Boral Building Products - NSW
Pollution Incident Response Management Plan (PIRMP)
Boral Montoro – Emu Plains Production Facility
Date: May 2016
Ref # 6
Dispatch Office
Ref # 1
Greases & lubricants
Gases Store
Ref # 2
Workshop
Ref # 8
QA Laboratory
Ref # 7
Administration Office
Ref # 10
Truck Loading Area
Ref # 11
Stock Yard
Ref # 5
Concrete Washout Pits
Ref # 4
Canola Oil
Ref # 3
Workshop 2
Ref # 12
Additives
Ref # 9
Dry Waste Area
Ref # 13
LPG Gas Tank
Ref # 14
Cement Silos
PIRMP Site Assessment Sheet
LIST OF POLLUTING SUBSTANCE STORAGES/USES AT SITE INITIAL ASSESSMENT
(all Chemicals listed in this sheet are to be subjected to a risk assessment)
Site Name:
Emu Plains
Responsible Person:
Warwick Juno (Plant Mngr)
Revision Dates:
1st
- 26/08/12
2nd – 02/05/13
3rd
– 05/06/14
4th
– 06/05/16
Name /
description
Covered under
Haz
Chemicals/MSDS?
Amount
stored
Location of
storage
Map
reference
Need for
early
warning1
Current controls See Risk Ass &
PIRMP Response
Action (see
Below)
CHEMICALS/FUELS/LUBRICANTS (raw materials and products which can cause pollution)
Oils/Solvents Class 3 Packaged
goods up
to 2000
Ltrs
Oil Storage Shed Ref No 1
Ref No 8
Local Fire
Brigade
• Portable Bunding
• Training
• Flammable Cabinets
• Spill Kits
• Inductions
• Fire Fighting
Equipment
• Security
• Isolated from factory
Incident # 1
Lubricants, Gases Class 2 Variable Maintenance
Workshop
Ref No 1
Ref No 2
Ref No 3
Local Fire
Brigade
• Fire Extinguishers
• Concrete Floor
• Enclosed / screens
• Containment Cages
and Cabinets
• Trained Personnel
• SWMS / SOP
• Isolated / lock up
areas
Incident # 2
MATERIALS (eg stockpiles, silos, bulk solids etc) – Vehicles used to load and move raw materials
1 Early warnings relate to informing neighbours who may be affected by the emission of this substance. If this substance is of a type and quantity which may reach
neighbours then early warning assessment of actions is required to be undertaken.
LPG Gas Class 2 Above
ground
5000 Litr
tank
Adjacent Staff
car park
Ref No 13 Local Fire
Brigade
• Fire Extinguishers /
Hydrant
• Trained Personnel
• SWMS / SOP
• Isolated / lock up
dispenser
Incident # 3
Additives
Canola Oil
Refer to Boral’s
MSDS
20,000
Ltrs
Storage Tank
opposite wash
out pits
Ref No 4 Local Fire
Brigade • Area Bunded
• Emergency fire
equipment
• Maintain
manageable levels
• Maintained delivery
equipment
Incident # 4
Additives
Oxides
Refer to Boral’s
MSDS
Max
5 tonnes
Dedicated on
site
Ref No 5 N/A • Emergency fire
equipment
• Maintain
manageable levels
• Maintained Load
shifting equipment
• Immediately clean
up spills
Incident # 4
Cement Silos Refer to Boral’s
MSDS
Max 35
Tonnes
Vertical Silos Ref No 14 N/A • Silos fitted with high
level warning and
cutout systems
• Silos fitted with
Baghouse and
overfill system
• Safety systems
regularly serviced
Incident # 5
Residue Waste N/A Variable Dedicated on
site
Ref No 9 N/A • Emergency fire
equipment for FEL
• Maintain
manageable levels –
remove excess waste
• Security
• Maintained Load
shifting equipment
Inert
No potential
incident
AQUEOUS (eg dams, wastewater tanks, other water storage area)
Concrete Wash
out pits
N/A Variable Concrete Wash
out pits
Ref No 5 N/A • Ensure wash out pits
are regularly
emptied and waste
remove from site
• Trained personnel
• Ensure pumps are
maintained through
scheduled
maintenance
• FEL maintained
• Qualified operator
Incident # 7
Yard Run off
Storm Water
Drains
N/A Variable Ref No 8 N/A • Regular inspection of
pump unit and
sediment level
• Ensure pumps are
maintained through
scheduled
maintenance
• Straw Bales
• Rubber and Earthen
Berms
• Audits
Advise Quarry
Manager if release of
water to the Quarry
dam is expected
Incident # 7
SUBSTANCES IN PROCESSES (substances which could be emitted from operational process i.e. treatment plants, vehicles etc)
Name /
description
Covered under
Haz
Chemicals/MSDS?
