8/18/2019 Bodipalem Bridge
1/155
Photographs
Bridge Location
Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350
(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*
8/18/2019 Bodipalem Bridge
2/155
.pe!i!ation Report to a!!ompan% the ,stimate
,stimate mount 1 Rs* 275*00 "akhs
Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*
7he desi$ns #or construction o# low level cause wa6 &V 8 (%3m were approvedvide Memo 9o% 132(3:00D;,):D"E
8/18/2019 Bodipalem Bridge
3/155
21) ,rovidin$ 1 mm dia 5" pipes #or weep holes at 1% M ":"
22) Suppl6in$ and 4xin$ o# "< draina$e spouts
8/18/2019 Bodipalem Bridge
4/155
23) ,lain cement concrete 013() #or levelin$ course under "" pavement
2&) Vibrated cement concrete M3' $rade #or "" pavement
2') ,rovidin$ 2'%&mm Mastic ,ad
2() *ormin$ shoulders with barrowed use#ul selected earth
2) *ormin$ embankment with borrowed use#ul earth #or "" pavement2-)
3) ,rovidin$= la6in$ Rein#orced cement concrete .ume pipes o# ( mm Dia%= 9,3 c
Road .afet%1-
1)
2)
3)
&)
iversion of anal and ross unds 1-
1) Earthwork excavation in soils upto SDR b6 mechanical means
2) *ormin$ embankment with Side earth b6 mechanical means upto SDR
". provisions1-
1) ,rovision towards V57 'F
2) ,rovision towards Gualit6 "ontrol char$es H1F3) ,rovision towards ,rice 5dIustment H &%2'F
&) ,rovision towards e''x''x( mm and 12cm hi$h
,rovidin$ and installation o# delineators0 Road wa6
8/18/2019 Bodipalem Bridge
5/155
G,4,R" .R
. 46 I, 684
9 2:&30)50
Sub 7otal 2:&30)50
"*. Provisions 1-
9 ,rovision towards V57 'F 9&29533
2 ,rovision towards Gualit6 "ontrol char$es H1F 2:&3073 ,rovision towards ,rice 5dIustment H &%2'F 920:303
& ,rovision towards
8/18/2019 Bodipalem Bridge
6/155
RIG, ,I", 8 .R ,.I,
4ame of #ork1-
%9o% Description o#
8/18/2019 Bodipalem Bridge
7/155
2
nder Ra#t 1 x 1 2%++ 13%& %1' '(%&
2 x 1 +% 3%1 %1 &%-(
2 x 1 1'% 2%3 %1 (%-
2 x 1 2(% 2%3 %1 11%-(
2 x 1 1% 1%& %1 2%+
2 x 1 3% 1% %1 %(
2 x 1 (% 1% %1 1%2
:&*&)
+&% '1+3%
cum
3
,lain cement concrete 013() nominal mix in #oundation with crushed stonea$$re$ate & mm nominal si>e mechanicall6 mixed= placed in #oundation andcompacted b6 vibration includin$ curin$ complete as per MoR7;. Speci4cation21 0&th Revision) for "evelling !ourse Belo# raft and #ing #alls
od6 walls on 5side9onvented level portion
od6 walls on Sside9onvented level portion
od6 walls on Sside9onvented level Rampportion
od6 walls on Sside9onvented level Rampportion
"ross walls on Sside9onvented level Rampportion
"ross walls on Sside9onvented level Rampportion
'iBrated !ement !on!rete 20 Grade on!rete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es
#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forfootings of Butments and PiersC Raft !ut-oD #alls *
8/18/2019 Bodipalem Bridge
8/155
sa6 &+&% ((&+%
cum
&
R5*7 *oundation 1 x 1 2%++ 0 13%& ) 1% 33%'-
33%'-
sa6 3&% 2-%
cum
'
*or 5butments 2 x 1 12%-' 0 % N 2%' ) (%-( 2++%&2
2
*or ,ier 2 x 1 13% 0 %( N 1%& ) (%-( 1-'%&&
2
*or cut waters 2 x 1 Π 0 %(O2 N 1%&O2) (%-( 13%+
& x 2
2 x 1 +% %++ 2% 2+
2 x 1 1'% %+ 1%&' 33%12'
'iBrated !ement !on!rete 25 Grade on!rete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$
cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forRaft*
'iBrated !ement !on!rete 20 Grade "oncrete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$= la6in$ in position="ompactin$= Vibratin$ and curin$ includin$all other incidental and all other operational char$es o# 7;, reAuired etc%=complete as per MoR7;. Speci4cation 1'=1= 22 0&th Revision) for .uB
stru!ture of aButmentsC piers and #ing #alls*
od6 walls on 5side
9onvented level portion
od6 walls on Sside9onvented level portion
od6 walls on Sside9 d l l R
8/18/2019 Bodipalem Bridge
9/155
do cut waters 2 x 1 %3 %3+
1(%3
97*00 -'1%
cum
3 x 1 +%& per Span 2&2%22
sa6 2&3% +1%
cum
+
2 x 1 3%+ 11% %1' 12%'&
92*5&
13% '+'%
cum
-
Π:& 0 %- )2
*urnishin$ and placin$ rein#orced cement concrete VR"" M 2' $rade as per
approved drawin$s and technical speci4cations as per MoR7;. speci4cation1'=1(=1 0&th revision ) and as per M%C%S% DR! 9o SD:12 excludin$ costo# steel and #abrication char$es #or VR"" M2' Super structure o# deck slabs
*or deck slabs 5s perStandard Dr$% SD:12
m3
,lain cement concrete M 1' !rade "oncrete usin$ &mm = 2mm and 1mm si>e.! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and4ne a$$re$ate con#ormin$ to table 12) includin$ cost=sei$nora$e andconve6ance o# all materials to site and all labour char$es #or machinemixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$ includin$ all otherincidental and all other operational char$es o# 7;, reAuired etc%= complete as perMoR7;. Speci4cation 1'=1= 21 0&th Revision) #or ?evellin$ coursebelow a roach slab%
?evellin$ course belowapproach slab%
V%R%"%"% M3 $rade concrete usin$ 2mm and 1mm si>e SS' .! crushedstone a$$re$ate includin$ cost and conve6ance o# all materials to site=
sei$niora$e char$es=labour char$es #or machine mixin$=la6in$=compactin$=curin$etc=includin$ all other incidental and operational char$es=7;, char$esetc=complete but excludin$ cost o# steel and its #abrication char$es= as per MoR7;.Speci4cations 1'=1=2&0&th Revision) #or pproa!h .laB%
8/18/2019 Bodipalem Bridge
10/155
3 x 1 PPP k$s per Span 1&&(-
5pproach slab 1 x 1 2' +' k$s:cum 2131%+
@earin$ coat 1 x 1 PPP ( k$s:cum 1+21%+
PPP
9:*50
or sa6 1-% '2&'%
M%7
12
1 x 1 1(%3 1 k$s:cum 1(2%
2 x 1 k$s 1&%
2 x 1 k$s 1&%
1 x 1 2 k$s 2%
1 x 1 3' k$s 3'%
revision) and as per
8/18/2019 Bodipalem Bridge
11/155
Ra#t 1 x 1 33%'- ' k$s:cum PPP
2 x 1 2 k$s &%
3 x 1 & k$s 12%
1 x 1 3' k$s 3'%
1 x 1 ' k$s '%
1 x 1 - k$s -%
1 x 1 2 k$s 2%
1 x 1 12' k$s 12'%PPP
22*3)
23% PPP
M%7
1&
5pproaches 2 x 3 %' 3%
PRE*Q J$s%
% PPP
M%7
Skin rein#orcement #orabutmentsSkin rein#orcement #orpiers
od6 walls on 5side9onvented level portionod6 walls on Sside9onvented level portion 9onvented level Rampportion 9onvented level Rampportion 9onvented level Ramp
portion
,rovidin$ ncoated Mild Steel bars 0 *e2' ) o# dierent diameters= wrou$ht andput up bars o# all diameters includin$ cost and conve6ance o# steel to site and all
labour char$es #or #abrication o# rein#orcement includin$ cuttin$= bendin$=bindin$ rods= t6in$ $rills= placin$ them in position etc%= complete includin$ costand conve6ance o# bindin$ wire and all handlin$ char$es and operationalchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or allR%"%" items #or 4nished item o# work as per standard drawin$s= as per thedirections o# the En$ineerin"har$e and as per MoR7;. speci4cation 1(;22 &th Revision and as er
8/18/2019 Bodipalem Bridge
12/155
cum
1
Guadrants & x 1 1%( %1' 1%((
90*))
11% 1-+%
or sa6 cum
1+
*or Auadrants & x 1 1%( %3 21%31
29*39
22% 23&-%cum
1-
7oe walls & x 1 (%'1 %( %( -%2
;*72
or sa6 1% 1'+%
cum
2
,rovidin$ and la6in$ 4lter material with $ravel underneath pitchin$ in slopesincludin$ cost and conve6ance o# materials to site includin$ labour char$es etc=complete #or 4nished item o# work as per MoR7. Speci4cation 9o%2'&0&thRevision)and as directed b6 the En$ineerin"har$e% *or pit!hing of slopes%
,rovidin$ !routed Revetment with rou$h stone other than $ranite o# not less
than 3 mm si>e $routed with %2 cum o# "" 01&+) includin$ cost=sei$niora$e char$es and conve6ance o# materials to site and includin$ labourchar$es #or packin$ the stones #or revetment etc%= complete #or 4nished item o#work as per MoR7;. speci4cation 2'& 0 & th revision ) and as directed b6 theEn$ineerin"har$e #or Auadrential revetment%
,rovidin$ rou$h stone revelment other than $ranite 3 mm thick usin$ 3mm i>e rou$h stonne varit6 includin$ cost =sei$niora$e and conve6ance o# allmaterials to site = labour c$ar$es etc = complete as per MCS7 speci4cation no%
, idi d l i b ld i b d # t ti i t
8/18/2019 Bodipalem Bridge
13/155
22
& x 2 +
sa6 + -(1%
9os
23
5ppanaramuni lanka sid 1 x 1 3% %' %1 2%+
Sakinetipall6 S
8/18/2019 Bodipalem Bridge
14/155
2(
Road work
"" ,avement 1 x 2 &% 1% %3 2&%
2&%
or sa6 2&0*00 12-%
cum
2
Road work 0nder "" ,avement)
1 x 1 &% %3 11'2%
11'2%
or sa6 9952*00 ((2%
cum
2+
*ormin$ shoulders with barrowed use#ul selected earth havin$ MDD o# not lessthan 1%' !ms:"" #rom out side road boundar6 b6 mechanical means with allleads and li#ts includin$ prewaterin$ o# soil at barrow area= removal o# top soil=excavation o# soils at barrowed area= conve6ance o# soil= depositin$ the soils onthe embankment= spreadin$ soils= beakin$ clods= sectionin$ and consoilidationwith vibrator6 road roller H CM" to meet reAuirement o# table 32 o#
MoR7;.= includin$ all hire and operational char$es o# 7;, and complete #or4nished item o# work as per MoR7;. speci4cation 3' 0 &th revision) 0 ,a6mentwill be made based on levels #or 4nished item o# work)%
*ormin$ embankment with borrowed use#ul earth #rom outside road boundar6b6 mechanical means up to SDR with all leads and li#ts includin$ prewaterin$ o#soil at borrow area= removal o# top soil= excavation o# soils at borrowed area=conve6ance o# soil= depositin$ the soil on the embankment= spreadin$ soil=breakin$ clods= sectionin$= $radin$ and consolidation with + to 1 7onnesVibrator6 Road Roller H CM" to meet reAuirement o# table 32 o# MoR7;.=includin$ all hire and operational char$es o# 7;, and 0excludin$ sei$niora$e)
char$es= complete #or 4nished item o# work as per MoR7;. speci4cation 3'
01%2N-%):2
"onstruction o# !ranular subbase b6 providin$ .! material con4rmin$ to!radin$
8/18/2019 Bodipalem Bridge
15/155
8/18/2019 Bodipalem Bridge
16/155
iversion of anal and ross unds 1-
31
1 x 1 1&% 1'% 2%2 &(2%
&(2%
or sa6 &)20*00 ((%1
cum
32
>or ross unds1
:S Side 1 x 1 02N1():2 0'N-):2 2%2 2%2
D:S Side 1 x 1 02N1():2 0'N-):2 2%2 2%21 x 1 01'N11):2 0N11):2 2%2 2'%&
+11%+
or sa6 :92*00 13%
cum
33 ,rovision towards V57 'F on Rs% 2+&3('
3& ,rovision towards Gualit6 "ontrol char$es H1F on Rs% 2+&3('
Earthwork excavation in soils upto SDR b6 mechanical means includin$trimmin$ bottom and side slopes in accordance with reAuirements o# lines =$rades and cross sections etc%= complete #or 4nished item o# work #or trenchcuttin$ as per MoR7;. speci4cation 310&th Revision) and as directed b6 the
En ineerin"har e
*ormin$ embankment with Side earth b6 mechanical means upto SDR includin$prewaterin$ o# soil = removal o# top soil= excavation o# soils = depositin$ the soils
on the embankment= spreadin$ soil= breakin$ clods= sectionin$ = $radin$ andconsolidation with + to 1 7onnes Vibrator6 Road Roller H CM" to meetreAuirement o# table 32 o# MoR7;.= includin$ all hire and operationalchar$es o# 7;,= complete #or 4nished item o# work as per MoR7;. speci4cation3' 0&th revision) 0,a6ment will be made based on level #or 4nished item o#work)%
8/18/2019 Bodipalem Bridge
17/155
,er 5mount- 1
00 6 7*350. G6'RI
8/18/2019 Bodipalem Bridge
18/155
1% &3'32
cum
8/18/2019 Bodipalem Bridge
19/155
1% 3EN(
cum
1% 3EN(
cum
8/18/2019 Bodipalem Bridge
20/155
1% 13'1(
cum
1% 2EN(
cum
1% '2'
cum
8/18/2019 Bodipalem Bridge
21/155
1% --2'
M%7
8/18/2019 Bodipalem Bridge
22/155
1% 1EN(
M%7
1%
M%7
8/18/2019 Bodipalem Bridge
23/155
cum
1% 2-++
cum
1% '1(+
cum
1% 1'+
cum
8/18/2019 Bodipalem Bridge
24/155
1% (++
9o%
1% 2EN(
cum
8/18/2019 Bodipalem Bridge
25/155
1% 3(-(
cum
1% (2(2&
cum
8/18/2019 Bodipalem Bridge
26/155
8/18/2019 Bodipalem Bridge
27/155
1% 3'3+2
cum
1% 1&&(
cum
FFF
9&29533
2:&307
,I", 8 .R ,.I, >6R R6 .>,? I4,R',4I64.
