1
PRICE INCLUDES: 1000 GALLON SEPTIC TANK 5’ CHAINLINK FENCE CONPLETE WITH GATES NATURAL GAS TO FRONT OF PROPERTY UNDERGROUND ELECTRIC TO THE FRONT OF THE PROPERTY TELEPHONE TO FRONT OF THE PROPERTY CABLE TV & HIGH SPEED INTERNET ACCESS TO FRONT OF PROPERTY TOTAL NEEDED: WATER HOOK-UP $350.00 N.M. TAX 2 6.2500% $22.31 TOTAL WATER $372.31 DOWN PAYMENT $995.00 CLOSING COST $350.00 TOTAL NEEDED $1,717.31 NMED SEPTIC PERMIT $100.00 DAC MHIP INSTALLATION PERMIT $100.00 3/4 ACRE LOT FOR $38.992.00 PAYMENTS @ 12% INTEREST FIXED DOWN PAYMENT $995.00 LOAN PAYMENT $38.000.00 LAND ESCROWED AT $25.11 A MONTH PLEASE MAKE ALL CHECKS PAYABLE TO: •CBG WATER: $372.31 FOR WATER METER HOOKUP •DESERT VIEW TRUST: $350 CLOSING COSTS •MOUNTAIN RANGE CORPORATION: FOR DOWN PAYMENT INTEREST & PRINCIPLE 30 YR. OPEN CONTRACT (360) $420.00 20 YR. OPEN CONTRACT (240) PURCHASER IS RESPONSIBLE FOR THE INSTALLATION COST OF THE YARD LINES FOR WATER, ELECTRIC, SEPTIC & NATURAL GAS. PURCHASER IS ALSO RESPONSIBLE FOR CHARGES FOR UTILITY DEPOSITS. AT THE TIME THE SEPTIC TANK IS INSTALLED, YOU CAN REQUEST AN RV DUMP OUTLET BE INSTALLED, COST IS YOUR RESPONSIBILITY. THE DIFFERENCE IS PAID TO DELARA ESTATES AND WE PAY THE CONTRACTOR ON YOUR BEHALF. ANY MODULAR HOME MUST BE NO OLDER THAN 10 YEARS AND FACTORY CONSTRUCTEDAND A MINIMUM OF 1200 SQUARE FEET OF ENCLOSED LIVING AREA AND DOUBLE WIDE IN CONSTRUCTION New!

Book club flyer - delaraestatesdelaraestates.com/uploads/tumbleweed_court_flyer.docx · Web viewLOAN PAYMENT$38.000.00 LAND ESCROWED AT $25.11 A MONTH PLEASE MAKE ALL CHECKS PAYABLE

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Book club flyer - delaraestatesdelaraestates.com/uploads/tumbleweed_court_flyer.docx · Web viewLOAN PAYMENT$38.000.00 LAND ESCROWED AT $25.11 A MONTH PLEASE MAKE ALL CHECKS PAYABLE

PRICE INCLUDES:

1000 GALLON SEPTIC TANK 5’ CHAINLINK FENCE CONPLETE WITH GATES NATURAL GAS TO FRONT OF PROPERTY UNDERGROUND ELECTRIC TO THE FRONT OF THE

PROPERTY TELEPHONE TO FRONT OF THE PROPERTY CABLE TV & HIGH SPEED INTERNET ACCESS TO FRONT

OF PROPERTYTOTAL NEEDED:

WATER HOOK-UP $350.00 N.M. TAX 2 6.2500% $22.31 TOTAL WATER $372.31 DOWN PAYMENT $995.00 CLOSING COST $350.00 TOTAL NEEDED $1,717.31

NMED SEPTIC PERMIT $100.00DAC MHIP INSTALLATION PERMIT $100.00DAC DRIVEWAY PERMIT $20.00PAPERWORK & CLOSING COSTS $100.00FILING FEES $30.00TOTAL CLOSING COSTS $350.00

3/4 ACRE LOT FOR $38.992.00

PAYMENTS @ 12% INTEREST FIXED

DOWN PAYMENT $995.00

LOAN PAYMENT $38.000.00

LAND ESCROWED AT $25.11 A MONTH

PLEASE MAKE ALL CHECKS PAYABLE TO:•CBG WATER: $372.31 FOR WATER METER HOOKUP•DESERT VIEW TRUST: $350 CLOSING COSTS•MOUNTAIN RANGE CORPORATION: FOR DOWN PAYMENT

INTEREST & PRINCIPLE30 YR. OPEN CONTRACT (360) $420.0020 YR. OPEN CONTRACT (240) $448.5215 YR. OPEN CONTRACT (180) $486.1710 YR. OPEN CONTRACT (120) $575.30

PURCHASER IS RESPONSIBLE FOR THE INSTALLATION COST OF THE YARD LINES FOR WATER, ELECTRIC, SEPTIC & NATURAL GAS. PURCHASER IS ALSO RESPONSIBLE FOR CHARGES FOR UTILITY DEPOSITS.

AT THE TIME THE SEPTIC TANK IS INSTALLED, YOU CAN REQUEST AN RV DUMP OUTLET BE INSTALLED, COST IS YOUR RESPONSIBILITY. THE DIFFERENCE IS PAID TO DELARA ESTATES AND WE PAY THE CONTRACTOR ON YOUR BEHALF.

ANY MODULAR HOME MUST BE NO OLDER THAN 10 YEARS AND FACTORY CONSTRUCTEDAND A MINIMUM OF 1200 SQUARE FEET OF ENCLOSED LIVING AREA AND DOUBLE WIDE IN CONSTRUCTION WITH A MINIMUM WIDTH OF 24 FEET AND PLACED ON A PERMANENT FOUNDATION.

New!