour char$es etc=complete #or 4nished item o# work as per MoR7. Speci4cation 9o%2'&0&thRevision)and as directed b6 the En$ineerin"har$e% *or pit!hing of slopes%

    ,rovidin$ !routed Revetment with rou$h stone other than $ranite o# not less

    than 3 mm si>e $routed with %2 cum o# "" 01&+) includin$ cost=sei$niora$e char$es and conve6ance o# materials to site and includin$ labourchar$es #or packin$ the stones #or revetment etc%= complete #or 4nished item o#work as per MoR7;. speci4cation 2'& 0 & th  revision ) and as directed b6 theEn$ineerin"har$e #or Auadrential revetment%

    ,rovidin$ rou$h stone revelment other than $ranite 3 mm thick usin$ 3mm i>e rou$h stonne varit6 includin$ cost =sei$niora$e and conve6ance o# allmaterials to site = labour c$ar$es etc = complete as per MCS7 speci4cation no%

    , idi d l i b ld i b d # t ti i t

  • 8/18/2019 Bodipalem Bridge

    13/155

    22

    & x 2 +

    sa6 + -(1%

    9os

    23

    5ppanaramuni lanka sid 1 x 1 3% %' %1 2%+

     Sakinetipall6 S

  • 8/18/2019 Bodipalem Bridge

    14/155

    2(

    Road work

    "" ,avement 1 x 2 &% 1% %3 2&%

    2&%

    or sa6 2&0*00 12-%

    cum

    2

    Road work 0nder "" ,avement)

    1 x 1 &% %3 11'2%

    11'2%

    or sa6 9952*00 ((2%

    cum

    2+

    *ormin$ shoulders with barrowed use#ul selected earth havin$ MDD o# not lessthan 1%' !ms:"" #rom out side road boundar6 b6 mechanical means with allleads and li#ts includin$ prewaterin$ o# soil at barrow area= removal o# top soil=excavation o# soils at barrowed area= conve6ance o# soil= depositin$ the soils onthe embankment= spreadin$ soils= beakin$ clods= sectionin$ and consoilidationwith vibrator6 road roller H CM" to meet reAuirement o# table 32 o#

    MoR7;.= includin$ all hire and operational char$es o# 7;, and complete #or4nished item o# work as per MoR7;. speci4cation 3' 0 &th revision) 0 ,a6mentwill be made based on levels #or 4nished item o# work)%

    *ormin$ embankment with borrowed use#ul earth #rom outside road boundar6b6 mechanical means up to SDR with all leads and li#ts includin$ prewaterin$ o#soil at borrow area= removal o# top soil= excavation o# soils at borrowed area=conve6ance o# soil= depositin$ the soil on the embankment= spreadin$ soil=breakin$ clods= sectionin$= $radin$ and consolidation with + to 1 7onnesVibrator6 Road Roller H CM" to meet reAuirement o# table 32 o# MoR7;.=includin$ all hire and operational char$es o# 7;, and 0excludin$ sei$niora$e)

    char$es= complete #or 4nished item o# work as per MoR7;. speci4cation 3'

    01%2N-%):2

    "onstruction o# !ranular subbase b6 providin$ .! material con4rmin$ to!radin$

  • 8/18/2019 Bodipalem Bridge

    15/155

  • 8/18/2019 Bodipalem Bridge

    16/155

    iversion of anal and ross unds 1-

    31

    1 x 1 1&% 1'% 2%2 &(2%

    &(2%

    or sa6 &)20*00 ((%1

    cum

    32

    >or ross unds1

    :S Side 1 x 1 02N1():2 0'N-):2 2%2 2%2

    D:S Side 1 x 1 02N1():2 0'N-):2 2%2 2%21 x 1 01'N11):2 0N11):2 2%2 2'%&

    +11%+

    or sa6 :92*00 13%

    cum

    33 ,rovision towards V57 'F on Rs% 2+&3('

    3& ,rovision towards Gualit6 "ontrol char$es H1F on Rs% 2+&3('

    Earthwork excavation in soils upto SDR b6 mechanical means includin$trimmin$ bottom and side slopes in accordance with reAuirements o# lines =$rades and cross sections etc%= complete #or 4nished item o# work #or trenchcuttin$ as per MoR7;. speci4cation 310&th Revision) and as directed b6 the

    En ineerin"har e

    *ormin$ embankment with Side earth b6 mechanical means upto SDR includin$prewaterin$ o# soil = removal o# top soil= excavation o# soils = depositin$ the soils

    on the embankment= spreadin$ soil= breakin$ clods= sectionin$ = $radin$ andconsolidation with + to 1 7onnes Vibrator6 Road Roller H CM" to meetreAuirement o# table 32 o# MoR7;.= includin$ all hire and operationalchar$es o# 7;,= complete #or 4nished item o# work as per MoR7;. speci4cation3' 0&th revision) 0,a6ment will be made based on level #or 4nished item o#work)%

  • 8/18/2019 Bodipalem Bridge

    17/155

    ,er 5mount- 1

    00 6 7*350. G6'RI

  • 8/18/2019 Bodipalem Bridge

    18/155

    1% &3'32

    cum

  • 8/18/2019 Bodipalem Bridge

    19/155

    1% 3EN(

    cum

    1% 3EN(

    cum

  • 8/18/2019 Bodipalem Bridge

    20/155

    1% 13'1(

    cum

    1% 2EN(

    cum

    1% '2'

    cum

  • 8/18/2019 Bodipalem Bridge

    21/155

    1% --2'

    M%7

     

  • 8/18/2019 Bodipalem Bridge

    22/155

    1% 1EN(

    M%7

    1%

    M%7

  • 8/18/2019 Bodipalem Bridge

    23/155

    cum

    1% 2-++

    cum

    1% '1(+

    cum

    1% 1'+

    cum

  • 8/18/2019 Bodipalem Bridge

    24/155

    1% (++

    9o%

    1% 2EN(

    cum

  • 8/18/2019 Bodipalem Bridge

    25/155

    1% 3(-(

    cum

    1% (2(2&

    cum

  • 8/18/2019 Bodipalem Bridge

    26/155

  • 8/18/2019 Bodipalem Bridge

    27/155

    1% 3'3+2

    cum

    1% 1&&(

    cum

    FFF

    9&29533

    2:&307

    ,I", 8 .R ,.I, >6R R6 .>,? I4,R',4I64.

  • 8/18/2019 Bodipalem Bridge

    28/155

    ,I", 8 .R ,.I, >6R R6 .>,? I4,R',4I64.

    4ame of #ork 1

    DES"Re &'x&'x(mm includin$ cost=conve6ance o# all materials= eAuipment= machinar6=labour ; all leads ; li#ts= loadin$ char$es necessar6 #orsatis#actir6 completion o# the work as directed b6 theEn$ineerinchar$e%

    9os

  • 8/18/2019 Bodipalem Bridge

    29/155

    os

    3

    & &

    & &-3 Each

    9os

    &

    Suppl6in$ and installation o# .a>ard Markers:Delinatorsusin$ M%S% an$le o# si>e ''x''x( mm and 12cm hi$habove $round level painted with two coats o# black ;white stripes o# 1'cm wide with 4rst Aualit6 s6ntheticenamel paint over one coat o# appropriate primer o#

    approved brand=colour= with 3cm x -cm 76pe L e 3cm x 3cm and'cm depth 4lled with "" M2 includin$ cost andconve6ance o# all materials= eAuipment=

    machiner6 and labour with all leads and li#ts= loadin$ andunloadin$ char$es necessar6 #or success#ull completiono# the work on an6 road in division as directed b6En$ineerin"har$e and con#ormin$ to

  • 8/18/2019 Bodipalem Bridge

    30/155

    Executive En$ineer 0R;)= Superintendin$ En$ine

    R; Division= 5malapuram R; "ircle= Jakin

  • 8/18/2019 Bodipalem Bridge

    31/155

    5mount

    +

     'RI

  • 8/18/2019 Bodipalem Bridge

    32/155

    1-(12

  • 8/18/2019 Bodipalem Bridge

    33/155

      r 0R;)=

      da

    4ame of #ork 1

  • 8/18/2019 Bodipalem Bridge

    34/155

    ", .,,4

    9 @G etal from =atheru uarr% 1

    >rom o R

    Guarr6 to ?alacheruvu 2 Jms "7 2x1%1 % 2% 2% 1%19. 1( PPP -&&%+' 3+%&'

    9. 1( to RaIavaram ,odalada Road PPP 31%3' 2-%(-

    9. 21& 011'%( to 12'%13') PPP 11'%( -%3'

    1%2 &%2 3%

    (% % (%

    0@orkin$ Reach 0(%( (%):2

    6r

    2 I8,4 4 ,8".I64 >R6 'I.=@ R,>I4R? 1

    >rom o R

    Re4ner6 to V%V% Road 9. 1(

    PPP +3-%( PPP

    Jathipudi to 5malapuram 9. 21( % 12'%13' PPP

    1%2 &%2 3%

    (% % (%

    0@orkin$ Reach 0(%( (%):2

    6r

    3 Gravel from =adi%am uarr% 1

    >rom o R Guarr6 to Vema$iri

    9. 1( PPP -&&%+' 2(%('

    9. 1( to RaIavaram ,odalada Road PPP (1%&2' 2-%(-

    9. 21( 011' ( t 12' 13') PPP 11' ( - 3'

    Re!onstru!tion of ridge in km 0/2 of =othapeta ridge to =apiles#arapuraRoad in ,*G*t*

    Sivakodu RamaraIulanka Road 01%2 to&%2)RamaraIulanka !ondi Road 0% to(%)

    Visakhapatanam to Jathipudi Kunction 9.

    Sivakodu RamaraIulanka Road 01%2 to&%2)RamaraIulanka !ondi Road 0% to(%)

  • 8/18/2019 Bodipalem Bridge

    35/155

    Executive En$ineer 0R;)= Superintendin$ En$inee

    R; Division 5malapuram R; "ircle Jakina

  • 8/18/2019 Bodipalem Bridge

    36/155

     

    "ead

    2%23+%&'

    2-%(-

    -%3'

    3%

    (%

    %3

    FFF&&*000

    =ms*

    "ead

    1%(

    12%(

    -(%3

    3%

    (%

    %3FFF

    FFF

    =ms*

     

    "ead&%(

    2(%('

    2-%(-

    - 3'

    m >err%

  • 8/18/2019 Bodipalem Bridge

    37/155

      0R;)=

      da

    ROAD METAL RATES as per 2008-2009 SSR

  • 8/18/2019 Bodipalem Bridge

    38/155

    Name of the Work::-

    S! No Des"r#pt#o$ of Meta  So%r"e of S%ppy &o$'eya$"e

     A( )OR ROAD WOR*S

    1@G etal from =atheru uarr% 1

    &&*00 53)*;0 &1-%

    2 &&*00 53)*;0 &'(%

    3 &&*00 53)*;0 '++%

    & &&*00 53)*;0 1(&%

    ' &&*00 53)*;0 &-%'

    ( &&*00 53)*;0 -'%

    @G etal from =atheru uarr% 1 &&*00 53)*;0 '++%

    + &&*00 53)*;0 -&&%

    - &&*00 53)*;0 -+&%

    IPR6',,4. 6 RR

  • 8/18/2019 Bodipalem Bridge

    39/155

    S! No Des"r#pt#o$ of Meta  So%r"e of S%ppy &o$'eya$"eLead #$

    *ms

    +$#t#a "ostess

    sta"k#$,

    1 &&*00 53)*;0 +%

    11 &&*00 53)*;0 ('(%

    12 &&*00 53)*;0 '&%

    13 &&*00 53)*;0 3+%

    1& &&*00 53)*;0 3'%

    1' !ravelGravel from =adi%am uarr% 1

    3&*00 ;02*55 '%'