8/18/2019 Bodipalem Bridge
28/155
,I", 8 .R ,.I, >6R R6 .>,? I4,R',4I64.
4ame of #ork 1
DES"Re &'x&'x(mm includin$ cost=conve6ance o# all materials= eAuipment= machinar6=labour ; all leads ; li#ts= loadin$ char$es necessar6 #orsatis#actir6 completion o# the work as directed b6 theEn$ineerinchar$e%
9os
8/18/2019 Bodipalem Bridge
29/155
os
3
& &
& &-3 Each
9os
&
Suppl6in$ and installation o# .a>ard Markers:Delinatorsusin$ M%S% an$le o# si>e ''x''x( mm and 12cm hi$habove $round level painted with two coats o# black ;white stripes o# 1'cm wide with 4rst Aualit6 s6ntheticenamel paint over one coat o# appropriate primer o#
approved brand=colour= with 3cm x -cm 76pe L e 3cm x 3cm and'cm depth 4lled with "" M2 includin$ cost andconve6ance o# all materials= eAuipment=
machiner6 and labour with all leads and li#ts= loadin$ andunloadin$ char$es necessar6 #or success#ull completiono# the work on an6 road in division as directed b6En$ineerin"har$e and con#ormin$ to
8/18/2019 Bodipalem Bridge
30/155
Executive En$ineer 0R;)= Superintendin$ En$ine
R; Division= 5malapuram R; "ircle= Jakin
8/18/2019 Bodipalem Bridge
31/155
5mount
+
'RI
8/18/2019 Bodipalem Bridge
32/155
1-(12
8/18/2019 Bodipalem Bridge
33/155
r 0R;)=
da
4ame of #ork 1
8/18/2019 Bodipalem Bridge
34/155
", .,,4
9 @G etal from =atheru uarr% 1
>rom o R
Guarr6 to ?alacheruvu 2 Jms "7 2x1%1 % 2% 2% 1%19. 1( PPP -&&%+' 3+%&'
9. 1( to RaIavaram ,odalada Road PPP 31%3' 2-%(-
9. 21& 011'%( to 12'%13') PPP 11'%( -%3'
1%2 &%2 3%
(% % (%
0@orkin$ Reach 0(%( (%):2
6r
2 I8,4 4 ,8".I64 >R6 'I.=@ R,>I4R? 1
>rom o R
Re4ner6 to V%V% Road 9. 1(
PPP +3-%( PPP
Jathipudi to 5malapuram 9. 21( % 12'%13' PPP
1%2 &%2 3%
(% % (%
0@orkin$ Reach 0(%( (%):2
6r
3 Gravel from =adi%am uarr% 1
>rom o R Guarr6 to Vema$iri
9. 1( PPP -&&%+' 2(%('
9. 1( to RaIavaram ,odalada Road PPP (1%&2' 2-%(-
9. 21( 011' ( t 12' 13') PPP 11' ( - 3'
Re!onstru!tion of ridge in km 0/2 of =othapeta ridge to =apiles#arapuraRoad in ,*G*t*
Sivakodu RamaraIulanka Road 01%2 to&%2)RamaraIulanka !ondi Road 0% to(%)
Visakhapatanam to Jathipudi Kunction 9.
Sivakodu RamaraIulanka Road 01%2 to&%2)RamaraIulanka !ondi Road 0% to(%)
8/18/2019 Bodipalem Bridge
35/155
Executive En$ineer 0R;)= Superintendin$ En$inee
R; Division 5malapuram R; "ircle Jakina
8/18/2019 Bodipalem Bridge
36/155
"ead
2%23+%&'
2-%(-
-%3'
3%
(%
%3
FFF&&*000
=ms*
"ead
1%(
12%(
-(%3
3%
(%
%3FFF
FFF
=ms*
"ead&%(
2(%('
2-%(-
- 3'
m >err%
8/18/2019 Bodipalem Bridge
37/155
0R;)=
da
ROAD METAL RATES as per 2008-2009 SSR
8/18/2019 Bodipalem Bridge
38/155
Name of the Work::-
S! No Des"r#pt#o$ of Meta So%r"e of S%ppy &o$'eya$"e
A( )OR ROAD WOR*S
1@G etal from =atheru uarr% 1
&&*00 53)*;0 &1-%
2 &&*00 53)*;0 &'(%
3 &&*00 53)*;0 '++%
& &&*00 53)*;0 1(&%
' &&*00 53)*;0 &-%'
( &&*00 53)*;0 -'%
@G etal from =atheru uarr% 1 &&*00 53)*;0 '++%
+ &&*00 53)*;0 -&&%
- &&*00 53)*;0 -+&%
IPR6',,4. 6 RR
8/18/2019 Bodipalem Bridge
39/155
S! No Des"r#pt#o$ of Meta So%r"e of S%ppy &o$'eya$"eLead #$
*ms
+$#t#a "ostess
sta"k#$,
1 &&*00 53)*;0 +%
11 &&*00 53)*;0 ('(%
12 &&*00 53)*;0 '&%
13 &&*00 53)*;0 3+%
1& &&*00 53)*;0 3'%
1' !ravelGravel from =adi%am uarr% 1
3&*00 ;02*55 '%'
( )OR R+D.E WOR*
1( & mm SS' .! M:" metal@G etal from =atheru uarr% 1
&&*00 53)*;0 (2%
1 2' mm SS' .! M:" metal &&*00 53)*;0 --&%
1+ 2 mm SS' .! M:" metal &&*00 53)*;0 13(%
1- 12 mm SS' .! M:" metal &&*00 53)*;0 +22%
12 to 1& mm
8/18/2019 Bodipalem Bridge
40/155
S! No Des"r#pt#o$ of Meta So%r"e of S%ppy &o$'eya$"eLead #$
*ms
+$#t#a "ostess
sta"k#$,
2 1 mm SS' .! M:" metal &&*00 53)*;0 (-2%
21 ( mm SS' .! M:" metal &&*00 53)*;0 '32%
22 Kedd6 stone &' to ( mm &&*00 53)*;0 1-%3
23 Sand #or Mortarat River Godavari at P* Gannavaram
2*00 &0:*95 (1%
2& Sand #or *illin$
at River Godavari at P* Gannavaram
2*00 2):*70 &(%
2' ./SD Steel 0*e&1' 7M7 ars) 3&%
2( (mm Mild Steel &1'%
2 Mild Steel &1%
2+ "ement '-2%
5sst% Executive En$ineer 0R;)= Deput6 Executive En$ineer 0R;)= Executive En$ineer 0R;)=
8/18/2019 Bodipalem Bridge
41/155
S! No Des"r#pt#o$ of Meta So%r"e of S%ppy &o$'eya$"eLead #$
*ms
+$#t#a "ostess
sta"k#$,
R; Section Malikipuram R; Subdivision Ra>ole R; Division 5malapuram
7 350 (64.R8I64 6> "6$ ",'," 8., $?
8/18/2019 Bodipalem Bridge
42/155
% % % (&%12 -(1%+
% % % (&%12 --+%+
% % % (&%12 113%+
(% % % (&%12 3%+
% % % (&%12 '22%2+
% % % (&%12 (3%+
% % % (&%12 113%+
% 23(% % (&%12 122%+
% 2&(% % (&%12 12%+
7*350 (64.R8I64 6> "6$ ",'," 8., $?
