Bill No-1: Class Room + Administration Bldg (A) 1/2-1 SITE WORKS
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 2 - SITE WORKS
Section 02315Earth Work
Excavation and Backfilling
2.1 M3 13308 2.250
Compacted fill
2.2 L.S L.S 6000.000
Section 02360Termite Control
2.3 L.S L.S 1500.000
Excavation for foundation in any type of soil even rock, up to required height including backfilling, shoring (if required), dewatering and removing of surplus excavated material from site to a place approved by the Municipality. Mechanical excavation shall be stopped 300mm above the Foundation level and completed manually.
Filling inside building (under slab on grade etc.) as per proposed levels, with approved quality imported filling material. Filling shall be compacted in layers (each layer shall not be more than 250mm thick) and compaction shall not be less than 98% of dry density. Selected excavated material may be used for filling but as per approval of the Engineer.
Termilte Control/Soil treatment for the whole building area all as described
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/2-2 SITE WORKS
Total Carried to CollectionITEM DESCRIPTION
DIVISION 2 - SITEWORKS
COLLECTION
Page No. 2-1
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/2-3 SITE WORKS
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/2-4 SITE WORKS
AMOUNTKD
29943.000
6000.000
1500.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/2-5 SITE WORKS
37443.000
AMOUNTKD
37,443.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/2-6 SITE WORKS
37,443.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-7 CONCRETE
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 3 - CONCRETE
Section 03300 Cast-in-place Concrete
Plain Concrete
3.1
3.1.1 100 mm thick under Foundation M2 1,400 3.500
3.1.2 50 mm thick under Ground beam & External steps M2 710 2.200
Reinforced Concrete
3.2
3.2.1 Foundation: Col/Wall Footings etc. M3 785 95.500
3.2.2 Column/wall Neck M3 190 100.000
3.2.3 Ground Beam, External Steps/ramp etc. M3 345 95.000
3.2.4 M2 3,930 7.250
3.3
3.3.1 Walls M3 698 95.000
3.3.4 Lintels, sills, bond beam etc. M3 93 98.000
Plain concrete grade using sulphate resisting cement including all form work and laid as described (smooth face)
Vibrated reinforced concrete using sulphate resisting cement filled into formwork and tamped around reinforcement including all formwork, tie bolts and reinforcement etc. complete as described (Fair finish for all exposed faces)
150mm thick slab on grade with turn down slab/edge thicnessing and including Isolation joints (with celotex and mastic fill). Construction joints shall be provided in case bay area is more than 25 m2.
Vibrated reinforced concrete using ordinary portland cement, filled into form work and tamped around reinforcement including all formwork, reinforcement etc. complete as described. (Fair finish for all exposed faces)
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-8 CONCRETE
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
Section 03530 Concrete Topping
3.4 M2 11821 5.000
Section 03410Plant Pre-cast Structural Concrete.
3.5
3.5.1 Design, suplly and fixation of precast concrete columns. L.S. L.S. 98,650.000
3.5.2 L.S. L.S. 205,450.000
3.5.3 L.S. L.S. 201,450.000
Minimum 50mm thick concrete topping with mesh reinforcement (Y8/200mm both direction)and laid over hollow core slab in proper shape with required expansion, construction and contraction joints. (K-300)
Vibrated precast prestressed reinforced concrete with compressive strenght of 48Mpa (Cube strenght) using Ordinary portland cement finished fairface on all exposed surfaces including all formwork, reinforcemet, tension wires anchorage, lifting hooks, hoisting, placing in position, bedding neoprene bearing pads, perimeter gaskets, sealent, shims, dowels and connections all as specified
Note : The dimensions mention below are as per the drawings, and the dimensions shown in the drawings are for guidance only, It is contractor's responsibility to design all the precast concrete element, and all connections and accessories as specified.
The slab system shown in the drawing (Hollow core system) is for guide line only, The contractor to design complete slab system as hollow core system or Double T (TT) System, after consideration of all services passing fron the ceiling and take the approval from Engineer before commencing of the work.
Design, suplly and fixation of rectangular beams, edge beams, spine beams.
Design, suplly and fixation of hollow core or Double TT, slab system.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-9 CONCRETE
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
3.5.4 Design, suplly and fixation of all staircases. L.S. L.S. 20,000.000
3.5.5 Design, suplly and fixation of parapet. M3 160 85.000
Section 03455Glass Reinforced Concrete (GRC)
3.6 Decorative GRC panels over Stair windows M2 112 24.000
Section 03550 Concrete Screed
3.7 M2 215 7.500
Precast GRC panel fixed over external wall including galvanized steel support, anchors, dowels etc. complete as described
Approx. 100mm thick smooth surface sand cement and thin gravel screed with steel wiremesh (6mm dia @ 200mm c/c) all as described.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-10 CONCRETE
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-11 CONCRETE
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 3 - CONCRETE
COLLECTION
Page No. 3-1
Page No. 3-2
Page No. 3-3
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-12 CONCRETE
AMOUNTKD
4900.000
1562.000
74967.500
19000.000
32775.000
28492.500
W1
66310.000###
9114.000###
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-13 CONCRETE
237121.000
AMOUNTKD
59,105.000
98,650.000
###
205,450.000
###
201,450.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-14 CONCRETE
###
564655.000
AMOUNTKD
20,000.000
13,600.000
2,688.000
1,612.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-15 CONCRETE
37900.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/3-16 CONCRETE
AMOUNTKD
237121.000
564655.000
37900.500
839,676.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/4-17 MASONRY
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 4 - MASONRY
Section 04200Unit Masonry
4.1
4.1.1 400 mm thick wall M2 72 12.250
4.1.2 300 mm thick wall M2 10 8.750
4.1.3 250 mm thick wall M2 75 7.300
4.1.4 200 mm thick wall M2 3,152 7.000
4.1.5 150 mm thick wall M2 5,480 5.250
4.1.6 100 mm thick wall M2 487 4.250
Sand Lime Bricks
4.2 M2 1990 7.000
Section 04225Light Weight Concrete Unit Masonry
4.3
4.3.1 200 mm thick wall M2 3,567 8.750
Solid concrete block wall bedded in sand cement motar with gavanized steel ties including scaffolding up to any height etc. complete as described.
Sand lime bricks size 290 x 90 x 45cm Standard 34. Malaki from National Industries Company or equally approved (Colour to be as per the approval of Engineer In-Charge) bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.
Light weight concrete block wall bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.(External wall)
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/4-18 MASONRY
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
DIVISION 4 - MASONRY
COLLECTION
Page No. 4-1
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/4-19 MASONRY
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/4-20 MASONRY
AMOUNTKD
882.000
87.500
547.500
22064.000
28770.000
2069.750
13930.000
31,211.250
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/4-21 MASONRY
99562.000
AMOUNTKD
99562.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/4-22 MASONRY
99,562.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-23 METAL
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 5 - METALS
Section 05500 Metal Fabrication
5.1 Steel Railing
5.1.1 MR 205 18.700
5.1.2 MR 55 19.800
5.1.3 MR 42 12.100
Access/Cat ladder:
5.2
5.2.1 Cat ladder 3750 mm high (approx.) Nos 6 121.000
5.2.2 Cat ladder 4650 mm high (approx.) Nos 2 154.000
Total Carried to Collection
900mm high steel pipe railing fixed over concrete with 25mm dia vertical steel post, 3 rows of 25mm dia horizontal steel pipe rail and 50mm dia steel pipe hand rail including anchors, dowels, fixing accssories and approved quality primer and alkyd paint etc. complete as described over Stairs
1000mm high steel pipe railing around openings fixed over concrete with 25mm dia vertical steel post and 50mm dia steel pipe hand rail including - ditto
200mm high steel pipe railing fixed over concrete over balconies with 25mm dia vertical steel post and 100mm dia steel pipe hand rail including - ditto.
