/ / مع م ق ر صة اق ن م ل ا70 / 2010 - 2011 ة وي ن ا ث مدرسة ة اي ن ص و ار ج ن ء وا ا ش ن ا/ طعة ةق ي ث ن م ر ل ا ة طق ن م ب. ن ي ن ب10 Bill No-1: Class Room + Administration Bldg (A) 1/2-1 SITE WORKS ITEM DESCRIPTION UNIT QTY UNIT RATE KD DIVISION 2 - SITE WORKS Section 02315 Earth Work Excavation and Backfilling 2.1 M3 13308 2.250 Compacted fill 2.2 L.S L.S 6000.000 Section 02360 Termite Control 2.3 L.S L.S 1500.000 Excavation for foundation in any type of soil even rock, up to required height including backfilling, shoring (if required), dewatering and removing of surplus excavated material from site to a place approved by the Municipality. Filling inside building (under slab on grade etc.) as per proposed levels, with approved quality imported filling material. Filling shall be compacted in layers (each layer shall not be more than 250mm thick) and compaction shall not be less than 98% of dry density. Termilte Control/Soil treatment for the whole building area all as

BOQ- form

Embed Size (px)

DESCRIPTION

BOQ

Citation preview

Page 1: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/2-1 SITE WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 2 - SITE WORKS

Section 02315Earth Work

Excavation and Backfilling

2.1 M3 13308 2.250

Compacted fill

2.2 L.S L.S 6000.000

Section 02360Termite Control

2.3 L.S L.S 1500.000

Excavation for foundation in any type of soil even rock, up to required height including backfilling, shoring (if required), dewatering and removing of surplus excavated material from site to a place approved by the Municipality. Mechanical excavation shall be stopped 300mm above the Foundation level and completed manually.

Filling inside building (under slab on grade etc.) as per proposed levels, with approved quality imported filling material. Filling shall be compacted in layers (each layer shall not be more than 250mm thick) and compaction shall not be less than 98% of dry density. Selected excavated material may be used for filling but as per approval of the Engineer.

Termilte Control/Soil treatment for the whole building area all as described

Page 2: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/2-2 SITE WORKS

Total Carried to CollectionITEM DESCRIPTION

DIVISION 2 - SITEWORKS

COLLECTION

Page No. 2-1

Page 3: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/2-3 SITE WORKS

TOTAL CARRIED TO SUMMARY

Page 4: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/2-4 SITE WORKS

AMOUNTKD

29943.000

6000.000

1500.000

Page 5: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/2-5 SITE WORKS

37443.000

AMOUNTKD

37,443.000

Page 6: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/2-6 SITE WORKS

37,443.000

Page 7: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-7 CONCRETE

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 3 - CONCRETE

Section 03300 Cast-in-place Concrete

Plain Concrete

3.1

3.1.1 100 mm thick under Foundation M2 1,400 3.500

3.1.2 50 mm thick under Ground beam & External steps M2 710 2.200

Reinforced Concrete

3.2

3.2.1 Foundation: Col/Wall Footings etc. M3 785 95.500

3.2.2 Column/wall Neck M3 190 100.000

3.2.3 Ground Beam, External Steps/ramp etc. M3 345 95.000

3.2.4 M2 3,930 7.250

3.3

3.3.1 Walls M3 698 95.000

3.3.4 Lintels, sills, bond beam etc. M3 93 98.000

Plain concrete grade using sulphate resisting cement including all form work and laid as described (smooth face)

Vibrated reinforced concrete using sulphate resisting cement filled into formwork and tamped around reinforcement including all formwork, tie bolts and reinforcement etc. complete as described (Fair finish for all exposed faces)

150mm thick slab on grade with turn down slab/edge thicnessing and including Isolation joints (with celotex and mastic fill). Construction joints shall be provided in case bay area is more than 25 m2.

Vibrated reinforced concrete using ordinary portland cement, filled into form work and tamped around reinforcement including all formwork, reinforcement etc. complete as described. (Fair finish for all exposed faces)

Page 8: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-8 CONCRETE

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

Section 03530 Concrete Topping

3.4 M2 11821 5.000

Section 03410Plant Pre-cast Structural Concrete.

3.5

3.5.1 Design, suplly and fixation of precast concrete columns. L.S. L.S. 98,650.000

3.5.2 L.S. L.S. 205,450.000

3.5.3 L.S. L.S. 201,450.000

Minimum 50mm thick concrete topping with mesh reinforcement (Y8/200mm both direction)and laid over hollow core slab in proper shape with required expansion, construction and contraction joints. (K-300)

Vibrated precast prestressed reinforced concrete with compressive strenght of 48Mpa (Cube strenght) using Ordinary portland cement finished fairface on all exposed surfaces including all formwork, reinforcemet, tension wires anchorage, lifting hooks, hoisting, placing in position, bedding neoprene bearing pads, perimeter gaskets, sealent, shims, dowels and connections all as specified

Note : The dimensions mention below are as per the drawings, and the dimensions shown in the drawings are for guidance only, It is contractor's responsibility to design all the precast concrete element, and all connections and accessories as specified.

The slab system shown in the drawing (Hollow core system) is for guide line only, The contractor to design complete slab system as hollow core system or Double T (TT) System, after consideration of all services passing fron the ceiling and take the approval from Engineer before commencing of the work.

Design, suplly and fixation of rectangular beams, edge beams, spine beams.

Design, suplly and fixation of hollow core or Double TT, slab system.

Page 9: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-9 CONCRETE

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

3.5.4 Design, suplly and fixation of all staircases. L.S. L.S. 20,000.000

3.5.5 Design, suplly and fixation of parapet. M3 160 85.000

Section 03455Glass Reinforced Concrete (GRC)

3.6 Decorative GRC panels over Stair windows M2 112 24.000

Section 03550 Concrete Screed

3.7 M2 215 7.500

Precast GRC panel fixed over external wall including galvanized steel support, anchors, dowels etc. complete as described

Approx. 100mm thick smooth surface sand cement and thin gravel screed with steel wiremesh (6mm dia @ 200mm c/c) all as described.

Page 10: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-10 CONCRETE

Total Carried to Collection

Page 11: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-11 CONCRETE

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 3 - CONCRETE

COLLECTION

Page No. 3-1

Page No. 3-2

Page No. 3-3

TOTAL CARRIED TO SUMMARY

Page 12: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-12 CONCRETE

AMOUNTKD

4900.000

1562.000

74967.500

19000.000

32775.000

28492.500

W1

66310.000###

9114.000###

Page 13: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-13 CONCRETE

237121.000

AMOUNTKD

59,105.000

98,650.000

###

205,450.000

###

201,450.000

Page 14: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-14 CONCRETE

###

564655.000

AMOUNTKD

20,000.000

13,600.000

2,688.000

1,612.500

Page 15: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-15 CONCRETE

37900.500

Page 16: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/3-16 CONCRETE

AMOUNTKD

237121.000

564655.000

37900.500

839,676.500

Page 17: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/4-17 MASONRY

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 4 - MASONRY

Section 04200Unit Masonry

4.1

4.1.1 400 mm thick wall M2 72 12.250

4.1.2 300 mm thick wall M2 10 8.750

4.1.3 250 mm thick wall M2 75 7.300

4.1.4 200 mm thick wall M2 3,152 7.000

4.1.5 150 mm thick wall M2 5,480 5.250

4.1.6 100 mm thick wall M2 487 4.250

Sand Lime Bricks

4.2 M2 1990 7.000

Section 04225Light Weight Concrete Unit Masonry

4.3

4.3.1 200 mm thick wall M2 3,567 8.750

Solid concrete block wall bedded in sand cement motar with gavanized steel ties including scaffolding up to any height etc. complete as described.

Sand lime bricks size 290 x 90 x 45cm Standard 34. Malaki from National Industries Company or equally approved (Colour to be as per the approval of Engineer In-Charge) bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.

Light weight concrete block wall bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.(External wall)

Page 18: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/4-18 MASONRY

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

DIVISION 4 - MASONRY

COLLECTION

Page No. 4-1

Page 19: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/4-19 MASONRY

TOTAL CARRIED TO SUMMARY

Page 20: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/4-20 MASONRY

AMOUNTKD

882.000

87.500

547.500

22064.000

28770.000

2069.750

13930.000

31,211.250

Page 21: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/4-21 MASONRY

99562.000

AMOUNTKD

99562.000

Page 22: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/4-22 MASONRY

99,562.000

Page 23: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-23 METAL

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 5 - METALS

Section 05500 Metal Fabrication

5.1 Steel Railing

5.1.1 MR 205 18.700

5.1.2 MR 55 19.800

5.1.3 MR 42 12.100

Access/Cat ladder:

5.2

5.2.1 Cat ladder 3750 mm high (approx.) Nos 6 121.000

5.2.2 Cat ladder 4650 mm high (approx.) Nos 2 154.000

Total Carried to Collection

900mm high steel pipe railing fixed over concrete with 25mm dia vertical steel post, 3 rows of 25mm dia horizontal steel pipe rail and 50mm dia steel pipe hand rail including anchors, dowels, fixing accssories and approved quality primer and alkyd paint etc. complete as described over Stairs

1000mm high steel pipe railing around openings fixed over concrete with 25mm dia vertical steel post and 50mm dia steel pipe hand rail including - ditto

200mm high steel pipe railing fixed over concrete over balconies with 25mm dia vertical steel post and 100mm dia steel pipe hand rail including - ditto.