ast#$,"har,es
Ma"h#$e"r%sh#$,"har,es
Se#,$#ora,e"har,es
edu!t93*)95H P
E 6@ !hargesfrom
!onve%an!e
Toa &ost per &%m
Ma"h#$e
edu!t93*)95H P
8/18/2019 Bodipalem Bridge
43/155
ast#$,"har,es
Ma"h#$e"r%sh#$,"har,es
Se#,$#ora,e"har,es
93*)95H PE 6@ !harges
from!onve%an!e
Toa &ost per &%m
% 1-'% % (&%12 1'1%+
% 1(&% % (&%12 13(2%+
% 12(% % (&%12 112%+
% % % (&%12 -2%+
% % % (&%12 +22%+
% % % 1%- +&'%2(
% 1''% % (&%12 131%+
% 2&+%' % (&%12 1+'%2+
% 2'-% % (&%12 1+3%+
% 2'%' % (&%12 1'%2+
t#Ma"h#$e
S # #
edu!t93*)95H P
T & t
8/18/2019 Bodipalem Bridge
44/155
ast#$,"har,es
Ma"h#$e"r%sh#$,"har,es
Se#,$#ora,e"har,es
E 6@ !hargesfrom
!onve%an!e
Toa &ost per &%m
% 13% % (&%12 1&%+
% 133% % (&%12 12%+
% % % (&%12 ((3%+
% % % &+%' -(-%&
% % % 32%- (-(%(1
% % % 3&%
% % % &1'%
&1%
% % % '-2%
Superintendin$ En$ineer 0R;)=
Ma"h#$e
edu!t93 )95H P
8/18/2019 Bodipalem Bridge
45/155
ast#$,"har,es
Ma"h#$e"r%sh#$,"har,es
Se#,$#ora,e"har,es
93*)95H PE 6@ !harges
from!onve%an!e
Toa &ost per &%m
R; "ircle Jakinada
8/18/2019 Bodipalem Bridge
46/155
LEAD CHARGES Cost of Materials, Labour
Metal
loading 51.40 102.80 Material Ratesunloading 15.70 15.70 60 to 63 mm IC ! Mo"# #$% metal
sta&'ing 0.00 0.00 50 to 55 mm IC ! Mo"# #$% metal
0.25 (( (( 40 to 45 mm IC ! Mo"# #$% metal
0.5 (( (( oug)stone 300mm *#$%+for reetment
1 31.00 2-.-0 oug)stone 225mm *#$%+for reetment
2 43.40 41.-0 eetment /or' 225mm
3 57.-0 57.-0 eetment /or' 300mm
4 70.30 70.30 eetment /or' 450mm
5 82.70 82.70 Laterite for eetment 225mm
6 -5.10 -5.10 Laterite for eetment 300mm
7 107.50 107.50 edd stone aboe 450mm to 600mm
8 11-.-0 11-.-0
- 132.30 132.30 150 mm soling stone #$% metal
10 144.70 144.70 40 to 45 mm IC ! Mo"# #$% MC metal
11 157.10 157.10 25 to 27 mm IC ! Mo"# #$% MC metal
12 16-.50 16-.50 1- to 22 mm IC ! Mo"# #$% MC metal13 181.-0 181.-0 12 to 14 mm IC ! Mo"# #$% MC metal
14 1-4.30 1-4.30 -.5 to 11.20 mm IC ! Mo"# #$% MC metal
15 206.70 206.70 5 to 7 mm IC ! Mo"# #$% MC metal
16 21-.10 21-.10 2.36 to 5 mm IC ! Mo"# #$% MC metal
17 231.50 231.50 #$% tone &)is 2.36mm and belo/
18 243.-0 243.-0 %rael
1- 256.30 256.30 40 mm 5 m& #$% metal
20 268.70 268.70 25 mm 5 m& #$% metal
21 281.10 281.10 20 mm 5 m& #$% metal
22 2-3.50 2-3.50 12 mm 5 m& #$% metal
23 305.-0 305.-0 10 mm 5 m& #$% metal
24 318 30 318 30 6 mm 5 m& #$% metal
;art)%raeland
8/18/2019 Bodipalem Bridge
47/155
42 516.30 516.30 Machiner" Rates
43 526.60 526.60 oer 80 #? for sreading @ 200 &um er )our
44 536.-0 536.-0 Motor grader 3.35M $lade @50 &um#r
45 547.20 547.20 #drali& e(&aator 46 557.50 557.50 ront end loader 1 &um &aa&it
47 567.80 567.80 "ier 5 &um
48 578.10 578.10 Aibrator roller 8"
4- 588.40 588.40 smoot) /)eeled roller 8 "on
50 5-8.70 5-8.70 Bater tan'er 6 L
51 60-.00 60-.00 "ra&tor
52 61-.30 61-.30 "ra&tor /it) otaator
53 62-.60 62-.60 Tractor with ripper attachment @ 60 cum per hour
54 63-.-0 63-.-0 =ir &omressor 250 &fm
55 650.20 650.20 Bet mi( lant of 60 tonne )r. &aa&it
56 660.50 660.50 Me&)ani&al broom @ 1250 sDm)r.
57 670.80 670.80 $itumen ressure distributor @1750 sDm)r
58 681.10 681.10 ;mulsion ressure distributor @1750 sDm)r
5- 6-1.40 6-1.40 #ot mi( lant 40 to 60 "?#
60 701.70 701.70 Me&)ani&al ?aer finis)er 100 "?#
61 712.00 712.00 Hydraulic self propelled chip spreader @ 1500 sqm/hr.
62 722.30 722.30 Finish rolling with 6! tonne smooth wheeled tandem roller.63 732.60 732.60 ?neumati& road oller
64 742.-0 742.-0 %$ ?lant 50 Cum
65 753.20 753.20 %enerator 250 A=
66 763.50 763.50 %enerator set 125 A=
67 773.80 773.80 %enerator set 35 A=
68 784.10 784.10 Con&rete mi(er 0.40.28 &um
6- 7-4.40 7-4.40 "ier 5.50 &um &aa&it er 10 "onnes er t'm
70 804.70 804.70 Tipper 5 cum capacity for "oil# $"%# &''# Hot mi(71 815.00 815.00 ?late &oma&tor?o/er rammer
72 825.30 825.30
73 835.60 835.60 Sand #or Mortar
8/18/2019 Bodipalem Bridge
48/155
-2 1031.30 1031.30
-3 1041.60 1041.60
-4 1051.-0 1051.-0
-5 1062.20 1062.20-6 1072.50 1072.50
-7 1082.80 1082.80
-8 10-3.10 10-3.10
-- 1103.40 1103.40
100 1113.70 1113.70
101 1124.00 1124.00
102 1134.30 1134.30
103 1144.60 1144.60
104 1154.-0 1154.-0
105 1165.20 1165.20
106 1175.50 1175.50
107 1185.80 1185.80
108 11-6.10 11-6.10
10- 1206.40 1206.40
110 1216.70 1216.70
111 1227.00 1227.00
112 1237.30 1237.30113 1247.60 1247.60
114 1257.-0 1257.-0
115 1268.20 1268.20
116 1278.50 1278.50
117 1288.80 1288.80
118 12--.10 12--.10
11- 130-.40 130-.40
120 131-.70 131-.70
121 1330.00 1330.00
122 1340.30 1340.30
123 1350.60 1350.60
124 1360 -0 1360 -0
8/18/2019 Bodipalem Bridge
49/155
142 1546.30 1546.30
143 1556.60 1556.60
144 1566.-0 1566.-0
145 1577.20 1577.20146 1587.50 1587.50
147 15-7.80 15-7.80
148 1608.10 1608.10
14- 1618.40 1618.40
150 1628.70 1628.70
8/18/2019 Bodipalem Bridge
50/155
SR 2015-16
=s er of ? et.41-.00 ?g. Eo.247, l.53 *oads+
456.00 ?g. Eo.247, l.52 *oads+
588.00 ?g. Eo.247, l.51 *oads+
172.00 ?g. Eo.244, l.- *oads+
177.00 ?g. Eo.244, l.8 *oads+
144.00 ?g. Eo.244, l.2 *oads+
164.00 ?g. Eo.244, l.3 *oads+
156.00 ?g. Eo.244, l.4 *oads+
136.00 ?g. Eo.244, l.6 *oads+
15-.00 ?g. Eo.244, l.7 *oads+
206.00 ?g. Eo.244, l.5 *oads+
4-.50
-5.00 ?g. Eo.248, l.7- *oads+
588.00 ?g. Eo.247, l.51 *oads+
-44.00 ?g. Eo.247, l.50 *oads+
-84.00 ?g. Eo.247, l.4- *oads+780.00 ?g. Eo.247, l.48 *oads+
656.00 ?g. Eo.247, l.47 *oads+
504.00 ?g. Eo.247, l.46 *oads+
308.00 ?g. Eo.247, l.45 *oads+
350.00 ?g. Eo.24-, l.-2 *oads+
103.00 ?g. Eo.24-, l.-0 *oads+
620.00 ?g. Eo.246, l.30 *oads+
--4.00 ?g. Eo.246, l.2- *oads+
1036.00 ?g. Eo.246, l.28 *oads+
822.00 ?g. Eo.246, l.27 *oads+
6-2.00 ?g. Eo.245, l.26 *oads+
532 00 ?g Eo 245 l 25 *oads+
*46:53+2 ?g.24-l. Eo.84 ! 85
8/18/2019 Bodipalem Bridge
51/155
2540.-0 ?g. Eo.256, l.1 *oads+
3220.00 ?g. Eo.256, l.3 *oads+
27-1.00 ?g. Eo.256, l.4 *oads+1650.00 ?g. Eo.256, l.5 *oads+
-0-.70 ?g. Eo.256, l.6 *oads+
260-.10 ?g. Eo.256, l.7 *oads+
1101.00 ?g. Eo.256, l.8 *oads+
630.00 ?g. Eo.256, l.10 *oads+
415.00 ?g. Eo.256, l.11 *oads+
425.00 ?g. Eo.256, l.12 *oads+
425.00 ?g. Eo.256, l.13 *oads+
538.20 ?g. Eo.256, l.14 *oads+
1650.00 ?g. Eo.256, l.15 *oads+
375.00 ?g. Eo.256, l.16 *oads+
1500.00 ?g. Eo.256, l.17 *oads+
860.00 ?g. Eo.256, l.18 *oads+
1-200.00 ?g. Eo.257, l.22 *oads+
2250.00 ?g. Eo.257, l.24 *oads+
26-5.00 ?g. Eo.257, l.25 *oads+
1650.00 ?g. Eo.257, l.26 *oads+1347.00 ?g. Eo.257, l.27 *oads+
1257.00 ?g. Eo.257, l.30 *oads+
1850.00 ?g. Eo.258, l.43 *oads+
1320.00 ?g. Eo.258, l.43 *oads+
816.80 ?g. Eo.258, l.43 *oads+
456.20 ?g. Eo.258, l.38 *oads+
7.12
7.1258.00 ?g. Eo.258, l.48 *oads+
677.00 ?g. Eo.24-, l.-5 *oads+
8/18/2019 Bodipalem Bridge
52/155
8/18/2019 Bodipalem Bridge
53/155
8/18/2019 Bodipalem Bridge
54/155
8/18/2019 Bodipalem Bridge
55/155
8/18/2019 Bodipalem Bridge
56/155
8/18/2019 Bodipalem Bridge
57/155
ridge portion
4ame o
f $ork IPR6',,4. 6 RR
8/18/2019 Bodipalem Bridge
58/155
uantit% es!ription of Item Rate per1
nit "um Page 323 of oRE@ .
7akin$ out put 2& "uma) eA!luding de#atering !harges In all soils upto .R upto 3*0 m depth using
(+"aBour
%32 da6 Mate 3'% da6
+% da6 Ma>door unskilled 32% da6
%F M55 2(+%
7otal(+a!hiner%
(% hrs .6draulic Excavator 1% cum bucket 2-1% hr
(+.eigniorage !harges
2&%"um Sei$niora$e char$es % cum
(+6ver head !harges 9;*)95H on (+ J (+J( +(,+otal of (+ J (+J( +J(+
(>+dd ontra!tors Prot at 90H on (,+
t 2&0 (,+ (>+
7*350 (64.R8I64 6> "6$ ",'," 8., $? &')*37,. G6'RI I.RI *
Earthwork in excavation o# #oundation o# structures as per drawin$ and technicalincludin$ settin$ out= construction o# shorin$ and bracin$= removal o# stumpdeleterious matter= dressin$ sides o# bottom= back 4llin$ the excavation earth treAuired etc%= complete includin$ sei$nioar$e char$es #or 4nished item o# work as
th
uantit% es!ription of Item Rate per
Rate #or 1 cum
R t t b d t d
8/18/2019 Bodipalem Bridge
59/155
Rate to be adopted
2
nit cum Page 339 of oRE@ .
7akin$ output 1' cum
(+"aBour
%(& nos Mate 3'% da61% nos Mason 3++%' da6
1'%nos Ma>door 32% da6
%F M55 '&2+%'
7otal
(+aterial
13%'cum "ost o# &mm SS' .! M:" metal 131%+ cum
(%' cum Sand at site -(-%& cum
3%&' M7 "ement at site '-2% M7
7otal
Ka!hiner%(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
(% hr !enerator set 3' JV5 +1(%+ hr
,rovidin$ P(9131)+ nominal mix in #oundation with crushed stone a$$re$ate &si>e mechanicall6 mixed = placed in #oundation and compacted b6 vibration includinincludin$ all other incidental and operational char$es o# all 7;, etc%= complete #oro# work as per MoR7;. speci4cation 21 0&th Revision) %
uantit% es!ription of Item Rate per
1%' nos Mason 3++%' da6
2 nos Ma>door 32 da6
8/18/2019 Bodipalem Bridge
60/155
2%nos Ma>door 32% da6
%F M55 3'%2'
7otal
(+aterial'%& cum "ost o# &mm SS' .! M:" metal 131%+ cum
'%& cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum
2% cum "ost o# 1mm SS' .! M:" metal 1&%+ cum
(%' cum Sand at site -(-%& cum
'%1( M7 "ement at site '-2% M7
7otal
Ka!hiner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
(% hr !enerator set 3' JV5 +1(%+ hr
7otal
(+>orm #ork
&% F *orm work H &F on 05)N0)N0 ") 2+&%-3 "um(,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")N0D)
(>+otal of (+ J (+J( +J(+J(,+
(G+dd ontra!tors Prot at 90H on (>+
ost per 95 !um (>+J(G+
Rate #or 1 cum
Rate to be adopted
uantit% es!ription of Item Rate per
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
( hr !enerator set 3' JV5 +1( + hr
8/18/2019 Bodipalem Bridge
61/155
(% hr !enerator set 3' JV5 +1(%+ hr
(+>orm #ork
1% F *orm work H 1F on 05)N0)N0 ") 2+&%-3 "um(,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")N0D)
(>+otal of (+ J (+J( +J(+J(,+
(G+dd ontra!tors Prot at 90H on (>+
ost per 95 !um (>+J(G+
Rate #or 1 cum
Rate to be adopted
'
nit cum Page 335 of oRE@ .
