Bond Construction Update Citizen’s Oversight Committee. Long Beach Community College District October 2008. EDUCATE ENGAGE EMPOWER. Agenda. Completed Construction Projects PCC Learning Resource Center Current & Upcoming Construction Projects LAC Central Plant LAC South Quad Complex - PowerPoint PPT Presentation
Citation preview
Bond Construction Bond Construction UpdateUpdateCitizen’s Oversight Citizen’s Oversight CommitteeCommittee
Bond Construction Bond Construction UpdateUpdateCitizen’s Oversight Citizen’s Oversight CommitteeCommittee
Long Beach Community College District October 2008
EDUCATE ENGAGE EMPOWER 1
Agenda Completed Construction Projects
PCC Learning Resource Center Current & Upcoming Construction Projects
LAC Central Plant LAC South Quad Complex LAC Learning Resource Center LAC Building A, Student Services Retrofit LAC Math Technology Building LAC Parking Structure LAC Infrastructure Improvements – Phase 3 PCC Central Plant PCC Industrial Tech Phase 1 PCC MDAB (Multi-Disciplinary Academic Building) PCC Building C Retrofit District Wide Building Needs Assessment Projects
Toilet Improvement Projects Quick-Start Projects ADA Projects Lighting Projects Classroom Improvement Projects
Q & A
2
Completed Construction Projects
Construction Complete Modern Facility with Computer Lab
and Multimedia Stand alone Data Center. Provides
District IT redundancy Bridge to building E Design elements move towards
energy efficiencies Ribbon cutting held 9/17/08
PCC Learning Resource Center – Measure E 2002PCC Learning Resource Center – Measure E 2002
3
Current and UpcomingConstruction Projects
Central Plant equipment, Public Safety, & Field House for Athletics
Final FF&E installation underway Plant ready for operation and awaiting
completion of LRC & SQC Construction 99% Complete Anticipated startup 11/08
LAC Central Plant – Measure E 2002LAC Central Plant – Measure E 2002
4
Current and UpcomingConstruction Projects
Construction approx. 86% Complete
Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room
Substantial completion anticipated December 2008
South Quad Complex – Measure E 2002South Quad Complex – Measure E 2002
5
Current and UpcomingConstruction Projects
Construction 89% Complete Adds 10,000 ASF to existing
building Substantial Completion
Anticipated December 2008
LAC/Learning Resource Center – Measure E 2002LAC/Learning Resource Center – Measure E 2002
6
Current and UpcomingConstruction Projects
Design Development to be submitted this month Adds 4,000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc.
LAC Building A – Student Services RetrofitLAC Building A – Student Services Retrofit
Measure E 2008Measure E 2008
7
Current and UpcomingConstruction Projects
Completed Schematic Design (June 2008) Currently in Design Development phase Will house Math and Culinary Arts instructional
program as well as Reprographics Estimated start of construction 2011
LAC Math Technology Building – Measure E 2008LAC Math Technology Building – Measure E 2008
8
Current and UpcomingConstruction Projects
Planning initiated for approximately 900 Vehicles To be procured under “Design Build Delivery”
method To be located Southeast corner of Lot J adjacent
to the Verizon building Photovoltaic Electrical Generation Array on top
level of structure
Anticipated start of construction 2009
LAC Parking Structure – Measure E 2008LAC Parking Structure – Measure E 2008
9
Current and UpcomingConstruction Projects
LAC Infrastructure Improvements – Phase 3LAC Infrastructure Improvements – Phase 3
Measure E 2008Measure E 2008
Planning underway with P2S Engineering
Completes chilled water lines to North side of campus
Includes other major utility upgrades; RW,DW, Data, etc.
Existing building HVAC systems to be upgraded in synch with infrastructure improvements
Coordinated with modernization and quick start projects
10
Current and UpcomingConstruction Projects
Houses Central Plant equipment and Maintenance and Operations facility
Construction Approximately 99% Complete
Currently provides chilled water to the PCC LRC
PCC Central Plant – Measure E 2002PCC Central Plant – Measure E 2002
11
Current and UpcomingConstruction Projects
Modern facility houses Machine Tool and Welding Departments
Construction is 42% complete
Replaces existing antiquated structures
New Northern face of the campus
Completion anticipated summer 2009
PCC Industrial Technology Center Phase 1PCC Industrial Technology Center Phase 1
Measure E 2002Measure E 2002
12
Current and UpcomingConstruction Projects
50% construction documents submitted Swing space planning completed 9/2008, construction Spring 2009 Anticipated start of MDAB construction Summer 2009 To be completed in two phases
PCC MDAB PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2002(Multi-Disciplinary Academic Building) Measure E 2002
13
Current and UpcomingConstruction Projects
To be designed by Hill Partnership Architects Houses the Fitness Center, Gymnasium, Weight
Room, and Faculty and Staff Offices Swing space to be located in PCC building V Anticipated start of construction Summer 2009 To be completed concurrently with MDAB project
PCC Building C Retrofit - Measure E 2008PCC Building C Retrofit - Measure E 2008
14
Current and UpcomingConstruction Projects
Toilet Improvement Projects
Quick-Start Projects ADA Projects
District Wide Building Needs Assessment ProjectDistrict Wide Building Needs Assessment ProjectMeasure E 2008Measure E 2008
15
Current and UpcomingConstruction Projects
Lighting Projects Classroom Improvement Projects
District Wide Building Needs Assessment ProjectsDistrict Wide Building Needs Assessment ProjectsMeasure E 2008Measure E 2008
16
QUESTIONS & ANSWERS