    ( )OR R+D.E WOR* 

    1( & mm SS' .! M:" metal@G etal from =atheru uarr% 1

    &&*00 53)*;0 (2%

    1 2' mm SS' .! M:" metal &&*00 53)*;0 --&%

    1+ 2 mm SS' .! M:" metal &&*00 53)*;0 13(%

    1- 12 mm SS' .! M:" metal &&*00 53)*;0 +22%

    12 to 1& mm

  • 8/18/2019 Bodipalem Bridge

    40/155

    S! No Des"r#pt#o$ of Meta  So%r"e of S%ppy &o$'eya$"eLead #$

    *ms

    +$#t#a "ostess

    sta"k#$,

    2 1 mm SS' .! M:" metal &&*00 53)*;0 (-2%

    21 ( mm SS' .! M:" metal &&*00 53)*;0 '32%

    22 Kedd6 stone &' to ( mm &&*00 53)*;0 1-%3

    23 Sand #or Mortarat River Godavari at P* Gannavaram

    2*00 &0:*95 (1%

    2& Sand #or *illin$

    at River Godavari at P* Gannavaram

    2*00 2):*70 &(%

    2' ./SD Steel 0*e&1' 7M7 ars) 3&%

    2( (mm Mild Steel &1'%

    2 Mild Steel &1%

    2+ "ement '-2%

    5sst% Executive En$ineer 0R;)= Deput6 Executive En$ineer 0R;)= Executive En$ineer 0R;)=

  • 8/18/2019 Bodipalem Bridge

    41/155

    S! No Des"r#pt#o$ of Meta  So%r"e of S%ppy &o$'eya$"eLead #$

    *ms

    +$#t#a "ostess

    sta"k#$,

    R; Section Malikipuram R; Subdivision Ra>ole R; Division 5malapuram

     7 350 (64.R8I64 6> "6$ ",'," 8., $?

  • 8/18/2019 Bodipalem Bridge

    42/155

    % % % (&%12 -(1%+

    % % % (&%12 --+%+

    % % % (&%12 113%+

    (% % % (&%12 3%+

    % % % (&%12 '22%2+

    % % % (&%12 (3%+

    % % % (&%12 113%+

    % 23(% % (&%12 122%+

    % 2&(% % (&%12 12%+

      7*350 (64.R8I64 6> "6$ ",'," 8., $?

    ast#$,"har,es

    Ma"h#$e"r%sh#$,"har,es

    Se#,$#ora,e"har,es

    edu!t93*)95H P

    E 6@ !hargesfrom

    !onve%an!e

    Toa &ost per &%m

    Ma"h#$e

    edu!t93*)95H P

  • 8/18/2019 Bodipalem Bridge

    43/155

    ast#$,"har,es

    Ma"h#$e"r%sh#$,"har,es

    Se#,$#ora,e"har,es

    93*)95H PE 6@ !harges

    from!onve%an!e

    Toa &ost per &%m

    % 1-'% % (&%12 1'1%+

    % 1(&% % (&%12 13(2%+

    % 12(% % (&%12 112%+

    % % % (&%12 -2%+

    % % % (&%12 +22%+

    % % % 1%- +&'%2(

    % 1''% % (&%12 131%+

    % 2&+%' % (&%12 1+'%2+

    % 2'-% % (&%12 1+3%+

    % 2'%' % (&%12 1'%2+

    t#Ma"h#$e

    S # #

    edu!t93*)95H P

    T & t

  • 8/18/2019 Bodipalem Bridge

    44/155

    ast#$,"har,es

    Ma"h#$e"r%sh#$,"har,es

    Se#,$#ora,e"har,es

    E 6@ !hargesfrom

    !onve%an!e

    Toa &ost per &%m

    % 13% % (&%12 1&%+

    % 133% % (&%12 12%+

    % % % (&%12 ((3%+

    % % % &+%' -(-%&

    % % % 32%- (-(%(1

    % % % 3&%

    % % % &1'%

    &1%

    % % % '-2%

    Superintendin$ En$ineer 0R;)=

    Ma"h#$e

    edu!t93 )95H P

  • 8/18/2019 Bodipalem Bridge

    45/155

    ast#$,"har,es

    Ma"h#$e"r%sh#$,"har,es

    Se#,$#ora,e"har,es

    93*)95H PE 6@ !harges

    from!onve%an!e

    Toa &ost per &%m

    R; "ircle Jakinada

  • 8/18/2019 Bodipalem Bridge

    46/155

    LEAD CHARGES Cost of Materials, Labour 

    Metal

     

    loading 51.40 102.80   Material Ratesunloading 15.70 15.70 60 to 63 mm IC ! Mo"# #$% metal

    sta&'ing 0.00 0.00 50 to 55 mm IC ! Mo"# #$% metal

    0.25 (( (( 40 to 45 mm IC ! Mo"# #$% metal

    0.5 (( (( oug)stone 300mm *#$%+for reetment

    1 31.00 2-.-0 oug)stone 225mm *#$%+for reetment

    2 43.40 41.-0 eetment /or' 225mm

    3 57.-0 57.-0 eetment /or' 300mm

    4 70.30 70.30 eetment /or' 450mm

    5 82.70 82.70 Laterite for eetment 225mm

    6 -5.10 -5.10 Laterite for eetment 300mm

    7 107.50 107.50 edd stone aboe 450mm to 600mm

    8 11-.-0 11-.-0

    - 132.30 132.30 150 mm soling stone #$% metal

    10 144.70 144.70 40 to 45 mm IC ! Mo"# #$% MC metal

    11 157.10 157.10 25 to 27 mm IC ! Mo"# #$% MC metal

    12 16-.50 16-.50 1- to 22 mm IC ! Mo"# #$% MC metal13 181.-0 181.-0 12 to 14 mm IC ! Mo"# #$% MC metal

    14 1-4.30 1-4.30 -.5 to 11.20 mm IC ! Mo"# #$% MC metal

    15 206.70 206.70 5 to 7 mm IC ! Mo"# #$% MC metal

    16 21-.10 21-.10 2.36 to 5 mm IC ! Mo"# #$% MC metal

    17 231.50 231.50 #$% tone &)is 2.36mm and belo/

    18 243.-0 243.-0 %rael

    1- 256.30 256.30 40 mm 5 m& #$% metal

    20 268.70 268.70 25 mm 5 m& #$% metal

    21 281.10 281.10 20 mm 5 m& #$% metal

    22 2-3.50 2-3.50 12 mm 5 m& #$% metal

    23 305.-0 305.-0 10 mm 5 m& #$% metal

    24 318 30 318 30 6 mm 5 m& #$% metal

    ;art)%raeland

  • 8/18/2019 Bodipalem Bridge

    47/155

    42 516.30 516.30   Machiner" Rates

    43 526.60 526.60 oer 80 #? for sreading @ 200 &um er )our 

    44 536.-0 536.-0 Motor grader 3.35M $lade @50 &um#r 

    45 547.20 547.20 #drali& e(&aator  46 557.50 557.50 ront end loader 1 &um &aa&it

    47 567.80 567.80 "ier 5 &um

    48 578.10 578.10 Aibrator roller 8"

    4- 588.40 588.40 smoot) /)eeled roller 8 "on

    50 5-8.70 5-8.70 Bater tan'er 6 L

    51 60-.00 60-.00 "ra&tor

    52 61-.30 61-.30 "ra&tor /it) otaator

    53 62-.60 62-.60 Tractor with ripper attachment @ 60 cum per hour

    54 63-.-0 63-.-0  =ir &omressor 250 &fm

    55 650.20 650.20 Bet mi( lant of 60 tonne )r. &aa&it

    56 660.50 660.50 Me&)ani&al broom @ 1250 sDm)r.

    57 670.80 670.80 $itumen ressure distributor @1750 sDm)r 

    58 681.10 681.10 ;mulsion ressure distributor @1750 sDm)r 

    5- 6-1.40 6-1.40 #ot mi( lant 40 to 60 "?#

    60 701.70 701.70 Me&)ani&al ?aer finis)er 100 "?#

    61 712.00 712.00 Hydraulic self propelled chip spreader @ 1500 sqm/hr.

    62 722.30 722.30 Finish rolling with 6! tonne smooth wheeled tandem roller.63 732.60 732.60 ?neumati& road oller 

    64 742.-0 742.-0 %$ ?lant 50 Cum

    65 753.20 753.20 %enerator 250 A=

    66 763.50 763.50 %enerator set 125 A=

    67 773.80 773.80 %enerator set 35 A=

    68 784.10 784.10 Con&rete mi(er 0.40.28 &um

    6- 7-4.40 7-4.40 "ier 5.50 &um &aa&it er 10 "onnes er t'm

    70 804.70 804.70 Tipper 5 cum capacity for "oil# $"%# &''# Hot mi(71 815.00 815.00 ?late &oma&tor?o/er rammer 