Steel access ladder comprising 32 mm Dia.tubular section, stringer 25mm dia tubular sections rungs at 300mm centres including wall struts, welding, bolting, removable galvanized steel chain barrier and fixing to structure, the item include application of primer and akyd paint to the required thickness, overall height as shown in the drawings for different areas at roof level.

Page 24: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-24 METAL

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

Steel shed over roof water tank

5.3 L.S. L.S. 1760.000

Section 05810 Expansion Joints and Cover Assemblies

5.4 L.S. L.S. 20000.000

Design, fabricate and install steel shade over roof water tank. Contractor shall provide designed working/shop drawings for Engineer's approval

20mm wide expansion joint for footings, columns, beams, slabs, walls etc. horizontally and vrtically using bitumen impregnated joint filler including 20x20mm approved quality mastic/sealant over exposed joint face and covered the exposed faces of joints with 30mm thick aluminium cover plate including all accessories complete as described

Page 25: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-25 METAL

Total Carried to CollectionITEM DESCRIPTION

DIVISION 5 - METALS

COLLECTION

Page No. 5-1

Page No. 5-2

Page 26: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-26 METAL

TOTAL CARRIED TO SUMMARY

Page 27: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-27 METAL

AMOUNTKD

3833.500

1089.000

508.200

726.000

308.000

6464.700

Page 28: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-28 METAL

AMOUNTKD

1760.000

20000.000

Page 29: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-29 METAL

21760.000

AMOUNTKD

6464.700

21760.000

Page 30: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/5-30 METAL

28,224.700

Page 31: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/6-31 WOOD AND PLASTIC

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 6 - WOOD AND PLASTICS

Section 06200Finish Carpentary

6.1 MR 405 13.000Preaperation and fixing of two wooden stripes parallel to each other of white wood having the size 25 x 100 mm each.( fixing on the walls other than which is having marker board)

Page 32: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/6-32 WOOD AND PLASTIC

Total Carried to CollectionITEM DESCRIPTION

DIVISION 6 - WOOD AND PLASTICS

COLLECTION

Page No. 6-1

Page 33: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/6-33 WOOD AND PLASTIC

TOTAL CARRIED TO SUMMARY

Page 34: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/6-34 WOOD AND PLASTIC

AMOUNTKD

5265.000

Page 35: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/6-35 WOOD AND PLASTIC

5265.000

AMOUNTKD

5265.000

Page 36: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/6-36 WOOD AND PLASTIC

5,265.000

Page 37: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-37 TH AND MOIST PROTECTION

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 7 - TH. & MOIST. PROTECTION

Section 07110Sheet Membrane Waterproofing

7.1 Polythylene sheet 1000 gauge under slab on grade M2 3930 0.550

7.2 L.S L.S 6750.000

Section 07140Fluid Applied Waterproofing

7.3 M2 220 0.800

Section 07110 & 07140

Waterproofing System (Toilets & Kitchen)

7.4

7.4.1 Two coats of fluid applied waterproofing paint M2 345 0.800over concrete floor and wall

7.4.2 130-150mm thick foam concrete fill M2 345 1.950

7.4.3 20 mm thick sand cement screed M2 345 0.950

7.4.4 4 mm thick waterproofing membrane M2 345 2.000

7.4.5 2 cm sand cement screed M2 345 0.950

4mm thick waterproofing membrane under, over and around foundation concrete elements contact in soil with 6mm thick protection board over vertical surfaces including 50mm thick horizontal protection screed below foundation bed all as per MPW specificaions

Rubberized waterproofing paint over external wall along stone cladding

Under tiling in wet areas (Toilets and Kitchen) including dressing up walls, which shall be including.

Page 38: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-38 TH AND MOIST PROTECTION

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

Section 07500 (Composite Roofing System)(Section 03520, 07110, 07140, 07200, 07320)

7.5

7.5.1 2 coats of fluid applied w.p. paint over concrete roof M2 3140 0.950

7.5.2 M2 3140 2.000

7.5.3 M2 3140 1.250

7.5.4 M2 3140 3.850

7.5.5 M2 3140 0.950

7.5.6 75 mm thick extruded polysterene insulation M2 3140 3.100

7.5.7 Filter fabric M2 3140 0.200

7.5.8 M2 3140 3.850

Section 07840Fire Stopping

7.6 L.S L.S

Roof Waterproofing System including testing and guarantee of the roofing system for any water leakage all as per specifications and Engineer's approval.

50-150mm thick lightweight concrete, 600 kg/m3 density with ordinary portland cement laid to falls and cross falls.

20mm thick cement sand screed (1:3) mortar laid over light weight concrete bed.

Two layer of 4mm thick membrane roofing including 350-450 mm girth laid over roof with primer

20mm thick cement sand screed (1:3) mortar laid over WP membrane

400x400x40mm Cement tile and 400x150x40mm skirting bedded in cement and sand mortar and laid over roof in 2.80x2.80m bay with 10cm wide gravel/aggregate strip filled with selected gravel at both direction all as per Engineer's approval and as described

Fire stopping over all openings around the perimeter of Fire Zone as described.

Page 39: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-39 TH AND MOIST PROTECTION

Total Carried to CollectionITEM DESCRIPTION

DIVISION 7 - THERMAL & MOIST.PROTECTION

COLLECTION

Page No. 7-1

Page No. 7-2

Page 40: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-40 TH AND MOIST PROTECTION

TOTAL CARRIED TO SUMMARY

Page 41: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-41 TH AND MOIST PROTECTION

AMOUNTKD

2161.500

6750.000

176.000

276.000

672.750

327.750

690.000

327.750

Page 42: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-42 TH AND MOIST PROTECTION

11381.750 AMOUNT

KD

2983.000

6280.000

3925.000

12089.000

2983.000

9734.000

628.000

12089.000

0.000

Page 43: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-43 TH AND MOIST PROTECTION

50711.000

AMOUNTKD

11381.750

50711.000

Page 44: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/7-44 TH AND MOIST PROTECTION

62,092.750

Page 45: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-45 DOORS AND WINDOWS

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVSION 8 - DOORS AND WINDOWS

Section 08110Metal Door and frame

8.1

8.1.1 Door Type FD1, size 1100x2200mm Nos 6 190.000

8.1.2 Door Type FD2, size 2000x2200mm Nos 7 420.000

8.1.3 Door Type FD3, size 1800x2200mm Nos 10 410.000

8.1.4 Door Type D02, size 2000x2200mm Nos 6 430.000

8.1.5 Door Type D03, size 1000x2200mm Nos 13 190.000

Section 08210, 06100,06200Wood door and Frame, Rough Carpentry

Finish Carpentry

8.2

8.2.1 Door Type D01, size 1100x2200mm Nos 52 240.000

8.2.2 Door Type D04, size 1000x2200mm Nos 37 233.000

8.2.3 Door Type D05, size 1000x2200mm Nos 38 233.000

8.2.4 Door Type D07, size 1100x2200mm Nos 6 240.000

8.2.5 Door Type D10, size 1800x2200mm Nos 5 430.000

8.2.6 Door Type D16, size 1100x2200mm Nos 18 240.000

8.2.7 Door Type D17, size 1000x2200mm Nos 6 233.000

8.2.8 Door Type D20, size 800x2200mm Nos 13 226.000

Hollow metal door and frame with all required weather sealing, fixing accessories, sealant with backup rod and fixing to concrete or block wall including required fire rating, glazing and Hardware etc. complete as described

Solid core flush timber teak veneered doors hanging to wood frames, fixed to concrete or block, including sub-frames/timber packings and fixings etc. complete as described. The item includes frames, finishes, Glazing, Fire Rating, Hardware etc., complete as described

Page 46: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-46 DOORS AND WINDOWS

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

Section 08520Aluminum Doors and Windows

8.3 Aluminium Door:

8.3.1 Door Type D06, size 1800x2200mm Nos 8 320.000

8.3.2 Door Type D08, size 1100x2200mm Nos 6 205.000

8.3.3 Door Type D11, size 7100x2200mm No 1 1313.000

8.3.4 Door Type D12, size 11800x3000mm Nos 2 2677.000

8.3.5 Door Type D13, size 1100x2200mm Nos 2 247.000

8.3.6 Door Type D14, size 3200x2200mm Nos 4 588.000

8.3.7 Door Type D15, size 3800x2200mm Nos 6 704.000

8.3.8 Door Type D18, size 1800x2200mm Nos 2 325.000

8.3.9 Door Type D19, size 2000x2200mm Nos 22 320.000

8.3.10 Door Type D21, size 1600x2200mm Nos 2 294.000

Notes: Door D09 included in the toilet partition, Div-10

8.4 Aluminium Windows

8.4.1 Window Type W01, size 1600x1600mm Nos 24 315.000

8.4.2 Window Type W02, size 25700x1600mm Nos 3 3360.000

Powder coated extruded section aluminium Doors and Windows including glazing as required, frames, fly screens, mullions, loacation angles, shims and plates, heads, sills and jambs, glazing and glazing beads, weather stripping, caulking, pointing, sealing, sub frames, all hard ware, etc. complete and fixing to concrete or block work as described.

