Page 1: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Bond ReferendaTown Hall Meeting

Page 2: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Potential Mobility Bond Projects

Ricardo Canizales - DirectorDepartment of Transportation

Page 3: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|3|

Devlin Road Widening

n Description: Widen to 4-lanes from Linton Hall Rd to Wellington Rd with a sidewalk and shared use path. Total project length of 1.8 miles.

n Approximate Project Cost: $50,000,000

n Project Duration: 4 to 6 years

n Existing Funding: $12.5 million RSTP (Federal) funding. Eligible for other funding.

Purpose: Four-lane widening of Devlin Road, which will connect to the Balls Ford Road Interchange and improves access to Prince William Parkway and I-66

Page 4: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|4|

University Boulevard Extension

n Description: Extends University Boulevard (2-lanes) from Devlin Road to Progress Court and a possible pedestrian facility. Total project length of 1.7 miles.

n Approximate Project Cost: $30,000,000

n Project Duration: 4 to 6 years

n Existing Funding: $3.9 million in RSTP (Federal) funding. Eligible for other funding.

Purpose: Two-lane (half-section) extension of University Boulevard to connect Devlin Road to Wellington Road. Completes last segment of University Boulevard, which will connect Route 29 to Prince William Parkway/Godwin Drive

Page 5: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|5|

Route 28 Bypass

n Description: 4-lane limited access road, extending from Flat Branch to Route 28 near the Fairfax/Prince William County Line and one bike/ped facility. Total project length of 3.5 miles.

n Approximate Project Cost: $300,000,000

n Proposed Project Funding: $100,000,000

n Existing Funding: $95 million in NVTA funds. $100,000,000 more needed from other sources.

n Project Duration: 5 to 7 years

Purpose: Construction of a bypass to relieve congestion between the City of Manassas and Fairfax County

Page 6: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|6|

Sudley Road Corridor Intersection Improvements

n Description: Roundabouts at the Catharpin Road/Sudley Road intersection and the Pageland Lane/Sanders Lane/Sudley Road intersection (Includes Pageland Lane Realignment).

n Approximate Project Cost: $12,500,000

n Project Duration: 3 to 5 years

n Existing Funding: None. Unlikely to receive other funding.

Purpose: Improve intersection safety and flow along Route 234 - Sudley Road

Page 7: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|7|

Route 55 Widening and Catharpin Road Intersection Improvements

n Description: 4-lane widening of Route 55 from Gillis Way to Catharpin Road, and intersection improvements at the intersection of Route 55 at Catharpin Road, includes bike/pedestrian facilities. Total project length of 0.8 miles

n Approximate Project Cost: $40,000,000

n Project Duration: 4 to 6 years

n Existing Funding: None. Unlikely to receive other funding.

Purpose: Eliminate bottleneck between two proposed developer projects and improve the intersection of Catharpin Road at Route 55

Page 8: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|8|

Minnieville Road at Prince William Pkwy Interchange

n Description: Grade separated intersection at Minnieville Road and Prince William Parkway.

n Approximate Project Cost: $70,000,000

n Project Duration: 4 to 6 years

n Existing Funding: None. Eligible for other funding.

Purpose: To provide improved operations at the intersection of Minnieville Road and Prince William Parkway

Concept Only*

Page 9: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|9|

Old Bridge Road at Gordon Boulevard Intersection Improvements

n Description: Construction of a flyover ramp from Route 123/I-95 to Old Bridge Road.

n Approximate Project Cost: $15,000,000

n Project Duration: 3 to 5 years

n Existing Funding: None. Eligible for other funding.

Purpose: To create safer traffic flow from I-95 to Old Bridge Road

Page 10: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Old Bridge Road at Prince William Parkway Intersection Improvements

n Description: Addition of a lane to the ramp that connects eastbound Prince William Parkway traffic at Old Bridge Road.

n Approximate Project Cost:$15,000,000

n Project Duration: 3 to 5 years

n Existing Funding: None. Eligible for other funding

Purpose: To promote use of Prince William Parkway to access I-95 by adding capacity and providing safety improvements to the eastbound direction

|10|

Page 11: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|11|

Summit School Road Extension

n Description: 4-lane extension of Summit School Road to Caton Hill Road (through Telegraph Road).

n Approximate Project Cost: $20,000,000

n Project Duration: 3 to 4 years

n Existing Funding: $11 million in NVTA Funds. Eligible for other funding.

Purpose: Provides for improved and new connection between Minnieville Rd and Telegraph Rd

Page 12: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|12|

Van Buren Road Extension

n Description: 4-lane extension of Van Buren Road between Route 234 and Cardinal Drive. Includes bike/ped facilities. Total project length of 2.7 miles.

n Approximate Project Cost: $70,000,000

n Project Duration: 4 to 6 years

n Existing Funding: None. Eligible for other funding.