    72 825.30 825.30

    73 835.60 835.60   Sand #or Mortar 

  • 8/18/2019 Bodipalem Bridge

    48/155

    -2 1031.30 1031.30

    -3 1041.60 1041.60

    -4 1051.-0 1051.-0

    -5 1062.20 1062.20-6 1072.50 1072.50

    -7 1082.80 1082.80

    -8 10-3.10 10-3.10

    -- 1103.40 1103.40

    100 1113.70 1113.70

    101 1124.00 1124.00

    102 1134.30 1134.30

    103 1144.60 1144.60

    104 1154.-0 1154.-0

    105 1165.20 1165.20

    106 1175.50 1175.50

    107 1185.80 1185.80

    108 11-6.10 11-6.10

    10- 1206.40 1206.40

    110 1216.70 1216.70

    111 1227.00 1227.00

    112 1237.30 1237.30113 1247.60 1247.60

    114 1257.-0 1257.-0

    115 1268.20 1268.20

    116 1278.50 1278.50

    117 1288.80 1288.80

    118 12--.10 12--.10

    11- 130-.40 130-.40

    120 131-.70 131-.70

    121 1330.00 1330.00

    122 1340.30 1340.30

    123 1350.60 1350.60

    124 1360 -0 1360 -0

  • 8/18/2019 Bodipalem Bridge

    49/155

    142 1546.30 1546.30

    143 1556.60 1556.60

    144 1566.-0 1566.-0

    145 1577.20 1577.20146 1587.50 1587.50

    147 15-7.80 15-7.80

    148 1608.10 1608.10

    14- 1618.40 1618.40

    150 1628.70 1628.70

  • 8/18/2019 Bodipalem Bridge

    50/155

    SR 2015-16

     =s er of ? et.41-.00 ?g. Eo.247, l.53 *oads+

    456.00 ?g. Eo.247, l.52 *oads+

    588.00 ?g. Eo.247, l.51 *oads+

    172.00 ?g. Eo.244, l.- *oads+

    177.00 ?g. Eo.244, l.8 *oads+

    144.00 ?g. Eo.244, l.2 *oads+

    164.00 ?g. Eo.244, l.3 *oads+

    156.00 ?g. Eo.244, l.4 *oads+

    136.00 ?g. Eo.244, l.6 *oads+

    15-.00 ?g. Eo.244, l.7 *oads+

    206.00 ?g. Eo.244, l.5 *oads+

    4-.50

    -5.00 ?g. Eo.248, l.7- *oads+

    588.00 ?g. Eo.247, l.51 *oads+

    -44.00 ?g. Eo.247, l.50 *oads+

    -84.00 ?g. Eo.247, l.4- *oads+780.00 ?g. Eo.247, l.48 *oads+

    656.00 ?g. Eo.247, l.47 *oads+

    504.00 ?g. Eo.247, l.46 *oads+

    308.00 ?g. Eo.247, l.45 *oads+

    350.00 ?g. Eo.24-, l.-2 *oads+

    103.00 ?g. Eo.24-, l.-0 *oads+

    620.00 ?g. Eo.246, l.30 *oads+

    --4.00 ?g. Eo.246, l.2- *oads+

    1036.00 ?g. Eo.246, l.28 *oads+

    822.00 ?g. Eo.246, l.27 *oads+

    6-2.00 ?g. Eo.245, l.26 *oads+

    532 00 ?g Eo 245 l 25 *oads+

    *46:53+2 ?g.24-l. Eo.84 ! 85

  • 8/18/2019 Bodipalem Bridge

    51/155

    2540.-0 ?g. Eo.256, l.1 *oads+

    3220.00 ?g. Eo.256, l.3 *oads+

    27-1.00 ?g. Eo.256, l.4 *oads+1650.00 ?g. Eo.256, l.5 *oads+

    -0-.70 ?g. Eo.256, l.6 *oads+

    260-.10 ?g. Eo.256, l.7 *oads+

    1101.00 ?g. Eo.256, l.8 *oads+

    630.00 ?g. Eo.256, l.10 *oads+

    415.00 ?g. Eo.256, l.11 *oads+

    425.00 ?g. Eo.256, l.12 *oads+

    425.00 ?g. Eo.256, l.13 *oads+

    538.20 ?g. Eo.256, l.14 *oads+

    1650.00 ?g. Eo.256, l.15 *oads+

    375.00 ?g. Eo.256, l.16 *oads+

    1500.00 ?g. Eo.256, l.17 *oads+

    860.00 ?g. Eo.256, l.18 *oads+

    1-200.00 ?g. Eo.257, l.22 *oads+

    2250.00 ?g. Eo.257, l.24 *oads+

    26-5.00 ?g. Eo.257, l.25 *oads+

    1650.00 ?g. Eo.257, l.26 *oads+1347.00 ?g. Eo.257, l.27 *oads+

    1257.00 ?g. Eo.257, l.30 *oads+

    1850.00 ?g. Eo.258, l.43 *oads+

    1320.00 ?g. Eo.258, l.43 *oads+

    816.80 ?g. Eo.258, l.43 *oads+

    456.20 ?g. Eo.258, l.38 *oads+

    7.12

    7.1258.00 ?g. Eo.258, l.48 *oads+

    677.00 ?g. Eo.24-, l.-5 *oads+

  • 8/18/2019 Bodipalem Bridge

    52/155

  • 8/18/2019 Bodipalem Bridge

    53/155

  • 8/18/2019 Bodipalem Bridge

    54/155

  • 8/18/2019 Bodipalem Bridge

    55/155

  • 8/18/2019 Bodipalem Bridge

    56/155

  • 8/18/2019 Bodipalem Bridge

    57/155

    ridge portion

    4ame o

    f $ork IPR6',,4. 6 RR

  • 8/18/2019 Bodipalem Bridge

    58/155

    uantit% es!ription of Item Rate per1

    nit "um Page 323 of oRE@ .

     7akin$ out put 2& "uma) eA!luding de#atering !harges In all soils upto .R upto 3*0 m depth using

    (+"aBour

    %32 da6 Mate 3'% da6

    +% da6 Ma>door unskilled 32% da6

    %F M55 2(+%

     7otal(+a!hiner%

    (% hrs .6draulic Excavator 1% cum bucket 2-1% hr

    (+.eigniorage !harges

    2&%"um Sei$niora$e char$es % cum

    (+6ver head !harges 9;*)95H on (+ J (+J( +(,+otal of (+ J (+J( +J(+

    (>+dd ontra!tors Prot at 90H on (,+

    t 2&0 (,+ (>+

    7*350 (64.R8I64 6> "6$ ",'," 8., $? &')*37,. G6'RI I.RI *

    Earthwork in excavation o# #oundation o# structures as per drawin$ and technicalincludin$ settin$ out= construction o# shorin$ and bracin$= removal o# stumpdeleterious matter= dressin$ sides o# bottom= back 4llin$ the excavation earth treAuired etc%= complete includin$ sei$nioar$e char$es #or 4nished item o# work as

    th 

    uantit% es!ription of Item Rate per

    Rate #or 1 cum

    R t t b d t d

  • 8/18/2019 Bodipalem Bridge

    59/155

    Rate to be adopted

    2

    nit cum Page 339 of oRE@ .

     7akin$ output 1' cum

    (+"aBour

    %(& nos Mate 3'% da61% nos Mason 3++%' da6

    1'%nos Ma>door 32% da6

    %F M55 '&2+%'

     7otal

    (+aterial

    13%'cum "ost o# &mm SS' .! M:" metal 131%+ cum

    (%' cum Sand at site -(-%& cum

    3%&' M7 "ement at site '-2% M7

     7otal

    Ka!hiner%(% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    (% hr !enerator set 3' JV5 +1(%+ hr

    ,rovidin$ P(9131)+ nominal mix in #oundation with crushed stone a$$re$ate &si>e mechanicall6 mixed = placed in #oundation and compacted b6 vibration includinincludin$ all other incidental and operational char$es o# all 7;, etc%= complete #oro# work as per MoR7;. speci4cation 21 0&th  Revision) %

    uantit% es!ription of Item Rate per

    1%' nos Mason 3++%' da6

    2 nos Ma>door 32 da6

  • 8/18/2019 Bodipalem Bridge

    60/155

    2%nos Ma>door 32% da6

    %F M55 3'%2'

     7otal

    (+aterial'%& cum "ost o# &mm SS' .! M:" metal 131%+ cum

    '%& cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum

    2% cum "ost o# 1mm SS' .! M:" metal 1&%+ cum

    (%' cum Sand at site -(-%& cum

    '%1( M7 "ement at site '-2% M7

     7otal

    Ka!hiner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    (% hr !enerator set 3' JV5 +1(%+ hr

     7otal

    (+>orm #ork 

    &% F *orm work H &F on 05)N0)N0 ") 2+&%-3 "um(,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")N0D)

    (>+otal of (+ J (+J( +J(+J(,+

    (G+dd ontra!tors Prot at 90H on (>+

    ost per 95 !um (>+J(G+

    Rate #or 1 cum

    Rate to be adopted

    uantit% es!ription of Item Rate per

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    ( hr !enerator set 3' JV5 +1( + hr

  • 8/18/2019 Bodipalem Bridge

    61/155

    (% hr !enerator set 3' JV5 +1(%+ hr

    (+>orm #ork 

    1% F *orm work H 1F on 05)N0)N0 ") 2+&%-3 "um(,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")N0D)

    (>+otal of (+ J (+J( +J(+J(,+

    (G+dd ontra!tors Prot at 90H on (>+

    ost per 95 !um (>+J(G+

    Rate #or 1 cum

    Rate to be adopted

    '

    nit cum Page 335 of oRE@ .

     7akin$ output 1' cum

    (+"aBour

    %+( nos Mate 3'% da6

    1%' nos Mason 3++%' da6

    2%nos Ma>door 32% da6%F M55 3'%2'

     7otal

    Vibrated Rein#orced cement concrete M 2' !rade "oncrete in #oundations with 2M:" $raded metal with a cube stren$th o# 2' 9 : mm2 at 2+ da6s work test on1' mm cubes and cost and and conve6ance o# all materials= vibratin$ centermixin$= curin$ hire and operational char$es o# all 7; , but excludin$ cost and it

    char$es o# steel etc complete as per MoR7;. Speci4cation 1'=1= 21 0&t

    uantit% es!ription of Item Rate per

    ( Vibrated Rein#orced cement concrete M 2' !rade "oncrete in #oundations with 2M:" $raded metal with a cube stren$th o# 2' 9 : mm2 at 2+ da6s work test on

  • 8/18/2019 Bodipalem Bridge

    62/155

    nit cum Page 335 of oRE@ .

     7akin$ output 1' cum

    (+"aBour

    %+( nos Mate 3'% da6

    1%' nos Mason 3++%' da6

    2%nos Ma>door 32% da6

    %F M55 3'%2'

     7otal

    (+aterial

    +%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum

    '%& cum "ost o# 1mm SS' .! M:" metal 1&%+ cum

    (%' cum Sand at site -(-%& cum

    (%' M7 "ement at site '-2% M7 7otal

    Ka!hiner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    (% hr !enerator set 3' JV5 +1(%+ hr

     7otal

    (+>orm #ork &% F *orm work H &F on 05)N0)N0 ") --%3 "um

    (,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    M:" $raded metal with a cube stren$th o# 2' 9 : mm2 at 2+ da6s work test on1' mm cubes and cost and and conve6ance o# all materials= vibratin$ centermixin$= curin$ hire and operational char$es o# all 7; , but excludin$ cost and itchar$es o# steel etc complete as per MoR7;. Speci4cation 1'=1= 21 0&t

    uantit% es!ription of Item Rate per

    +%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum

    ' & cum "ost o# 1mm SS' .! M:" metal 1& +

  • 8/18/2019 Bodipalem Bridge

    63/155

    '%& cum "ost o# 1mm SS ' .! M:" metal 1&%+

    (%' cum Sand at site -(-%& cum

    (%' M7 "ement at site '-2% M7

     7otalKa! ner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    (% hr !enerator set 3' JV5 +1(%+ hr

     7otal

     7otal 5NN" #or 1' cum

    a)@eight from 5m to 90masic rate #or 1' cum o# concrete

    1%+ F 5dd on cost o# concrete to cater extra li#t --%3 Rs

    11%+ F 5dd #or *orm work on cost o# concrete --%3 Rs

     7otal Rs

    1-%(1' F 5dd #or Cver head char$es

    1% F 5dd #or "ontractors pro4tRate ,er 1' "um

    Rate ,er 1 "um

    Rate to be adopted

    b)@eight upto 5m

    asic rate #or 1' cum o# concrete

    1% F 5dd #or *orm work on cost o# concrete --%3 Rs 7otal Rs

    1- (1' F 5dd #or Cver head char$es

    uantit% es!ription of Item Rate per

    (+aterial

    + 1 cum "ost o# 2mm SS' .! M:" metal 1+3 + cum

  • 8/18/2019 Bodipalem Bridge

    64/155

    +%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum

    '%& cum "ost o# 1mm SS' .! M:" metal 1&%+

    (%' cum Sand at site -(-%& cum

    '%-- M7 "ement at site '-2% M7

     7otal

    Ka!hiner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    (% hr !enerator set 3' JV5 +1(%+ hr

     7otal

     7otala)

    #or Deck slab slab Super structure

    2% F .ei$ht upto 'm 2 percent -&3'%'3

    1-%(1' F 5dd Cver .ead "har$es -'322%(&

    1% F 5dd "ontractorTs ,ro4t 11&2%1+

    Rate per 1' cum

    Rate per cum

    Cr Sa6

    b)*or #orm work add the #ollowin$ 0.ei$ht ' 1 m)#or Deck slab Super structure 2'

    o# asic rate o# concrete

    *or #orm work add the #ollowin$ (@eight 0 - 5 m+

    uantit% es!ription of Item Rate per

    2%nos Ma>door 32% da6

    % F M55 3'%2'

  • 8/18/2019 Bodipalem Bridge

    65/155

    % F M55 3'%2'

     7otal

    (+aterial+%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum

    '%& cum "ost o# 1mm SS' .! M:" metal 1&%+ cum

    (%' cum Sand at site -(-%& cum

    (%1 M7 "ement at site '-2% M7

     7otalKa!hiner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr(% hr !enerator set 3' JV5 +1(%+ hr

     7otal >orm #or

    2% F *orm work H 2F on 05)N0)N0 ") ++(%3 "um

    (,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")N0D)