Steel access ladder comprising 32 mm Dia.tubular section, stringer 25mm dia tubular sections rungs at 300mm centres including wall struts, welding, bolting, removable galvanized steel chain barrier and fixing to structure, the item include application of primer and akyd paint to the required thickness, overall height as shown in the drawings for different areas at roof level.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-24 METAL
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
Steel shed over roof water tank
5.3 L.S. L.S. 1760.000
Section 05810 Expansion Joints and Cover Assemblies
5.4 L.S. L.S. 20000.000
Design, fabricate and install steel shade over roof water tank. Contractor shall provide designed working/shop drawings for Engineer's approval
20mm wide expansion joint for footings, columns, beams, slabs, walls etc. horizontally and vrtically using bitumen impregnated joint filler including 20x20mm approved quality mastic/sealant over exposed joint face and covered the exposed faces of joints with 30mm thick aluminium cover plate including all accessories complete as described
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-25 METAL
Total Carried to CollectionITEM DESCRIPTION
DIVISION 5 - METALS
COLLECTION
Page No. 5-1
Page No. 5-2
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-26 METAL
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-27 METAL
AMOUNTKD
3833.500
1089.000
508.200
726.000
308.000
6464.700
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-28 METAL
AMOUNTKD
1760.000
20000.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-29 METAL
21760.000
AMOUNTKD
6464.700
21760.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/5-30 METAL
28,224.700
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/6-31 WOOD AND PLASTIC
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 6 - WOOD AND PLASTICS
Section 06200Finish Carpentary
6.1 MR 405 13.000Preaperation and fixing of two wooden stripes parallel to each other of white wood having the size 25 x 100 mm each.( fixing on the walls other than which is having marker board)
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/6-32 WOOD AND PLASTIC
Total Carried to CollectionITEM DESCRIPTION
DIVISION 6 - WOOD AND PLASTICS
COLLECTION
Page No. 6-1
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/6-33 WOOD AND PLASTIC
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/6-34 WOOD AND PLASTIC
AMOUNTKD
5265.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/6-35 WOOD AND PLASTIC
5265.000
AMOUNTKD
5265.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/6-36 WOOD AND PLASTIC
5,265.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-37 TH AND MOIST PROTECTION
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 7 - TH. & MOIST. PROTECTION
Section 07110Sheet Membrane Waterproofing
7.1 Polythylene sheet 1000 gauge under slab on grade M2 3930 0.550
7.2 L.S L.S 6750.000
Section 07140Fluid Applied Waterproofing
7.3 M2 220 0.800
Section 07110 & 07140
Waterproofing System (Toilets & Kitchen)
7.4
7.4.1 Two coats of fluid applied waterproofing paint M2 345 0.800over concrete floor and wall
7.4.2 130-150mm thick foam concrete fill M2 345 1.950
7.4.3 20 mm thick sand cement screed M2 345 0.950
7.4.4 4 mm thick waterproofing membrane M2 345 2.000
7.4.5 2 cm sand cement screed M2 345 0.950
4mm thick waterproofing membrane under, over and around foundation concrete elements contact in soil with 6mm thick protection board over vertical surfaces including 50mm thick horizontal protection screed below foundation bed all as per MPW specificaions
Rubberized waterproofing paint over external wall along stone cladding
Under tiling in wet areas (Toilets and Kitchen) including dressing up walls, which shall be including.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-38 TH AND MOIST PROTECTION
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
Section 07500 (Composite Roofing System)(Section 03520, 07110, 07140, 07200, 07320)
7.5
7.5.1 2 coats of fluid applied w.p. paint over concrete roof M2 3140 0.950
7.5.2 M2 3140 2.000
7.5.3 M2 3140 1.250
7.5.4 M2 3140 3.850
7.5.5 M2 3140 0.950
7.5.6 75 mm thick extruded polysterene insulation M2 3140 3.100
7.5.7 Filter fabric M2 3140 0.200
7.5.8 M2 3140 3.850
Section 07840Fire Stopping
7.6 L.S L.S
Roof Waterproofing System including testing and guarantee of the roofing system for any water leakage all as per specifications and Engineer's approval.
50-150mm thick lightweight concrete, 600 kg/m3 density with ordinary portland cement laid to falls and cross falls.
20mm thick cement sand screed (1:3) mortar laid over light weight concrete bed.
Two layer of 4mm thick membrane roofing including 350-450 mm girth laid over roof with primer
20mm thick cement sand screed (1:3) mortar laid over WP membrane
400x400x40mm Cement tile and 400x150x40mm skirting bedded in cement and sand mortar and laid over roof in 2.80x2.80m bay with 10cm wide gravel/aggregate strip filled with selected gravel at both direction all as per Engineer's approval and as described
Fire stopping over all openings around the perimeter of Fire Zone as described.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-39 TH AND MOIST PROTECTION
Total Carried to CollectionITEM DESCRIPTION
DIVISION 7 - THERMAL & MOIST.PROTECTION
COLLECTION
Page No. 7-1
Page No. 7-2
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-40 TH AND MOIST PROTECTION
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-41 TH AND MOIST PROTECTION
AMOUNTKD
2161.500
6750.000
176.000
276.000
672.750
327.750
690.000
327.750
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-42 TH AND MOIST PROTECTION
11381.750 AMOUNT
KD
2983.000
6280.000
3925.000
12089.000
2983.000
9734.000
628.000
12089.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-43 TH AND MOIST PROTECTION
50711.000
AMOUNTKD
11381.750
50711.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/7-44 TH AND MOIST PROTECTION
62,092.750
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-45 DOORS AND WINDOWS
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVSION 8 - DOORS AND WINDOWS
Section 08110Metal Door and frame
8.1
8.1.1 Door Type FD1, size 1100x2200mm Nos 6 190.000
8.1.2 Door Type FD2, size 2000x2200mm Nos 7 420.000
8.1.3 Door Type FD3, size 1800x2200mm Nos 10 410.000
8.1.4 Door Type D02, size 2000x2200mm Nos 6 430.000
8.1.5 Door Type D03, size 1000x2200mm Nos 13 190.000
Section 08210, 06100,06200Wood door and Frame, Rough Carpentry
Finish Carpentry
8.2
8.2.1 Door Type D01, size 1100x2200mm Nos 52 240.000
8.2.2 Door Type D04, size 1000x2200mm Nos 37 233.000
8.2.3 Door Type D05, size 1000x2200mm Nos 38 233.000
8.2.4 Door Type D07, size 1100x2200mm Nos 6 240.000
8.2.5 Door Type D10, size 1800x2200mm Nos 5 430.000
8.2.6 Door Type D16, size 1100x2200mm Nos 18 240.000
8.2.7 Door Type D17, size 1000x2200mm Nos 6 233.000
8.2.8 Door Type D20, size 800x2200mm Nos 13 226.000
Hollow metal door and frame with all required weather sealing, fixing accessories, sealant with backup rod and fixing to concrete or block wall including required fire rating, glazing and Hardware etc. complete as described
Solid core flush timber teak veneered doors hanging to wood frames, fixed to concrete or block, including sub-frames/timber packings and fixings etc. complete as described. The item includes frames, finishes, Glazing, Fire Rating, Hardware etc., complete as described
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-46 DOORS AND WINDOWS
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
Section 08520Aluminum Doors and Windows
8.3 Aluminium Door:
8.3.1 Door Type D06, size 1800x2200mm Nos 8 320.000
8.3.2 Door Type D08, size 1100x2200mm Nos 6 205.000
8.3.3 Door Type D11, size 7100x2200mm No 1 1313.000
8.3.4 Door Type D12, size 11800x3000mm Nos 2 2677.000
8.3.5 Door Type D13, size 1100x2200mm Nos 2 247.000
8.3.6 Door Type D14, size 3200x2200mm Nos 4 588.000
8.3.7 Door Type D15, size 3800x2200mm Nos 6 704.000
8.3.8 Door Type D18, size 1800x2200mm Nos 2 325.000
8.3.9 Door Type D19, size 2000x2200mm Nos 22 320.000
8.3.10 Door Type D21, size 1600x2200mm Nos 2 294.000
Notes: Door D09 included in the toilet partition, Div-10
8.4 Aluminium Windows
8.4.1 Window Type W01, size 1600x1600mm Nos 24 315.000
8.4.2 Window Type W02, size 25700x1600mm Nos 3 3360.000
Powder coated extruded section aluminium Doors and Windows including glazing as required, frames, fly screens, mullions, loacation angles, shims and plates, heads, sills and jambs, glazing and glazing beads, weather stripping, caulking, pointing, sealing, sub frames, all hard ware, etc. complete and fixing to concrete or block work as described.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-47 DOORS AND WINDOWS
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD8.4.3 Window Type W03, size 3200x1600mm Nos 8 677.000
8.4.4 Window Type W04, size 3200x700mm Nos 6 340.000
8.4.5 Window Type W05, size 4800x1600mm Nos 65 782.000
8.4.6 Window Type W06, size 21500x1600mm Nos 1 2835.000
8.4.7 Window Type W07, size 1600x1600mm Nos 12 195.000
8.4.8 Window Type W08, size 800x1600mm Nos 8 100.000
8.4.9 Window Type W09, size 2550x1600mm (internal) Nos 4 368.000
8.4.10 Window Type W12, size 2000x1200mm (internal) No 1 184.000
8.4.11 Window Type W13, size 7100x2200mm (internal) No 1 1240.000
Section 08600Skylight
8.5
8.5.1 Skylight size 4000x1000mm, Type W10 Nos 2 1890.000
8.5.2 Skylight size 7300x1500mm, Type W11 No 1 7500.000
Shutter
8.6 SH01 4800 x 3750mm No 1 2000.000
Aluminum framed double glazed skylight with complete waterproof installation
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-48 DOORS AND WINDOWS
Total Carried to CollectionITEM DESCRIPTION
DIVISION 8 - DOORS AND WINDOWS
COLLECTION
Page No. 8-1
Page No. 8-2
Page No. 8-3
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-49 DOORS AND WINDOWS
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-50 DOORS AND WINDOWS
AMOUNTKD
1140.000
2940.000
4100.000
2580.000
2470.000
12480.000
8621.000
8854.000
1440.000
2150.000
4320.000
1398.000
2938.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-51 DOORS AND WINDOWS
55431.000
AMOUNTKD
2560.000
1230.000
1313.000
5354.000
494.000
2352.000
4224.000
650.000
7040.000
588.000
7560.000
10080.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-52 DOORS AND WINDOWS
43445.000
AMOUNTKD
5416.000
2040.000
50830.000
2835.000
2340.000
800.000
1472.000
184.000
1240.000
3780.000
7500.000
2000.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-53 DOORS AND WINDOWS
80437.000
AMOUNTKD
55431.000
43445.000
80437.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/8-54 DOORS AND WINDOWS
179,313.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-55 FINISHES
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 9 - FINISHES
Section 09200Lath and plaster
9.1 M2 20,360 2.250
Section 09260Gypsum Board
9.2 M2 250 6.500
Section 09310Ceramic Tiles
9.3
9.3.1 M2 345 7.000
9.3.2 M2 1,236 7.500
9.3.3 M2 6,876 7.000
20mm thick cement and sand plaster (with mesh fabric) applied to internal wall and ceiling, stairs and shafts (concrete or block wall) including under coat, metal lath, corner beads, stop beads etc. complete as described.