Amount
stored
Location of
storage
Map
reference
Need for
early
warning2
Current controls See Risk Ass &
PIRMP Response
Action (see
Below)
Mobile Plant
(onsite) BORAL
LPG Powered Up to 4
on site
Dedicated on
site
N/A N/A • Spill Kits
• Pre start checks
• PMP
• Training
Incident # 8
Mobile Plant Class 3 Variable Variable N/A N/A • Spill Kits Incident # 9
2 Early warnings relate to informing neighbours who may be affected by the emission of this substance. If this substance is of a type and quantity which may reach
neighbours then early warning assessment of actions is required to be undertaken.
Contractor/visitor Locations • Training
• Inductions
Car Parking up to
40 vehicles
Class 3 Variable Site Office Ref No 10 N/A • Spill Kits
• Training
Incident # 9
IMPACT ON NEIGHBOURS ASSESSMENT – EARLY WARNINGS Site Name: Emu Plains
Responsible Person: Warwick Juno Date: 06/04/16
Incident
type/description
External Release (air,
waterway etc)
Neighbors
impacted/extent of
impact
Communication
methods
Early warnings
Actions and other control measures (eg posting on website, community group meetings)
Cement dust discharge Air Minor Local Radio/News Follow up by Site Manager if required
Emergency Drills Conducted
Date Practice Drill
Completed
Type of Drill Rating 1-5 on
Effectiveness
Comment
24/03/2012 24/03/2012 PIRMP 5 Highly Effective Minimal Recommendations
05/04/2013 05/04/2013 PIRMP 5 Highly Effective Minimal Recommendations
16/5/2014 16/5/2014 PIRMP 5 Highly Effective Minimal Recommendations
28/04/2016 28/04/2016 PIRMP 5 Highly Effective Minimal Recommendations
RISK ASSESSMENT MATRIX
TABLE 1: Measures of Consequence
Value Description Impact
1 Minor On-site release immediately contained
2 Moderate On-site release immediately contained with outside assistance
3 Major Off –site release regional or national impact long term damage with specialist clean up required
TABLE 2: Measures of Likelihood
Value Description Impact
3 Highly Likely The event could occur weekly in normal circumstances.
2 Likely The event could occur once per month
1 Unlikely The event could occur once every one to five years.
TABLE 3: Risk Ranking Table
Consequence Likelihood
Minor
(1)
Moderate
(2)
Major
(3)
Highly Likely (3) M (3) H (6) H (9)
Likely (2) L (2) M (4) H (6)
Unlikely (1) L (1) L (2) M (3)
RISK ASSESSMENT on POTENTIAL IMPACTS
Hazard and Likelihood Risk Assessment and Corrective Control Measures
Emu Plains
Responsible Person Plant/HSE Managers
Review Date 6th April 2016
Name / ref of
pollutant/ chemical
Description of Hazard / Incident leading to hazard
Consequence
Likely hood
Risk
Impact on
neigh-bours
3
Control Measures Corrective Action
Coverage under other Plans
Responsible person
Action date
Oils/ Solvents
Incident # 1 Loss of oils solvents inside bund during delivery and or use
1 1 L1 N/A Consequence :(Minor): Failure resulting in loss of oils/solvents from packaged goods would be captured entirely by existing primary bund with no release to soil or water. Likelihood :(Unlikely): Due to location within the bund, spillage during
As per PIRMP
action plan
When required
3 If the incident may impact on neighbours then it will need to trigger the early warnings assessment and actions
delivery and use is unlikely to occur. In addition hoses and decanting equipment are maintained in good structural integrity with low risk of failure.