    (>+otal of (+ J (+J( +J(+J(,+

    (G+dd ontra!tors Prot at 90H on (>+

    ost per 95 !um (>+J(G+

    Rate #or 1 cum M 3 "oncrete

    Rate to be adopted

    1 V%R%"%"% M3 $rade concrete usin$ 2mm and 1mm si>e SS' .! crushed stonincludin$ cost and conve6ance o# all materials to site= sei$niora$e char$es=labourmachine mixin$ la6in$ compactin$ curin$ etc includin$ all other incidental and

    uantit% es!ription of Item Rate per

    %1' nos ?abour #or cleanin$ deck slab concrete 32% da6

    % F M55 &+%

  • 8/18/2019 Bodipalem Bridge

    66/155

    Rate per cum

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F5dd #or Cver head char$es H 1-%(1'F on

    '&-%&'(,+otal of (+ J (+J( +J(+

    (>+dd ontra!tors Prot at 90H on (,+ost per 95 !um (,+J(>+

    Rate to be adopted

    11

    nit M7 Page &:;C&;0 of oRE@ . 7akin$ output 1 M7

    (+"aBour

    %&& nos Mate 3'% da6

    3%nos lack smith 3'% da6

    +% nos Ma>door 32% da6

    % F M55 3+'%

     7otal(+aterial

    1%' M7 ./SD bars includin$ overlaps 3&% M7

    + J i di i M7

    ,rovidin$ ./SD bars 0 *e&1' ) o# dierent diameters= wrou$ht and put up bars o#

    includin$ cost and conve6ance o# steel to site and all labour char$es #or # rein#orcement includin$ cuttin$= bendin$= bindin$ rods= t6in$ $rills= placin$ them incomplete includin$ cost and conve6ance o# bindin$ wire and all handlin$ char$es anchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or all R%4nished item o# work as per standard drawin$s= as per the directions o# the En$inand as per MoR7;. speci4cation 1( ;22 0&th revision) and as per

  • 8/18/2019 Bodipalem Bridge

    67/155

    1%' M7 ./SD bars includin$ overlaps 3&% M7

    (% J$ indin$ wire &1'% M7

     7otal

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)

    (+otal of (+ J (+J( +

    (,+dd ontra!tors Prot at 90H on (+Rate for 9 (+J(,+

    Rate to be adopted

    13

    nit M7 Page &&: of oRE@ . 7akin$ output 1 M7

    (+"aBour

    %& nos Mate 3'% da6

    2%nos lack smith 3'% da6

    (% nos Ma>door 32% da6

    % F M55 2+2%

     7otal(+aterial

    ,rovidin$ ./SD bars 0*e&1') o# dierent diameters= wrou$ht and put up bars o#includin$ cost and conve6ance o# steel to site and all labour char$es #or # rein#orcement includin$ cuttin$= bendin$= bindin$ rods= t6in$ $rills= placin$ them incomplete includin$ cost and conve6ance o# bindin$ wire and all handlin$ char$es anchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or all R%4nished item o# work as per standard drawin$s= as per the directions o# the En$inand as per MoR7;. speci4cation 1( ;22 0&th revision) and as per

  • 8/18/2019 Bodipalem Bridge

    68/155

     7otal

    Ka!hiner%

    2%' hr ,late compactor:,ower rammer:road roller '+% hr%' hr @ater tanker ( J? capacit6 (3% hr

     7otal

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")

    (,+otal of (+ J (+J( +J(+

    (>+dd ontra!tors Prot at 90H on (,+

    ost per 90 !um (,+J(>+Rate #or 1 cum

    Rate to be adopted

    1'

    nit cum Page &)3 of oRE@ .

     7akin$ output 1 cum

    (+"aBour

    32 nos Mate 3' da6

    ,rovidin$ and la6in$ o# lter media  with !ranular materials : stone crushedsatis#6in$ the reAuirements laid down in clause 2'&%2%2 o# MoR7;. speci4cations to# not less than (mm with smaller si>e towards the soil and bi$$er si>e towardsprovided over the entire sur#ace behind the abutment= win$ wall and return wall to tcompacted to a 4rm condition includin$ cost and conve6ance o# all metal sei$nor=and all labour char$es as directed b6 the departmental ocers as per drawin$ aspeci4cations as per clause 1%1%1 o#

  • 8/18/2019 Bodipalem Bridge

    69/155

    "ost o# ""01&+) Page 339C522 of oRE@ .

     7akin$ output 1' cum

    (+"aBour

    %(& nos Mate 3'% da6

    1% nos Mason 3++%' da6

    1'%nos Ma>door 32% da6

    % F M55 '&2+%'

     7otal

    (+aterial

    13%' cum "ost o# &mm SS' .! M:" metal 131%+ cum

    (%' cum Sand at site -(-%& cum

    2%&3 M7 "ement at site '-2% M7

     7otal(!+a!hiner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr

    (% hr !enerator set 3' JV5 +1(%+ hr

    "ost per 1' cum

    Rate #or 1 cum

    ost of Grouted Revetment

    nit "um

    7akin$ output 1 cum

    with %2 cum o# "" 01&+) includin$ cost= sei$niora$e char$es and conve6ance o#site and includin$ labour char$es #or packin$ the stones #or revetment etc%= completitem o# work as per MoR7;. speci4cation 2'& 0 &th revision ) and as directed b6 the"har e for uadrential revetment*

    uantit% es!ription of Item Rate per 

    revetment etc%= comp ete or n s e tem o wor as per MoR7;. spec cat orevision ) and as directed b6 the En$ineerin"har$e for Pit!hing of slopes for o

  • 8/18/2019 Bodipalem Bridge

    70/155

    (+"aBour Page 522 of oRE@ .

    %& nos Mate 3'% da6

    %3' nos Mason 3++%' da6%'nos Ma>door #or la6in$ stones= 4llin$ Auarr6 spal 32% da6

    % F M55 3-%-+

     7otal

    (+aterial

    1% cum "ost o# Rou$h stone 3mm thick 3%+ cum

    %2cum "ost o# stone spalls '22%2+ cum

     7otal

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0) 11--%22

    (+otal of (+ J (+J( +

    (,+dd ontra!tors Prot at 90H on (+

    ost per 9 !umRate to be adopted

    1+

    nit cum Page 523 of oRE@ .

    7akin$ output 1 "um

    Providing and la%ing lter material #ith Gravel underneath pit!hing in slo  cost= sei$niora$e char$es and conve6ance o# materials to site includin$ labour ccomplete #or 4nished item o# work as per MoR7;. Speci4cation 2'& 0&th  Revi

    directed b6 the En$ineerin"har$e under Revetment*

    uantit% es!ription of Item Rate per

    nit nos

     7akin$ output 3 RM

    C 1 " M i l # 1 3 " M

  • 8/18/2019 Bodipalem Bridge

    71/155

    Cutput 1 "um= Material #or 13 "ement Mortor

    (+"aBour

    %& nos Mate 3'% da6%- nos Ma>door 32% da6

    % F M55 33%

     7otal

    (+aterial

    %'1 M7 "ost o# "ement '-2% M7

    1%' "um "ost o# Sand -(-%& cum

     7otal"ost per 1 "um "M 013)

    (+"aBour

    %3 nos Mate 3'% da6

    %' nos Mason 3++%' da6

    %2' Ma>door 32% da6

    % F M55 2+'%'

     7otal

    (+aterial

    39*5 RM "ost o# 1mm dia 5" pipe 1(1% RM

    includin$ 'F wasta$e 0avera$e len$th 1m)

    1% 9os 1(%1 Each

    3% 9os MS clamps 13% Each

    %' cum "ement mortor 013) &3&% "um 7otal

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    "ollors #or 5" pipe 0avera$e) takin$ 1 o# pi

    uantit% es!ription of Item Rate per

    %2 da6 Mate 3'% da6

    %2 da6 Skilled 0lacksmith= welder etc%) 3++%' da6

  • 8/18/2019 Bodipalem Bridge

    72/155

    %2 da6 Ma>door 32% da6

    % F M55 21%(

     7otal(!+"aBour for Aing in position

    %1 da6 Mate 3'% da6

    %1 da6 Mason 3++%' da6

    %2 da6 Ma>door 32% da6

    % F M55 1%(&

     7otal

    ' F (-'%31

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 3%+

    (,+otal of (+ J (+J( +J(+

    (>+dd ontra!tors Prot at 90H on (,+

    ost per 9 4os (,+J(>+

    Rate to be adopted

    21

    electrodes= cuttin$ $as= sealant= anticorrosive bituminous paint= mild steel$ratin$ etc%

    ,rovidin$ and la6in$ "aun!hing aprons #or protection a$ainst scour with &' m

    uantit% es!ription of Item Rate per

    Rate to be adopted

  • 8/18/2019 Bodipalem Bridge

    73/155

    22

    nit cum Page 335 of oRE@ .

     7akin$ output 1' cum(+"aBour

    %+( nos Mate 3'% da6

    1%' nos Mason 3++%' da6

    2%nos Ma>door 32% da6

    % F M55 3'%2'

     7otal

    (+aterial+%1 cum "ost o# &mm SS' .! M:" metal 131%+ cum

    &%' cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum

    1%3' cum "ost o# 1mm SS' .! M:" metal 1&%+ cum

    (%' cum Sand at site -(-%& cum

    &%13 M7 "ement at site '-2% M7

     7otal

    Ka!hiner%

    ( hr "oncrete mi er &: 2+ cum &'( 2 hr

    ,lain cement concrete M 1' !rade "oncrete usin$ &mm = 2mm and 1mm si>e

    stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and 4ne a$$re$ate ctable 12) includin$ cost=sei$nora$e and conve6ance o# all materials to site achar$es #or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$other incidental and all other operational char$es o# 7;, reAuired etc%= complete asSpeci4cation 1'=1= 21 ; 2 0&th Revision) #or ?evellin$ course below appr

    uantit% es!ription of Item Rate per

    1% nos Mason 3++%' da6

    1'%nos Ma>door 32% da6

    F M55 '&2+ '

  • 8/18/2019 Bodipalem Bridge

    74/155

    % F M55 '&2+%'

     7otal

    (+aterial13%'cum "ost o# &mm SS' .! M:" metal 131%+ cum

    (%' cum Sand at site -(-%& cum

    2%&3 M7 "ement at site '-2% M7

     7otal

    Ka!hiner%

    (% hr "oncrete mixer %&:%2+ cum &'(%2 hr(% hr !enerator set 3' JV5 +1(%+ hr

    2% .r @ater tanker (J? capacit6 (3% hr

     7otal

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 530&5*5:

    (,+otal of (+ J (+J( +J(+

    (>+dd ontra!tors Prot at 90H on (,+

    ost per 95 !um (,+J(>+

    Rate #or 1 cum

    Rate to be adopted

    2&Vibrated cement concrete M 3' $rade usin$ 2mm ; 1mm .! crushed ston0"oarse a$$re$ate con#ormin$ to table 11 and 4ne a$$re$ate con#ormin$ to tincludin$ cost= 0excludin$ sei$niora$e) conve6ance o# all materials to site and lab

    i hi i i l i ib i i i l di ll h i

    uantit% es!ription of Item Rate per

     7otal

    3%' F *orm work H 3%'F on 5NN" +1&&+%33

    (+ 6ver head !harges 9; )95H (25H-'-Insuran!e+

  • 8/18/2019 Bodipalem Bridge

    75/155

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 :&2;;*02

    (,+otal of (+ J (+J( +J(+(>+dd ontra!tors Prot at 90H on (,+

    ost per 95 !um (,+J(>+

    Rate #or 1 cum

    Rate to be adopted

      *0*000 6.P4 + I4

  • 8/18/2019 Bodipalem Bridge

    76/155

    mount

     ma!hinar%

    12%

    2'(%

    %

    2(+%

    1(&(%

    %

    3+1%&1

    FFF

    2323*)&

    FFF

    speci4cationand otherthe extent

    per MoR7;.