Page 47: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-47 DOORS AND WINDOWS

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD8.4.3 Window Type W03, size 3200x1600mm Nos 8 677.000

8.4.4 Window Type W04, size 3200x700mm Nos 6 340.000

8.4.5 Window Type W05, size 4800x1600mm Nos 65 782.000

8.4.6 Window Type W06, size 21500x1600mm Nos 1 2835.000

8.4.7 Window Type W07, size 1600x1600mm Nos 12 195.000

8.4.8 Window Type W08, size 800x1600mm Nos 8 100.000

8.4.9 Window Type W09, size 2550x1600mm (internal) Nos 4 368.000

8.4.10 Window Type W12, size 2000x1200mm (internal) No 1 184.000

8.4.11 Window Type W13, size 7100x2200mm (internal) No 1 1240.000

Section 08600Skylight

8.5

8.5.1 Skylight size 4000x1000mm, Type W10 Nos 2 1890.000

8.5.2 Skylight size 7300x1500mm, Type W11 No 1 7500.000

Shutter

8.6 SH01 4800 x 3750mm No 1 2000.000

Aluminum framed double glazed skylight with complete waterproof installation

Page 48: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-48 DOORS AND WINDOWS

Total Carried to CollectionITEM DESCRIPTION

DIVISION 8 - DOORS AND WINDOWS

COLLECTION

Page No. 8-1

Page No. 8-2

Page No. 8-3

Page 49: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-49 DOORS AND WINDOWS

TOTAL CARRIED TO SUMMARY

Page 50: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-50 DOORS AND WINDOWS

AMOUNTKD

1140.000

2940.000

4100.000

2580.000

2470.000

12480.000

8621.000

8854.000

1440.000

2150.000

4320.000

1398.000

2938.000

Page 51: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-51 DOORS AND WINDOWS

55431.000

AMOUNTKD

2560.000

1230.000

1313.000

5354.000

494.000

2352.000

4224.000

650.000

7040.000

588.000

7560.000

10080.000

Page 52: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-52 DOORS AND WINDOWS

43445.000

AMOUNTKD

5416.000

2040.000

50830.000

2835.000

2340.000

800.000

1472.000

184.000

1240.000

3780.000

7500.000

2000.000

Page 53: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-53 DOORS AND WINDOWS

80437.000

AMOUNTKD

55431.000

43445.000

80437.000

Page 54: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/8-54 DOORS AND WINDOWS

179,313.000

Page 55: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-55 FINISHES

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 9 - FINISHES

Section 09200Lath and plaster

9.1 M2 20,360 2.250

Section 09260Gypsum Board

9.2 M2 250 6.500

Section 09310Ceramic Tiles

9.3

9.3.1 M2 345 7.000

9.3.2 M2 1,236 7.500

9.3.3 M2 6,876 7.000

20mm thick cement and sand plaster (with mesh fabric) applied to internal wall and ceiling, stairs and shafts (concrete or block wall) including under coat, metal lath, corner beads, stop beads etc. complete as described.

100 mm thick and 2200mm high metal stud partition comprising 12.5 mm thick waterproof quality gypsum wall board on both sides with sound attenuation blanket including metal furring channels, head and sill runners, caulking, leveling shims etc. all as described

Non slip ceramic floor tiles on and including cement & sand setting bed, sand cushion and joints grouted in waterproof grout over concrete floor all as described.

(Prime cost for all the ceramic are 2.5 KD/M2, similar to L& M artificial marble tiles ,Eagle ceramic tiles or equally approved, sizes mention here are only for reference , contrcator can use standard sizes of ceramic)

Non-slip decorative ceramic tile for wet areas, type CT1, size 600x600x10mm

Acid resistant ceramic tile, type CT2, size 600x600x10mm

Non-slip decorative ceramic tile with border, type CT4 & CT7, size 600x600x10mm

Page 56: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-56 FINISHES

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

9.3.4 Ditto-but with pattern and different color for Corridoors M2 240 7.250

9.3.5 M2 553 6.500

9.4 Ceramic Skirting - Ditto

9.4.1 Coved ceramic skirting, 600x100x10mm MR 3,475 2.000

9.4.2 Coved ceramic skirting, 300x100x9mm MR 442 2.500

9.5

9.5.1 M2 1,270 5.150

9.5.2 300x300x6mm ceramic tile with border for wet areas M2 1,375 5.500

9.5.3 Ditto but for laboratory areas (acid resistant) M2 1,665 6.000

9.5.4300x300x 6mm ceramic tile for storage areas at F.F

M2 154 5.150

Section 09420Terrazzo

9.6 M2 500 6.000

9.7 MR 362 3.500

Non-slip ceramic tile, type CT5 for store and service area, size 300x300x9mm

Wall ceramic tiles fixed on concrete or block work on and including cement and sand backing and joints grouted in waterproof grout, all as described.

300x300x6mm ceramic tile over corridor wall 1200mm high

Precast Terrazzo floor tile, size 300x300x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described

Precast Terrazzo Skirting, size 300x100x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described

Page 57: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-57 FINISHES

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KDSection 09510

Acoustic tile Ceiling

9.8 M2 216 6.000

Section 09513Metal Suspended Ceiling

9.9 M2 345 8.500

Section 09260, 09535

Gypsum Board Ceiling / Acoustic tile Ceiling

9.10 M2 8,755 7.500

Section 09260Glass Fiber Reinforced Gypsum (GRG) Ceiling

9.10 GRG Ceiling

9.10.1 M2 220 6.000

Section 09260

Gypsum Board Ceiling

9.10.2 M2 695 6.500

Acoustic tile ceiling, size 600x1200x15mm including all frame work, suspension system, access panels etc. complete as described

Metal tile / ribed crrugated sheet with anti bacterial paint ceiling including all frame work, suspension system, access panels etc. complete as described for wet areas

Combination of 12.5mm thick Gypsum board ceiling with emulsion paint finish and 600x600x15mm acoustic tile ceiling including all frame work, suspension system, access panels etc. complete as described

20mm thick Decorative GRG ceiling with emulsion paint finish including all frame work, suspension system, access panels etc. complete as described

12.5mm thick waterproof qualityGypsum board ceiling with waterproof paint for wet areas all as shown and described.

Page 58: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-58 FINISHES

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KDSection 09600

Granite & Marble

9.11 Stone & Marble:

9.11.1 MR 51 15.000

9.11.2 M2 120 35.000

9.11.3 M2 395 20.000

9.11.4 MR 960 13.000

9.11.5 MR 547 5.000

9.11.6 30mm thick Italian carrara marble threshold MR 36 4.000

9.11.7 Nos 6 750.000

9.11.8 Ditto- but 1200mm with 1 Bowl No 1 160.000

9.11.9 Ditto- but1900mm with 2 Bowl No 1 250.000

Section 09680

Carpet Tiles

Natural Granite steps for external entrances, 30mm thick and 300mm wide Treadx 20mm thick and 160mm high Riser all as described.

3cm thick granite flooring tiles for Main & Rear Entrances, type M-5,

400x400x30mm thick Italian carrara marble tile for stair hall and landings

Italian carrara marble Steps, 30mm thick and 300mm wide Tread x 20mm thick and 160mm high Riser

Italian carrara marble Skirting for Stair, 160mm highx20mm thick

12mm thick synthetic marble (L.G. , Corrian or equally approved) wash basin counter fixed over galvanized steel supports including marble fascia, back spalsh, cut out for wash basin, all required accessories, sealant etc. complete as described. 30mm thickx600mm wide and 7220mm long with 7 Bowls

Page 59: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-59 FINISHES

9.12 M2 225 7.000

Total Carried to Collection

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

Section 09710 , 09842 Acoustical Wall Panel /

Stretched fabric acoustic panels.

9.13 M2 520 46.000

Section 09800 Epoxy

9.14 M2 215 3.000

Section 09900Painting

9.15

9.15.1 Emulsion paint M2 13,140 1.200

9.15.2 Oil paint M2 4,065 1.300

9.15.3 M2 2,184 2.600

Carpet tiles laid over screed floor with approved quality additives. (screed measured separately )

Combination of acoustic wood panel and Proprietary make "Streched Fabric" Acoustic wall panel inside Seminar hall, Library/Office, Vocal room and instrument music including all fittings and accessories as decribed

(lower 1mt. Height from flooring wooden acoustic panel and fabric panels to be up to the ceiling from top of the wood panels)

Epoxy finish over screed, Type CO-2 (Screed measured separately in Div-3) min 300 micron dry thick

Prepare and apply 3 coats paint of approved colour over plastered surface (wall and ceiling) including preparation of surfaces, undercoat, sealcoat etc. complete as described

Texture paint system as specified including two coats of Polyurethane protection layers (NIC texture paint system or equally approved)..