100 mm thick and 2200mm high metal stud partition comprising 12.5 mm thick waterproof quality gypsum wall board on both sides with sound attenuation blanket including metal furring channels, head and sill runners, caulking, leveling shims etc. all as described
Non slip ceramic floor tiles on and including cement & sand setting bed, sand cushion and joints grouted in waterproof grout over concrete floor all as described.
(Prime cost for all the ceramic are 2.5 KD/M2, similar to L& M artificial marble tiles ,Eagle ceramic tiles or equally approved, sizes mention here are only for reference , contrcator can use standard sizes of ceramic)
Non-slip decorative ceramic tile for wet areas, type CT1, size 600x600x10mm
Acid resistant ceramic tile, type CT2, size 600x600x10mm
Non-slip decorative ceramic tile with border, type CT4 & CT7, size 600x600x10mm
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-56 FINISHES
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
9.3.4 Ditto-but with pattern and different color for Corridoors M2 240 7.250
9.3.5 M2 553 6.500
9.4 Ceramic Skirting - Ditto
9.4.1 Coved ceramic skirting, 600x100x10mm MR 3,475 2.000
9.4.2 Coved ceramic skirting, 300x100x9mm MR 442 2.500
9.5
9.5.1 M2 1,270 5.150
9.5.2 300x300x6mm ceramic tile with border for wet areas M2 1,375 5.500
9.5.3 Ditto but for laboratory areas (acid resistant) M2 1,665 6.000
9.5.4300x300x 6mm ceramic tile for storage areas at F.F
M2 154 5.150
Section 09420Terrazzo
9.6 M2 500 6.000
9.7 MR 362 3.500
Non-slip ceramic tile, type CT5 for store and service area, size 300x300x9mm
Wall ceramic tiles fixed on concrete or block work on and including cement and sand backing and joints grouted in waterproof grout, all as described.
300x300x6mm ceramic tile over corridor wall 1200mm high
Precast Terrazzo floor tile, size 300x300x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described
Precast Terrazzo Skirting, size 300x100x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-57 FINISHES
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KDSection 09510
Acoustic tile Ceiling
9.8 M2 216 6.000
Section 09513Metal Suspended Ceiling
9.9 M2 345 8.500
Section 09260, 09535
Gypsum Board Ceiling / Acoustic tile Ceiling
9.10 M2 8,755 7.500
Section 09260Glass Fiber Reinforced Gypsum (GRG) Ceiling
9.10 GRG Ceiling
9.10.1 M2 220 6.000
Section 09260
Gypsum Board Ceiling
9.10.2 M2 695 6.500
Acoustic tile ceiling, size 600x1200x15mm including all frame work, suspension system, access panels etc. complete as described
Metal tile / ribed crrugated sheet with anti bacterial paint ceiling including all frame work, suspension system, access panels etc. complete as described for wet areas
Combination of 12.5mm thick Gypsum board ceiling with emulsion paint finish and 600x600x15mm acoustic tile ceiling including all frame work, suspension system, access panels etc. complete as described
20mm thick Decorative GRG ceiling with emulsion paint finish including all frame work, suspension system, access panels etc. complete as described
12.5mm thick waterproof qualityGypsum board ceiling with waterproof paint for wet areas all as shown and described.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-58 FINISHES
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KDSection 09600
Granite & Marble
9.11 Stone & Marble:
9.11.1 MR 51 15.000
9.11.2 M2 120 35.000
9.11.3 M2 395 20.000
9.11.4 MR 960 13.000
9.11.5 MR 547 5.000
9.11.6 30mm thick Italian carrara marble threshold MR 36 4.000
9.11.7 Nos 6 750.000
9.11.8 Ditto- but 1200mm with 1 Bowl No 1 160.000
9.11.9 Ditto- but1900mm with 2 Bowl No 1 250.000
Section 09680
Carpet Tiles
Natural Granite steps for external entrances, 30mm thick and 300mm wide Treadx 20mm thick and 160mm high Riser all as described.
3cm thick granite flooring tiles for Main & Rear Entrances, type M-5,
400x400x30mm thick Italian carrara marble tile for stair hall and landings
Italian carrara marble Steps, 30mm thick and 300mm wide Tread x 20mm thick and 160mm high Riser
Italian carrara marble Skirting for Stair, 160mm highx20mm thick
12mm thick synthetic marble (L.G. , Corrian or equally approved) wash basin counter fixed over galvanized steel supports including marble fascia, back spalsh, cut out for wash basin, all required accessories, sealant etc. complete as described. 30mm thickx600mm wide and 7220mm long with 7 Bowls
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-59 FINISHES
9.12 M2 225 7.000
Total Carried to Collection
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
Section 09710 , 09842 Acoustical Wall Panel /
Stretched fabric acoustic panels.
9.13 M2 520 46.000
Section 09800 Epoxy
9.14 M2 215 3.000
Section 09900Painting
9.15
9.15.1 Emulsion paint M2 13,140 1.200
9.15.2 Oil paint M2 4,065 1.300
9.15.3 M2 2,184 2.600
Carpet tiles laid over screed floor with approved quality additives. (screed measured separately )
Combination of acoustic wood panel and Proprietary make "Streched Fabric" Acoustic wall panel inside Seminar hall, Library/Office, Vocal room and instrument music including all fittings and accessories as decribed
(lower 1mt. Height from flooring wooden acoustic panel and fabric panels to be up to the ceiling from top of the wood panels)
Epoxy finish over screed, Type CO-2 (Screed measured separately in Div-3) min 300 micron dry thick
Prepare and apply 3 coats paint of approved colour over plastered surface (wall and ceiling) including preparation of surfaces, undercoat, sealcoat etc. complete as described
Texture paint system as specified including two coats of Polyurethane protection layers (NIC texture paint system or equally approved)..