    mount

    111%+3

    992*00

    9 um

  • 8/18/2019 Bodipalem Bridge

    77/155

    9 um

    2&%3++%'

    &+%

    %

    '&2+%'

    1-%3

    ('&3%&'

    2&2&%

    &&'%&+

    23%2

    &-%+

     mm nominalcurin$ etc%=nished item

    mount

    '+2%'

    (&%

    %

  • 8/18/2019 Bodipalem Bridge

    78/155

    %

    3'%2'

    11(%1

    --2&%1

    3+1%1

    ('&3%&'

    3'&%2

    '-31%(+

    23%2

    &-%+

    (3+%

    FFF

    2-1'%

    1&+((%1-

    FFF

    ;0)5*)9

    ;;729*73

    ((&+%12

    ))&:*009 um

    mount

    23%2

    &-%+

    (3+%

  • 8/18/2019 Bodipalem Bridge

    79/155

    2+&%-3

    2+%&-

    1'23%+(

    FFF

    ;5::*)3

    FFF

    31%((

    7032*009 um

    322%'

    '+2%'

    (&%%

    3'%2'

      m0SS').!1' 8 1' 8in$ machines #abrication

    Revision)

    mount

      m0SS').!1' 8 1' 8in$ machine

    # b i i

  • 8/18/2019 Bodipalem Bridge

    80/155

    322%'

    '+2%'

    (&%

    %3'%2'

    1&++(%2

    (2%1

    ('&3%&'

    3'+1(%

    (&+&%&+

    23%2

    &-%+

    (3+%

    FFF

    31-1%(3

    s #abricationRevision)

    mount

    1&++(%2

    (2%1

    ('&3%&'

  • 8/18/2019 Bodipalem Bridge

    81/155

    3'+1(%

    (&+&%&+

    23%2

    &-%+

    (3+%

    --%3

    --%3

    1&3(%23

    -&1'%31

    -(&2%2

    1-%&+

    PPP

    1+&2%1+PPP

    7;50*;3

    7;59*00

    cum

    --%3

    --%+(-%+

    121( '

    mount

    1&++(%2

    (2%1

  • 8/18/2019 Bodipalem Bridge

    82/155

    ('&3%&'

    3'&(%+(&&-2%2+

    23%2

    &-%+

    (3+%

    -&3'%'3

    -&3'%'3

    1'++%11

    -'322%(&

    1+(-%'&PPP

    11&2%2

    PPP

    +3(1%&+

    :3)9*00

    -&3'%'3

    mount

    (&%

    %

    3'%2'

  • 8/18/2019 Bodipalem Bridge

    83/155

    1&++(%2

    (2%1

    ('&3%&'

    3(112%

    ('1&3%&+

    23%2&-%+

    (3+%

    1(1%3

    1(23%1-

    FFF

    ;779*97

    FFF

    1('%'2

    79))*009 um

    e a$$re$atechar$es #oroperational

    mount

    &+%

    %

    '&-%&'

  • 8/18/2019 Bodipalem Bridge

    84/155

    1(1%(

    )&70*59)&7*05

    7997*5)

    799:*00

    9 um

    1('%

    112'%

    2'(%

    %

    3+'%

    3'%

    332

      ll diametersbrication o#

    position etc%=operational%" items #orerin"har$eo# 1-+' #or

    mount

    2-'%'

    3'%

    2&-

  • 8/18/2019 Bodipalem Bridge

    85/155

    2&-%

    3'-&-%

    (31%'1

    FFF

    &)53*:0

    '11-1%+1

    FFF

    9

    1'%

    '%

    1-2%

    %2+2%

      ll diametersbrication o#

    position etc%=operational%" items #orerin"har$eo# 1-+' #or

    mount

    11&3%12

    11&3%12

  • 8/18/2019 Bodipalem Bridge

    86/155

    1&'%

    31%'

    1(%'

    2&+&%1

    FFF

    959&*::

    FFF1(((%3

    9)))*00

    9 um

    12

      a$$re$atesa thickness

    the wall ande #ull hei$hta$e char$esnd 7echnicalRevision) #or

    mount

     si>e $routedmaterials to#or 4nished

  • 8/18/2019 Bodipalem Bridge

    87/155

    2&%

    3++%'

    &+%

    %'&2+%'

    1-%3

    ('&3%&'

    1&3+'%(

    3+1-%+

    23%2

    &-%+

    (3+%

    FFF

    3&52*37

    #or 4nishedEn$ineerin

    mount

    1'

  • 8/18/2019 Bodipalem Bridge

    88/155

    1'%

    13'%-+2&%

    %

    3-%-+

    3%+

    1&%&(

    ++%2&

    23'%23

    9&3&*&5

    9&3*&5

    9577*;0

    1'%-

    957:*00

    9 um

    es includin$ar$es etc%=ion) and as

  • 8/18/2019 Bodipalem Bridge

    89/155

    mount

    %'

    %

    (%&

  • 8/18/2019 Bodipalem Bridge

    90/155

    %

    21%(

    3%'

    3%+-

    (&%

    %

    1%(&(-'%31

    3&*77

    730*0:

    1&3%2

    :73*2:

    :7*33

    ;)0*)0

    ;)9*00

    9 4os

    to ( mm

    mount

    957:*00

    9 um

    ! crushed

  • 8/18/2019 Bodipalem Bridge

    91/155

    322%'

    '+2%'

    (&%

    %

    3'%2'

    1(&%2

    &&3%1

    1-%'

    ('&3%&'

    2&&&-%(

    '11%'+

    23 2

      ! crushedon#ormin$ to

    nd all labourincludin$ allper MoR7;.oach slab%

    mount

    3++%'

    &+%

    %

    '&2+%'

  • 8/18/2019 Bodipalem Bridge

    92/155

    1-%3

    ('&3%&'

    1&3+'%(

    3+1-%+

    23%2&-%+

    12(%

    ++-+%

    1&&%+-

    FFF

    )3&5*05FFF

    &('3%3

    &)53*00

    9 um

    e a$$re$ateble 12)

    our char$es=id l d

    mount

    (3+%

    2+'%(-

    1('3'%2'

  • 8/18/2019 Bodipalem Bridge

    93/155

    FFF

    FFF

    FFF

    3-&%'1

    73;5*00

    9 um

  • 8/18/2019 Bodipalem Bridge

    94/155

    ost per 9:0 !um (+ J (,+

    Rate per "um

    Rate per 9 !um

  • 8/18/2019 Bodipalem Bridge

    95/155

    mount

      includin$ pre  e soils on the

    ation with + to2 o# MoR7;.=o# work as per

  • 8/18/2019 Bodipalem Bridge

    96/155

    %'

    1(%

    1(%'

    &('1%(

    322%

    2'2%

    2(-%1

    13%2'+2%-(

    95759*23

    9575*92

    9732)*35

    13%2(

    973*00

    9 um

    vel #or 4nished

    embankment

  • 8/18/2019 Bodipalem Bridge

    97/155

    .4o uantit% 8nit es!ription of Item Rate per

    9 2 3 & 5 )

  • 8/18/2019 Bodipalem Bridge

    98/155

    27

    0 Page ):C); of oRE@ .

    0 8nit 1 um

    0 aking out put N 900 um

    0 (+ "aBour

    0 %& da6 Mate 3'% 1%0 1% da6 Ma>door unskilled 32% 1%

    0

    0 % F Municipal 5rea 5llowance 33'%

    0  7C75? N

    0

    0 (+ a!hiner%

    0

    1%( hr 2;79*00 1%

    *ormin$ embankment with borrowed use#ul earth #rom outside road boundar6 b6mechanical means up to SDR with all leads and li#ts includin$ prewaterin$ o# soil atborrow area= removal o# top soil= excavation o# soils at borrowed area= conve6ance o#soil= depositin$ the soil on the embankment= spreadin$ soil= breakin$ clods=sectionin$= $radin$ and consolidation with + to 1 7onnes Vibrator6 Road Roller HCM" to meet reAuirement o# table 32 o# MoR7;.= includin$ all hire andoperational char$es o# 7;, and 0excludin$ sei$niora$e) char$es= complete #or4nished item o# work as per MoR7;. speci4cation 3'

    (&th revision+ $ith a lead of 3&= (Pa%ment #ill Be made Based on levelsfor nished item of #ork+*

    .6draulic excavator1 cum bucket capacit6 H (cum per hour

    .4o uantit% 8nit es!ription of Item Rate per

    9 2 3 & 5 )

    2: "onstruction o# !ranular subbase b6 providin$ .! material con4rmin$ to !radin$

  • 8/18/2019 Bodipalem Bridge

    99/155

  • 8/18/2019 Bodipalem Bridge

    100/155

    2$ 8nit N !um2$ aking output N 300 !um

    2$ (+ "aBour

    2$ %& da6 Mate 3'% 1%

    2$ 2% da6 Ma>door skilled 3++%' 1%

    2$ +% da6 Ma>door unskilled 32% 1%

    2$

    2$ % F Municipal 5rea 5llowance 3&+%2$  7C75? N

    2$ (+ a!hiner%

    2$ (% hour Motor $rader 3%3'M lade H' cum:.r% 322% 1%

    2$ 12% hour  7ractor Rotavator 0223N1123&) &2'% 1%

    2$ (% hour Vibrator6 roller +7 2(-%1 1%

    2$ 3% hour @ater tanker ( J? (3% 1%

    2$  7C75? N2$

    2$ (+ aterial

    2$ "oarse $raded !ranular subbase material as per

    2$  7able &2 o# MCR7;.

    2$ -%'&%'mm

  • 8/18/2019 Bodipalem Bridge

    101/155

    2% s per ", 3/5 of I.1&5:-2003 E 4ote 52% 1% RM $s N (9*9:J2*20O9&0/925+ 3*)&&0

    2%

    2%

    2% R9 N ( .2- .9+/9000 $s

    2% 1% RM  R9 N ( &2500 - &9000 +/ 9000 3*)&&

    2%

    2% 1% RM &%2%

    2% 1% RM at the time o# preparation o# Estimate '-2%

    2% I.1&5:-2003

    2% *rom 75?E 3 arrel wall 7hickness 0 mm ) +'%

    2% "oncrete Gt6:&0%U%%(U%() 0cum) %1+2-

    2% *rom "?5SE '%' "ement "ontent0 k$:cum) 3&%

    2%2% 1% RM 0 as per

  • 8/18/2019 Bodipalem Bridge

    102/155

    &0  7C75? N

    &0 (+ aterial

    &0 12%' RM "ost o# ( mm Dia pipes 2'2%32 1%

    &0  7C75? N

    &0 ( J +

    &0

    &0 &%(1' F (+ 6ver @ead harges on (J+ 32-+%2'

    &0&0 1% F (,+ ontra!tors Prot on (JJ+ 3&311%+-

    &0

    &0 12%' RM 7C75? "ost #or 12%' RM 05NN"ND)

    &0 Rate per 1 RM

    &0 Rate per 9 R

    &0

    mount

    7

  • 8/18/2019 Bodipalem Bridge

    103/155

    1'%32%

    33'%

    %

    335*00

    &-(1%'

    mount

    7

  • 8/18/2019 Bodipalem Bridge

    104/155

    mount

    7

  • 8/18/2019 Bodipalem Bridge

    105/155

    1'%

    %

    2'(%

    3&+%

    %

    3&:7*00

    1-32%

    '1%

    1'('&%(

    1+-%

    &9;)&*)0

    2-&3+3%-

    1(13+%(2

    FFF

    mount

    7

  • 8/18/2019 Bodipalem Bridge

    106/155

    '%&

    11-%&

    2&33*:7

    mount

    7

    %

    920) 75

  • 8/18/2019 Bodipalem Bridge

    107/155

    920)*75

    31'-1%'