7akin$ output 1' cum
(+"aBour
%+( nos Mate 3'% da6
1%' nos Mason 3++%' da6
2%nos Ma>door 32% da6%F M55 3'%2'
7otal
Vibrated Rein#orced cement concrete M 2' !rade "oncrete in #oundations with 2M:" $raded metal with a cube stren$th o# 2' 9 : mm2 at 2+ da6s work test on1' mm cubes and cost and and conve6ance o# all materials= vibratin$ centermixin$= curin$ hire and operational char$es o# all 7; , but excludin$ cost and it
char$es o# steel etc complete as per MoR7;. Speci4cation 1'=1= 21 0&t
uantit% es!ription of Item Rate per
( Vibrated Rein#orced cement concrete M 2' !rade "oncrete in #oundations with 2M:" $raded metal with a cube stren$th o# 2' 9 : mm2 at 2+ da6s work test on
8/18/2019 Bodipalem Bridge
62/155
nit cum Page 335 of oRE@ .
7akin$ output 1' cum
(+"aBour
%+( nos Mate 3'% da6
1%' nos Mason 3++%' da6
2%nos Ma>door 32% da6
%F M55 3'%2'
7otal
(+aterial
+%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum
'%& cum "ost o# 1mm SS' .! M:" metal 1&%+ cum
(%' cum Sand at site -(-%& cum
(%' M7 "ement at site '-2% M7 7otal
Ka!hiner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
(% hr !enerator set 3' JV5 +1(%+ hr
7otal
(+>orm #ork &% F *orm work H &F on 05)N0)N0 ") --%3 "um
(,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
M:" $raded metal with a cube stren$th o# 2' 9 : mm2 at 2+ da6s work test on1' mm cubes and cost and and conve6ance o# all materials= vibratin$ centermixin$= curin$ hire and operational char$es o# all 7; , but excludin$ cost and itchar$es o# steel etc complete as per MoR7;. Speci4cation 1'=1= 21 0&t
uantit% es!ription of Item Rate per
+%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum
' & cum "ost o# 1mm SS' .! M:" metal 1& +
8/18/2019 Bodipalem Bridge
63/155
'%& cum "ost o# 1mm SS ' .! M:" metal 1&%+
(%' cum Sand at site -(-%& cum
(%' M7 "ement at site '-2% M7
7otalKa! ner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
(% hr !enerator set 3' JV5 +1(%+ hr
7otal
7otal 5NN" #or 1' cum
a)@eight from 5m to 90masic rate #or 1' cum o# concrete
1%+ F 5dd on cost o# concrete to cater extra li#t --%3 Rs
11%+ F 5dd #or *orm work on cost o# concrete --%3 Rs
7otal Rs
1-%(1' F 5dd #or Cver head char$es
1% F 5dd #or "ontractors pro4tRate ,er 1' "um
Rate ,er 1 "um
Rate to be adopted
b)@eight upto 5m
asic rate #or 1' cum o# concrete
1% F 5dd #or *orm work on cost o# concrete --%3 Rs 7otal Rs
1- (1' F 5dd #or Cver head char$es
uantit% es!ription of Item Rate per
(+aterial
+ 1 cum "ost o# 2mm SS' .! M:" metal 1+3 + cum
8/18/2019 Bodipalem Bridge
64/155
+%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum
'%& cum "ost o# 1mm SS' .! M:" metal 1&%+
(%' cum Sand at site -(-%& cum
'%-- M7 "ement at site '-2% M7
7otal
Ka!hiner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
(% hr !enerator set 3' JV5 +1(%+ hr
7otal
7otala)
#or Deck slab slab Super structure
2% F .ei$ht upto 'm 2 percent -&3'%'3
1-%(1' F 5dd Cver .ead "har$es -'322%(&
1% F 5dd "ontractorTs ,ro4t 11&2%1+
Rate per 1' cum
Rate per cum
Cr Sa6
b)*or #orm work add the #ollowin$ 0.ei$ht ' 1 m)#or Deck slab Super structure 2'
o# asic rate o# concrete
*or #orm work add the #ollowin$ (@eight 0 - 5 m+
uantit% es!ription of Item Rate per
2%nos Ma>door 32% da6
% F M55 3'%2'
8/18/2019 Bodipalem Bridge
65/155
% F M55 3'%2'
7otal
(+aterial+%1 cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum
'%& cum "ost o# 1mm SS' .! M:" metal 1&%+ cum
(%' cum Sand at site -(-%& cum
(%1 M7 "ement at site '-2% M7
7otalKa!hiner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr(% hr !enerator set 3' JV5 +1(%+ hr
7otal >orm #or
2% F *orm work H 2F on 05)N0)N0 ") ++(%3 "um
(,+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")N0D)
(>+otal of (+ J (+J( +J(+J(,+
(G+dd ontra!tors Prot at 90H on (>+
ost per 95 !um (>+J(G+
Rate #or 1 cum M 3 "oncrete
Rate to be adopted
1 V%R%"%"% M3 $rade concrete usin$ 2mm and 1mm si>e SS' .! crushed stonincludin$ cost and conve6ance o# all materials to site= sei$niora$e char$es=labourmachine mixin$ la6in$ compactin$ curin$ etc includin$ all other incidental and
uantit% es!ription of Item Rate per
%1' nos ?abour #or cleanin$ deck slab concrete 32% da6
% F M55 &+%
8/18/2019 Bodipalem Bridge
66/155
Rate per cum
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F5dd #or Cver head char$es H 1-%(1'F on
'&-%&'(,+otal of (+ J (+J( +J(+
(>+dd ontra!tors Prot at 90H on (,+ost per 95 !um (,+J(>+
Rate to be adopted
11
nit M7 Page &:;C&;0 of oRE@ . 7akin$ output 1 M7
(+"aBour
%&& nos Mate 3'% da6
3%nos lack smith 3'% da6
+% nos Ma>door 32% da6
% F M55 3+'%
7otal(+aterial
1%' M7 ./SD bars includin$ overlaps 3&% M7
+ J i di i M7
,rovidin$ ./SD bars 0 *e&1' ) o# dierent diameters= wrou$ht and put up bars o#
includin$ cost and conve6ance o# steel to site and all labour char$es #or # rein#orcement includin$ cuttin$= bendin$= bindin$ rods= t6in$ $rills= placin$ them incomplete includin$ cost and conve6ance o# bindin$ wire and all handlin$ char$es anchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or all R%4nished item o# work as per standard drawin$s= as per the directions o# the En$inand as per MoR7;. speci4cation 1( ;22 0&th revision) and as per
8/18/2019 Bodipalem Bridge
67/155
1%' M7 ./SD bars includin$ overlaps 3&% M7
(% J$ indin$ wire &1'% M7
7otal
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)
(+otal of (+ J (+J( +
(,+dd ontra!tors Prot at 90H on (+Rate for 9 (+J(,+
Rate to be adopted
13
nit M7 Page &&: of oRE@ . 7akin$ output 1 M7
(+"aBour
%& nos Mate 3'% da6
2%nos lack smith 3'% da6
(% nos Ma>door 32% da6
% F M55 2+2%
7otal(+aterial
,rovidin$ ./SD bars 0*e&1') o# dierent diameters= wrou$ht and put up bars o#includin$ cost and conve6ance o# steel to site and all labour char$es #or # rein#orcement includin$ cuttin$= bendin$= bindin$ rods= t6in$ $rills= placin$ them incomplete includin$ cost and conve6ance o# bindin$ wire and all handlin$ char$es anchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or all R%4nished item o# work as per standard drawin$s= as per the directions o# the En$inand as per MoR7;. speci4cation 1( ;22 0&th revision) and as per
8/18/2019 Bodipalem Bridge
68/155
7otal
Ka!hiner%
2%' hr ,late compactor:,ower rammer:road roller '+% hr%' hr @ater tanker ( J? capacit6 (3% hr
7otal
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 ")
(,+otal of (+ J (+J( +J(+
(>+dd ontra!tors Prot at 90H on (,+
ost per 90 !um (,+J(>+Rate #or 1 cum
Rate to be adopted
1'
nit cum Page &)3 of oRE@ .
7akin$ output 1 cum
(+"aBour
32 nos Mate 3' da6
,rovidin$ and la6in$ o# lter media with !ranular materials : stone crushedsatis#6in$ the reAuirements laid down in clause 2'&%2%2 o# MoR7;. speci4cations to# not less than (mm with smaller si>e towards the soil and bi$$er si>e towardsprovided over the entire sur#ace behind the abutment= win$ wall and return wall to tcompacted to a 4rm condition includin$ cost and conve6ance o# all metal sei$nor=and all labour char$es as directed b6 the departmental ocers as per drawin$ aspeci4cations as per clause 1%1%1 o#
8/18/2019 Bodipalem Bridge
69/155
"ost o# ""01&+) Page 339C522 of oRE@ .
7akin$ output 1' cum
(+"aBour
%(& nos Mate 3'% da6
1% nos Mason 3++%' da6
1'%nos Ma>door 32% da6
% F M55 '&2+%'
7otal
(+aterial
13%' cum "ost o# &mm SS' .! M:" metal 131%+ cum
(%' cum Sand at site -(-%& cum
2%&3 M7 "ement at site '-2% M7
7otal(!+a!hiner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr
(% hr !enerator set 3' JV5 +1(%+ hr
"ost per 1' cum
Rate #or 1 cum
ost of Grouted Revetment
nit "um
7akin$ output 1 cum
with %2 cum o# "" 01&+) includin$ cost= sei$niora$e char$es and conve6ance o#site and includin$ labour char$es #or packin$ the stones #or revetment etc%= completitem o# work as per MoR7;. speci4cation 2'& 0 &th revision ) and as directed b6 the"har e for uadrential revetment*
uantit% es!ription of Item Rate per
revetment etc%= comp ete or n s e tem o wor as per MoR7;. spec cat orevision ) and as directed b6 the En$ineerin"har$e for Pit!hing of slopes for o
8/18/2019 Bodipalem Bridge
70/155
(+"aBour Page 522 of oRE@ .
%& nos Mate 3'% da6
%3' nos Mason 3++%' da6%'nos Ma>door #or la6in$ stones= 4llin$ Auarr6 spal 32% da6
% F M55 3-%-+
7otal
(+aterial
1% cum "ost o# Rou$h stone 3mm thick 3%+ cum
%2cum "ost o# stone spalls '22%2+ cum
7otal
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0) 11--%22
(+otal of (+ J (+J( +
(,+dd ontra!tors Prot at 90H on (+
ost per 9 !umRate to be adopted
1+
nit cum Page 523 of oRE@ .