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-60 FINISHES
Total Carried to Collection
ITEM DESCRIPTION
DIVISION 9 - FINISHES
COLLECTION
Page No. 9-1
Page No. 9-2
Page No. 9-3
Page No. 9-4
Page No. 9-5
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-61 FINISHES
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-62 FINISHES
AMOUNTKD
45810.000
1625.000
2415.000
9270.000
48132.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-63 FINISHES
107252.000
AMOUNTKD
1740.000
3594.500
6950.000
1105.000
6540.500
7562.500
9990.000
793.100
3000.000
1267.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-64 FINISHES
42542.600
AMOUNTKD
1296.000
2932.500
65662.500
1320.000
4517.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-65 FINISHES
123331.200
AMOUNTKD
765.000
4200.000
7900.000
12480.000
2735.000
144.000
4500.000
160.000
250.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-66 FINISHES
1575.000
34709.000
AMOUNTKD
23920.000
645.000
15768.000
5284.500
5678.400
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-67 FINISHES
27375.900
AMOUNTKD
107252.000
42542.600
123331.200
34709.000
27375.900
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/9-68 FINISHES
335,210.700
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-69 SPECIALITIES
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 10 - SPECIALTIES
Section 10100Visual Display Board
10.1
10.1.1 Nos 50 50.000
10.1.2 Nos 22 50.000
10.1.3 Nos 100 30.000
10.1.4 Nos 48 30.000
Section 10170Toilet Partition/Cubicle
10.2
10.2.1 Nos 12 1700.000
Section 10651Operable Panel Partition
10.3 Nos. 4 2400.000
Wall mounted marker board and tack board with silver anodising frame with plastic rounded corners, elegant alluminium tray ,fixing etc. complete as described
Marker board having the size 2.5 mt x 1.25 mt for general class room
Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop
Marker board having the size 1.30 mt x 1.25 mt for general class room.
Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop.
Proprietary make Plastic toilet partition, cubicles including doors, front panels, divisions, end panels with all required hardware and accessories as described.
Toilet partition/cubicle 13mm thick with five (5) doors, size 12750x2200mm (Door TypeD09)
Proprietary make "Manually Operated" Operable Partition over Class room, size 8500x3500m including all fittings, accessories and hardware all as described.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-70 SPECIALITIES
Total Carried to Collection
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
Section 10800Toilet Accessories
10.4
10.4.1 Waste Receptacle (WR) Nos 76 40.000
10.4.2 Toilet Paper Dispenser (TPD) recessed Nos 70 15.000
10.4.3 Paper Towel Dispenser (PTD) Nos 22 12.000
10.4.4 Robe Hook (RH) Nos 70 10.000
10.4.5 Soap Dispenser Vertical (SDV) wall mounted Nos 39 10.000
10.4.6 St.steel framed mirror (FM), size 7600x900mm Nos 6 300.000
10.4.7 Ditto but size 1870x900mm No 1 120.000
10.4.8 St.steel framed mirror (FM), size 700x1000mm Nos 10 75.000
10.4.9 St.Steel Grab Bar (GB) Nos 52 2.500
10.4.10 Folding Shower Seat (FSS) No 1 200.000
10.4.11 Utility Shelf, Mop and Broom Holder (MH) Nos 6 10.000
10.4.12 Hot Air Dryer (HD) Nos 6 135.000
Supply and fix toilet accessories including all component parts, assembling, plugging, screwing or otherwise fixing and making good all as described.
Notes: Flexible hose with spray nozzle included with WC in Div-15, Mechanical
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-71 SPECIALITIES
Total Carried to CollectionITEM DESCRIPTION
DIVISION 10 - SPECILITIES
COLLECTION
Page No. 10-1
Page No. 10-2
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-72 SPECIALITIES
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-73 SPECIALITIES
AMOUNTKD
2500.000
1100.000
3000.000
1440.000
20400.000
9600.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-74 SPECIALITIES
38040.000
AMOUNTKD
3040.000
1050.000
264.000
700.000
390.000
1800.000
120.000
750.000
130.000
200.000
60.000
810.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-75 SPECIALITIES
9314.000
AMOUNTKD
38040.000
9314.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/10-76 SPECIALITIES
47,354.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-77 FURNISHINGS
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 12 FURNISHINGS
Section 12357 Kitchen Casework/Cabinet
12.1
12.1.1 MR 12
12.1.2 Wall Unit size 400x600mm high - ditto MR 12
Section 12358Laboratory Casework
12.2 BASE CABINETS:
12.2.1 Base cabinet type CK055PHX Nos 240
12.2.2 Base cabinet type CD0455PHX Nos 64
12.2.3 Base cabinet type CB050PHX Nos 8
12.2.4 Base cabinet type CD050PHX Nos 4
Total Carried to Collection
Kitchen area base and wall units complete with double doors, adjustable shelves, sides, tops, bottoms, backs, skirting and all required accessories, hardware, fixings, components, support legs, sealing, plugging, screwing, making good, all as as per Engineer's approval.
Base unit size 600mm deep x 850mm high set in range including sink units with dustbin, shaped corner units and 3mm thick stainless steel top with cutout for sinks and recesses for appliances(Sink measured separately in Div-15, Mechanical.)
Supply and fix Laboratory Casework for Biology Lab 1 & 2, Geology Lab 1 & 2, Chemistry Lab 1 & 2 and Physics Lab 1 & 2, with all required fittings, weather sealing, fixing accessories, sealant with backup rod and fixing to concrete, block work or gypsum board including all required hardware and accessories as described.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-78 FURNISHINGS
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
12.2.5 Base cabinet type CA060PHX Nos 20
12.2.6 Base cabinet type CB060PHX Nos 6
12.2.7 Base cabinet type CA045PHX Nos 4
12.2.8 Base cabinet type CB045PHX Nos 14
WALL CABINETS:12.3 Wall cabinet type S2PND090-30 Nos 32
STORAGE CABINETS:12.4 Storage cabinet type Q2PND120-40 Nos 14
12.5 WORKTOP COUNTERS:12.5.1 Worktop counter type 16TRE60 MR 382
12.5.2 Worktop counter type 24MEL75 MR 9
12.6 SINK CABINETS:12.6.1 Sink cabinet type CS060PHX Nos 44
12.6.2 Sink cabinet type CS120PHX Nos 4
12.7 MISCELLANEOUS CABINETS/COUNTERS:12.7.1 Type KB46 Nos 70
12.7.2 Type COD028 Nos 70
12.7.3 Type LE2WP Nos 238
12.7.4 Type JCWSO Nos 14
12.7.5 Type PPSINK Nos 52
12.7.6 Type LMXSO Nos 40
12.7.7 Type LGISO Nos 32
FUME HOOD WITH BASIC CABINET:12.8 Type FC120 Nos 2
SAFETY SHOWER12.9 Type S&E Wash Nos 2
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-79 FURNISHINGS
Total Carried to CollectionITEM DESCRIPTION
DIVISION 12 FURNISHINGS
COLLECTION
Page No. 12-1
Page No. 12-2
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-80 FURNISHINGS
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-81 FURNISHINGS
AMOUNTKD
0.000
0.000
0.000
0.000
0.000
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-82 FURNISHINGS
AMOUNTKD
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-83 FURNISHINGS
0.000
AMOUNTKD
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/12-84 FURNISHINGS
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/14-85 CONVEYNG SYSTEM
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION 14- CONVEYING SYSTEM
Electrical Passenger Elevator.
14.1 Nos 2
14.2 LS LS
14.3 Nos. 4
14.4 LS LS
14.5 LS LS
14.6 Allow for builder’s works required for the elevator. LS LS
14.7 LS LS
14.8 LS LS
14.9 Allow for Lloyd’s approval certification LS LS
Supply, Install & Commissioning Duplex Electrical Passenger Elevator for 3 stops, 1600Kg. ( 21 Passengers) Loading capacity, Complete with all necessary requirement as per contract and Fire Brigade specification as shown on the drawing. Including Fire Brigade approval.
Allows for electrical works (power, control, fire alarm, etc.) associated with Elevators Equipments, and System, Including cabling, wiring, switching, elevator control panels with all accessories and all other related works as per specification and Kuwait Fire Brigade..
Emergency Diesel Generator 45 KW for Fire Brigade operation and in case of power failure complete with all accessories
Allow for interlocking the elevators control with the building managements system.
Any other item (s) not mentioned either above or in the specification but it’s necessary for the optimum operation of the system in according with the specification and Kuwait Fire Brigade requirements.
Allow for submitting shop working drawing, coordination drawing, builder works drawing, as-built drawing, operation & maintenance manual, etc.