    395;9*50

    327;:*25

    1'13%(&

    3&31%1-

    3&3%+

    31-%&'

    309;*00

    .4o uantit% 8nit es!ription of Item Rate per

    39 *ormin$ shoulders with barrowed use#ul selected earth havin$ MDD o# not lessthan 1%' !ms:"" #rom out side road boundar6 b6 mechanical means with all leadsand li#ts includin$ prewaterin$ o# soil at barrow area= removal o# top soil= excavationo# soils at barrowed area= conve6ance o# soil= depositin$ the soils on the

  • 8/18/2019 Bodipalem Bridge

    108/155

    0 Page ):C); of oRE@ .

    0 8nit 1 um

    0 aking out put N 900 um

    0 (+ "aBour

    0 %& da6 Mate 3'% 1%

    0 1% da6 Ma>door unskilled 32% 1%

    00 % F Municipal 5rea 5llowance 33'%

    0  7C75? N

    0

    0 (+ a!hiner%

    0

    1%( hr 27;9*00 1%

    0 92720*00 t%km ipper ( for 7;*500 km N 9)0 A 7;*500+ t*km 7*22 t%km0 5dd 1F o# cost o# carria$e to cover

    0 t # l di d l di

    embankment= spreadin$ soils= beakin$ clods= sectionin$ and consoilidation withvibrator6 road roller H CM" to meet reAuirement o# table 32 o# MoR7;.=includin$ all hire and operational char$es o# 7;, and complete #or 4nished item o#work as per MoR7;. speci4cation 3' 0 &th revision) 0 ,a6ment will be made basedon levels #or 4nished item o# work)%

    (&th Revision+ $ith a lead of 7;*500 km (Pa%ment #ill Be made Based onlevels for nished item of #ork+*

    .6draulic excavator1 cum bucket capacit6 H (cum per hour

    .4o uantit% 8nit es!ription of Item Rate per

    32

    &2 8nit N .Lm*

    ,rovidin$ 25*& mm masti! pads #or ?on$itudinal Ioints= 7ransversal eApansion Ioints and "onstruction Ioints o# approved Aualit6 includin$ cost= conve6ance andplacin$ in position= etc%= complete as directed b6 the En$ineerinchar$e%

  • 8/18/2019 Bodipalem Bridge

    109/155

    &2 (+ aterial

    &2 1% SAm Rate as per uildin$ SSR

  • 8/18/2019 Bodipalem Bridge

    110/155

    p

    Executive En$ineer 0R;)= Superintendin$ En$ine

    R; Division= 5malapuram R; "ircle= Jakin

    mount

  • 8/18/2019 Bodipalem Bridge

    111/155

    1'%

    32%

    33'%%

    335*00

    &((%-

    -1+3+%&

    -1+3 +&

    mount

  • 8/18/2019 Bodipalem Bridge

    112/155

    --1%

    ;;9*00

    -(%(

    '1%'

    1(22%'

    223(%(

    mount

      er 0R;)=

      a>ole

  • 8/18/2019 Bodipalem Bridge

    113/155

      r 0R;)=

      da

    4ame of $ork 1-

    ,arth/ Gravel etal/ .tone

    Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/3of "o# "evel ause $a% &' )*37m span + in ,*G*t*

  • 8/18/2019 Bodipalem Bridge

    114/155

    .*4o .pe!i!ation in rief 8nit uantit% !um !um

    >a!tor uantit% >a!tor uantit%

    9 2 3 & 5 ) 7 :

    9 1 cum +31% 1% +31%

    2 1 cum 12+% 1% 12+%

    3 P 9131) 1 cum +&% %- '%(

    & 1 cum &+&% %- &3'%(

    5 1 cum (3&% %- '%(

    ) 'R 25 for Raft 1 cum 3&% %- 33(%(

    7 'R 25 for edBlo!ks 1 cum 1% %- 1'%3: 'R 25 for e!k .laB 1 cum 2&3% %- 21+%

    ; 'R 30 for pproa!h .laB 1 cum 2(% %- 23%&

    90 'R 30 for $earing oat 1 cum 3% %- 2%

    99 a!k lling #ith gravel 1 cum ((&% 1%2 -(%+

    92 >ilter media using 950 mm ston 1 cum 1'% 1%2 1+%

    93 Grouted Revetment #ith (91&1 1 cum 22% 1%1+ 2'%-(

    9& 1 cum 1 1 2 12

    ,/$ for >oundation ,A!ludingde#atering

    ,/$ for >oundation in!luding

    de#atering

    ' 20 for >ootings ofButmentsC Piers

    ' 20 for suBstru!ture ofButmentsC Piers

    .tone pit!hing #ith 300mm

    R; Section= Malikipuram R; Subdivision= Ra>ole R; Division= 5malapuram R; "i

  • 8/18/2019 Bodipalem Bridge

    115/155

    .and

      0 (onstru!tion

  • 8/18/2019 Bodipalem Bridge

    116/155

    !um

    >a!tor uantit%

    ; 90

    %&' 3%+

    %&' 21%+

    %&' 2+'%3

    %&' 1(+%3

    %&' %('%&' 1-%3'

    %&' 11%

    %&' 13%'

    %- 1%-+

      rcle= Jakinada

  • 8/18/2019 Bodipalem Bridge

    117/155

    , R I > I ,

    4ame of $ork1

    Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*

  • 8/18/2019 Bodipalem Bridge

    118/155

    1)

    2)

    3) "erti4ed that all the distances in the Auarr6 map are correct%

    &) "erti4ed that the Auarries provided are the nearest%

    ')

    ()

    )

    +)

    "erti4ed that < have personall6 inspected the above Road on WWWWWW% andthe provisions made in the estimate #or the above work are adeAuate andessential%

    "erti4ed that the leads provided in the R%M%R o# the estimate are shortest andthere is sucient 6ield o# $ood Aualit6 material #rom the Auarries proposed inthe estimate%

    "erti4ed that the routes shown in the Auarr6 map are the shortest #or thetransportation o# the materials%

    "erti4ed that all the materials can be easil6 Auarried%

    "erti4ed that the description o# all materials mentioned are correct to the besto# m6 knowled$e%

  • 8/18/2019 Bodipalem Bridge

    119/155

    1

    Ra#t 1 x 1 2+%2( -%1 %( 1'&%3

    *lexible approns

    5prons :S side 1 x 1 2+%2( 3% 0 %( ) '%+

    5prons D:S side 1 x 1 2+%2( (% 0 %( ) 11%&

    2 x 1 +% 3%1 1%( -%3(

    2 x 1 1'% 2%3 1%( 11%&

    2 x 1 2(% 2%3 1%( 1-1%3(

    2 x 1 1% 1%& 1%1 3%+

    ' x 1 1 1 3'

    Earthwork in excavation o# #oundation o# structures as per drawin$ and technicalspeci4cation includin$ settin$ out= construction o# shorin$ and bracin$= removalo# stumps and other deleterious matter= dressin$ sides o# bottom= back 4llin$the excavation earth to the extent reAuired etc%= complete includin$ sei$nioar$echar$es #or 4nished item o# work as per MoR7;. speci4cation 3& 0&th Revision)

    ,A!luding de#atering 0-3*0 ,P@ aBove sill

    od6 walls on 5side9onvented level portion

    od6 walls on Sside9onvented level portion

    od6 walls on Sside9onvented level Rampportion

    od6 walls on Sside9onvented level Rampportion

    "ross walls on Sside9onvented level Rampportion

    2

    nder Ra#t 1 x 1 2+%2( -%1 %1' 3+%'

    2 x 1 +% 3%1 %1 &%-(

    ,lain cement concrete 013() nominal mix in #oundation with crushed stonea$$re$ate & mm nominal si>e mechanicall6 mixed= placed in #oundation andcompacted b6 vibration includin$ curin$ complete as per MoR7;. Speci4cation21 0&th Revision) for "evelling !ourse Belo# raft and #ing #alls

    od6 walls on 5side9onvented level portion

    od6 walls on S side

  • 8/18/2019 Bodipalem Bridge

    120/155

    2 x 1 1'% 2%3 %1 (%-

    2 x 1 2(% 2%3 %1 11%-(

    2 x 1 1% 1%& %1 2%+

    ' x 1 % 1% %1 3%'

    ):*);

    (-% '1+3%

    cum

    3

    "ut o walls :S side 1 x 1 2+%2( 0 %( ) 2% 33%-1"ut o walls D:S side 1 x 1 2+%2( 0 %( ) 2% 33%-1

    * 5b t t 2 1 + &' 0 1 2 ) 1 3 1+

    od6 walls on Sside9onvented level portion

    od6 walls on Sside9onvented level Rampportion

    od6 walls on Sside9onvented level Rampportion

    "ross walls on Sside9onvented level Rampportion

    'iBrated !ement !on!rete 20 Grade on!rete usin$ &mm = 2mm and

    1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forfootings of Butments and PiersC Raft !ut-oD #alls *

    &

    R5*7 *oundation 1 x 1 2+%2( 0 -%1 ) %( 1'&%3

    1'& 3

    'iBrated !ement !on!rete 25 Grade on!rete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forRaft*

  • 8/18/2019 Bodipalem Bridge

    121/155

    1'&%3sa6 1''% 2-%

    cum

    '

    *or 5butments 2 x 1 +%&' 0 % N 1% ) 3%1& (3%(+

    2

    *or ,ier 3 x 1 %' 0 %( N 1% ) 3%1& (2%1

    2

    *or cut waters 3 x 1   Π   0 %(O2 N 1%O2) 3%1& '%+&& x 2

    2 x 1 +% %++ 2% 2+

    2 x 1 1'% %+ 1%&' 33%12'

    2 x 1 2(% %+ 1%&' '+%&3'

    'iBrated !ement !on!rete 20 Grade "oncrete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es

    #or machine mixin$= la6in$ in position="ompactin$= Vibratin$ and curin$ includin$all other incidental and all other operational char$es o# 7;, reAuired etc%=complete as per MoR7;. Speci4cation 1'=1= 22 0&th Revision) for .uBstru!ture of aButmentsC piers and #ing #alls*

    od6 walls on 5side9onvented level portion

    od6 walls on Sside9onvented level portion

    od6 walls on Sside9onvented level Ramp

    portionod6 walls on Sside9 d l l R

    92*00 -'1%cum

    upto '%m hei$ht

    & 1 2+ + S 11' &+

    *urnishin$ and placin$ rein#orced cement concrete VR"" M 2' $rade as perapproved drawin$s and technical speci4cations as per MoR7;. speci4cation1'=1(=1 0&th revision ) and as per M%C%7 DR! 9o D:1& 5; 2&excludin$ cost o# steel and #abrication char$es #or VR"" M2' Super structure

    3

  • 8/18/2019 Bodipalem Bridge

    122/155

    & x 1 2+%+ per Span 11'%&+

    sa6 11(% +1%

    cum

    +

    2 x 1 %' &% %1' -%

    ;*00

    -% '+'%

    cum

    -

    *or approach slab 2 x 1 &%3 %' %3 1-%3'

    1- 3'

    *or deck slabs 5s perStandard Dr$% D:2&

    m3

    ,lain cement concrete M 1' !rade "oncrete usin$ &mm = 2mm and 1mm si>e.! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and4ne a$$re$ate con#ormin$ to table 12) includin$ cost=sei$nora$e andconve6ance o# all materials to site and all labour char$es #or machinemixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$ includin$ all otherincidental and all other operational char$es o# 7;, reAuired etc%= complete as perMoR7;. Speci4cation 1'=1= 21 0&th Revision) #or ?evellin$ coursebelow approach slab%?evellin$ course belowapproach slab%