Page 60: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-60 FINISHES

Total Carried to Collection

ITEM DESCRIPTION

DIVISION 9 - FINISHES

COLLECTION

Page No. 9-1

Page No. 9-2

Page No. 9-3

Page No. 9-4

Page No. 9-5

Page 61: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-61 FINISHES

TOTAL CARRIED TO SUMMARY

Page 62: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-62 FINISHES

AMOUNTKD

45810.000

1625.000

2415.000

9270.000

48132.000

Page 63: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-63 FINISHES

107252.000

AMOUNTKD

1740.000

3594.500

6950.000

1105.000

6540.500

7562.500

9990.000

793.100

3000.000

1267.000

Page 64: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-64 FINISHES

42542.600

AMOUNTKD

1296.000

2932.500

65662.500

1320.000

4517.500

Page 65: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-65 FINISHES

123331.200

AMOUNTKD

765.000

4200.000

7900.000

12480.000

2735.000

144.000

4500.000

160.000

250.000

Page 66: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-66 FINISHES

1575.000

34709.000

AMOUNTKD

23920.000

645.000

15768.000

5284.500

5678.400

Page 67: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-67 FINISHES

27375.900

AMOUNTKD

107252.000

42542.600

123331.200

34709.000

27375.900

Page 68: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/9-68 FINISHES

335,210.700

Page 69: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-69 SPECIALITIES

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 10 - SPECIALTIES

Section 10100Visual Display Board

10.1

10.1.1 Nos 50 50.000

10.1.2 Nos 22 50.000

10.1.3 Nos 100 30.000

10.1.4 Nos 48 30.000

Section 10170Toilet Partition/Cubicle

10.2

10.2.1 Nos 12 1700.000

Section 10651Operable Panel Partition

10.3 Nos. 4 2400.000

Wall mounted marker board and tack board with silver anodising frame with plastic rounded corners, elegant alluminium tray ,fixing etc. complete as described

Marker board having the size 2.5 mt x 1.25 mt for general class room

Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop

Marker board having the size 1.30 mt x 1.25 mt for general class room.

Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop.

Proprietary make Plastic toilet partition, cubicles including doors, front panels, divisions, end panels with all required hardware and accessories as described.

Toilet partition/cubicle 13mm thick with five (5) doors, size 12750x2200mm (Door TypeD09)

Proprietary make "Manually Operated" Operable Partition over Class room, size 8500x3500m including all fittings, accessories and hardware all as described.

Page 70: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-70 SPECIALITIES

Total Carried to Collection

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

Section 10800Toilet Accessories

10.4

10.4.1 Waste Receptacle (WR) Nos 76 40.000

10.4.2 Toilet Paper Dispenser (TPD) recessed Nos 70 15.000

10.4.3 Paper Towel Dispenser (PTD) Nos 22 12.000

10.4.4 Robe Hook (RH) Nos 70 10.000

10.4.5 Soap Dispenser Vertical (SDV) wall mounted Nos 39 10.000

10.4.6 St.steel framed mirror (FM), size 7600x900mm Nos 6 300.000

10.4.7 Ditto but size 1870x900mm No 1 120.000

10.4.8 St.steel framed mirror (FM), size 700x1000mm Nos 10 75.000

10.4.9 St.Steel Grab Bar (GB) Nos 52 2.500

10.4.10 Folding Shower Seat (FSS) No 1 200.000

10.4.11 Utility Shelf, Mop and Broom Holder (MH) Nos 6 10.000

10.4.12 Hot Air Dryer (HD) Nos 6 135.000

Supply and fix toilet accessories including all component parts, assembling, plugging, screwing or otherwise fixing and making good all as described.

Notes: Flexible hose with spray nozzle included with WC in Div-15, Mechanical

Page 71: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-71 SPECIALITIES

Total Carried to CollectionITEM DESCRIPTION

DIVISION 10 - SPECILITIES

COLLECTION

Page No. 10-1

Page No. 10-2

Page 72: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-72 SPECIALITIES

TOTAL CARRIED TO SUMMARY

Page 73: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-73 SPECIALITIES

AMOUNTKD

2500.000

1100.000

3000.000

1440.000

20400.000

9600.000

Page 74: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-74 SPECIALITIES

38040.000

AMOUNTKD

3040.000

1050.000

264.000

700.000

390.000

1800.000

120.000

750.000

130.000

200.000

60.000

810.000

Page 75: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-75 SPECIALITIES

9314.000

AMOUNTKD

38040.000

9314.000

Page 76: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/10-76 SPECIALITIES

47,354.000

Page 77: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-77 FURNISHINGS

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 12 FURNISHINGS

Section 12357 Kitchen Casework/Cabinet

12.1

12.1.1 MR 12

12.1.2 Wall Unit size 400x600mm high - ditto MR 12

Section 12358Laboratory Casework

12.2 BASE CABINETS:

12.2.1 Base cabinet type CK055PHX Nos 240

12.2.2 Base cabinet type CD0455PHX Nos 64

12.2.3 Base cabinet type CB050PHX Nos 8

12.2.4 Base cabinet type CD050PHX Nos 4

Total Carried to Collection

Kitchen area base and wall units complete with double doors, adjustable shelves, sides, tops, bottoms, backs, skirting and all required accessories, hardware, fixings, components, support legs, sealing, plugging, screwing, making good, all as as per Engineer's approval.

Base unit size 600mm deep x 850mm high set in range including sink units with dustbin, shaped corner units and 3mm thick stainless steel top with cutout for sinks and recesses for appliances(Sink measured separately in Div-15, Mechanical.)

Supply and fix Laboratory Casework for Biology Lab 1 & 2, Geology Lab 1 & 2, Chemistry Lab 1 & 2 and Physics Lab 1 & 2, with all required fittings, weather sealing, fixing accessories, sealant with backup rod and fixing to concrete, block work or gypsum board including all required hardware and accessories as described.

Page 78: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-78 FURNISHINGS

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

12.2.5 Base cabinet type CA060PHX Nos 20

12.2.6 Base cabinet type CB060PHX Nos 6

12.2.7 Base cabinet type CA045PHX Nos 4

12.2.8 Base cabinet type CB045PHX Nos 14

WALL CABINETS:12.3 Wall cabinet type S2PND090-30 Nos 32

STORAGE CABINETS:12.4 Storage cabinet type Q2PND120-40 Nos 14

12.5 WORKTOP COUNTERS:12.5.1 Worktop counter type 16TRE60 MR 382

12.5.2 Worktop counter type 24MEL75 MR 9

12.6 SINK CABINETS:12.6.1 Sink cabinet type CS060PHX Nos 44

12.6.2 Sink cabinet type CS120PHX Nos 4

12.7 MISCELLANEOUS CABINETS/COUNTERS:12.7.1 Type KB46 Nos 70

12.7.2 Type COD028 Nos 70

12.7.3 Type LE2WP Nos 238

12.7.4 Type JCWSO Nos 14

12.7.5 Type PPSINK Nos 52

12.7.6 Type LMXSO Nos 40

12.7.7 Type LGISO Nos 32

FUME HOOD WITH BASIC CABINET:12.8 Type FC120 Nos 2

SAFETY SHOWER12.9 Type S&E Wash Nos 2

Page 79: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-79 FURNISHINGS

Total Carried to CollectionITEM DESCRIPTION

DIVISION 12 FURNISHINGS

COLLECTION

Page No. 12-1

Page No. 12-2

Page 80: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-80 FURNISHINGS

TOTAL CARRIED TO SUMMARY

Page 81: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-81 FURNISHINGS

AMOUNTKD

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Page 82: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-82 FURNISHINGS

AMOUNTKD

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Page 83: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-83 FURNISHINGS

0.000

AMOUNTKD

0.000

0.000

Page 84: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/12-84 FURNISHINGS

0.000

Page 85: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/14-85 CONVEYNG SYSTEM

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION 14- CONVEYING SYSTEM

Electrical Passenger Elevator.

14.1 Nos 2

14.2 LS LS

14.3 Nos. 4

14.4 LS LS

14.5 LS LS

14.6 Allow for builder’s works required for the elevator. LS LS

14.7 LS LS

14.8 LS LS

14.9 Allow for Lloyd’s approval certification LS LS

Supply, Install & Commissioning Duplex Electrical Passenger Elevator for 3 stops, 1600Kg. ( 21 Passengers) Loading capacity, Complete with all necessary requirement as per contract and Fire Brigade specification as shown on the drawing. Including Fire Brigade approval.

Allows for electrical works (power, control, fire alarm, etc.) associated with Elevators Equipments, and System, Including cabling, wiring, switching, elevator control panels with all accessories and all other related works as per specification and Kuwait Fire Brigade..

Emergency Diesel Generator 45 KW for Fire Brigade operation and in case of power failure complete with all accessories

Allow for interlocking the elevators control with the building managements system.

Any other item (s) not mentioned either above or in the specification but it’s necessary for the optimum operation of the system in according with the specification and Kuwait Fire Brigade requirements.

Allow for submitting shop working drawing, coordination drawing, builder works drawing, as-built drawing, operation & maintenance manual, etc.

Allow for testing & commissioning of the elevators in accordance with specification and Kuwait Fire Brigade including handing over to Kuwait Fire Brigade.