Allow for testing & commissioning of the elevators in accordance with specification and Kuwait Fire Brigade including handing over to Kuwait Fire Brigade.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/14-86 CONVEYNG SYSTEM
Total Carried to CollectionITEM DESCRIPTION
DIVISION 14 CONVEYING SYSTEM
COLLECTION
Page No. 14-1
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/14-87 CONVEYNG SYSTEM
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/14-88 CONVEYNG SYSTEM
AMOUNTKD
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/14-89 CONVEYNG SYSTEM
0.000
AMOUNTKD
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/14-90 CONVEYNG SYSTEM
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-91 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
DIVISION - 15 MECHANICAL WORKSDRAINAGE
15.1
15.1.1 Dia 50mm MR 409 3.15015.1.2 Dia 75mm MR 170 4.20015.1.3 Dia 100mm MR 778 5.25015.1.4 Dia 150mm MR 433 8.400
15.2 Polished bronze rain water shoe
Dia 4" Nos 28 36.750
15.3
Dia 4" Nos 51 47.250
15.4
15.4..1 Dia 4" Nos 85 47.250
15.4.2 Dia 3" Nos 3 47.250
15.5 Vent Hood Caps15.5.1 Dia 4" Nos 2 15.750
The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price.
Include in price all adjustment required by code or as per coordination with other disciplines.
Contractor responsible to get approvals all authorities having jurisdictions for shop drawings.
Contractor must attach a breakdown analysis for lump sum items.
High density polyethylene tempered (HDPE) to DIN 19535 / 19637 and DIN 8075 drainage piping for underground and above ground drainage system in all aspect as specified.
Adjustable floor cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug, with nickel bronze top
Adjustable floordrain cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug,with nickel bronze top
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-92 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-93 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
15.6 GcoDia 6" Nos 1 47.250
15.7 Dia 3" Planter drain Nos 2 31.500
15.8 Roof Rain water outlets15.8.1 Dia 6" Nos 8 78.75015.8.2 Dia 4" Nos 2 31.500
15.9 Dia 3"Funnel floor drain Nos 18 68.250
15.10
15.10.1 Ewc Nos 50 105.00015.10.2 Awc Nos 12 105.00015.10.3 Ablution hose Nos 62 5.25015.10.4 Wash basin (counter) Nos 42 94.50015.10.5 Wash basin (pedstal) Nos 8 94.50015.10.6 Pantry sinks-single bowl Nos 7 126.00015.10.7 LabSink-Single bowl Nos 65 262.50015.10.8 LabSink-double bowl Nos 2 315.00015.10.9 Shower Trays Nos 1 105.000
15.10.10 Drinking Fountain (Type-A) Nos 6 294.000
15.11 L.S. L.S.
15.12 L.S. L.S.
Toilet & kitchen fixtures as shown on the on arch drawings with chrome fittings of drainage accessories, flexible hoses etc.
Cleaning, flushing and painting of all the drainage piping as per colour codes.
Builders work like including connecting pipes and gullys through cement pipes to manhole and covers for particular application and installation of toilet
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-94 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-95 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
WATER SUPPLY
NOTE :
15.13
15.13.1 Dia 3" MR 20 18.90015.13.2 Dia 2" MR 164 8.40015.13.3 Dia 1 1/2" MR 170 7.35015.13.4 Dia 1 1/4" MR 150 6.30015.13.5 Dia 1" MR 193 5.25015.13.6 Dia 3/4" MR 678 4.20015.13.7 Dia 1/2" MR 520 3.150
15.14 Nos 5 840.000
15.14.1 Nos 2 420.000
15.15
15.15.1 Unit Boiler 120 liter Nos 6 126.00015.15.2 Unit boiler of capacity 80 liters/each Nos 6 89.25015.15.3 Unit boiler of capacity 50 liters/each Nos 7 78.750
Supply, installation, testing and commissioning of the following items & piping networks for buildings for hot and cold water supply system with fittings, valves, equipments, support and requiredpipe,fittings, valves, equipment, supports with pipe, accessories in all aspect as specified.
All exposed water supply piping on roof and inside roof shall be poly propylene, as per specification.
Water supply piping network from water tank to Including risers, with all accessories like gate valve, check valve.
Polythelene water tanks (Shaded) including all accessories, fittings (float switches,inlet valve, drain valves, over flow and drain pipe up to required length etc) Cat and mouse water level indicator including all galvanized steel supports,frames and bases etc. complete 3000 gallon each.
Ditto - But Capacity 2000 gallon capacity for brackish water supply
Electric water heater pressure type with concealed valve, pressure and temperature relief valves, all fittings and accessories.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-96 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-97 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
15.16 Water filters15.16.1 Central water filters of capacity 10 m3/hr Nos 1 997.50015.16.2 Unit filters for kitchen - Dia 1/2" Nos 10 21.000
15.17 Nos 1 1312.500
Notes :All the above rates to be including of the following :
Electrical works related to all Plumbing services
Testing and commissioning of all plumbing services
Booster pump set with pressure tank 200 ltr. Minimum capacity including all acccessories having capacity 40 Gpm @ 4 bar.
Submitting as-built drawings, providing all operation, instruction and maintenance materials etc..
Builders work related to all plumbing works including trenches, patching, chipping works etc.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-98 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-99 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
FIRE FIGHTING
15.18
Dia 65mm MR 30 15.750
15.19
15.19.1 Dia 50mm MR 222 12.60015.19.2 Dia 40mm MR 24 8.40015.19.3 Dia 32mm MR 35 7.350
15.20 L.S. L.S. 525.000
15.21 FHC Nos 18 288.750
15.22 FC
Nos 2 84.000
The tender drawing is for guidance only. Contractor should arranage the layout coordinated with all disciplines, submit calculation, catalogues for material and equipment for engineers approval and KFB.
The BOQ is for guidance only. Contractor should quote for lump sum price including approval of KFB.
Black steel piping network suitable for welding type joints to schedule 40 seamless ( for sprinkler system from tank to pumps, pump rooms, by pass, risers etc. complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers.
Galvanised steel piping suitable for threaded type joints to schedule 40 seamless complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers.
Painting of all fire fighting piping (2 coats of primer and 2 coats of final finish painting) as per colour codes, labelling, flow direction marking and tags for valves.
80cm x 160cmx40 cm including 25mm fire hose reel 30m long manual swing type fire extinguisher as specified 6 kg Dry powder and 2 gallons water/gas
Fire extinguisher cabinet with 6 kg Dry powder and 2 gallons water/gas
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-100 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-101 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
15.23 Automatic air ventsDia 25mm Nos 2 26.250
Fire Pumps and Accessories
15.24
15.24.1 Capacity of 200 gpm@ 5.5 bar-20 K.W Nos 2 2625.000
15.24.2 Valves and fittings L.S. L.S.
15.24.3 L.S. L.S.
Notes : All the above rates to be including of the following :
Electrcial works related to all firefighting services
Testing & commissioning of all firefighting services
Builders work related to all firefighting works
Electrical fire pumps of type vertical multistage with all accessories and 2 years maintenance in all aspect including pressure tanks (approval to be done)
Suction pipe from firewater tank to pumps including all fittings, connection to all valves, mater, strainers, header
Submitting as-built drawings, providing all operation, instruction & maintenance materials etc.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-102 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-103 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
HVAC - GENERAL NOTES
Duct Work15.25 Kgs. 31000 1.694
Duct Insulation15.26 M2 4500 3.033
15.27 L.S. L.S. 1575.000
Air Outlets and Inlets15.28 L.S. L.S. 12600.000
The following BOQ is for guidance only. Contractor is responsible to get approval from all local authorites.
The BOQ is for guidance only. Contractor should quote for lump sum price including approval of MEW . Include in quotation all catalogues for equipments.
Glavanized sheet metal duct work complete with required volume control dampers, joints, test holes/back draft dampers, air turning devices, duct access doors. As specified , shown and required for functioning the system..
Perform iinsulation material secured around duct work complete with finishing and aluminium cladding etc. as specified.
Perform internal acoustic lining material secured on internal surface of duct as specified.