    V%R%"%"% M3 $rade concrete usin$ 2mm and 1mm si>e SS' .! crushedstone a$$re$ate includin$ cost and conve6ance o# all materials to site=sei$niora$e char$es=labour char$es #or machine mixin$=la6in$=compactin$=curin$etc=includin$ all other incidental and operational char$es=7;, char$esetc=complete but excludin$ cost o# steel and its #abrication char$es= as per MoR7;.Speci4cations 1'=1=2&0&th Revision) #or pproa!h .laB%

    & x 1 PPP k$s per Span &(&

    5pproach slab 1 x 1 1- +' k$s:cum 1(&&%'

    @earin$ coat 1 x 1 PPP ( k$s:cum 12%1+

    PPP

    90*&0

    or sa6 11% '2&'%M 7

    *or deck slabs 5s perStandard Dr$%D:&&

  • 8/18/2019 Bodipalem Bridge

    123/155

    6M%7

    12

    1 x 1 11%1 1 k$s:cum 111%2

    2 x 1 3' k$s %

    3 x 1 3' k$s 1'%

    1 x 1 2 k$s 2%

    1 x 1 3' k$s 3'%

    1 x 1 '2 k$s '2%

    ,rovidin$ @?. Bars ( >e-&95 + o# dierent diameters= wrou$ht and put up barso# all diameters includin$ cost and conve6ance o# steel to site and all labourchar$es #or #abrication o# rein#orcement includin$ cuttin$= bendin$= bindin$ rods=t6in$ $rills= placin$ them in position etc%= complete includin$ cost andconve6ance o# bindin$ wire and all handlin$ char$es and operational char$es

    etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or all R%"%"items #or 4nished item o# work as per standard drawin$s= as per the directions o#the En$ineerin"har$e and as per MoR7;. speci4cation 1( ;22 0&threvision) and as per

  • 8/18/2019 Bodipalem Bridge

    124/155

    $

    1 x 1 2 k$s 2%

    1 x 1 12' k$s 12'%

    PPP

    90*;;

    11% PPP

    M%7

    1&

    5pproaches ' x 3 %' '%

    "" pavement 11 x 2+ %' 1'&%

    22-% RM

    ++1%(' k$s

    & x & 1%' 2&% RM

    +32%'( J$s

    11& 21

    p9onvented level Rampportion  9onvented level Rampportion

    ,rovidin$ ncoated Mild Steel bars 0 *e2' ) o# dierent diameters= wrou$ht andput up bars o# all diameters includin$ cost and conve6ance o# steel to site and alllabour char$es #or #abrication o# rein#orcement includin$ cuttin$= bendin$=bindin$ rods= t6in$ $rills= placin$ them in position etc%= complete includin$ costand conve6ance o# bindin$ wire and all handlin$ char$es and operationalchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or allR%"%" items #or 4nished item o# work as per standard drawin$s= as per the

    directions o# the En$ineerin"har$e and as per MoR7;. speci4cation 1(;22 &th Revision and as er

  • 8/18/2019 Bodipalem Bridge

    125/155

    Guadrants & x 1 1%( %1' 1%((

    90*))

    11% 1-+%

    or sa6 cum

    1+

    *or Auadrants & x 1 1%( %3 21%31

    29*3922% 23&-%

    cum

    1-

     7oe walls & x 1 (%'1 %( %( -%2;*72

    p p pRevision)and as directed b6 the En$ineerin"har$e% *or pit!hing of slopes%

    ,rovidin$ !routed Revetment with rou$h stone other than $ranite o# not lessthan 3 mm si>e $routed with %2 cum o# "" 01&+) includin$ cost=sei$niora$e char$es and conve6ance o# materials to site and includin$ labourchar$es #or packin$ the stones #or revetment etc%= complete #or 4nished item o#work as per MoR7;. speci4cation 2'& 0 & th  revision ) and as directed b6 theEn$ineerin"har$e #or Auadrential revetment%

    ,rovidin$ rou$h stone revelment other than $ranite 3 mm thick usin$ 3mm i>e rou$h stonne varit6 includin$ cost =sei$niora$e and conve6ance o# allmaterials to site = labour c$ar$es etc = complete as per MCS7 speci4cation no%

    od6 walls SS

  • 8/18/2019 Bodipalem Bridge

    126/155

    9os

    23

    5ppanaramuni lanka sid 1 x 1 3% %' %1 2%+

     Sakinetipall6 Se .! crushedstone a$$re$ate and 4ne a$$re$ate con#ormin$ to table 12 o# MoR7;.includin$ cost= 0excludin$ sei$niora$e) conve6ance o# all materials to site andlabour char$es= centerin$= machine mixin$= la6in$= Vibratin$= curin$ etc%=includin$ all other incidental and operational char$es o# all 7;, etc%= complete#or 4nished item o# work as per MoR7;. speci4cation 1'=1= 21 0&th

    Revision) and as directed b6 the En$ineerin"har$e #or base coarse%

    Vibrated cement concrete M 3' $rade usin$ 2mm ; 1mm .! crushedstone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and 4nea$$re$ate con#ormin$ to table 12) includin$ cost= 0excludin$ sei$niora$e)conve6ance o# all materials to site and labour char$es= centerin$= machinemixin$= la6in$= vibratin$= curin$ etc%= includin$ all other incidental and

    operational char$es o# all 7;, etc%= complete #or 4nished item o# work as perMoR7;. speci4cation 1'= 1= 21 ; 22 0&th Revision) and as directed

    2( *ormin$ shoulders with barrowed use#ul selected earth havin$ MDD o# not lessthan 1%' !ms:"" #rom out side road boundar6 b6 mechanical means with allleads and li#ts includin$ prewaterin$ o# soil at barrow area= removal o# top soil=excavation o# soils at barrowed area= conve6ance o# soil= depositin$ the soils onthe embankment= spreadin$ soils= beakin$ clods= sectionin$ and consoilidationwith vibrator6 road roller H CM" to meet reAuirement o# table 32 o#MoR7;.= includin$ all hire and operational char$es o# 7;, and complete #or4nished item o# work as per MoR7;. speci4cation 3' 0 &th revision) 0 ,a6ment

    will be made based on levels #or 4nished item o# work)%

  • 8/18/2019 Bodipalem Bridge

    127/155

    Road work

    "" ,avement 1 x 2 &% 1% %3 2&%

    2&%

    or sa6 2&0*00 12-%

    cum

    2

    Road work 0nder "" ,avement)1 x 1 &% %3 11'2%

    11'2%

    or sa6 9952*00 ((2%

    cum

    2+

    *ormin$ embankment with borrowed use#ul earth #rom outside road boundar6b6 mechanical means up to SDR with all leads and li#ts includin$ prewaterin$ o#soil at borrow area= removal o# top soil= excavation o# soils at borrowed area=conve6ance o# soil= depositin$ the soil on the embankment= spreadin$ soil=breakin$ clods= sectionin$= $radin$ and consolidation with + to 1 7onnesVibrator6 Road Roller H CM" to meet reAuirement o# table 32 o# MoR7;.=includin$ all hire and operational char$es o# 7;, and 0excludin$ sei$niora$e)char$es= complete #or 4nished item o# work as per MoR7;. speci4cation 3'

    01%2N-%):2

    "onstruction o# !ranular subbase b6 providin$ .! material con4rmin$ to

    !radin$

  • 8/18/2019 Bodipalem Bridge

    128/155

    iversion of anal and ross unds 1-

    31

    1 x 1 1&% 1'% 2%2 &(2%

    &(2%or sa6 &)20 00 (( 1

    Earthwork excavation in soils upto SDR b6 mechanical means includin$trimmin$ bottom and side slopes in accordance with reAuirements o# lines =$rades and cross sections etc%= complete #or 4nished item o# work #or trenchcuttin$ as per MoR7;. speci4cation 310&th Revision) and as directed b6 theEn ineerin"har e

  • 8/18/2019 Bodipalem Bridge

    129/155

    or sa6 &)20*00 ((%1

    cum

    32

    >or ross unds1

    :S Side 1 x 1 02N1():2 0'N-):2 2%2 2%2

    D:S Side 1 x 1 02N1():2 0'N-):2 2%2 2%2

    1 x 1 01'N11):2 0N11):2 2%2 2'%&

    +11%+

    or sa6 :92*00 13%

    cum

    33 ,rovision towards V57 'F on Rs% 223(-31+

    3& ,rovision towards Gualit6 "ontrol char$es H1F on Rs% 223(-31+

    *ormin$ embankment with Side earth b6 mechanical means upto SDR includin$prewaterin$ o# soil = removal o# top soil= excavation o# soils = depositin$ the soilson the embankment= spreadin$ soil= breakin$ clods= sectionin$ = $radin$ andconsolidation with + to 1 7onnes Vibrator6 Road Roller H CM" to meet

    reAuirement o# table 32 o# MoR7;.= includin$ all hire and operationalchar$es o# 7;,= complete #or 4nished item o# work as per MoR7;. speci4cation3' 0&th revision) 0,a6ment will be made based on level #or 4nished item o#work)%

  • 8/18/2019 Bodipalem Bridge

    130/155

  • 8/18/2019 Bodipalem Bridge

    131/155

    1% 3'(2

    cum

    1% 1EN(

  • 8/18/2019 Bodipalem Bridge

    132/155

    cum

    1% -'&12cum

    1 1E (

  • 8/18/2019 Bodipalem Bridge

    133/155

    1% 1EN(

    cum

    1% '2('

    cum

    1% '22'M%7

  • 8/18/2019 Bodipalem Bridge

    134/155

     

  • 8/18/2019 Bodipalem Bridge

    135/155

    1% '(1121

    M%7

    1% 2(&&'

    cum

  • 8/18/2019 Bodipalem Bridge

    136/155

    1% 2-++

    cum

    1% '1(+

    cum

    1% 33&'(

    R%M

    1% (++9o%

  • 8/18/2019 Bodipalem Bridge

    137/155

    1% 2EN(

    cum

  • 8/18/2019 Bodipalem Bridge

    138/155

    1% 3(-(

    cum

    1% (2(2&

    cum

    1&++++

  • 8/18/2019 Bodipalem Bridge

    139/155

    1% 3'3+2

    cum

  • 8/18/2019 Bodipalem Bridge

    140/155

    cum

    1% 1&&(

    cum

    FFF

    999:&))

    223);3

    uantit% es!ription of Item Rate per

    2'

    ourse sand #ih Bitumen

    12%M lon$ x 1mm wide x 1mm deepaterial

    12cum "ost o# sand #or 4llin$ 313 cum

     

    ,rovdin$ and 4llin$ Ioints sealin$ compound as per Drawin$ and 7echnical specidirected b6 the En$ineer in char$e%

  • 8/18/2019 Bodipalem Bridge

    141/155

    %12cum "ost o# sand #or 4llin$ 313% cum

    %1 M7 "ost o# itumen +:1 PPP M7

    "aBour

    %'cum Man Ma>door #or heatin$ bitumen 2-'% each

    Rate #or 12 RMRate #or 1 RM 33%&-

    Rate to be adopted

    2(

    2'mm Dia1% RM ,art

  • 8/18/2019 Bodipalem Bridge

    142/155

    mount

    3%(

      4cation and as

  • 8/18/2019 Bodipalem Bridge

    143/155

    3%(

    &-%(+

    1&%'

    2%-3

    &09*:7

    33*00

    R

    1'%+&

    9)*00

    R

    and technical

    oncrete to behine to releaseterin$ process=

    in vibration o#t includin$ hire

  • 8/18/2019 Bodipalem Bridge

    144/155

    4ame of $ork 1

    Revised ost of R Plain ,nded pipes

     7he rates o# R"" ,lain ended pipes as per SSR 2+- are based on the raw materials costs%