Purpose: Creates an internal parallel route to I-95 and Route 1 between Dale Boulevard and Route 234

Page 13: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|13|

North Woodbridge Mobility Improvements

n Description: Projects may consist of various mobility improvements adjacent to Route 1, Route 123, Horner Road, Annapolis Way and Marina Way.

n Approximate Project Cost: $165,000,000

n Proposed Project Funding: $55,000,000

n Existing Funding: $450,000 Local TRIP funds (Annapolis Way). Eligible for other funding,

n Project Duration: 5 to 10 years

Purpose: To improve the mobility network in the North Woodbridge Area

Page 14: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|14|

Other Safety/Operational and Bicycle/Pedestrian Projects

A separate line item is proposed for other safety/operational and bicycle/pedestrian projects Countywide for $35 million

Page 15: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

|15|

Summary

n Number of projects: 11

n Total new lane miles: 50 miles

n Total length of bicycle and pedestrian facilities: 22 miles

n Total cost of all projects: $512,500,000

n Funding currently available: $27,850,000

n Total Bonding amount: $400,000,000

n Funding needed from other sources: $184,650,000 (Includes $100,000,000 additional for Route 28 Bypass Project)

Page 16: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Potential Park Bond Projects

Seth Hendler-Voss, DirectorDepartment of Parks, Recreation, and Tourism

Page 17: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Field House§ Description: Indoor multi-

sport practice facility for local leagues, high schools, and residents

§ Specs: 125,000+/- square feet, practice track, multi-use courts

§ Estimated Cost: $17.6 million

§ Project Duration: 36-48 months

§ Uses: Futsal, basketball, tennis, pickleball, field hockey, etc.

17

Page 18: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Howison Park Improvements§ Description: Functional and accessibility

improvements to existing community park

§ Specs: ADA improvements, trail, spectator seating, fitness equipment, comfort station expansion, additional parking

§ Estimated Cost: $6 million

§ Project Duration: 24 months

18

COMFORT STATION EXPANSION

OUTDOOR GYM

TRAIL

PERIMETER SIDEWALKSEATING

Page 19: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Indoor Turf Fieldhouse§ Description: Indoor multi-sport

practice field

§ Specs: 87,000+/- square feet

§ Estimated Cost: $4.0 million

§ Project Duration: 24 months

§ Uses: Soccer, football, lacrosse, rugby, cricket, ultimate frisbee, etc.

19

Page 20: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Long Park Improvements

§ Description: Upgrades and expansion to existing regional park

§ Specs: Road improvements, soccer field #1 and #2 lights and irrigation, addition of two baseball fields, comfort station, sewer line, parking expansion

§ Estimated Cost: $10.8 million

§ Project Duration: 36 months

20ADD 2 FIELDSAND COMFORT STATION

LIGHTS AND IRRIGATION

ADD LEFT TURN LANE

EXPAND PARKING

Page 21: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

New Park Development§ Description: New amenity-rich

community park

§ Specs: Dynamic playground, climbing wall, hill slides, skating ribbon, pedal powered monorail, and amphitheater

§ Estimated Cost: $6 million

§ Project Duration: 36 months

21

Page 22: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Indoor Sports Complex

§ Description: Indoor competition and practice facility for local leagues, high schools, and residents

§ Specs: 230,000+/- square feet, hydraulic banked 200 meter/6 lane track, courts, 3,500 fixed seats, and turf

§ Estimated Cost: $84 million

§ Project Duration: 48 months

22

Field Hockey Basketball/Volleyball

Cheer Wrestling

Indoor Track

Pickle Ball

Graduations/Concerts

Turf Sports

Page 23: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Fuller Heights Expansion

§ Description: Expand existing community park

§ Specs: 2-230’ fields and parking

§ Estimated Cost: $6 million

§ Project Duration: 36 months

23

ADD 2 FIELDS

Page 24: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

Aquatic and Fitness Center§ Description: Family-based aquatic and

fitness facility

§ Specs: 50,000+/- square feet, competition and leisure pool, weight/functional fitness room, fitness classrooms, basketball court, children/youth area, community space

§ Estimated Cost: $42 million

§ Project Duration: 48 months

24

Page 25: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound

§ Description: Advance numerous off-road trail projects in various stages of completion and open space acquisition

§ Allowance: $23.6 million

§ Project Duration: 120 months

25

Trails & Open Space

Page 26: Bond Referenda Town Hall Meeting - pwcgov.org · Old Bridge Road at Prince William Parkway Intersection Improvements nDescription: Addition of a lane to the ramp that connects eastbound