7akin$ output 1 "um
Providing and la%ing lter material #ith Gravel underneath pit!hing in slo cost= sei$niora$e char$es and conve6ance o# materials to site includin$ labour ccomplete #or 4nished item o# work as per MoR7;. Speci4cation 2'& 0&th Revi
directed b6 the En$ineerin"har$e under Revetment*
uantit% es!ription of Item Rate per
nit nos
7akin$ output 3 RM
C 1 " M i l # 1 3 " M
8/18/2019 Bodipalem Bridge
71/155
Cutput 1 "um= Material #or 13 "ement Mortor
(+"aBour
%& nos Mate 3'% da6%- nos Ma>door 32% da6
% F M55 33%
7otal
(+aterial
%'1 M7 "ost o# "ement '-2% M7
1%' "um "ost o# Sand -(-%& cum
7otal"ost per 1 "um "M 013)
(+"aBour
%3 nos Mate 3'% da6
%' nos Mason 3++%' da6
%2' Ma>door 32% da6
% F M55 2+'%'
7otal
(+aterial
39*5 RM "ost o# 1mm dia 5" pipe 1(1% RM
includin$ 'F wasta$e 0avera$e len$th 1m)
1% 9os 1(%1 Each
3% 9os MS clamps 13% Each
%' cum "ement mortor 013) &3&% "um 7otal
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
"ollors #or 5" pipe 0avera$e) takin$ 1 o# pi
uantit% es!ription of Item Rate per
%2 da6 Mate 3'% da6
%2 da6 Skilled 0lacksmith= welder etc%) 3++%' da6
8/18/2019 Bodipalem Bridge
72/155
%2 da6 Ma>door 32% da6
% F M55 21%(
7otal(!+"aBour for Aing in position
%1 da6 Mate 3'% da6
%1 da6 Mason 3++%' da6
%2 da6 Ma>door 32% da6
% F M55 1%(&
7otal
' F (-'%31
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 3%+
(,+otal of (+ J (+J( +J(+
(>+dd ontra!tors Prot at 90H on (,+
ost per 9 4os (,+J(>+
Rate to be adopted
21
electrodes= cuttin$ $as= sealant= anticorrosive bituminous paint= mild steel$ratin$ etc%
,rovidin$ and la6in$ "aun!hing aprons #or protection a$ainst scour with &' m
uantit% es!ription of Item Rate per
Rate to be adopted
8/18/2019 Bodipalem Bridge
73/155
22
nit cum Page 335 of oRE@ .
7akin$ output 1' cum(+"aBour
%+( nos Mate 3'% da6
1%' nos Mason 3++%' da6
2%nos Ma>door 32% da6
% F M55 3'%2'
7otal
(+aterial+%1 cum "ost o# &mm SS' .! M:" metal 131%+ cum
&%' cum "ost o# 2mm SS' .! M:" metal 1+3%+ cum
1%3' cum "ost o# 1mm SS' .! M:" metal 1&%+ cum
(%' cum Sand at site -(-%& cum
&%13 M7 "ement at site '-2% M7
7otal
Ka!hiner%
( hr "oncrete mi er &: 2+ cum &'( 2 hr
,lain cement concrete M 1' !rade "oncrete usin$ &mm = 2mm and 1mm si>e
stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and 4ne a$$re$ate ctable 12) includin$ cost=sei$nora$e and conve6ance o# all materials to site achar$es #or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$other incidental and all other operational char$es o# 7;, reAuired etc%= complete asSpeci4cation 1'=1= 21 ; 2 0&th Revision) #or ?evellin$ course below appr
uantit% es!ription of Item Rate per
1% nos Mason 3++%' da6
1'%nos Ma>door 32% da6
F M55 '&2+ '
8/18/2019 Bodipalem Bridge
74/155
% F M55 '&2+%'
7otal
(+aterial13%'cum "ost o# &mm SS' .! M:" metal 131%+ cum
(%' cum Sand at site -(-%& cum
2%&3 M7 "ement at site '-2% M7
7otal
Ka!hiner%
(% hr "oncrete mixer %&:%2+ cum &'(%2 hr(% hr !enerator set 3' JV5 +1(%+ hr
2% .r @ater tanker (J? capacit6 (3% hr
7otal
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 530&5*5:
(,+otal of (+ J (+J( +J(+
(>+dd ontra!tors Prot at 90H on (,+
ost per 95 !um (,+J(>+
Rate #or 1 cum
Rate to be adopted
2&Vibrated cement concrete M 3' $rade usin$ 2mm ; 1mm .! crushed ston0"oarse a$$re$ate con#ormin$ to table 11 and 4ne a$$re$ate con#ormin$ to tincludin$ cost= 0excludin$ sei$niora$e) conve6ance o# all materials to site and lab
i hi i i l i ib i i i l di ll h i
uantit% es!ription of Item Rate per
7otal
3%' F *orm work H 3%'F on 5NN" +1&&+%33
(+ 6ver head !harges 9; )95H (25H-'-Insuran!e+
8/18/2019 Bodipalem Bridge
75/155
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1'F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)N0 :&2;;*02
(,+otal of (+ J (+J( +J(+(>+dd ontra!tors Prot at 90H on (,+
ost per 95 !um (,+J(>+
Rate #or 1 cum
Rate to be adopted
*0*000 6.P4 + I4
8/18/2019 Bodipalem Bridge
76/155
mount
ma!hinar%
12%
2'(%
%
2(+%
1(&(%
%
3+1%&1
FFF
2323*)&
FFF
speci4cationand otherthe extent
per MoR7;.
mount
111%+3
992*00
9 um
8/18/2019 Bodipalem Bridge
77/155
9 um
2&%3++%'
&+%
%
'&2+%'
1-%3
('&3%&'
2&2&%
&&'%&+
23%2
&-%+
mm nominalcurin$ etc%=nished item
mount
'+2%'
(&%
%
8/18/2019 Bodipalem Bridge
78/155
%
3'%2'
11(%1
--2&%1
3+1%1
('&3%&'
3'&%2
'-31%(+
23%2
&-%+
(3+%
FFF
2-1'%
1&+((%1-
FFF
;0)5*)9
;;729*73
((&+%12
))&:*009 um
mount
23%2
&-%+
(3+%
8/18/2019 Bodipalem Bridge
79/155
2+&%-3
2+%&-
1'23%+(
FFF
;5::*)3
FFF
31%((
7032*009 um
322%'
'+2%'
(&%%
3'%2'
m0SS').!1' 8 1' 8in$ machines #abrication
Revision)
mount
m0SS').!1' 8 1' 8in$ machine
# b i i
8/18/2019 Bodipalem Bridge
80/155
322%'
'+2%'
(&%
%3'%2'
1&++(%2
(2%1
('&3%&'
3'+1(%
(&+&%&+
23%2
&-%+
(3+%
FFF
31-1%(3
s #abricationRevision)
mount
1&++(%2
(2%1
('&3%&'
8/18/2019 Bodipalem Bridge
81/155
3'+1(%
(&+&%&+
23%2
&-%+
(3+%
--%3
--%3
1&3(%23
-&1'%31
-(&2%2
1-%&+
PPP
1+&2%1+PPP
7;50*;3
7;59*00
cum
--%3
--%+(-%+
121( '
mount
1&++(%2
(2%1
8/18/2019 Bodipalem Bridge
82/155
('&3%&'
3'&(%+(&&-2%2+
23%2
&-%+
(3+%
-&3'%'3
-&3'%'3
1'++%11
-'322%(&
1+(-%'&PPP
11&2%2
PPP
+3(1%&+
:3)9*00
-&3'%'3
mount
(&%
%
3'%2'
8/18/2019 Bodipalem Bridge
83/155
1&++(%2
(2%1
('&3%&'
3(112%
('1&3%&+
23%2&-%+
(3+%
1(1%3
1(23%1-
FFF
;779*97
FFF
1('%'2
79))*009 um
e a$$re$atechar$es #oroperational
mount
&+%
%
'&-%&'
8/18/2019 Bodipalem Bridge
84/155
1(1%(
)&70*59)&7*05
7997*5)
799:*00
9 um
1('%
112'%
2'(%
%
3+'%
3'%
332
ll diametersbrication o#
position etc%=operational%" items #orerin"har$eo# 1-+' #or
mount
2-'%'
3'%
2&-
8/18/2019 Bodipalem Bridge
85/155
2&-%
3'-&-%
(31%'1
FFF
&)53*:0
'11-1%+1
FFF
9
1'%
'%
1-2%
%2+2%
ll diametersbrication o#
position etc%=operational%" items #orerin"har$eo# 1-+' #or
mount
11&3%12
11&3%12
8/18/2019 Bodipalem Bridge
86/155
1&'%
31%'
1(%'
2&+&%1
FFF
959&*::
FFF1(((%3
9)))*00
9 um
12
a$$re$atesa thickness
the wall ande #ull hei$hta$e char$esnd 7echnicalRevision) #or
mount
si>e $routedmaterials to#or 4nished
8/18/2019 Bodipalem Bridge
87/155
2&%
3++%'
&+%
%'&2+%'
1-%3
('&3%&'
1&3+'%(
3+1-%+
23%2
&-%+
(3+%
FFF
3&52*37
#or 4nishedEn$ineerin
mount
1'
8/18/2019 Bodipalem Bridge
88/155
1'%
13'%-+2&%
%
3-%-+
3%+
1&%&(
++%2&
23'%23
9&3&*&5
9&3*&5
9577*;0
1'%-
957:*00
9 um
es includin$ar$es etc%=ion) and as
8/18/2019 Bodipalem Bridge
89/155
mount
%'
%
(%&
8/18/2019 Bodipalem Bridge
90/155
%
21%(
3%'
3%+-
(&%
%
1%(&(-'%31
3&*77
730*0:
1&3%2
:73*2:
:7*33
;)0*)0
;)9*00
9 4os
to ( mm
mount
957:*00
9 um
! crushed
8/18/2019 Bodipalem Bridge
91/155
322%'
'+2%'
(&%
%
3'%2'
1(&%2
&&3%1
1-%'
('&3%&'
2&&&-%(
'11%'+
23 2
! crushedon#ormin$ to
nd all labourincludin$ allper MoR7;.oach slab%
mount
3++%'
&+%
%
'&2+%'
8/18/2019 Bodipalem Bridge
92/155
1-%3
('&3%&'
1&3+'%(
3+1-%+
23%2&-%+
12(%
++-+%
1&&%+-
FFF
)3&5*05FFF
&('3%3
&)53*00
9 um
e a$$re$ateble 12)
our char$es=id l d
mount
(3+%
2+'%(-
1('3'%2'
8/18/2019 Bodipalem Bridge
93/155
FFF
FFF
FFF
3-&%'1
73;5*00
9 um
8/18/2019 Bodipalem Bridge
94/155
ost per 9:0 !um (+ J (,+
Rate per "um
Rate per 9 !um
8/18/2019 Bodipalem Bridge
95/155
mount
includin$ pre e soils on the
ation with + to2 o# MoR7;.=o# work as per
8/18/2019 Bodipalem Bridge
96/155
%'
1(%
1(%'
&('1%(
322%
2'2%
2(-%1
13%2'+2%-(
95759*23
9575*92
9732)*35
13%2(
973*00
9 um
vel #or 4nished
embankment
8/18/2019 Bodipalem Bridge
97/155
.4o uantit% 8nit es!ription of Item Rate per
9 2 3 & 5 )
8/18/2019 Bodipalem Bridge
98/155
27
0 Page ):C); of oRE@ .
0 8nit 1 um
0 aking out put N 900 um
0 (+ "aBour
0 %& da6 Mate 3'% 1%0 1% da6 Ma>door unskilled 32% 1%
0
0 % F Municipal 5rea 5llowance 33'%
0 7C75? N
0
0 (+ a!hiner%
0
1%( hr 2;79*00 1%
*ormin$ embankment with borrowed use#ul earth #rom outside road boundar6 b6mechanical means up to SDR with all leads and li#ts includin$ prewaterin$ o# soil atborrow area= removal o# top soil= excavation o# soils at borrowed area= conve6ance o#soil= depositin$ the soil on the embankment= spreadin$ soil= breakin$ clods=sectionin$= $radin$ and consolidation with + to 1 7onnes Vibrator6 Road Roller HCM" to meet reAuirement o# table 32 o# MoR7;.= includin$ all hire andoperational char$es o# 7;, and 0excludin$ sei$niora$e) char$es= complete #or4nished item o# work as per MoR7;. speci4cation 3'
(&th revision+ $ith a lead of 3&= (Pa%ment #ill Be made Based on levelsfor nished item of #ork+*
.6draulic excavator1 cum bucket capacit6 H (cum per hour
.4o uantit% 8nit es!ription of Item Rate per
9 2 3 & 5 )
2: "onstruction o# !ranular subbase b6 providin$ .! material con4rmin$ to !radin$
8/18/2019 Bodipalem Bridge
99/155
8/18/2019 Bodipalem Bridge
100/155
2$ 8nit N !um2$ aking output N 300 !um
2$ (+ "aBour
2$ %& da6 Mate 3'% 1%
2$ 2% da6 Ma>door skilled 3++%' 1%
2$ +% da6 Ma>door unskilled 32% 1%
2$
2$ % F Municipal 5rea 5llowance 3&+%2$ 7C75? N
2$ (+ a!hiner%
2$ (% hour Motor $rader 3%3'M lade H' cum:.r% 322% 1%
2$ 12% hour 7ractor Rotavator 0223N1123&) &2'% 1%
2$ (% hour Vibrator6 roller +7 2(-%1 1%
2$ 3% hour @ater tanker ( J? (3% 1%
2$ 7C75? N2$
2$ (+ aterial
2$ "oarse $raded !ranular subbase material as per
2$ 7able &2 o# MCR7;.