Lubricants / Gases
Incident # 2 Loss of oils / gases inside bund during delivery and or use
1 1 L1 N/A Consequence :(Minor): Failure resulting in loss of oils/solvents from packaged goods would be captured entirely by existing primary bund with no release to soil or water. Likelihood :(Unlikely): Due to location within the bund, spillage during delivery and use is unlikely to occur. In addition hoses and decanting equipment are maintained in good structural integrity with low risk of failure.
As per PIRMP
action plan
When required
Gas leak form storage tank
Incident # 3 Loss of gas and potential for fire / explosion
2 1 L2 N/A Consequence :(Minor): Failure resulting in loss of gas from tank and potential for fire / explosion. No release to soil or water. Likelihood :(Unlikely): Due to location of tank, and protective barriers, damage to tank and exposure to heat sources, likely to cause operation of relief valve are unlikely to occur. In addition hoses and decanting equipment are maintained in good structural integrity with low risk of failure.
As per PIRMP
action plan
When required
Liquid Storage Tanks
Incident #4 Catastrophic failure of one or more Canola Oil / liquid Oxide tanks releasing large volumes of liquids into on-site and off-site water courses (i.e creek).
1 2 L2 N/A Consequence: (moderate): Catastrophic failure of one or more bulk liquid storage tanks are likely to result in no off-site impacts to water courses due to on site and Boral Quarry on site retention dams. As such, impact to the environment/human health is not considered to be significant. Likelihood: (unlikely): Quarry dams are frequently monitored and inspected for levels and integrity. Risk Assessment = Moderate Vs Unlikely = L (2) Note: For PIRMP purposes overflow events during extreme wet weather will be reported under POEO Licence obligations and not Immediate Reporting.
As per PIRMP
action plan
When required
Cement Silos
Incident # 5 Release of dust to atmosphere
1 2 L2 Y Consequence :(Minor): Failure resulting in loss of cement dust gas from silo and potential for air contamination. No release to soil or water. Likelihood :(Unlikely): Due to location of silos, and protective systems, overfilling of silo, likely to cause dust discharge to atmosphere is unlikely to occur. In addition hoses and decanting equipment on company delivery tankers are maintained in good structural integrity with low risk of failure.
As per PIRMP
action plan
When required
Mobile Plant
Incident # 6 Mobile plant, hydraulic hose or fuel tank failure
1 2 L2 N Consequence: (minor): Failure from fuel tank or hydraulic hoses would be maintain to a small localised area on site. Likelihood :( unlikely): Hose or fuel tank failure from mobile plant would be minimal as prestart and regular maintenance programs are in place
As per PIRMP
action plan
When required
to capture and prevent such occurrences. Spills kits also maintain and available in various areas.
Water discharge - waste pits / yard runoff
Incident # 7 Excessive water runoff from yard, accidental water discharge from waste pits
1 2 L2 N Consequence: (minor): Run off water enters on site sediment settling pits and then flows to Boral Quarry site retention dam where it is pumped to the quarry crushing plant for use in dust suppression / road base manufacture Likelihood :( likely): no water discharged from Boral site
N/A When required
Mobile plant/ Contractor,
Visitor
Incident # 8 Mobile plant, hydraulic hose or fuel tank failure
1 2 L2 N Consequence: (minor): Failure from fuel tank or hydraulic hoses would be maintain to a small localised area on site. Likelihood :( unlikely): Hose or fuel tank failure from mobile plant would be minimal as prestart and regular maintenance programs are in place to capture and prevent such occurrences. Spills kits also maintain and available in various areas. Inductions for all contractors demonstrating their accountabilities and responsibilities for reporting environmental incidents.
As per PIRMP
action plan
When required
Car Park Incident # 9 Ruptured fuel tank
1 2 L2 N Consequence: (minor): Failure from fuel tank or hydraulic hoses would be maintain to a small localised area on site. Likelihood :( unlikely): Hose or fuel tank failure from mobile plant would be minimal as prestart and regular maintenance programs are in place to capture and prevent such occurrences. Spills kits also maintain and available in various areas
As per PIRMP
action plan
When required
PIRMP RESPONSE ACTIONS
Incident No 1
Incident No 1
Spill of oils / lubricants
Actions Required:
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Ensure bunds are capturing full volume of product
• Ensure bund integrity is sound throughout the entire period of incident (i.e. periodic inspections)
• Contact service provider, Caltex Kurnell, (or Transpacific 02 96007185) to pump-out bund contents
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release from bund
• If any release from bund onto unsealed soil/surface water - Environmental Consultants to be engaged to investigate and remediate
contamination.