Page 86: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/14-86 CONVEYNG SYSTEM

Total Carried to CollectionITEM DESCRIPTION

DIVISION 14 CONVEYING SYSTEM

COLLECTION

Page No. 14-1

Page 87: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/14-87 CONVEYNG SYSTEM

TOTAL CARRIED TO SUMMARY

Page 88: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/14-88 CONVEYNG SYSTEM

AMOUNTKD

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Page 89: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/14-89 CONVEYNG SYSTEM

0.000

AMOUNTKD

0.000

Page 90: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/14-90 CONVEYNG SYSTEM

0.000

Page 91: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-91 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

DIVISION - 15 MECHANICAL WORKSDRAINAGE

15.1

15.1.1 Dia 50mm MR 409 3.15015.1.2 Dia 75mm MR 170 4.20015.1.3 Dia 100mm MR 778 5.25015.1.4 Dia 150mm MR 433 8.400

15.2 Polished bronze rain water shoe

Dia 4" Nos 28 36.750

15.3

Dia 4" Nos 51 47.250

15.4

15.4..1 Dia 4" Nos 85 47.250

15.4.2 Dia 3" Nos 3 47.250

15.5 Vent Hood Caps15.5.1 Dia 4" Nos 2 15.750

The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price.

Include in price all adjustment required by code or as per coordination with other disciplines.

Contractor responsible to get approvals all authorities having jurisdictions for shop drawings.

Contractor must attach a breakdown analysis for lump sum items.

High density polyethylene tempered (HDPE) to DIN 19535 / 19637 and DIN 8075 drainage piping for underground and above ground drainage system in all aspect as specified.

Adjustable floor cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug, with nickel bronze top

Adjustable floordrain cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug,with nickel bronze top

Page 92: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-92 Mechanical work

Total Carried to Collection

Page 93: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-93 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

15.6 GcoDia 6" Nos 1 47.250

15.7 Dia 3" Planter drain Nos 2 31.500

15.8 Roof Rain water outlets15.8.1 Dia 6" Nos 8 78.75015.8.2 Dia 4" Nos 2 31.500

15.9 Dia 3"Funnel floor drain Nos 18 68.250

15.10

15.10.1 Ewc Nos 50 105.00015.10.2 Awc Nos 12 105.00015.10.3 Ablution hose Nos 62 5.25015.10.4 Wash basin (counter) Nos 42 94.50015.10.5 Wash basin (pedstal) Nos 8 94.50015.10.6 Pantry sinks-single bowl Nos 7 126.00015.10.7 LabSink-Single bowl Nos 65 262.50015.10.8 LabSink-double bowl Nos 2 315.00015.10.9 Shower Trays Nos 1 105.000

15.10.10 Drinking Fountain (Type-A) Nos 6 294.000

15.11 L.S. L.S.

15.12 L.S. L.S.

Toilet & kitchen fixtures as shown on the on arch drawings with chrome fittings of drainage accessories, flexible hoses etc.

Cleaning, flushing and painting of all the drainage piping as per colour codes.

Builders work like including connecting pipes and gullys through cement pipes to manhole and covers for particular application and installation of toilet

Page 94: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-94 Mechanical work

Total Carried to Collection

Page 95: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-95 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

WATER SUPPLY

NOTE :

15.13

15.13.1 Dia 3" MR 20 18.90015.13.2 Dia 2" MR 164 8.40015.13.3 Dia 1 1/2" MR 170 7.35015.13.4 Dia 1 1/4" MR 150 6.30015.13.5 Dia 1" MR 193 5.25015.13.6 Dia 3/4" MR 678 4.20015.13.7 Dia 1/2" MR 520 3.150

15.14 Nos 5 840.000

15.14.1 Nos 2 420.000

15.15

15.15.1 Unit Boiler 120 liter Nos 6 126.00015.15.2 Unit boiler of capacity 80 liters/each Nos 6 89.25015.15.3 Unit boiler of capacity 50 liters/each Nos 7 78.750

Supply, installation, testing and commissioning of the following items & piping networks for buildings for hot and cold water supply system with fittings, valves, equipments, support and requiredpipe,fittings, valves, equipment, supports with pipe, accessories in all aspect as specified.

All exposed water supply piping on roof and inside roof shall be poly propylene, as per specification.

Water supply piping network from water tank to Including risers, with all accessories like gate valve, check valve.

Polythelene water tanks (Shaded) including all accessories, fittings (float switches,inlet valve, drain valves, over flow and drain pipe up to required length etc) Cat and mouse water level indicator including all galvanized steel supports,frames and bases etc. complete 3000 gallon each.

Ditto - But Capacity 2000 gallon capacity for brackish water supply

Electric water heater pressure type with concealed valve, pressure and temperature relief valves, all fittings and accessories.

Page 96: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-96 Mechanical work

Total Carried to Collection

Page 97: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-97 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

15.16 Water filters15.16.1 Central water filters of capacity 10 m3/hr Nos 1 997.50015.16.2 Unit filters for kitchen - Dia 1/2" Nos 10 21.000

15.17 Nos 1 1312.500

Notes :All the above rates to be including of the following :

Electrical works related to all Plumbing services

Testing and commissioning of all plumbing services

Booster pump set with pressure tank 200 ltr. Minimum capacity including all acccessories having capacity 40 Gpm @ 4 bar.

Submitting as-built drawings, providing all operation, instruction and maintenance materials etc..

Builders work related to all plumbing works including trenches, patching, chipping works etc.

B110
user16: Lock marked cells
Page 98: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-98 Mechanical work

Total Carried to Collection

Page 99: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-99 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

FIRE FIGHTING

15.18

Dia 65mm MR 30 15.750

15.19

15.19.1 Dia 50mm MR 222 12.60015.19.2 Dia 40mm MR 24 8.40015.19.3 Dia 32mm MR 35 7.350

15.20 L.S. L.S. 525.000

15.21 FHC Nos 18 288.750

15.22 FC

Nos 2 84.000

The tender drawing is for guidance only. Contractor should arranage the layout coordinated with all disciplines, submit calculation, catalogues for material and equipment for engineers approval and KFB.

The BOQ is for guidance only. Contractor should quote for lump sum price including approval of KFB.

Black steel piping network suitable for welding type joints to schedule 40 seamless ( for sprinkler system from tank to pumps, pump rooms, by pass, risers etc. complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers.

Galvanised steel piping suitable for threaded type joints to schedule 40 seamless complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers.

Painting of all fire fighting piping (2 coats of primer and 2 coats of final finish painting) as per colour codes, labelling, flow direction marking and tags for valves.

80cm x 160cmx40 cm including 25mm fire hose reel 30m long manual swing type fire extinguisher as specified 6 kg Dry powder and 2 gallons water/gas

Fire extinguisher cabinet with 6 kg Dry powder and 2 gallons water/gas

Page 100: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-100 Mechanical work

Total Carried to Collection

Page 101: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-101 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

15.23 Automatic air ventsDia 25mm Nos 2 26.250

Fire Pumps and Accessories

15.24

15.24.1 Capacity of 200 gpm@ 5.5 bar-20 K.W Nos 2 2625.000

15.24.2 Valves and fittings L.S. L.S.

15.24.3 L.S. L.S.

Notes : All the above rates to be including of the following :

Electrcial works related to all firefighting services

Testing & commissioning of all firefighting services

Builders work related to all firefighting works

Electrical fire pumps of type vertical multistage with all accessories and 2 years maintenance in all aspect including pressure tanks (approval to be done)

Suction pipe from firewater tank to pumps including all fittings, connection to all valves, mater, strainers, header

Submitting as-built drawings, providing all operation, instruction & maintenance materials etc.

B179
user16: Lock marked cells and change the numbering
Page 102: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-102 Mechanical work

Total Carried to Collection

Page 103: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-103 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

HVAC - GENERAL NOTES

Duct Work15.25 Kgs. 31000 1.694

Duct Insulation15.26 M2 4500 3.033

15.27 L.S. L.S. 1575.000

Air Outlets and Inlets15.28 L.S. L.S. 12600.000

The following BOQ is for guidance only. Contractor is responsible to get approval from all local authorites.

The BOQ is for guidance only. Contractor should quote for lump sum price including approval of MEW . Include in quotation all catalogues for equipments.

Glavanized sheet metal duct work complete with required volume control dampers, joints, test holes/back draft dampers, air turning devices, duct access doors. As specified , shown and required for functioning the system..

Perform iinsulation material secured around duct work complete with finishing and aluminium cladding etc. as specified.

Perform internal acoustic lining material secured on internal surface of duct as specified.

Air Outlets and Inlets, include on diffusers, Linear bar grilles, registers, exhaust air valves, louvers, 4' thick filter grilles etc. complete as specified.