2$ -%'&%'mm
8/18/2019 Bodipalem Bridge
101/155
2% s per ", 3/5 of I.1&5:-2003 E 4ote 52% 1% RM $s N (9*9:J2*20O9&0/925+ 3*)&&0
2%
2%
2% R9 N ( .2- .9+/9000 $s
2% 1% RM R9 N ( &2500 - &9000 +/ 9000 3*)&&
2%
2% 1% RM &%2%
2% 1% RM at the time o# preparation o# Estimate '-2%
2% I.1&5:-2003
2% *rom 75?E 3 arrel wall 7hickness 0 mm ) +'%
2% "oncrete Gt6:&0%U%%(U%() 0cum) %1+2-
2% *rom "?5SE '%' "ement "ontent0 k$:cum) 3&%
2%2% 1% RM 0 as per
8/18/2019 Bodipalem Bridge
102/155
&0 7C75? N
&0 (+ aterial
&0 12%' RM "ost o# ( mm Dia pipes 2'2%32 1%
&0 7C75? N
&0 ( J +
&0
&0 &%(1' F (+ 6ver @ead harges on (J+ 32-+%2'
&0&0 1% F (,+ ontra!tors Prot on (JJ+ 3&311%+-
&0
&0 12%' RM 7C75? "ost #or 12%' RM 05NN"ND)
&0 Rate per 1 RM
&0 Rate per 9 R
&0
mount
7
8/18/2019 Bodipalem Bridge
103/155
1'%32%
33'%
%
335*00
&-(1%'
mount
7
8/18/2019 Bodipalem Bridge
104/155
mount
7
8/18/2019 Bodipalem Bridge
105/155
1'%
%
2'(%
3&+%
%
3&:7*00
1-32%
'1%
1'('&%(
1+-%
&9;)&*)0
2-&3+3%-
1(13+%(2
FFF
mount
7
8/18/2019 Bodipalem Bridge
106/155
'%&
11-%&
2&33*:7
mount
7
%
920) 75
8/18/2019 Bodipalem Bridge
107/155
920)*75
31'-1%'
395;9*50
327;:*25
1'13%(&
3&31%1-
3&3%+
31-%&'
309;*00
.4o uantit% 8nit es!ription of Item Rate per
39 *ormin$ shoulders with barrowed use#ul selected earth havin$ MDD o# not lessthan 1%' !ms:"" #rom out side road boundar6 b6 mechanical means with all leadsand li#ts includin$ prewaterin$ o# soil at barrow area= removal o# top soil= excavationo# soils at barrowed area= conve6ance o# soil= depositin$ the soils on the
8/18/2019 Bodipalem Bridge
108/155
0 Page ):C); of oRE@ .
0 8nit 1 um
0 aking out put N 900 um
0 (+ "aBour
0 %& da6 Mate 3'% 1%
0 1% da6 Ma>door unskilled 32% 1%
00 % F Municipal 5rea 5llowance 33'%
0 7C75? N
0
0 (+ a!hiner%
0
1%( hr 27;9*00 1%
0 92720*00 t%km ipper ( for 7;*500 km N 9)0 A 7;*500+ t*km 7*22 t%km0 5dd 1F o# cost o# carria$e to cover
0 t # l di d l di
embankment= spreadin$ soils= beakin$ clods= sectionin$ and consoilidation withvibrator6 road roller H CM" to meet reAuirement o# table 32 o# MoR7;.=includin$ all hire and operational char$es o# 7;, and complete #or 4nished item o#work as per MoR7;. speci4cation 3' 0 &th revision) 0 ,a6ment will be made basedon levels #or 4nished item o# work)%
(&th Revision+ $ith a lead of 7;*500 km (Pa%ment #ill Be made Based onlevels for nished item of #ork+*
.6draulic excavator1 cum bucket capacit6 H (cum per hour
.4o uantit% 8nit es!ription of Item Rate per
32
&2 8nit N .Lm*
,rovidin$ 25*& mm masti! pads #or ?on$itudinal Ioints= 7ransversal eApansion Ioints and "onstruction Ioints o# approved Aualit6 includin$ cost= conve6ance andplacin$ in position= etc%= complete as directed b6 the En$ineerinchar$e%
8/18/2019 Bodipalem Bridge
109/155
&2 (+ aterial
&2 1% SAm Rate as per uildin$ SSR
8/18/2019 Bodipalem Bridge
110/155
p
Executive En$ineer 0R;)= Superintendin$ En$ine
R; Division= 5malapuram R; "ircle= Jakin
mount
8/18/2019 Bodipalem Bridge
111/155
1'%
32%
33'%%
335*00
&((%-
-1+3+%&
-1+3 +&
mount
8/18/2019 Bodipalem Bridge
112/155
--1%
;;9*00
-(%(
'1%'
1(22%'
223(%(
mount
er 0R;)=
a>ole
8/18/2019 Bodipalem Bridge
113/155
r 0R;)=
da
4ame of $ork 1-
,arth/ Gravel etal/ .tone
Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/3of "o# "evel ause $a% &' )*37m span + in ,*G*t*
8/18/2019 Bodipalem Bridge
114/155
.*4o .pe!i!ation in rief 8nit uantit% !um !um
>a!tor uantit% >a!tor uantit%
9 2 3 & 5 ) 7 :
9 1 cum +31% 1% +31%
2 1 cum 12+% 1% 12+%
3 P 9131) 1 cum +&% %- '%(
& 1 cum &+&% %- &3'%(
5 1 cum (3&% %- '%(
) 'R 25 for Raft 1 cum 3&% %- 33(%(
7 'R 25 for edBlo!ks 1 cum 1% %- 1'%3: 'R 25 for e!k .laB 1 cum 2&3% %- 21+%
; 'R 30 for pproa!h .laB 1 cum 2(% %- 23%&
90 'R 30 for $earing oat 1 cum 3% %- 2%
99 a!k lling #ith gravel 1 cum ((&% 1%2 -(%+
92 >ilter media using 950 mm ston 1 cum 1'% 1%2 1+%
93 Grouted Revetment #ith (91&1 1 cum 22% 1%1+ 2'%-(
9& 1 cum 1 1 2 12
,/$ for >oundation ,A!ludingde#atering
,/$ for >oundation in!luding
de#atering
' 20 for >ootings ofButmentsC Piers
' 20 for suBstru!ture ofButmentsC Piers
.tone pit!hing #ith 300mm
R; Section= Malikipuram R; Subdivision= Ra>ole R; Division= 5malapuram R; "i
8/18/2019 Bodipalem Bridge
115/155
.and
0 (onstru!tion
8/18/2019 Bodipalem Bridge
116/155
!um
>a!tor uantit%
; 90
%&' 3%+
%&' 21%+
%&' 2+'%3
%&' 1(+%3
%&' %('%&' 1-%3'
%&' 11%
%&' 13%'
%- 1%-+
rcle= Jakinada
8/18/2019 Bodipalem Bridge
117/155
, R I > I ,
4ame of $ork1
Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*
8/18/2019 Bodipalem Bridge
118/155
1)
2)
3) "erti4ed that all the distances in the Auarr6 map are correct%
&) "erti4ed that the Auarries provided are the nearest%
')
()
)
+)
"erti4ed that < have personall6 inspected the above Road on WWWWWW% andthe provisions made in the estimate #or the above work are adeAuate andessential%
"erti4ed that the leads provided in the R%M%R o# the estimate are shortest andthere is sucient 6ield o# $ood Aualit6 material #rom the Auarries proposed inthe estimate%
"erti4ed that the routes shown in the Auarr6 map are the shortest #or thetransportation o# the materials%
"erti4ed that all the materials can be easil6 Auarried%
"erti4ed that the description o# all materials mentioned are correct to the besto# m6 knowled$e%
8/18/2019 Bodipalem Bridge
119/155
1
Ra#t 1 x 1 2+%2( -%1 %( 1'&%3
*lexible approns
5prons :S side 1 x 1 2+%2( 3% 0 %( ) '%+
5prons D:S side 1 x 1 2+%2( (% 0 %( ) 11%&
2 x 1 +% 3%1 1%( -%3(
2 x 1 1'% 2%3 1%( 11%&
2 x 1 2(% 2%3 1%( 1-1%3(
2 x 1 1% 1%& 1%1 3%+
' x 1 1 1 3'
Earthwork in excavation o# #oundation o# structures as per drawin$ and technicalspeci4cation includin$ settin$ out= construction o# shorin$ and bracin$= removalo# stumps and other deleterious matter= dressin$ sides o# bottom= back 4llin$the excavation earth to the extent reAuired etc%= complete includin$ sei$nioar$echar$es #or 4nished item o# work as per MoR7;. speci4cation 3& 0&th Revision)
,A!luding de#atering 0-3*0 ,P@ aBove sill
od6 walls on 5side9onvented level portion
od6 walls on Sside9onvented level portion
od6 walls on Sside9onvented level Rampportion
od6 walls on Sside9onvented level Rampportion
"ross walls on Sside9onvented level Rampportion
2
nder Ra#t 1 x 1 2+%2( -%1 %1' 3+%'
2 x 1 +% 3%1 %1 &%-(
,lain cement concrete 013() nominal mix in #oundation with crushed stonea$$re$ate & mm nominal si>e mechanicall6 mixed= placed in #oundation andcompacted b6 vibration includin$ curin$ complete as per MoR7;. Speci4cation21 0&th Revision) for "evelling !ourse Belo# raft and #ing #alls
od6 walls on 5side9onvented level portion
od6 walls on S side
8/18/2019 Bodipalem Bridge
120/155
2 x 1 1'% 2%3 %1 (%-
2 x 1 2(% 2%3 %1 11%-(
2 x 1 1% 1%& %1 2%+
' x 1 % 1% %1 3%'
):*);
(-% '1+3%
cum
3
"ut o walls :S side 1 x 1 2+%2( 0 %( ) 2% 33%-1"ut o walls D:S side 1 x 1 2+%2( 0 %( ) 2% 33%-1
* 5b t t 2 1 + &' 0 1 2 ) 1 3 1+
od6 walls on Sside9onvented level portion
od6 walls on Sside9onvented level Rampportion
od6 walls on Sside9onvented level Rampportion
"ross walls on Sside9onvented level Rampportion
'iBrated !ement !on!rete 20 Grade on!rete usin$ &mm = 2mm and
1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forfootings of Butments and PiersC Raft !ut-oD #alls *
&
R5*7 *oundation 1 x 1 2+%2( 0 -%1 ) %( 1'&%3
1'& 3
'iBrated !ement !on!rete 25 Grade on!rete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es#or machine mixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$includin$ all other incidental and all other operational char$es o# 7;, reAuiredetc%= complete as per MoR7;. Speci4cation 1'=1= 21 0&th Revision) forRaft*
8/18/2019 Bodipalem Bridge
121/155
1'&%3sa6 1''% 2-%
cum
'
*or 5butments 2 x 1 +%&' 0 % N 1% ) 3%1& (3%(+
2
*or ,ier 3 x 1 %' 0 %( N 1% ) 3%1& (2%1
2
*or cut waters 3 x 1 Π 0 %(O2 N 1%O2) 3%1& '%+&& x 2
2 x 1 +% %++ 2% 2+
2 x 1 1'% %+ 1%&' 33%12'
2 x 1 2(% %+ 1%&' '+%&3'
'iBrated !ement !on!rete 20 Grade "oncrete usin$ &mm = 2mm and1mm si>e .! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table11 and 4ne a$$re$ate con#ormin$ to table 12) includin$cost=sei$nora$e and conve6ance o# all materials to site and all labour char$es
#or machine mixin$= la6in$ in position="ompactin$= Vibratin$ and curin$ includin$all other incidental and all other operational char$es o# 7;, reAuired etc%=complete as per MoR7;. Speci4cation 1'=1= 22 0&th Revision) for .uBstru!ture of aButmentsC piers and #ing #alls*