• Repair/replace tanks
• Refuel tanks
• Inspect bund for ongoing serviceability
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency • Scott Mckay (reporting to Warwick Juno)
Controller • Call service provider (Scott Mckay)
• Spill Kit manager (Supervisor)
• Periodic inspections and update reporting of site and bund (Warwick Juno) As per Annual HSE Monitoring Plan
Scale of incident Incident would be restricted to chemical storage area with minimal external impact, however, potential for bund overflow or failure may result
in soil and surface water contamination that will require specialist investigation/remediation.
Evacuate Only if fire or explosion potential exists. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate
notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of diesel and advise on required clean-up.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 2
Incident No 2
Loss of oils / gases due to filling and refueling from delivery vehicles.
Actions Required:
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Ensure bunds are capturing full volume of product
• Ensure area is well ventilated if gas is escaping cylinders
• Ensure bund integrity is sound throughout the entire period of incident (i.e. periodic inspections)
• Contact service provider (Caltex No. 1800033111 or Transpacific 02 96007185) to pump-out bund contents
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release from bund
• If any release from bund onto unsealed soil/surface water - Environmental Consultants to be engaged to investigate and remediate
contamination.
• Repair/replace tanks
• Refuel tanks
• Inspect bund for ongoing serviceability
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency • Scott Mckay (reporting to Warwick Juno)
Controller • Call service provider (Scott Mckay)
• Spill Kit manager (Supervisor)
• Periodic inspections and update reporting of site and bund (Warwick Juno)
Scale of incident Incident would be restricted to chemical storage area with minimal external impact. However, potential for bund overflow or failure may result
in soil and surface water contamination that will require specialist investigation/remediation.
Evacuate Only if fire or explosion potential exists. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate
notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of diesel and advise on required clean-up.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 3
Incident No 3
Failure/activation of pressure release valve on bulk gas storage tank
Actions Required:
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Ensure area is isolated from FLT / Vehicles
• Contact emergency services – Fire and Rescue
• Maintain continuous waterflow to tank surface to keep tank cool until tank has vented
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release of contaminated water (if requird)
• If any release from bund onto unsealed soil/surface water - Environmental Consultants to be engaged to investigate and remediate
contamination.
• Repair/replace tanks
• Refuel tanks
• Inspect bund for ongoing serviceability
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency
Controller
• Warwick Juno (reporting to Michael Morrissey)
• Scott Mckay (reporting to Warwick Juno)
• Spill Kit manager (Supervisor)
Periodic inspections and update reporting of site and bund (Warwick Juno)
Scale of incident Incident would be restricted to chemical storage area with minimal external impact. However, potential for bund overflow or failure may result
in soil and surface water contamination that will require specialist investigation/remediation.
Evacuate Yes. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of diesel and advise on required clean-up.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 4
Incident No 4
Loss off liquids, canola oil / liquid oxides
Actions Required:
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Ensure bunds are capturing full volume of oil/solvents
• Ensure bund integrity is sound throughout the entire period of incident (i.e. periodic inspections)
• Contact service provider (Caltex No. 1800033111or Transpacific 02 96007185) to pump-out bund contents
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release from bund
• If any release from bund onto unsealed soil/surface water - Environmental Consultants to be engaged to investigate and remediate
contamination.
• Inspect bund for ongoing serviceability
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency
Controller
• Warwick Juno (reporting to Michael Morrissey)
• Call service provider (Warwick Juno)
• Spill Kit manager (Supervisor)
• Periodic inspections and update reporting of site and bund (Warwick Juno)
Scale of incident Incident would be restricted to chemical storage area with minimal external impact. However, potential for bund overflow or failure may result
in soil and surface water contamination that will require specialist investigation/remediation.