Page 104: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-104 Mechanical work

Total Carried to Collection

Page 105: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-105 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

15.29

15.29.1 E.F -01 , 2700 cfm Nos 1 5985.00015.29.2 E.F -02 , 200 cfm Nos 1

15.29.3 E.F -03 , 2925cfm Nos 1

15.29.4 E.F -04 , 300 cfm Nos 1

15.29.5 E.F -05,06 , 400cfm Nos 2

15.29.6 E.F -07, 400cfm Nos 1

15.29.7 E.F -08 , 600 cfm Nos 1

15.29.8 E.F -09 , 200 cfm Nos 1

15.29.9 E.F -10 , 400 cfm Nos 1

15.29.10 E.F -11 , 400 cfm Nos 1

15.29.11 E.F -12,13,14,17,18,19 , 200 cfm Nos 6

15.29.12 E.F -15-16 , 200 cfm Nos 2

15.30 Package Units

15.30.1 PU-GF1&GF6 , 262800 BTU/Hr, 8750 cfm. Nos 2 3780.000

15.30.2 Nos 4 3780.000

15.30.3 PU-GF4&GF7, 200000 BTU/Hr, 7500cfm. Nos 2 3780.00015.30.4 PU-FF1&FF9, 280000 BTU/Hr., 10000 cfm Nos 2 3780.00015.30.5 PU-FF2&FF10, 262800 BTU/Hr. 8750cfm. Nos 2 3780.00015.30.6 PU-FF3 to FF8 , 262800 BTU/Hr. , 8750 cfm Nos 6 3780.00015.30.7 PU-SF1&SF6 , 315000 BTU/Hr.,12500 cfm Nos 2 3780.00015.30.8 PU-SF2&SF5, 280000 BTU/Hr. , 10000 cfm Nos 2 3780.00015.30.9 PU-SF3 ,271800 BTU/Hr., 9000 cfm Nos 1 3780.000

15.30.10 PU-SF4 , 262800 BTU/Hr., 8750 cfm Nos 1 3780.000

15.31 Automatic Control SequenceElectrical type wall mounted thermostats Nos 24 52.500

Total Carried to Collection

Exhaust Fans complete with bird screen, back draft damper and other accessories as specified.

Package Unit complete with all accessories like filters ,mixing box etc as specified @ 115F

PU-GF2&GF3&PU-GF5&GF8, 280000 BTU/Hr, 10000cfm

Page 106: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-106 Mechanical work

ITEM DESCRIPTION UNIT QTY UNIT RATEKD

15.32 L.S. L.S. 1260.000

15.33 L.S. L.S. 2625.000

15.34 L.S. L.S. 3675.000

Refrigrant Piping / Condensate Drainnage piping Complete With Insulation , Hangers and cladding and insulation

Civil works related to A/C such as foundations, steel walkways over the piping on roof, openings and supporting structures, etc.

Allow for electrical works ( power, control and fire alarm) associated with HVAC works including cabling, wiring, switching, motor control panels with accessories and all other related works.

Page 107: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-107 Mechanical work

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

DIVISION - 15 MECHANICAL WORKSMEDICAL GAS SYSTEM,

15.35

15.35.1 Dia 3" MR 78 31.50015.35.2 Dia 2" MR 72 26.25015.35.3 Dia 1 1/4" MR 108 21.00015.35.4 Dia 1" MR 70 15.75015.35.5 Dia 3/4" MR 120 12.60015.35.6 Dia 1/2" MR 80 10.500

Control valves 15.36

15.36.1 Dia 2" Nos 20 84.00015.36.2 Central Gas regular 3Ø Nos 1 126.00015.36.3 Regulating valve Ø 2" Nos 2 52.500

15.37 Gas Cylinders

15.37.1 Gas Cylinders (spare) Nos 8 52.500

The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price.

Include in price all adjustment required by code or as per coordination with other disciplines.

Contractor responsible to get approvals all authorities having jurisdictions.

Contractor must attach a breakdown analysis for lumpsum items.

Supply and Installation of Medical Grade, Degreased Copper Pipes as per specification complete with all fixtures,insulation.

Supply and Installation of Medical Grade, Degreased Control valves as per specification complete with all fixtures,insulation.

Supply and Installation of Medical Grade GS12 gas cylinders

Page 108: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-108 Mechanical work

Total Carried to CollectionITEM DESCRIPTION UNIT QTY UNIT RATE

KD

15.38 Builders work related to Medical Gas euipment and Piping L.S. L.S. 525.000

15.39 Testing and commissioning of all medical gas services L.S. L.S. 315.000

15.40 L.S. L.S. 26250.000

Building Automation System (BAS) for Complete Project

Full building automation system (BAS) complete with controller (Lontalk) type and (Bac) net, protocols and all control panels,wiring, sensors,devices, transformers etc. as as per BAS specifications and system points list schedules for each equipment as per BAS drawings.

(This includes the connection of all services (plumbing, fire fighting, HVAC) to BAS system as per specification and drawings)

Page 109: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-109 Mechanical work

Total Carried to Collection

Page 110: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-110 Mechanical work

ITEM DESCRIPTION

DIVISION - 15 MECHANICAL WORKS

COLLECTION

Page No. 15-1Page No. 15-2Page No. 15-3Page No. 15-4Page No. 15-5Page No. 15-6Page No. 15-7Page No. 15-8Page No. 15-9Page No. 15-10Page No. 15-11

Page 111: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-111 Mechanical work

TOTAL CARRIED TO SUMMARY

Page 112: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-112 Mechanical work

AMOUNTKD

1288.350714.000

4084.5003637.200

1029.000

2409.750

4016.250

141.750

31.500

Page 113: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-113 Mechanical work

17352.300

Page 114: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-114 Mechanical work

AMOUNTKD

47.250

63.000

630.00063.000

1228.500

5250.0001260.000325.500

3969.000756.000882.000

17062.500630.000105.000

1764.000

0.000

0.000

Page 115: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-115 Mechanical work

34035.750

Page 116: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-116 Mechanical work

AMOUNTKD

378.0001377.6001249.500945.000

1013.2502847.6001638.000

4200.000

840.000

756.000535.500551.250

Page 117: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-117 Mechanical work

16331.700

Page 118: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-118 Mechanical work

AMOUNTKD

997.500210.000

1312.500

Page 119: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-119 Mechanical work

2520.000

Page 120: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-120 Mechanical work

AMOUNTKD

472.500

2797.200201.600257.250

525.000

5197.500

168.000

Page 121: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-121 Mechanical work

9619.050

Page 122: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-122 Mechanical work

AMOUNTKD

52.500

5250.000

0.000

0.000

0.000

0.000

0.000

0.000

Page 123: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-123 Mechanical work

5302.500

Page 124: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-124 Mechanical work

AMOUNTKD

52503.150

13650.525

1575.000

12600.000

Page 125: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-125 Mechanical work

80328.675

Page 126: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-126 Mechanical work

AMOUNTKD

5985.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

7560.000

15120.000

7560.0007560.0007560.00022680.0007560.0007560.0003780.0003780.000

1260.000

97965.000

Page 127: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-127 Mechanical work

AMOUNTKD

1260.000

2625.000

3675.000

Page 128: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-128 Mechanical work

7560.000

AMOUNTKD

2457.0001890.0002268.0001102.5001512.000840.000

1680.000126.000105.000

420.000

Page 129: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-129 Mechanical work

12400.500

AMOUNTKD

525.000

315.000

26250.000

Page 130: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-130 Mechanical work

27090.000

Page 131: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-131 Mechanical work

AMOUNTKD

17352.30034035.75016331.7002520.0009619.0505302.50080328.67597965.0007560.00012400.50027090.000

Page 132: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/15-132 Mechanical work

310,505.475

Page 133: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-133 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

DIVISION 16 - ELECTRICAL

General Consideration for all items:

16.1

16.2

16.3

16.4 L.S. L.S.

The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables, wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work.

All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOE (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer.

All works shall be carried out to comply with the BAS (Building Automation System) requirements.

The Contractor is reffered to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, wheather or not they are specifically mentioned within the items.

BUILDER WORK:All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholds, earth pits, ducts, trenches, cable tiles … etc.including supply and install 6" & 4" PVC ducts for MLTP, MSB's DB's cables as per shown in drawing and as per MOE (E&W) regulation. Including all ducts between ( LT, Panel and Transformer ) and H.T. duct for MOE (E&W) intake cable. And all civil work as per Drawings, Specification and the Approval of the Engineer.

Page 134: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-134 ELECTRICAL WORKS

Total Carried to Collection

Page 135: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-135 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

Section 16426Distribution Equipment

16426 : Main Switch Board16.5

16.5.01 MSB - A-G-1 No 1

16.5.02 MSB - A-G-2 No 1

16.5.03 MSB - PU-G No 1

16.5.04 MSB - A-F-1 No 1

16.5.05 MSB - A-F-2 No 1

16.5.06 MSB - PU-F No 1

16.5.07 MSB - A-S-1 No 1

16.5.08 MSB - A-S-2 No 1

16.5.09 MSB - A-PU-S NO 1

16.5.10 MSB - A-R No 1

16.5.11 MSB - FF No 1

Supply, install and connect the following electrical board or S/Fs or DBs, including all cables, cable trays, access conduit, wiring, boxes, W/T Enclosure, earthing, labels name plates , wire and cables markers , foundation trenches , and All required for the connection with the Central Control Management and Monitoring System, etc., as MPW, MOE (E&W) requirements and as shown in the drawings.The Contractor Must Submit Detail For The Separate Phase Wire To Feed The Backup Battery For Approval, and He is Obligee to Achieve The Engineer Satisfaction.