od6 walls on 5side9onvented level portion
od6 walls on Sside9onvented level portion
od6 walls on Sside9onvented level Ramp
portionod6 walls on Sside9 d l l R
92*00 -'1%cum
upto '%m hei$ht
& 1 2+ + S 11' &+
*urnishin$ and placin$ rein#orced cement concrete VR"" M 2' $rade as perapproved drawin$s and technical speci4cations as per MoR7;. speci4cation1'=1(=1 0&th revision ) and as per M%C%7 DR! 9o D:1& 5; 2&excludin$ cost o# steel and #abrication char$es #or VR"" M2' Super structure
3
8/18/2019 Bodipalem Bridge
122/155
& x 1 2+%+ per Span 11'%&+
sa6 11(% +1%
cum
+
2 x 1 %' &% %1' -%
;*00
-% '+'%
cum
-
*or approach slab 2 x 1 &%3 %' %3 1-%3'
1- 3'
*or deck slabs 5s perStandard Dr$% D:2&
m3
,lain cement concrete M 1' !rade "oncrete usin$ &mm = 2mm and 1mm si>e.! crushed stone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and4ne a$$re$ate con#ormin$ to table 12) includin$ cost=sei$nora$e andconve6ance o# all materials to site and all labour char$es #or machinemixin$=la6in$ in position= "ompactin$ = Vibratin$ and curin$ includin$ all otherincidental and all other operational char$es o# 7;, reAuired etc%= complete as perMoR7;. Speci4cation 1'=1= 21 0&th Revision) #or ?evellin$ coursebelow approach slab%?evellin$ course belowapproach slab%
V%R%"%"% M3 $rade concrete usin$ 2mm and 1mm si>e SS' .! crushedstone a$$re$ate includin$ cost and conve6ance o# all materials to site=sei$niora$e char$es=labour char$es #or machine mixin$=la6in$=compactin$=curin$etc=includin$ all other incidental and operational char$es=7;, char$esetc=complete but excludin$ cost o# steel and its #abrication char$es= as per MoR7;.Speci4cations 1'=1=2&0&th Revision) #or pproa!h .laB%
& x 1 PPP k$s per Span &(&
5pproach slab 1 x 1 1- +' k$s:cum 1(&&%'
@earin$ coat 1 x 1 PPP ( k$s:cum 12%1+
PPP
90*&0
or sa6 11% '2&'%M 7
*or deck slabs 5s perStandard Dr$%D:&&
8/18/2019 Bodipalem Bridge
123/155
6M%7
12
1 x 1 11%1 1 k$s:cum 111%2
2 x 1 3' k$s %
3 x 1 3' k$s 1'%
1 x 1 2 k$s 2%
1 x 1 3' k$s 3'%
1 x 1 '2 k$s '2%
,rovidin$ @?. Bars ( >e-&95 + o# dierent diameters= wrou$ht and put up barso# all diameters includin$ cost and conve6ance o# steel to site and all labourchar$es #or #abrication o# rein#orcement includin$ cuttin$= bendin$= bindin$ rods=t6in$ $rills= placin$ them in position etc%= complete includin$ cost andconve6ance o# bindin$ wire and all handlin$ char$es and operational char$es
etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or all R%"%"items #or 4nished item o# work as per standard drawin$s= as per the directions o#the En$ineerin"har$e and as per MoR7;. speci4cation 1( ;22 0&threvision) and as per
8/18/2019 Bodipalem Bridge
124/155
$
1 x 1 2 k$s 2%
1 x 1 12' k$s 12'%
PPP
90*;;
11% PPP
M%7
1&
5pproaches ' x 3 %' '%
"" pavement 11 x 2+ %' 1'&%
22-% RM
++1%(' k$s
& x & 1%' 2&% RM
+32%'( J$s
11& 21
p9onvented level Rampportion 9onvented level Rampportion
,rovidin$ ncoated Mild Steel bars 0 *e2' ) o# dierent diameters= wrou$ht andput up bars o# all diameters includin$ cost and conve6ance o# steel to site and alllabour char$es #or #abrication o# rein#orcement includin$ cuttin$= bendin$=bindin$ rods= t6in$ $rills= placin$ them in position etc%= complete includin$ costand conve6ance o# bindin$ wire and all handlin$ char$es and operationalchar$es etc%= and includin$ over lappin$ weldin$ i# reAuired etc%= complete #or allR%"%" items #or 4nished item o# work as per standard drawin$s= as per the
directions o# the En$ineerin"har$e and as per MoR7;. speci4cation 1(;22 &th Revision and as er
8/18/2019 Bodipalem Bridge
125/155
Guadrants & x 1 1%( %1' 1%((
90*))
11% 1-+%
or sa6 cum
1+
*or Auadrants & x 1 1%( %3 21%31
29*3922% 23&-%
cum
1-
7oe walls & x 1 (%'1 %( %( -%2;*72
p p pRevision)and as directed b6 the En$ineerin"har$e% *or pit!hing of slopes%
,rovidin$ !routed Revetment with rou$h stone other than $ranite o# not lessthan 3 mm si>e $routed with %2 cum o# "" 01&+) includin$ cost=sei$niora$e char$es and conve6ance o# materials to site and includin$ labourchar$es #or packin$ the stones #or revetment etc%= complete #or 4nished item o#work as per MoR7;. speci4cation 2'& 0 & th revision ) and as directed b6 theEn$ineerin"har$e #or Auadrential revetment%
,rovidin$ rou$h stone revelment other than $ranite 3 mm thick usin$ 3mm i>e rou$h stonne varit6 includin$ cost =sei$niora$e and conve6ance o# allmaterials to site = labour c$ar$es etc = complete as per MCS7 speci4cation no%
od6 walls SS
8/18/2019 Bodipalem Bridge
126/155
9os
23
5ppanaramuni lanka sid 1 x 1 3% %' %1 2%+
Sakinetipall6 Se .! crushedstone a$$re$ate and 4ne a$$re$ate con#ormin$ to table 12 o# MoR7;.includin$ cost= 0excludin$ sei$niora$e) conve6ance o# all materials to site andlabour char$es= centerin$= machine mixin$= la6in$= Vibratin$= curin$ etc%=includin$ all other incidental and operational char$es o# all 7;, etc%= complete#or 4nished item o# work as per MoR7;. speci4cation 1'=1= 21 0&th
Revision) and as directed b6 the En$ineerin"har$e #or base coarse%
Vibrated cement concrete M 3' $rade usin$ 2mm ; 1mm .! crushedstone a$$re$ate 0"oarse a$$re$ate con#ormin$ to table 11 and 4nea$$re$ate con#ormin$ to table 12) includin$ cost= 0excludin$ sei$niora$e)conve6ance o# all materials to site and labour char$es= centerin$= machinemixin$= la6in$= vibratin$= curin$ etc%= includin$ all other incidental and
operational char$es o# all 7;, etc%= complete #or 4nished item o# work as perMoR7;. speci4cation 1'= 1= 21 ; 22 0&th Revision) and as directed
2( *ormin$ shoulders with barrowed use#ul selected earth havin$ MDD o# not lessthan 1%' !ms:"" #rom out side road boundar6 b6 mechanical means with allleads and li#ts includin$ prewaterin$ o# soil at barrow area= removal o# top soil=excavation o# soils at barrowed area= conve6ance o# soil= depositin$ the soils onthe embankment= spreadin$ soils= beakin$ clods= sectionin$ and consoilidationwith vibrator6 road roller H CM" to meet reAuirement o# table 32 o#MoR7;.= includin$ all hire and operational char$es o# 7;, and complete #or4nished item o# work as per MoR7;. speci4cation 3' 0 &th revision) 0 ,a6ment
will be made based on levels #or 4nished item o# work)%
8/18/2019 Bodipalem Bridge
127/155
Road work
"" ,avement 1 x 2 &% 1% %3 2&%
2&%
or sa6 2&0*00 12-%
cum
2
Road work 0nder "" ,avement)1 x 1 &% %3 11'2%
11'2%
or sa6 9952*00 ((2%
cum
2+
*ormin$ embankment with borrowed use#ul earth #rom outside road boundar6b6 mechanical means up to SDR with all leads and li#ts includin$ prewaterin$ o#soil at borrow area= removal o# top soil= excavation o# soils at borrowed area=conve6ance o# soil= depositin$ the soil on the embankment= spreadin$ soil=breakin$ clods= sectionin$= $radin$ and consolidation with + to 1 7onnesVibrator6 Road Roller H CM" to meet reAuirement o# table 32 o# MoR7;.=includin$ all hire and operational char$es o# 7;, and 0excludin$ sei$niora$e)char$es= complete #or 4nished item o# work as per MoR7;. speci4cation 3'
01%2N-%):2
"onstruction o# !ranular subbase b6 providin$ .! material con4rmin$ to
!radin$
8/18/2019 Bodipalem Bridge
128/155
iversion of anal and ross unds 1-
31
1 x 1 1&% 1'% 2%2 &(2%
&(2%or sa6 &)20 00 (( 1
Earthwork excavation in soils upto SDR b6 mechanical means includin$trimmin$ bottom and side slopes in accordance with reAuirements o# lines =$rades and cross sections etc%= complete #or 4nished item o# work #or trenchcuttin$ as per MoR7;. speci4cation 310&th Revision) and as directed b6 theEn ineerin"har e
8/18/2019 Bodipalem Bridge
129/155
or sa6 &)20*00 ((%1
cum
32
>or ross unds1
:S Side 1 x 1 02N1():2 0'N-):2 2%2 2%2
D:S Side 1 x 1 02N1():2 0'N-):2 2%2 2%2
1 x 1 01'N11):2 0N11):2 2%2 2'%&
+11%+
or sa6 :92*00 13%
cum
33 ,rovision towards V57 'F on Rs% 223(-31+
3& ,rovision towards Gualit6 "ontrol char$es H1F on Rs% 223(-31+
*ormin$ embankment with Side earth b6 mechanical means upto SDR includin$prewaterin$ o# soil = removal o# top soil= excavation o# soils = depositin$ the soilson the embankment= spreadin$ soil= breakin$ clods= sectionin$ = $radin$ andconsolidation with + to 1 7onnes Vibrator6 Road Roller H CM" to meet
reAuirement o# table 32 o# MoR7;.= includin$ all hire and operationalchar$es o# 7;,= complete #or 4nished item o# work as per MoR7;. speci4cation3' 0&th revision) 0,a6ment will be made based on level #or 4nished item o#work)%
8/18/2019 Bodipalem Bridge
130/155
8/18/2019 Bodipalem Bridge
131/155
1% 3'(2