Air Outlets and Inlets, include on diffusers, Linear bar grilles, registers, exhaust air valves, louvers, 4' thick filter grilles etc. complete as specified.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-104 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-105 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
15.29
15.29.1 E.F -01 , 2700 cfm Nos 1 5985.00015.29.2 E.F -02 , 200 cfm Nos 1
15.29.3 E.F -03 , 2925cfm Nos 1
15.29.4 E.F -04 , 300 cfm Nos 1
15.29.5 E.F -05,06 , 400cfm Nos 2
15.29.6 E.F -07, 400cfm Nos 1
15.29.7 E.F -08 , 600 cfm Nos 1
15.29.8 E.F -09 , 200 cfm Nos 1
15.29.9 E.F -10 , 400 cfm Nos 1
15.29.10 E.F -11 , 400 cfm Nos 1
15.29.11 E.F -12,13,14,17,18,19 , 200 cfm Nos 6
15.29.12 E.F -15-16 , 200 cfm Nos 2
15.30 Package Units
15.30.1 PU-GF1&GF6 , 262800 BTU/Hr, 8750 cfm. Nos 2 3780.000
15.30.2 Nos 4 3780.000
15.30.3 PU-GF4&GF7, 200000 BTU/Hr, 7500cfm. Nos 2 3780.00015.30.4 PU-FF1&FF9, 280000 BTU/Hr., 10000 cfm Nos 2 3780.00015.30.5 PU-FF2&FF10, 262800 BTU/Hr. 8750cfm. Nos 2 3780.00015.30.6 PU-FF3 to FF8 , 262800 BTU/Hr. , 8750 cfm Nos 6 3780.00015.30.7 PU-SF1&SF6 , 315000 BTU/Hr.,12500 cfm Nos 2 3780.00015.30.8 PU-SF2&SF5, 280000 BTU/Hr. , 10000 cfm Nos 2 3780.00015.30.9 PU-SF3 ,271800 BTU/Hr., 9000 cfm Nos 1 3780.000
15.30.10 PU-SF4 , 262800 BTU/Hr., 8750 cfm Nos 1 3780.000
15.31 Automatic Control SequenceElectrical type wall mounted thermostats Nos 24 52.500
Total Carried to Collection
Exhaust Fans complete with bird screen, back draft damper and other accessories as specified.
Package Unit complete with all accessories like filters ,mixing box etc as specified @ 115F
PU-GF2&GF3&PU-GF5&GF8, 280000 BTU/Hr, 10000cfm
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-106 Mechanical work
ITEM DESCRIPTION UNIT QTY UNIT RATEKD
15.32 L.S. L.S. 1260.000
15.33 L.S. L.S. 2625.000
15.34 L.S. L.S. 3675.000
Refrigrant Piping / Condensate Drainnage piping Complete With Insulation , Hangers and cladding and insulation
Civil works related to A/C such as foundations, steel walkways over the piping on roof, openings and supporting structures, etc.
Allow for electrical works ( power, control and fire alarm) associated with HVAC works including cabling, wiring, switching, motor control panels with accessories and all other related works.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-107 Mechanical work
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
DIVISION - 15 MECHANICAL WORKSMEDICAL GAS SYSTEM,
15.35
15.35.1 Dia 3" MR 78 31.50015.35.2 Dia 2" MR 72 26.25015.35.3 Dia 1 1/4" MR 108 21.00015.35.4 Dia 1" MR 70 15.75015.35.5 Dia 3/4" MR 120 12.60015.35.6 Dia 1/2" MR 80 10.500
Control valves 15.36
15.36.1 Dia 2" Nos 20 84.00015.36.2 Central Gas regular 3Ø Nos 1 126.00015.36.3 Regulating valve Ø 2" Nos 2 52.500
15.37 Gas Cylinders
15.37.1 Gas Cylinders (spare) Nos 8 52.500
The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price.
Include in price all adjustment required by code or as per coordination with other disciplines.
Contractor responsible to get approvals all authorities having jurisdictions.
Contractor must attach a breakdown analysis for lumpsum items.
Supply and Installation of Medical Grade, Degreased Copper Pipes as per specification complete with all fixtures,insulation.
Supply and Installation of Medical Grade, Degreased Control valves as per specification complete with all fixtures,insulation.
Supply and Installation of Medical Grade GS12 gas cylinders
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-108 Mechanical work
Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE
KD
15.38 Builders work related to Medical Gas euipment and Piping L.S. L.S. 525.000
15.39 Testing and commissioning of all medical gas services L.S. L.S. 315.000
15.40 L.S. L.S. 26250.000
Building Automation System (BAS) for Complete Project
Full building automation system (BAS) complete with controller (Lontalk) type and (Bac) net, protocols and all control panels,wiring, sensors,devices, transformers etc. as as per BAS specifications and system points list schedules for each equipment as per BAS drawings.
(This includes the connection of all services (plumbing, fire fighting, HVAC) to BAS system as per specification and drawings)
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-109 Mechanical work
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-110 Mechanical work
ITEM DESCRIPTION
DIVISION - 15 MECHANICAL WORKS
COLLECTION
Page No. 15-1Page No. 15-2Page No. 15-3Page No. 15-4Page No. 15-5Page No. 15-6Page No. 15-7Page No. 15-8Page No. 15-9Page No. 15-10Page No. 15-11
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-111 Mechanical work
TOTAL CARRIED TO SUMMARY
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-112 Mechanical work
AMOUNTKD
1288.350714.000
4084.5003637.200
1029.000
2409.750
4016.250
141.750
31.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-113 Mechanical work
17352.300
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-114 Mechanical work
AMOUNTKD
47.250
63.000
630.00063.000
1228.500
5250.0001260.000325.500
3969.000756.000882.000
17062.500630.000105.000
1764.000
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-115 Mechanical work
34035.750
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-116 Mechanical work
AMOUNTKD
378.0001377.6001249.500945.000
1013.2502847.6001638.000
4200.000
840.000
756.000535.500551.250
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-117 Mechanical work
16331.700
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-118 Mechanical work
AMOUNTKD
997.500210.000
1312.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-119 Mechanical work
2520.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-120 Mechanical work
AMOUNTKD
472.500
2797.200201.600257.250
525.000
5197.500
168.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-121 Mechanical work
9619.050
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-122 Mechanical work
AMOUNTKD
52.500
5250.000
0.000
0.000
0.000
0.000
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-123 Mechanical work
5302.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-124 Mechanical work
AMOUNTKD
52503.150
13650.525
1575.000
12600.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-125 Mechanical work
80328.675
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-126 Mechanical work
AMOUNTKD
5985.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
7560.000
15120.000
7560.0007560.0007560.00022680.0007560.0007560.0003780.0003780.000
1260.000
97965.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-127 Mechanical work
AMOUNTKD
1260.000
2625.000
3675.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-128 Mechanical work
7560.000
AMOUNTKD
2457.0001890.0002268.0001102.5001512.000840.000
1680.000126.000105.000
420.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-129 Mechanical work
12400.500
AMOUNTKD
525.000
315.000
26250.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-130 Mechanical work
27090.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-131 Mechanical work
AMOUNTKD
17352.30034035.75016331.7002520.0009619.0505302.50080328.67597965.0007560.00012400.50027090.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/15-132 Mechanical work
310,505.475
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-133 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
DIVISION 16 - ELECTRICAL
General Consideration for all items:
16.1
16.2
16.3
16.4 L.S. L.S.
The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables, wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work.
All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOE (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer.
All works shall be carried out to comply with the BAS (Building Automation System) requirements.
The Contractor is reffered to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, wheather or not they are specifically mentioned within the items.
BUILDER WORK:All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholds, earth pits, ducts, trenches, cable tiles … etc.including supply and install 6" & 4" PVC ducts for MLTP, MSB's DB's cables as per shown in drawing and as per MOE (E&W) regulation. Including all ducts between ( LT, Panel and Transformer ) and H.T. duct for MOE (E&W) intake cable. And all civil work as per Drawings, Specification and the Approval of the Engineer.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-134 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-135 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
Section 16426Distribution Equipment
16426 : Main Switch Board16.5
16.5.01 MSB - A-G-1 No 1
16.5.02 MSB - A-G-2 No 1
16.5.03 MSB - PU-G No 1
16.5.04 MSB - A-F-1 No 1
16.5.05 MSB - A-F-2 No 1
16.5.06 MSB - PU-F No 1
16.5.07 MSB - A-S-1 No 1
16.5.08 MSB - A-S-2 No 1
16.5.09 MSB - A-PU-S NO 1
16.5.10 MSB - A-R No 1
16.5.11 MSB - FF No 1
Supply, install and connect the following electrical board or S/Fs or DBs, including all cables, cable trays, access conduit, wiring, boxes, W/T Enclosure, earthing, labels name plates , wire and cables markers , foundation trenches , and All required for the connection with the Central Control Management and Monitoring System, etc., as MPW, MOE (E&W) requirements and as shown in the drawings.The Contractor Must Submit Detail For The Separate Phase Wire To Feed The Backup Battery For Approval, and He is Obligee to Achieve The Engineer Satisfaction.
