Boot Key Boundary Amendment Proposed by The City of Marathon Acquisition and Restoration Council December 9 and 10, 2010 Presented by Muller and Associates, Inc.

Boot Key Boundary Amendment Proposed by The City of Marathon

  • Upload
    magnar

  • View
    24

  • Download
    2

Embed Size (px)

DESCRIPTION

Boot Key Boundary Amendment Proposed by The City of Marathon. Acquisition and Restoration Council December 9 and 10, 2010 Presented by Muller and Associates, Inc. Boot Key Highlights. Renowned fall raptor migration site – average single-day counts of almost 800 raptors - PowerPoint PPT Presentation

Citation preview

Page 1: Boot Key Boundary Amendment Proposed by  The City of Marathon

Boot Key Boundary AmendmentProposed by

The City of Marathon

Acquisition and Restoration CouncilDecember 9 and 10, 2010

Presented by Muller and Associates, Inc.

Page 2: Boot Key Boundary Amendment Proposed by  The City of Marathon
Page 3: Boot Key Boundary Amendment Proposed by  The City of Marathon
Page 4: Boot Key Boundary Amendment Proposed by  The City of Marathon
Page 5: Boot Key Boundary Amendment Proposed by  The City of Marathon

Boot Key Highlights

• Renowned fall raptor migration site – average single-day counts of almost 800 raptors– FWC Wildlife Viewing Area– Important Bird Area

• Habitat for at least 21 imperiled species (3 state-listed animals, 12 state-listed plants)

• Tropical hardwood hammock (rockland hammock), coastal berm/beach dune (S2 rank)

Page 6: Boot Key Boundary Amendment Proposed by  The City of Marathon

Boot Key Highlights

• Adjacent to Florida Keys National Marine Sanctuary

• Complements conservation/education/ historical facilities

• Adjacent to Florida Keys Overseas Paddling Trail

• Potential side-trip for the Florida Keys Overseas Heritage Trail

Page 7: Boot Key Boundary Amendment Proposed by  The City of Marathon
Page 8: Boot Key Boundary Amendment Proposed by  The City of Marathon
Page 9: Boot Key Boundary Amendment Proposed by  The City of Marathon

Boundary Amendment

• Will allow 100% conservation ownership and management of island, after purchase of critical ownership (Yampol)

• Provide gateway to island for public access (essential since bridge was removed)

• City of Marathon will manage the island, in cooperation with FWC

Page 10: Boot Key Boundary Amendment Proposed by  The City of Marathon

CELCP NOAA Funding

• 50/50 cost share federal/state and local funding - Coastal and Estuarine Land Conservation Program (CELCP), administered by the National Oceanic and Atmospheric Administration (NOAA)

• Boot Key ranked sixth in the nation on the preliminary priority list of projects eligible for CELCP funding, well within the anticipated funding

Page 11: Boot Key Boundary Amendment Proposed by  The City of Marathon

CELCP NOAA Funding

• Florida’s guidelines - projects proposed for CELCP must be on the Florida Forever/Board of Trustees acquisition list.

• The City of Marathon worked with the Florida Department of Environmental Protection Coastal Management Program to prepare the Boot Key application.

Page 12: Boot Key Boundary Amendment Proposed by  The City of Marathon
Page 13: Boot Key Boundary Amendment Proposed by  The City of Marathon

State/Keys Cooperative Agreement

• >>date, agreement, amt Marathon committed