Supply, install and connect the following main switch board (MSB), Sub-Main switch Boards (SMSB) complete with Conduits,wiring, earthing, cable glands, meters and all accessories as necessary, testing and commissioning to be ready for good working and all acording to drawings, specification and the Engineer approval.

Page 136: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-136 ELECTRICAL WORKS

Total Carried to Collection

Page 137: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-137 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

16426 : Isolators and Switch Fuses& PANEL BOARDS

16.6

The following items fed from MSB - A-G-1-1

16.6.01 DB-A-G-02L No 1

16.6.02 DB-A-G-02P No 1

16.6.03 DB-A-G-03L No 1

16.6.04 DB-A-G-03P No 1

16.6.05 DB-A-G-05LP No 1

16.6.06 DB-A-G-07L No 1

16.6.07 DB-A-G-07P No 1

16.6.08 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1

16.6.09 15A TPN S/F in W.P.Enclosure for GU No 1

The following items fed from MSB - A-G-1-2

16.6.10 DB-A-G-01L No 1

16.6.11 DB-A-G-01P No 1

16.6.12 DB-A-G-04L No 1

Supply, install and connect est and make necessary commissioning, complete with all necessary conduits feeding wirings and cables, earthing , HRC fuses, magnetic contactors ...etc. and all necessary accessories following electrical board and S/F , as per the drawing, specification, MOE (E&W) regulation, and approval of Engineer.All (S/F's, MCCB, ELCB, DB - AHU) protected by water tight enclosure.

Page 138: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-138 ELECTRICAL WORKS

Total Carried to Collection

Page 139: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-139 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

16.6.16 DB-A-G-04P No 1

16.6.17 DB-A-G-06L No 1

16.6.18 DB-A-G-06P1 No 1

16.6.19 DB-A-G-06P2 No 1

16.6.20 DB-A-G-06P3 No 1

16.6.21 DB-A-G-08LP No 1

16.6.22 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1

The following items fed from DB-A-G-06P1

16.6.23 15A SPN S/F in W.P.Enclosure No 1

The following items fed from MSB - A-G-2-2

16.6.24 30A TPN S/F in W.P.Enclosure for GU No 2

The following items fed from MSB - A-F-1-1

16.6.25 DB-A - F -02L No 1

16.6.26 DB-A - F -02P No 1

16.6.27 DB-A - F -03L No 1

16.6.28 DB-A - F -03P No 1

16.6.29 DB-A - F -05LP No 1

16.6.30 DB-A - F -07LP No 1

16.6.31 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1

The following items fed from MSB - A-F-1-2

16.6.32 30A TPN S/F in W.P.Enclosure for Klin room No 1

Page 140: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-140 ELECTRICAL WORKS

Total Carried to Collection

Page 141: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-141 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

The following items fed from MSB - A-F-2-1

16.6.33 DB-A - F -01L No 1

16.6.34 DB-A - F -01P No 1

16.6.35 DB-A - F -04LP No 1

16.6.36 DB-A - F -06LP No 1

16.6.37 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1

The following items fed from MSB - A-F-2-2

16.6.38 DB-A - S -02L No 1

16.6.39 DB-A - S -02P No 1

16.6.40 DB-A - S -03L No 1

16.6.41 DB-A - S -03P1 No 1

16.6.42 DB-A - S -03P2 No 1

16.6.43 DB-A - S -03P3 No 1

16.6.44 DB-A - S -05LP No 1

16.6.45 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1

The following items fed from MSB - A-S-2

16.6.46 DB-A - S -01L No 1

16.6.47 DB-A - S -01P1 No 1

16.6.48 DB-A - S -01P2 No 1

16.6.49 DB-A - S -01P3 No 1

16.6.50 DB-A - S -04LP No 1

16.6.51 DB-A - S -06LP No 1

Page 142: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-142 ELECTRICAL WORKS

Total Carried to Collection

Page 143: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-143 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

16.6.52 30A TPN S/F in W.P.Enclosure for Water Cooler Type C No 1

The following items fed from MSB - A-R

16.6.53 DB-A - Roof LP No 1

16.6.54 DB-A - EX FAN No 1

16.6.55 15A TPN S/F in W.P.Enclosure (for FAF-1&2, W.Pump 1&2) No 4

The following items fed from MSB - F-F

16.6.56 Main Fire Pump -01 No 1

16.6.57 Main Fire Pump -02 No 1

The following items fed from DB-A - EX FAN

16.6.58 15A TPN S/F in W.P.Enclosure No 4

16.6.59 15A SPN S/F in W.P.Enclosure No 1416140 : Electrical Points

16.7

16.7.01 13 A switch / socket / outlet, 3 pin single socket No 438

16.7.02 13 A switch / socket / outlet, 3 pin Twin socket No 570

16.7.03 13 A W/T, 3 pin single socket, as specified and as per the drawing. No 51

16.7.04

No 5

16.7.05 Junction box with 20A DP switch for F.C. Unit No 7

16.7.06 Junction box with 20A DP switch for E. W. Heater No 16

16.7.07 Junction box with 20A DP switch for Fire A. C. Panel with AVA. No 1

Supply, install and connect to their respective DB's, the following points including conduit , wiring , draw boxes, outlet boxes , trenching, earthing, switches, accessories, cable, silicon wire, switches double pole switches and all requirements as specified and as shown in drawing and as per the approval of Engineer.

3 Compartment Under Floor Service Outlet Box complete with all accessories including the flexible connection to the Power , Telephone , and Data.

Page 144: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-144 ELECTRICAL WORKS

Total Carried to Collection

Page 145: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-145 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

16.7.08 Junction box with 20A DP switch for W. Cooler No 6

16.7.09 Junction box with 20A DP switch for Fume No 2 16515 : Lighting

Lighting System16.8

16.8.01 Light Points No 407

16.8.02 Exit sing + EM Light No 49

16.8.03 No 1

LIGHTING FITTINGS:

16.9

16.9.01 Type A No 776

16.9.02 Type Ae No 113

16.9.03 Type B No 917

16.9.04 Type Be No 99

16.9.05 Type E No 205

16.9.06 Type E-EM No 47

Total Carried to Collection

The price for the following items shall included the lighting points C/W wiring conduit, earthing, switches, push-button, ceiling rose, silicon wire and all accessories with supplying installation, connecting, testing and making ready for work of all, lighting fittings. The contractor should submit the fixation way of light fittings for approval.

Lighting control panel with all Push Buttons, labeling in grave and indication lambs (the indication Lampe shall indicate the on-off).

Supply light fitting complete with lamps, tubes , reflectors, diffusers , louvers , transformers , control gears , etc…and with all required fixing accessories , brackets , concrete bases , etc… all as shown on the drawings , specified and as required for proper operation, and as per the approval of the Engineer.

Page 146: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-146 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

16.9.07 Type F No 157

16.9.08 Type F-EM No 18

16.9.09 Type G-70 No 86

16.9.10 Type H No 109

16.9.11 Type H-EM No 37

16.9.12 Type-EX No 44

16.9.13 Type-EM No 5

16.9.14 Type I No 15

16.9.15 Type O No 91

16.9.16 Type FL No 12

16.9.17 Type M No 229

16.9.18 Type M-EM No 16

16.9.19 Type L No 45

16.9.20 Type L-EM No 45

16.9.21 Type Z No 18

16.9.22 Type Z-EM No 6

16.9.23 Type J No 60

16.9.24 Type J-EM No 5

16.9.25 Type N (1 x 3) No 16

16.9.26 Type ST No 6

Total Carried to Collection

Page 147: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-147 ELECTRICAL WORKS

Item DescriptionUnit Qty

No.

16452 : Earthing

16.10 L.S. L.S.

16.11 L.S. L.S.

16.12 L.S. L.S.

16.13 L.S. L.S.

Supply, install and connect complete earthing system as per drawings, specification and MOE (E&W) regulation. Any additional earth electrodes needed shall be included without extra cost.

Prepare complete set of electrical and telephone as built drawings and get the approval from MOE (E&W) and MOC.

Testing and inspection of the electrical and telephone installation on completion and before being energized and get the approved by MOE (E&W) and MOC inspectors in accordance to the MOE (E&W) and MOC regulations and to the approved drawing.

Allow for submitting as built drawings, providing all operation, instruction and maintenance manuals etc…

Page 148: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-148 ELECTRICAL WORKS

Total Carried to Collection

Description

Unit QtyNo.

DIVISION 16 - ELECTRICAL (LOW VOLTAGE)

General Consideration for all items:

16.14

16.15

16.16

The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work.

BUILDER WORK:All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholes, earth pits, ducts, trenches cable tiles … etc.

All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOP (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer.

All works shall be carried out to comply with the BAS (Building Automation System) requirements.

The Contractor is referred to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items.

Page 149: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-149 ELECTRICAL WORKS

Total Carried to Collection

Page 150: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-150 ELECTRICAL WORKS

Item Description

Unit QtyNo.

