2
SUBSEA HANDLING EQUIPMENT BOP CHAIN HOISTS BOP Chain Hoists are often employed on Jack-ups to move and maintain the BOP Stack beneath the cantilever. Working as a pair, each chain hoist connects to the BOP Lift ring providing tandem lifts of up to 200 Tonnes. Each Hoist is mounted on runway beams suspended beneath the drill floor structure. Travel along each runway beam is via rack and pinion mechanisms on each hoist / Beam. The hoist lifting chains are dispensed from a chain bucket by the hoist drive and reeved via idler sprockets over the lifting block assemblies. Each hoist can be operated independently, and used for BOP Stack Maintenance tasks. Typical Specification Safe working load: Up to 100 Te per hoist Hoist speed: Up to 1.1m/min Travel speed: Up to 6m/min Chain safety factor: 5:1 Type of control: Deck mounted or hanging pendant DESIGNED & CONSTRUCTED TO OPERATE IN ZONE 1 & SAFE AREAS

BOP Chain Hoists

Embed Size (px)

DESCRIPTION

Carrinho de movimentação BOP offshore, sistema controlado através de sistema eletro-hidráulico acionado remotamente pelo toolpusher, para movimentar e montar o BOP em cima do LMRP.

Citation preview

  • SUBSEA HANDLING EQUIPMENT

    BOP CHAINHOISTS

    BOP Chain Hoists are often employed on Jack-ups to move and maintain the BOP Stack beneath thecantilever. Working as a pair, each chain hoist connects to the BOP Lift ring providing tandem lifts of up to200 Tonnes.

    Each Hoist is mounted on runwaybeams suspended beneath thedrill floor structure.Travel along each runway beamis via rack and pinion mechanismson each hoist / Beam. The hoist liftingchains are dispensed from a chain bucketby the hoist drive and reeved via idler sprocketsover the lifting block assemblies.

    Each hoist can be operated independently, and used for BOPStack Maintenance tasks.

    Typical Specification

    Safe working load: Up to 100 Te per hoist

    Hoist speed: Up to 1.1m/min

    Travel speed: Up to 6m/min

    Chain safety factor: 5:1

    Type of control: Deck mounted or hangingpendant

    DESIGNED & CONSTRUCTEDTO OPERATE IN ZONE 1 & SAFE AREAS

  • Block 1, Units 3-7Souterhead RoadAltensAberdeen AB12 3LF Scotland UKT: +44 (0) 1224 249355F: +44 (0) 1224 249339E: [email protected]

    1424 West Sam Houston Parkway NorthSuite 140HoustonTexas 77043 USAT: +1 713 468 5325F: +1 713 468 3498E: [email protected]

    65 Victoria RoadGuiseleyLeedsLS20 8DQEngland UKT: +44(0)1943 870 822E: [email protected]

    11c Tuas RoadSingapore638509T: +65 6794 5261E: [email protected]

    www.efcgroup.net

    PRODUCT NAMEHERE

    Wire Rope Hoists are sometimesused on jack-ups for handling the BOPStack. These systems are mounted on parallel runwaybeams which span the cantilever.

    Trolleys traverse each runway beam via rack andpinion, carrying lifting blocks and reeving arrangements above to suit.The winches are mounted at fixed points on the end of each runwaybeam and reeved around sheaves at the opposite end of each runwaybeam. Spool-geared diverter sheave arrangements may be employedwhere headroom is limited to ensure rope fleet angles are within limitsand rope life is preserved.

    The parallel wire rope hoisting arrangements provide tandem lifts of upto 100 Tonnes, using the BOP's lifting arrangement / lift ring

    Typical Specification

    Capacity: 2 x 45 Tonnes*

    Number of ropes: 2 ropes per winch

    Number of falls: 4 falls per rope*

    Rope safety factor: 5:1

    Winch & Travel: Hydraulic drives

    Travel speed : 0 to 5 m/min

    Hoist speed: 0 to 4.5m/min

    Travel and hoist limits: Hydraulic or electric

    [*Higher capacities available with additionalfalls of rope and slower hoisting speeds]

    SUBSEA HANDLING EQUIPMENT

    WIRE ROPE BOPHOISTS