Supply, install and connect the following main switch board (MSB), Sub-Main switch Boards (SMSB) complete with Conduits,wiring, earthing, cable glands, meters and all accessories as necessary, testing and commissioning to be ready for good working and all acording to drawings, specification and the Engineer approval.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-136 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-137 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
16426 : Isolators and Switch Fuses& PANEL BOARDS
16.6
The following items fed from MSB - A-G-1-1
16.6.01 DB-A-G-02L No 1
16.6.02 DB-A-G-02P No 1
16.6.03 DB-A-G-03L No 1
16.6.04 DB-A-G-03P No 1
16.6.05 DB-A-G-05LP No 1
16.6.06 DB-A-G-07L No 1
16.6.07 DB-A-G-07P No 1
16.6.08 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1
16.6.09 15A TPN S/F in W.P.Enclosure for GU No 1
The following items fed from MSB - A-G-1-2
16.6.10 DB-A-G-01L No 1
16.6.11 DB-A-G-01P No 1
16.6.12 DB-A-G-04L No 1
Supply, install and connect est and make necessary commissioning, complete with all necessary conduits feeding wirings and cables, earthing , HRC fuses, magnetic contactors ...etc. and all necessary accessories following electrical board and S/F , as per the drawing, specification, MOE (E&W) regulation, and approval of Engineer.All (S/F's, MCCB, ELCB, DB - AHU) protected by water tight enclosure.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-138 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-139 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
16.6.16 DB-A-G-04P No 1
16.6.17 DB-A-G-06L No 1
16.6.18 DB-A-G-06P1 No 1
16.6.19 DB-A-G-06P2 No 1
16.6.20 DB-A-G-06P3 No 1
16.6.21 DB-A-G-08LP No 1
16.6.22 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1
The following items fed from DB-A-G-06P1
16.6.23 15A SPN S/F in W.P.Enclosure No 1
The following items fed from MSB - A-G-2-2
16.6.24 30A TPN S/F in W.P.Enclosure for GU No 2
The following items fed from MSB - A-F-1-1
16.6.25 DB-A - F -02L No 1
16.6.26 DB-A - F -02P No 1
16.6.27 DB-A - F -03L No 1
16.6.28 DB-A - F -03P No 1
16.6.29 DB-A - F -05LP No 1
16.6.30 DB-A - F -07LP No 1
16.6.31 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1
The following items fed from MSB - A-F-1-2
16.6.32 30A TPN S/F in W.P.Enclosure for Klin room No 1
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-140 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-141 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
The following items fed from MSB - A-F-2-1
16.6.33 DB-A - F -01L No 1
16.6.34 DB-A - F -01P No 1
16.6.35 DB-A - F -04LP No 1
16.6.36 DB-A - F -06LP No 1
16.6.37 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1
The following items fed from MSB - A-F-2-2
16.6.38 DB-A - S -02L No 1
16.6.39 DB-A - S -02P No 1
16.6.40 DB-A - S -03L No 1
16.6.41 DB-A - S -03P1 No 1
16.6.42 DB-A - S -03P2 No 1
16.6.43 DB-A - S -03P3 No 1
16.6.44 DB-A - S -05LP No 1
16.6.45 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1
The following items fed from MSB - A-S-2
16.6.46 DB-A - S -01L No 1
16.6.47 DB-A - S -01P1 No 1
16.6.48 DB-A - S -01P2 No 1
16.6.49 DB-A - S -01P3 No 1
16.6.50 DB-A - S -04LP No 1
16.6.51 DB-A - S -06LP No 1
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-142 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-143 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
16.6.52 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1
The following items fed from MSB - A-R
16.6.53 DB-A - Roof LP No 1
16.6.54 DB-A - EX FAN No 1
16.6.55 15A TPN S/F in W.P.Enclosure (for FAF-1&2, W.Pump 1&2) No 4
The following items fed from MSB - F-F
16.6.56 Main Fire Pump -01 No 1
16.6.57 Main Fire Pump -02 No 1
The following items fed from DB-A - EX FAN
16.6.58 15A TPN S/F in W.P.Enclosure No 4
16.6.59 15A SPN S/F in W.P.Enclosure No 1416140 : Electrical Points
16.7
16.7.01 13 A switch / socket / outlet, 3 pin single socket No 438
16.7.02 13 A switch / socket / outlet, 3 pin Twin socket No 570
16.7.03 13 A W/T, 3 pin single socket, as specified and as per the drawing. No 51
16.7.04
No 5
16.7.05 Junction box with 20A DP switch for F.C. Unit No 7
16.7.06 Junction box with 20A DP switch for E. W. Heater No 16
16.7.07 Junction box with 20A DP switch for Fire A. C. Panel with AVA. No 1
Supply, install and connect to their respective DB's, the following points including conduit , wiring , draw boxes, outlet boxes , trenching, earthing, switches, accessories, cable, silicon wire, switches double pole switches and all requirements as specified and as shown in drawing and as per the approval of Engineer.
3 Compartment Under Floor Service Outlet Box complete with all accessories including the flexible connection to the Power , Telephone , and Data.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-144 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-145 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
16.7.08 Junction box with 20A DP switch for W. Cooler No 6
16.7.09 Junction box with 20A DP switch for Fume No 2 16515 : Lighting
Lighting System16.8
16.8.01 Light Points No 407
16.8.02 Exit sing + EM Light No 49
16.8.03 No 1
LIGHTING FITTINGS:
16.9
16.9.01 Type A No 776
16.9.02 Type Ae No 113
16.9.03 Type B No 917
16.9.04 Type Be No 99
16.9.05 Type E No 205
16.9.06 Type E-EM No 47
Total Carried to Collection
The price for the following items shall included the lighting points C/W wiring conduit, earthing, switches, push-button, ceiling rose, silicon wire and all accessories with supplying installation, connecting, testing and making ready for work of all, lighting fittings. The contractor should submit the fixation way of light fittings for approval.
Lighting control panel with all Push Buttons, labeling in grave and indication lambs (the indication Lampe shall indicate the on-off).
Supply light fitting complete with lamps, tubes , reflectors, diffusers , louvers , transformers , control gears , etc…and with all required fixing accessories , brackets , concrete bases , etc… all as shown on the drawings , specified and as required for proper operation, and as per the approval of the Engineer.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-146 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
16.9.07 Type F No 157
16.9.08 Type F-EM No 18
16.9.09 Type G-70 No 86
16.9.10 Type H No 109
16.9.11 Type H-EM No 37
16.9.12 Type-EX No 44
16.9.13 Type-EM No 5
16.9.14 Type I No 15
16.9.15 Type O No 91
16.9.16 Type FL No 12
16.9.17 Type M No 229
16.9.18 Type M-EM No 16
16.9.19 Type L No 45
16.9.20 Type L-EM No 45
16.9.21 Type Z No 18
16.9.22 Type Z-EM No 6
16.9.23 Type J No 60
16.9.24 Type J-EM No 5
16.9.25 Type N (1 x 3) No 16
16.9.26 Type ST No 6
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-147 ELECTRICAL WORKS
Item DescriptionUnit Qty
No.
16452 : Earthing
16.10 L.S. L.S.
16.11 L.S. L.S.
16.12 L.S. L.S.
16.13 L.S. L.S.
Supply, install and connect complete earthing system as per drawings, specification and MOE (E&W) regulation. Any additional earth electrodes needed shall be included without extra cost.
Prepare complete set of electrical and telephone as built drawings and get the approval from MOE (E&W) and MOC.
Testing and inspection of the electrical and telephone installation on completion and before being energized and get the approved by MOE (E&W) and MOC inspectors in accordance to the MOE (E&W) and MOC regulations and to the approved drawing.
Allow for submitting as built drawings, providing all operation, instruction and maintenance manuals etc…
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-148 ELECTRICAL WORKS
Total Carried to Collection
Description
Unit QtyNo.
DIVISION 16 - ELECTRICAL (LOW VOLTAGE)
General Consideration for all items:
16.14
16.15
16.16
The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work.
BUILDER WORK:All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholes, earth pits, ducts, trenches cable tiles … etc.
All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOP (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer.
All works shall be carried out to comply with the BAS (Building Automation System) requirements.
The Contractor is referred to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-149 ELECTRICAL WORKS
Total Carried to Collection
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-150 ELECTRICAL WORKS
Item Description
Unit QtyNo.