Section:16721Fire Detection & Alarm System

16.17

16.17.01 Fire Alarm Control Panel complete with all accessories. No 1

16.17.02 Fire Alarm Active mimic display panel No 1

16.17.03 Main operating , display graphics and programming terminal with processor. No 1

16.17.04 Logging and event system printer. No 1

16.17.05 Optical smoke detector ( addressable type). Nos 235

16.17.06 Heat Detector (addressable type). Nos 11

16.17.07 Duct Detector (addressable type). Nos 20

16.17.08 Fire alarm manual call point (addressable type). Nos 10

16.17.09 Local alarm horn. Nos 35

16.17.10 L.S. L.S.

Total Carried to Collection

Supply, install, connect, test and commission the fire detection and alarm system complete as per the drawings, specification and to the rules and regulation of Kuwait fire brigade and as per approval of Engineer. Work shall include all conduits , wiring, accessories and components.

Connection up to Motorized Dampers, Doors Opener, HVAC control panels, elevator control panels, sprinkler flow switches, Air pressure fans, Smoke and Fresh air Fans…etc.

Page 151: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-151 ELECTRICAL WORKS

Item Description Unit QtyNo.

Section:16740 Telephone System - Cabling

16.18

16.18.01 telephone socket outlets Nos 151

16.18.02 MDF Nos 1

16.18.03 TTB-A-F(80X90X15 CM) Nos 1

16.18.04 TTB-A-S(70X80X15 CM) Nos 1

16.18.05 TTB-A-F (80x90x15cm) Nos 1

16.18.06 TTB-A-S (70x80x15cm) Nos 1

16.18.7 Any other missing items required for full functioning of the job (if any) L.S. L.S.

Supply, install, connect, test and make ready for works the following Telephone System including conduits, wire, terminal boxes, draw boxes, socket outlet, all as per schematic, drawings

Page 152: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-152 ELECTRICAL WORKS

Total Carried to CollectionItem Description Unit QtyNo.

Section 16750Audio Visual System

16.23

16.23.4 Seminar Hall16.23.4.01 Data And Video Projector 4000 ANSI Lumens No 1

16.23.4.02 Rear Projection Lens No 1

16.23.4.03 Rear projection screen No 1

16.23.4.04 Rear Projection screen frame No 1

16.23.4.05 DVD No 1

16.23.4.06 VCR No 1

16.23.4.07 Visualizer No 1

16.23.4.08 PC interface No 1

16.23.4.09 Hide away unit No 1

16.23.4.10 AV switcher No 1

16.23.4.11 Power amplifier Nos 3

16.23.4.12 Mixer and preamplifier No 1

16.23.4.13 Sub waffer speaker Nos 2

16.23.4.14 Monitoring panel No 1

16.23.4.15 Stage speaker Nos 6

Total Carried to Collection

Supply, install, connect test and make ready for works, Sound system including all, conduit, boxes, draw boxes, terminal boxes wires, connection of Gl conduit, The price for the sound system shall include the supply of all materials and equipment delivery to site,installations, connections, testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes, switches , push-buttons , cable trays, and all work required to make the work done. All should be as per the contract drawing and the approval of Engineer.

Page 153: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-153 ELECTRICAL WORKS

PAGE DESCRIPTION

NO

DIVISION 16 - ELECTRICAL

COLLECTION

Page No. 16-1

Page No. 16-2

Page No. 16-3

Page No. 16-4

Page No. 16-5

Page No. 16-6

Page No. 16-7

Page No. 16-8

Page No. 16-9

Page No. 16-10

Page No. 16-11

Page No. 16-12

Page No. 16-13

Page No. 16-14

Page 154: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-154 ELECTRICAL WORKS

Total Carried to Summary

Page 155: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-155 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

9900.000 9900.000

Page 156: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-156 ELECTRICAL WORKS

9900.000

Page 157: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-157 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

3300.000 3300.000

2640.000 2640.000

3168.000 3168.000

2420.000 2420.000

2420.000 2420.000

3300.000 3300.000

2750.000 2750.000

2970.000 2970.000

2805.000

2475.000 2475.000

3300.000 3300.000

Page 158: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-158 ELECTRICAL WORKS

28743.000

Page 159: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-159 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

854.700 854.700

737.000 737.000

854.700 854.700

907.500 907.500

693.000 693.000

836.000 836.000

902.000 902.000

192.500 192.500

88.000 88.000

825.000 825.000

495.000 495.000

495.000 495.000

Page 160: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-160 ELECTRICAL WORKS

7880.400

Page 161: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-161 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

385.000 385.000

660.000 660.000

770.000 770.000

412.500 412.500

385.000 385.000

825.000 825.000

313.500 313.500

89.100 89.100

385.000 770.000

660.000 660.000

660.000 660.000

632.500 632.500

660.000 660.000

715.000 715.000

715.000 715.000

220.000 220.000

385.000 385.000

Page 162: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-162 ELECTRICAL WORKS

9257.600

Page 163: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-163 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

385.000 385.000

440.000 440.000

275.000 275.000

440.000 440.000

165.000 165.000

825.000 825.000

660.000 660.000

385.000 385.000

660.000 660.000

742.500 742.500

605.000 605.000

660.000 660.000

330.000 330.000

660.000 660.000

605.000 605.000

605.000 605.000

825.000 825.000

715.000 715.000

770.000 770.000

Page 164: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-164 ELECTRICAL WORKS

20395.100

Page 165: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-165 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

330.000 330.000

440.000 440.000

302.500 302.500

66.000 264.000

192.500 192.500

192.500 192.500

82.500 330.000

66.000 924.000

16.500 7227.000

19.800 11286.000

39.600 2019.600

55.000 275.000

27.500 192.500

27.500 440.000

27.500 27.500

Page 166: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-166 ELECTRICAL WORKS

2975.500

Page 167: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-167 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

27.500 165.000

27.500 55.000

101.200 41188.400

13.200 646.800

550.000 550.000

44.000 34144.000

77.000 8701.000

44.000 40348.000

77.000 7623.000

60.500 12402.500

93.500 4394.500

42605.200

Page 168: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-168 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

49.500 7771.500

77.000 1386.000

93.500 8041.000

55.000 5995.000

82.500 3052.500

55.000 2420.000

33.000 165.000

38.500 577.500

55.000 5005.000

82.500 990.000

60.500 13854.500

88.000 1408.000

44.000 1980.000

71.500 3217.500

38.500 693.000

66.000 396.000

82.500 4950.000

110.000 550.000

275.000 4400.000

27.500 165.000

50666.000

Page 169: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-169 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

8250.000 8250.000

0.000

0.000

0.000

Page 170: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-170 ELECTRICAL WORKS

8250.000

Unit Price Total Price

KD. Fils KD. Fils

0.000

Page 171: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-171 ELECTRICAL WORKS

0.000

Page 172: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-172 ELECTRICAL WORKS

Unit Price Total Price

KD. Fils KD. Fils

2585.000 2585.000

1750.000 1750.000

4400.000 4400.000

275.000 275.000

38.500 9047.500

38.500 423.500

137.500 2750.000

38.500 385.000

55.000 1925.000

825.000 825.000

24366.000

Page 173: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-173 ELECTRICAL WORKS

Unit Price Total PriceKD. Fils KD. Fils

38.500 5813.500

715.000 715.000

550.000 550.000

440.000 440.000

550.000 550.000

440.000 440.000

0.000

Page 174: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-174 ELECTRICAL WORKS

8508.500

Unit Price Total PriceKD. Fils KD. Fils

2200.000 2200.000

385.000 385.000

1375.000 1375.000

220.000 220.000

132.000 132.000

82.500 82.500

1430.000 1430.000

330.000 330.000

1265.000 1265.000

132.000 132.000

495.000 1485.000

715.000 715.000

385.000 385.000

275.000 1650.000

2035.000

Page 175: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-175 ELECTRICAL WORKS

Total Price

KD. Fils

9900.000

28743.000

7880.400

9257.600

20395.100

2975.500

42605.200

Page 176: BOQ- form

ع / / م رقم 2011 -2010 /70المناقصةثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/16-176 ELECTRICAL WORKS

121756.800

Page 177: BOQ- form

PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة

ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1

PAGE NO. DIVISION TITLENO.

2-2 2 SITE WORKS

3-4 3 CONCRETE

4-2 4 MASONRY

5-3 5 METAL WORKS

6-2 6 WOOD AND PLASTIC

7-3 7 THERMAL AND MOISTURE PROTECTION

8-4 8 DOORS AND WINDOWS

9-6 9 FINISHES

10-3 10 SPECIALTIES

12-3 12 FURNISHINGS

14-2 14 CONVEYING SYSTEM

15-12 15 MECHANICAL WORKS

16-14 16 ELECTRICAL WORKS

Page 178: BOQ- form

PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة

ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1

TOTAL CARRIED TO MAIN SUMMARY KD

Page 179: BOQ- form

PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة

ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1

AMOUNTKD

37443.000

839676.500

99562.000

28224.700

5265.000

62092.750

179313.000

335210.700

47354.000

0.000

0.000

310505.475

Page 180: BOQ- form

PART SUMMARY - 1 ع / / م رقم 2011 -70/2010المناقصة

ثانوية مدرسة وصيانة وإنجاز إنشاءقطعة/ الرميثيه بمنطقة 10بنين

Bill No-1: Class Room + Administration Bldg (A) 1/SUM-1 PART SUMMARY-1

1944647.125