cum
1% 1EN(
8/18/2019 Bodipalem Bridge
132/155
cum
1% -'&12cum
1 1E (
8/18/2019 Bodipalem Bridge
133/155
1% 1EN(
cum
1% '2('
cum
1% '22'M%7
8/18/2019 Bodipalem Bridge
134/155
8/18/2019 Bodipalem Bridge
135/155
1% '(1121
M%7
1% 2(&&'
cum
8/18/2019 Bodipalem Bridge
136/155
1% 2-++
cum
1% '1(+
cum
1% 33&'(
R%M
1% (++9o%
8/18/2019 Bodipalem Bridge
137/155
1% 2EN(
cum
8/18/2019 Bodipalem Bridge
138/155
1% 3(-(
cum
1% (2(2&
cum
1&++++
8/18/2019 Bodipalem Bridge
139/155
1% 3'3+2
cum
8/18/2019 Bodipalem Bridge
140/155
cum
1% 1&&(
cum
FFF
999:&))
223);3
uantit% es!ription of Item Rate per
2'
ourse sand #ih Bitumen
12%M lon$ x 1mm wide x 1mm deepaterial
12cum "ost o# sand #or 4llin$ 313 cum
,rovdin$ and 4llin$ Ioints sealin$ compound as per Drawin$ and 7echnical specidirected b6 the En$ineer in char$e%
8/18/2019 Bodipalem Bridge
141/155
%12cum "ost o# sand #or 4llin$ 313% cum
%1 M7 "ost o# itumen +:1 PPP M7
"aBour
%'cum Man Ma>door #or heatin$ bitumen 2-'% each
Rate #or 12 RMRate #or 1 RM 33%&-
Rate to be adopted
2(
2'mm Dia1% RM ,art
8/18/2019 Bodipalem Bridge
142/155
mount
3%(
4cation and as
8/18/2019 Bodipalem Bridge
143/155
3%(
&-%(+
1&%'
2%-3
&09*:7
33*00
R
1'%+&
9)*00
R
and technical
oncrete to behine to releaseterin$ process=
in vibration o#t includin$ hire
8/18/2019 Bodipalem Bridge
144/155
4ame of $ork 1
Revised ost of R Plain ,nded pipes
7he rates o# R"" ,lain ended pipes as per SSR 2+- are based on the raw materials costs%
"ement 0"1) &=&Steel 0MS Rods) 0S1) &1='
Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350(onstru!tion of "o# "evel ause $a% &' )*37m span + in ,*G*t*
8/18/2019 Bodipalem Bridge
145/155
7he revised raw materials costs i%e%= the rates adopted in the estimate%
"ement 0"2) (=&!%C% R7 9o% 2(-= 5pril 21'= Dt% 2+%'%21'
Steel 0MS Rods) 0S2) &'=
7otal Auantit6 o# "oncrete reAuired 0as per
8/18/2019 Bodipalem Bridge
146/155
3 MM dia 0&'= &1=') :1 0&'= &1=') :1 0&'= &1=') :1
x 2%'+ J$s% Rs ;*03 x 1%' J$s% Rs 5*50 x %1 J$s% Rs 2*&;
&' MM dia 0&'= &1=') :1 0&'= &1=') :1 0&'= &1=') :1
x &%' J$s% Rs 9)*00 x 2%' J$s% Rs ;*)3 x 1%&+ J$s% Rs 5*9:
( MM dia 0&'= &1=') :1 0&'= &1=') :1 0&'= &1=') :1x +%1- J$s% Rs 2:*)7 x &%2' J$s% Rs 9&*:: x 1%+- J$s% Rs )*)2
due to chan$e in the cost o# "ement 0"2"1):1 8 @c%
ia 9,3 "lass pipes 9,2 "lass pipes 9,2 "lass "ollars
3 MM dia 0(=& &=&) :1 0(=& &=&) :1 0(=& &=&) :1x1'%3- J$s% Rs 30*7: x11%2 J$s% Rs 22*&0 x1%'3 J$s% Rs 3*0)
&' MM dia 0(=& &=&) :1 0(=& &=&) :1 0(=& &=&) :1
x&&%'' J$s% Rs :;*90 x1-%21 J$s% Rs 3:*&2 x3%'( J$s% Rs 7*92
( MM dia 0(=& &=&) :1 0(=& &=&) :1 0(=& &=&) :1
x('%++ J$s% Rs 939*7) x32%+& J$s% Rs )5*): x'%- J$s% Rs 99*5:
Revised "ost "ost as per the SSR N R1 N R2
Revised "ost R2 1 Variation 0increase : decrease ) in cost 0Rs% per metre)
R; Section Malikipuram R; Subdivision Ra>ole R; Division 5malapuram
8/18/2019 Bodipalem Bridge
147/155
uantit% es!ription of Item Rate per
3
nit metre Page 272C273 of oRE@ . 7akin$ output 12%' metre
300 mm ia*C
,rovidin$= la6in$ Rein#orced cement concrete .ume pipes o# 9,3 class #or pipe culcost and conve6ance o# ,ipes etc%= complete and ?abour char$es #or la6in3mm:&'mm:(mm dia% R%"%" .ume pipes in position includin$ li#tin$= ali$nin$hoistin$ etc%= as per drawin$ and as per MoR7;. Speci4cation 2-= 2-' and 2-and
8/18/2019 Bodipalem Bridge
148/155
300 mm ia*C
(+"aBour
% nos Mate 1++% da6
%2' nos Mason 1-3%& da6
1%' nos Ma>door 1&(% da6
7otal
(+aterial12%' RM "ost o# 3mm Dia%= pipes (3%+1 RM
7otal
(+ 6ver head !harges 9;*)95H (25H-'-Insuran!e+
1-%(1' F 5dd #or Cver head char$es H 1-%(1'F on 05)N0)
(+ otal of (+ J (+J( +
(,+ dd ontra!tors Prot at 90H on (+ost per 92*5 metre (+J(,+
Rate #or 1 RMRate to be adopted
&50 mm ia*C
(+"aBour
%11 nos Mate 1++% da6
%3+ nos Mason 1-3%& da6
2%2' nos Ma>door 1&(% da6
7otal(+aterial
8/18/2019 Bodipalem Bridge
149/155
mount
erts includin$$= Iointin$ o#= lowerin$ and( 0&th Revision)nished item o#
8/18/2019 Bodipalem Bridge
150/155
13%1(
&+%3'
21-%
2+%'1
-'&%(3
-'&%(3
%
;:2:*9&
0*00
;:2:*9&
+(%2'7:)*00
9 R
2%(+
3%&-
32+%'
&22%(
9 R
8/18/2019 Bodipalem Bridge
151/155
LEAD CHARGES 'SSR 201(-15) Cost of Materials, Labour Metal
SSR 201(-15
loading 52.50 105.00 Material Rates =s er of ? et.
unloading 15.-0 15.-0 60 to 63 mm IC ! Mo"# #$% metal 41-.00 ?g. Eo.17, l.53 *oads+
sta&'ing (( (( 50 to 55 mm IC ! Mo"# #$% metal 456.00 ?g. Eo.17, l.52 *oads+
0.25 (( (( 40 to 45 mm IC ! Mo"# #$% metal 588.00 ?g. Eo.16, l.51 *oads+
0.5 (( (( oug)stone 300mm *#$%+for reetment 156.00 ?g. Eo.13, l.- *oads+
1 31.50 30.40 oug)stone 225mm *#$%+for reetment 154.00 ?g. Eo.13, l.8 *oads+
2 44.10 42.60 eetment /or' 225mm 144.00 ?g. Eo.13, l.2 *oads+
3 58.-0 58.-0 eetment /or' 300mm 164.00 ?g. Eo.13, l.3 *oads+
4 71.50 71.50 eetment /or' 450mm 136.00 ?g. Eo.13, l.4 *oads+
5 84.10 84.10 Laterite for eetment 225mm 118.00 ?g. Eo.13, l.6 *oads+
6 -6.70 -6.70 Laterite for eetment 300mm 138.00 ?g. Eo.13, l.7 *oads+
7 10- 30 10- 30 edd stone aboe 450mm to 600mm 188 00 ?g Eo 13 l 5 *oads+
;art)%raeland
8/18/2019 Bodipalem Bridge
152/155
7 10-.30 10-.30 edd stone aboe 450mm to 600mm 188.00 ?g. Eo.13, l.5 *oads+
8 121.-0 121.-045.00
- 134.50 134.50 150 mm soling stone #$% metal -5.00 ?g. Eo.18, l.7- *oads+
10 147.10 147.10 40 to 45 mm IC ! Mo"# #$% MC metal 588.00 ?g. Eo.16, l.51 *oads+
11 15-.70 15-.7025 to 27 mm IC ! Mo"# #$% MC metal -44.00 ?g. Eo.16, l.50 *oads+
12 172.30 172.301- to 22 mm IC ! Mo"# #$% MC metal -84.00 ?g. Eo.16, l.4- *oads+
13 184.-0 184.-012 to 14 mm IC ! Mo"# #$% MC metal 780.00 ?g. Eo.16, l.48 *oads+
14 1-7.50 1-7.50 -.5 to 11.20 mm IC ! Mo"# #$% MC metal 656.00 ?g. Eo.16, l.47 *oads+
15 210.10 210.10 5 to 7 mm IC ! Mo"# #$% MC metal 504.00 ?g. Eo.16, l.46 *oads+
16 222.70 222.70 2.36 to 5 mm IC ! Mo"# #$% MC metal 308.00 ?g. Eo.16, l.45 *oads+
17 235.30 235.30 #$% tone &)is 2.36mm and belo/ 340.00 ?g. Eo.18, l.-2 *oads+
18 247.-0 247.-0 %rael 103.00 ?g. Eo.18, l.-0 *oads+
1- 260.50 260.50 40 mm 5 m& #$% metal*;(&luding $lasting ! 620.00 ?g. Eo.15, l.30 *oads+
20 273.10 273.1025 mm 5 m& #$% metal GG --4.00 ?g. Eo.15, l.2- *oads+
21 285.70 285.7020 mm 5 m& #$% metal GG 1036.00 ?g. Eo.15, l.28 *oads+
22 2-8.30 2-8.3012 mm 5 m& #$% metal GG 822.00 ?g. Eo.15, l.27 *oads+
23 310.-0 310.-0 10 mm 5 m& #$% metal GG 6-2.00 ?g. Eo.14, l.26 *oads+
24 323.50 323.50 6 mm 5 m& #$% metal GG 532.00 ?g. Eo.14, l.25 *oads+
25 336.10 336.10 and for Con&rete 462.00 ?g. Eo.1-, l.-4 *oads+
8/18/2019 Bodipalem Bridge
153/155
34 441.10 441.10 $lasting &)arges for roug) stone ((35 451.60 451.60 Seigniorage charges
36 462.10 462.10 Metal 50.00
37 472.60 472.60 %raeleart) 22.00 =s er t)e %.>.s
38 483.10 483.10 and 40.00
3- 4-3.60 4-3.60 Lao!r Rates
40 504.10 504.10 Mate 345.00 ?g. Eo.10, l.71 *oads+
41 514.60 514.60 Madoor s'illed *385 ( 309 : 345 ( 709+ 357.00
42 525.10 525.10 Madoor uns'illed 2-5.00 ?g. Eo.10, l.73 *oads+
43 535.60 535.60 Machiner" Rates
44 546.10 546.10 oer 80 #? for sreading @ 200 &um er )our 2575.60 ?g. Eo.25, l.1 *oads+
45 556.60 556.60 Motor grader 3.35M $lade @50 &um#r 3216.00 ?g. Eo.25, l.3 *oads+
46 567.10 567.10 #drali& e(&aator 2848.50 ?g. Eo.25, l.4 *oads+
47 577.60 577.60 ront end loader 1 &um &aa&it 1646.00 ?g. Eo.25, l.5 *oads+
48 588 10 588 10 "ier 5 &um -22 00 ?g Eo 25 l 6 *oads+
8/18/2019 Bodipalem Bridge
154/155
48 588.10 588.10 "ier 5 &um -22.00 ?g. Eo.25, l.6 *oads+
4- 5-8.60 5-8.60 Aibrator roller 8" 2678.30 ?g. Eo.25, l.7 *oads+
50 60-.10 60-.10 smoot) /)eeled roller 8 "on 1146.70 ?g. Eo.25, l.8 *oads+
51 61-.60 61-.60 Bater tan'er 6 L 624.00 ?g. Eo.25, l.10 *oads+
52 630.10 630.10 "ra&tor 415.00 ?g. Eo.25, l.11 *oads+
53 640.60 640.60 "ra&tor /it) otaator 422.00 ?g. Eo.25, l.12 *oads+
54 651.10 651.10 Tractor with ripper attachment @ 60 cum per hour 422.00 ?g. Eo.25, l.13 *oads+
55 661.60 661.60 =ir &omressor 250 &fm 507.50 ?g. Eo.25, l.14 *oads+56 672.10 672.10 Bet mi( lant of 60 tonne )r. &aa&it 1646.00 ?g. Eo.26, l.15 *oads+
57 682.60 682.60 Me&)ani&al broom @ 1250 sDm)r. 357.00 ?g. Eo.26, l.16 *oads+
58 6-3.10 6-3.10 $itumen ressure distributor @1750 sDm)r 14-8.00 ?g. Eo.26, l.17 *oads+
5- 703.60 703.60 ;mulsion ressure distributor @1750 sDm)r 860.00 ?g. Eo.26, l.18 *oads+
60 714.10 714.10 #ot mi( lant 40 to 60 "?# 1-120.00 ?g. Eo.26, l.22 *oads+
61 724.60 724.60 Me&)ani&al ?aer finis)er 100 "?# 224-.00 ?g. Eo.26, l.24 *oads+
62 735.10 735.10 Hydraulic self