Section:16721Fire Detection & Alarm System
16.17
16.17.01 Fire Alarm Control Panel complete with all accessories. No 1
16.17.02 Fire Alarm Active mimic display panel No 1
16.17.03 Main operating , display graphics and programming terminal with processor. No 1
16.17.04 Logging and event system printer. No 1
16.17.05 Optical smoke detector ( addressable type). Nos 235
16.17.06 Heat Detector (addressable type). Nos 11
16.17.07 Duct Detector (addressable type). Nos 20
16.17.08 Fire alarm manual call point (addressable type). Nos 10
16.17.09 Local alarm horn. Nos 35
16.17.10 L.S. L.S.
Total Carried to Collection
Supply, install, connect, test and commission the fire detection and alarm system complete as per the drawings, specification and to the rules and regulation of Kuwait fire brigade and as per approval of Engineer. Work shall include all conduits , wiring, accessories and components.
Connection up to Motorized Dampers, Doors Opener, HVAC control panels, elevator control panels, sprinkler flow switches, Air pressure fans, Smoke and Fresh air Fans…etc.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-151 ELECTRICAL WORKS
Item Description Unit QtyNo.
Section:16740 Telephone System - Cabling
16.18
16.18.01 telephone socket outlets Nos 151
16.18.02 MDF Nos 1
16.18.03 TTB-A-F(80X90X15 CM) Nos 1
16.18.04 TTB-A-S(70X80X15 CM) Nos 1
16.18.05 TTB-A-F (80x90x15cm) Nos 1
16.18.06 TTB-A-S (70x80x15cm) Nos 1
16.18.7 Any other missing items required for full functioning of the job (if any) L.S. L.S.
Supply, install, connect, test and make ready for works the following Telephone System including conduits, wire, terminal boxes, draw boxes, socket outlet, all as per schematic, drawings
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-152 ELECTRICAL WORKS
Total Carried to CollectionItem Description Unit QtyNo.
Section 16750Audio Visual System
16.23
16.23.4 Seminar Hall16.23.4.01 Data And Video Projector 4000 ANSI Lumens No 1
16.23.4.02 Rear Projection Lens No 1
16.23.4.03 Rear projection screen No 1
16.23.4.04 Rear Projection screen frame No 1
16.23.4.05 DVD No 1
16.23.4.06 VCR No 1
16.23.4.07 Visualizer No 1
16.23.4.08 PC interface No 1
16.23.4.09 Hide away unit No 1
16.23.4.10 AV switcher No 1
16.23.4.11 Power amplifier Nos 3
16.23.4.12 Mixer and preamplifier No 1
16.23.4.13 Sub waffer speaker Nos 2
16.23.4.14 Monitoring panel No 1
16.23.4.15 Stage speaker Nos 6
Total Carried to Collection
Supply, install, connect test and make ready for works, Sound system including all, conduit, boxes, draw boxes, terminal boxes wires, connection of Gl conduit, The price for the sound system shall include the supply of all materials and equipment delivery to site,installations, connections, testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes, switches , push-buttons , cable trays, and all work required to make the work done. All should be as per the contract drawing and the approval of Engineer.
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-153 ELECTRICAL WORKS
PAGE DESCRIPTION
NO
DIVISION 16 - ELECTRICAL
COLLECTION
Page No. 16-1
Page No. 16-2
Page No. 16-3
Page No. 16-4
Page No. 16-5
Page No. 16-6
Page No. 16-7
Page No. 16-8
Page No. 16-9
Page No. 16-10
Page No. 16-11
Page No. 16-12
Page No. 16-13
Page No. 16-14
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-154 ELECTRICAL WORKS
Total Carried to Summary
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-155 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
9900.000 9900.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-156 ELECTRICAL WORKS
9900.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-157 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
3300.000 3300.000
2640.000 2640.000
3168.000 3168.000
2420.000 2420.000
2420.000 2420.000
3300.000 3300.000
2750.000 2750.000
2970.000 2970.000
2805.000
2475.000 2475.000
3300.000 3300.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-158 ELECTRICAL WORKS
28743.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-159 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
854.700 854.700
737.000 737.000
854.700 854.700
907.500 907.500
693.000 693.000
836.000 836.000
902.000 902.000
192.500 192.500
88.000 88.000
825.000 825.000
495.000 495.000
495.000 495.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-160 ELECTRICAL WORKS
7880.400
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-161 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
385.000 385.000
660.000 660.000
770.000 770.000
412.500 412.500
385.000 385.000
825.000 825.000
313.500 313.500
89.100 89.100
385.000 770.000
660.000 660.000
660.000 660.000
632.500 632.500
660.000 660.000
715.000 715.000
715.000 715.000
220.000 220.000
385.000 385.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-162 ELECTRICAL WORKS
9257.600
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-163 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
385.000 385.000
440.000 440.000
275.000 275.000
440.000 440.000
165.000 165.000
825.000 825.000
660.000 660.000
385.000 385.000
660.000 660.000
742.500 742.500
605.000 605.000
660.000 660.000
330.000 330.000
660.000 660.000
605.000 605.000
605.000 605.000
825.000 825.000
715.000 715.000
770.000 770.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-164 ELECTRICAL WORKS
20395.100
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-165 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
330.000 330.000
440.000 440.000
302.500 302.500
66.000 264.000
192.500 192.500
192.500 192.500
82.500 330.000
66.000 924.000
16.500 7227.000
19.800 11286.000
39.600 2019.600
55.000 275.000
27.500 192.500
27.500 440.000
27.500 27.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-166 ELECTRICAL WORKS
2975.500
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-167 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
27.500 165.000
27.500 55.000
101.200 41188.400
13.200 646.800
550.000 550.000
44.000 34144.000
77.000 8701.000
44.000 40348.000
77.000 7623.000
60.500 12402.500
93.500 4394.500
42605.200
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-168 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
49.500 7771.500
77.000 1386.000
93.500 8041.000
55.000 5995.000
82.500 3052.500
55.000 2420.000
33.000 165.000
38.500 577.500
55.000 5005.000
82.500 990.000
60.500 13854.500
88.000 1408.000
44.000 1980.000
71.500 3217.500
38.500 693.000
66.000 396.000
82.500 4950.000
110.000 550.000
275.000 4400.000
27.500 165.000
50666.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-169 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
8250.000 8250.000
0.000
0.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-170 ELECTRICAL WORKS
8250.000
Unit Price Total Price
KD. Fils KD. Fils
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-171 ELECTRICAL WORKS
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-172 ELECTRICAL WORKS
Unit Price Total Price
KD. Fils KD. Fils
2585.000 2585.000
1750.000 1750.000
4400.000 4400.000
275.000 275.000
38.500 9047.500
38.500 423.500
137.500 2750.000
38.500 385.000
55.000 1925.000
825.000 825.000
24366.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-173 ELECTRICAL WORKS
Unit Price Total PriceKD. Fils KD. Fils
38.500 5813.500
715.000 715.000
550.000 550.000
440.000 440.000
550.000 550.000
440.000 440.000
0.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-174 ELECTRICAL WORKS
8508.500
Unit Price Total PriceKD. Fils KD. Fils
2200.000 2200.000
385.000 385.000
1375.000 1375.000
220.000 220.000
132.000 132.000
82.500 82.500
1430.000 1430.000
330.000 330.000
1265.000 1265.000
132.000 132.000
495.000 1485.000
715.000 715.000
385.000 385.000
275.000 1650.000
2035.000
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-175 ELECTRICAL WORKS
Total Price
KD. Fils
9900.000
28743.000
7880.400
9257.600
20395.100
2975.500
42605.200
ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/16-176 ELECTRICAL WORKS
121756.800
PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة
ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1
PAGE NO. DIVISION TITLENO.
2-2 2 SITE WORKS
3-4 3 CONCRETE
4-2 4 MASONRY
5-3 5 METAL WORKS
6-2 6 WOOD AND PLASTIC
7-3 7 THERMAL AND MOISTURE PROTECTION
8-4 8 DOORS AND WINDOWS
9-6 9 FINISHES
10-3 10 SPECIALTIES
12-3 12 FURNISHINGS
14-2 14 CONVEYING SYSTEM
15-12 15 MECHANICAL WORKS
16-14 16 ELECTRICAL WORKS
PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة
ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1
TOTAL CARRIED TO MAIN SUMMARY KD
PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة
ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1
AMOUNTKD
37443.000
839676.500
99562.000
28224.700
5265.000
62092.750
179313.000
335210.700
47354.000
0.000
0.000
310505.475
PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة
ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين
Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1
1944647.125