Evacuate Only if fire or explosion potential exists. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate
notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of diesel and advise on required clean-up.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 5
Incident No 5
Cement dust release from silos due to overfill
Actions Required:
• Contact all relevant people/departments (refer to Immediate Reporting Contact Sheet)
• Area to be restricted to Incident Response Personnel
• If necessary contact local community to advise release
• Clean up crew to be mobilized, to handle community complaints if required
• Environmental Consultants to be engaged to investigate and remediate contamination of dam, if required
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency
Controller
• Warwick Juno (reporting to Michael Morrissey)
• Call Emergencies services
• Periodic inspections and update reporting of site (Warwick Juno)
Scale of incident Incident would be restricted to quarry and stockpile areas with minimal external impact. However, potential soil and surface water
contamination that will require specialist investigation/remediation.
Evacuate No
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of diesel and advise on required clean-up.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 6
Incident No 6
Mobile plant, hydraulic hose or fuel tank failure
Actions Required:
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release from mobile plant & equipment
• If any release from mobile plant onto unsealed soil/surface water is investigated and remediated immediately
• Call service provider to inspect plant & equipment for serviceability
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency
Controller
• Scott McKay (reporting to Warwick Juno)
• Call service provider (Scott Mckay)
• Spill Kit manager (operator)
Scale of incident Incident would be localized to the area with no external impact..
Evacuate Only if fire or explosion potential exists. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate
notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of diesel and advise on required clean-up.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 7
Incident No 7
Excessive water off from site area and concrete wash out pits
Actions Required:
• Employees, Contractor/Visitor to notify site representative of issue immediately. (induction)
• Quarry Manger to be advised
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Monitor discharge and advise when completed
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency
Controller
• Scott Mckay (reporting to Warwick Juno)
• Site operations manager to instruct site personnel (Scott Mckay)
Scale of incident Incident would be localized to the area with no external impact.
Evacuate No.
Communications Internal:
• Plant Manager (Warwick Juno)
External mandatory:
• Immediate Reporting Contact Sheet to be used if required
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
N/A
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 8
Incident No 8
Mobile plant, hydraulic hose or fuel tank failure from contractors / visitors
Actions Required:
• Contractor/Visitor to notify site representative of issue immediately. (induction)
• Contact all relevant people/department (refer to Immediate Reporting Contact Sheet)
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release from mobile plant & equipment
• If any release from mobile plant onto unsealed soil/surface water is investigated and remediated immediately
• Call service provider to inspect plant & equipment for serviceability
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency • Warwick Juno (reporting to Michael Morrissey)
Controller • Call service provider (Warwick Juno)
• Spill Kit manager (operator, contractor)
Scale of incident Incident would be localized to the area with no external impact..
Evacuate Only if fire or explosion potential exists. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate
notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of contaminates.
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Incident No 9
Incident No 9
Car Park/ fuel tank failure
Actions Required:
• Contractor/Visitor to notify site representative of issue immediately. (induction)
• Area to be restricted to Incident Response Personnel
• Ensure spill kit available for any release from mobile plant
• If any release from mobile plant onto unsealed soil/surface water is investigated and remediated immediately
• Call service provider to inspect plant & equipment
Alarm raising Any personnel involved or witnessing incident to report to immediate supervisor and PIRMP actions to be implemented.
Emergency
Controller
• Warwick Juno (reporting to Michael Morrissey)
• Spill Kit manager (site personnel)
Scale of incident Incident would be localized to the area with no external impact.
Evacuate Only if fire or explosion potential exists. Plant Manager and any advice provided by Fire Dept as part of attendance after immediate
notification.
Communications Internal:
• Plant Manager
• Ian Owen (HSE Advisor)
External mandatory:
• Immediate Reporting Contact Sheet to be used
External non-mandatory: N/A
Rescuer /
respondent +
safety checks
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Rescue + First
Aid
As per Site Emergency Plan or Fire Department as part of Immediate Reporting
Clean up and
Waste disposal
Service Provider to dispose of contaminate
Reporting and
re-preparedness
See SOPs:
• Incident Investigation GRP-HSEQ-3-02
• Emergency Planning and Response GRP-HSEQ-2-09
Prepared 06.05.2016 – Warwick Juno