    "ement 0"1) &=&Steel 0MS Rods) 0S1) &1='

    Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*

  • 8/18/2019 Bodipalem Bridge

    145/155

     7he revised raw materials costs i%e%= the rates adopted in the estimate%

    "ement 0"2) (=&!%C% R7 9o% 2(-= 5pril 21'= Dt% 2+%'%21'

    Steel 0MS Rods) 0S2) &'=

     7otal Auantit6 o# "oncrete reAuired 0as per

  • 8/18/2019 Bodipalem Bridge

    146/155

    3 MM dia 0&'= &1=') :1 0&'= &1=') :1 0&'= &1=') :1

    x 2%'+ J$s% Rs ;*03 x 1%' J$s% Rs 5*50 x %1 J$s% Rs 2*&;

    &' MM dia 0&'= &1=') :1 0&'= &1=') :1 0&'= &1=') :1

    x &%' J$s% Rs 9)*00 x 2%' J$s% Rs ;*)3 x 1%&+ J$s% Rs 5*9:

    ( MM dia 0&'= &1=') :1 0&'= &1=') :1 0&'= &1=') :1x +%1- J$s% Rs 2:*)7 x &%2' J$s% Rs 9&*:: x 1%+- J$s% Rs )*)2

    due to chan$e in the cost o# "ement 0"2"1):1 8 @c%

    ia 9,3 "lass pipes 9,2 "lass pipes 9,2 "lass "ollars

    3 MM dia 0(=& &=&) :1 0(=& &=&) :1 0(=& &=&) :1x1'%3- J$s% Rs 30*7: x11%2 J$s% Rs 22*&0 x1%'3 J$s% Rs 3*0)

    &' MM dia 0(=& &=&) :1 0(=& &=&) :1 0(=& &=&) :1

    x&&%'' J$s% Rs :;*90 x1-%21 J$s% Rs 3:*&2 x3%'( J$s% Rs 7*92

    ( MM dia 0(=& &=&) :1 0(=& &=&) :1 0(=& &=&) :1

    x('%++ J$s% Rs 939*7) x32%+& J$s% Rs )5*): x'%- J$s% Rs 99*5:

    Revised "ost "ost as per the SSR N R1 N R2

    Revised "ost R2 1 Variation 0increase : decrease ) in cost 0Rs% per metre)

    R; Section Malikipuram R; Subdivision Ra>ole R; Division 5malapuram

  • 8/18/2019 Bodipalem Bridge

    147/155

    uantit% es!ription of Item Rate per

    3

    nit metre Page 272C273 of oRE@ . 7akin$ output 12%' metre

    300 mm ia*C

    ,rovidin$= la6in$ Rein#orced cement concrete .ume pipes o# 9,3 class #or pipe culcost and conve6ance o# ,ipes etc%= complete and ?abour char$es #or la6in3mm:&'mm:(mm dia% R%"%" .ume pipes in position includin$ li#tin$= ali$nin$hoistin$ etc%= as per drawin$ and as per MoR7;. Speci4cation 2-= 2-' and 2-and

  • 8/18/2019 Bodipalem Bridge

    148/155

    300 mm ia*C

    (+"aBour

    % nos Mate 1++% da6

    %2' nos Mason 1-3%& da6

    1%' nos Ma>door 1&(% da6

     7otal

    (+aterial12%' RM "ost o# 3mm Dia%= pipes (3%+1 RM

     7otal

    (+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+

    1-%(1' F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)

    (+ otal of (+ J (+J( +

    (,+ dd ontra!tors Prot at 90H on (+ost per 92*5 metre (+J(,+

    Rate #or 1 RMRate to be adopted

    &50 mm ia*C

    (+"aBour

    %11 nos Mate 1++% da6

    %3+ nos Mason 1-3%& da6

    2%2' nos Ma>door 1&(% da6

     7otal(+aterial

  • 8/18/2019 Bodipalem Bridge

    149/155

    mount

      erts includin$$= Iointin$ o#= lowerin$ and( 0&th  Revision)nished item o#

  • 8/18/2019 Bodipalem Bridge

    150/155

    13%1(

    &+%3'

    21-%

    2+%'1

    -'&%(3

    -'&%(3

    %

    ;:2:*9&

    0*00

    ;:2:*9&

    +(%2'7:)*00

    9 R

    2%(+

    3%&-

    32+%'

    &22%(

    9 R

  • 8/18/2019 Bodipalem Bridge

    151/155

    LEAD CHARGES 'SSR 201(-15) Cost of Materials, Labour Metal

    SSR 201(-15

    loading 52.50 105.00   Material Rates  =s er of ? et.

    unloading 15.-0 15.-0 60 to 63 mm IC ! Mo"# #$% metal 41-.00 ?g. Eo.17, l.53 *oads+

    sta&'ing (( (( 50 to 55 mm IC ! Mo"# #$% metal 456.00 ?g. Eo.17, l.52 *oads+

    0.25 (( (( 40 to 45 mm IC ! Mo"# #$% metal 588.00 ?g. Eo.16, l.51 *oads+

    0.5 (( (( oug)stone 300mm *#$%+for reetment 156.00 ?g. Eo.13, l.- *oads+

    1 31.50 30.40 oug)stone 225mm *#$%+for reetment 154.00 ?g. Eo.13, l.8 *oads+

    2 44.10 42.60 eetment /or' 225mm 144.00 ?g. Eo.13, l.2 *oads+

    3 58.-0 58.-0 eetment /or' 300mm 164.00 ?g. Eo.13, l.3 *oads+

    4 71.50 71.50 eetment /or' 450mm 136.00 ?g. Eo.13, l.4 *oads+

    5 84.10 84.10 Laterite for eetment 225mm 118.00 ?g. Eo.13, l.6 *oads+

    6 -6.70 -6.70 Laterite for eetment 300mm 138.00 ?g. Eo.13, l.7 *oads+

    7 10- 30 10- 30 edd stone aboe 450mm to 600mm 188 00 ?g Eo 13 l 5 *oads+

    ;art)%raeland

  • 8/18/2019 Bodipalem Bridge

    152/155

    7 10-.30 10-.30 edd stone aboe 450mm to 600mm 188.00 ?g. Eo.13, l.5 *oads+

    8 121.-0 121.-045.00

    - 134.50 134.50 150 mm soling stone #$% metal -5.00 ?g. Eo.18, l.7- *oads+

    10 147.10 147.10 40 to 45 mm IC ! Mo"# #$% MC metal 588.00 ?g. Eo.16, l.51 *oads+

    11 15-.70 15-.7025 to 27 mm IC ! Mo"# #$% MC metal -44.00 ?g. Eo.16, l.50 *oads+

    12 172.30 172.301- to 22 mm IC ! Mo"# #$% MC metal -84.00 ?g. Eo.16, l.4- *oads+

    13 184.-0 184.-012 to 14 mm IC ! Mo"# #$% MC metal 780.00 ?g. Eo.16, l.48 *oads+

    14 1-7.50 1-7.50 -.5 to 11.20 mm IC ! Mo"# #$% MC metal 656.00 ?g. Eo.16, l.47 *oads+

    15 210.10 210.10 5 to 7 mm IC ! Mo"# #$% MC metal 504.00 ?g. Eo.16, l.46 *oads+

    16 222.70 222.70 2.36 to 5 mm IC ! Mo"# #$% MC metal 308.00 ?g. Eo.16, l.45 *oads+

    17 235.30 235.30 #$% tone &)is 2.36mm and belo/ 340.00 ?g. Eo.18, l.-2 *oads+

    18 247.-0 247.-0 %rael 103.00 ?g. Eo.18, l.-0 *oads+

    1- 260.50 260.50 40 mm 5 m& #$% metal*;(&luding $lasting ! 620.00 ?g. Eo.15, l.30 *oads+

    20 273.10 273.1025 mm 5 m& #$% metal GG --4.00 ?g. Eo.15, l.2- *oads+

    21 285.70 285.7020 mm 5 m& #$% metal GG 1036.00 ?g. Eo.15, l.28 *oads+

    22 2-8.30 2-8.3012 mm 5 m& #$% metal GG 822.00 ?g. Eo.15, l.27 *oads+

    23 310.-0 310.-0 10 mm 5 m& #$% metal GG 6-2.00 ?g. Eo.14, l.26 *oads+

    24 323.50 323.50 6 mm 5 m& #$% metal GG 532.00 ?g. Eo.14, l.25 *oads+

    25 336.10 336.10 and for Con&rete 462.00 ?g. Eo.1-, l.-4 *oads+

  • 8/18/2019 Bodipalem Bridge

    153/155

    34 441.10 441.10 $lasting &)arges for roug) stone ((35 451.60 451.60   Seigniorage charges

    36 462.10 462.10 Metal 50.00

    37 472.60 472.60 %raeleart) 22.00 =s er t)e %.>.s

    38 483.10 483.10 and 40.00

    3- 4-3.60 4-3.60   Lao!r Rates

    40 504.10 504.10 Mate 345.00 ?g. Eo.10, l.71 *oads+

    41 514.60 514.60 Madoor s'illed *385 ( 309 : 345 ( 709+ 357.00

    42 525.10 525.10 Madoor uns'illed 2-5.00 ?g. Eo.10, l.73 *oads+

    43 535.60 535.60   Machiner" Rates

    44 546.10 546.10 oer 80 #? for sreading @ 200 &um er )our  2575.60 ?g. Eo.25, l.1 *oads+

    45 556.60 556.60 Motor grader 3.35M $lade @50 &um#r  3216.00 ?g. Eo.25, l.3 *oads+

    46 567.10 567.10 #drali& e(&aator 2848.50 ?g. Eo.25, l.4 *oads+

    47 577.60 577.60 ront end loader 1 &um &aa&it 1646.00 ?g. Eo.25, l.5 *oads+

    48 588 10 588 10 "ier 5 &um -22 00 ?g Eo 25 l 6 *oads+

  • 8/18/2019 Bodipalem Bridge

    154/155

    48 588.10 588.10 "ier 5 &um -22.00 ?g. Eo.25, l.6 *oads+

    4- 5-8.60 5-8.60 Aibrator roller 8" 2678.30 ?g. Eo.25, l.7 *oads+

    50 60-.10 60-.10 smoot) /)eeled roller 8 "on 1146.70 ?g. Eo.25, l.8 *oads+

    51 61-.60 61-.60 Bater tan'er 6 L 624.00 ?g. Eo.25, l.10 *oads+

    52 630.10 630.10 "ra&tor 415.00 ?g. Eo.25, l.11 *oads+

    53 640.60 640.60 "ra&tor /it) otaator 422.00 ?g. Eo.25, l.12 *oads+

    54 651.10 651.10 Tractor with ripper attachment @ 60 cum per hour 422.00 ?g. Eo.25, l.13 *oads+

    55 661.60 661.60  =ir &omressor 250 &fm 507.50 ?g. Eo.25, l.14 *oads+56 672.10 672.10 Bet mi( lant of 60 tonne )r. &aa&it 1646.00 ?g. Eo.26, l.15 *oads+

    57 682.60 682.60 Me&)ani&al broom @ 1250 sDm)r. 357.00 ?g. Eo.26, l.16 *oads+

    58 6-3.10 6-3.10 $itumen ressure distributor @1750 sDm)r  14-8.00 ?g. Eo.26, l.17 *oads+

    5- 703.60 703.60 ;mulsion ressure distributor @1750 sDm)r  860.00 ?g. Eo.26, l.18 *oads+

    60 714.10 714.10 #ot mi( lant 40 to 60 "?# 1-120.00 ?g. Eo.26, l.22 *oads+

    61 724.60 724.60 Me&)ani&al ?aer finis)er 100 "?# 224-.00 ?g. Eo.26, l.24 *oads+

    62 735.10 735.10 Hydraulic self