22
Boundary Review Public Information Meeting February 15, 2018

Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Boundary ReviewPublic Information Meeting

February 15, 2018

Page 2: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Boundary Review

AGENDA

1. Boundary Review Process2. Demographic Information3. Proposed Eagle Mountain Elementary

• Options 1 & 24. Other Proposed Boundary Adjustments

• Auguston/Prince Charles• Terry Fox/Dr R Bondar• Stenersen/Sandy Hill

5. Questions

Page 3: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Boundary Review

Process

• Development of Options• Community Input

• Public Meeting• Online information (feedback until end of March)

• Evaluation of Options• Recommendation to Board of Education

Page 4: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Abbotsford Enrolment (Headcount) History & Projected

17000

17500

18000

18500

19000

19500

20000

20500

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

Page 5: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Review of Enrolment

0

1000

2000

3000

4000

5000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

Headcount Enrolment Robert Bateman Family of Schools

Enrolment Functional Capacity

0500

1000150020002500300035004000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

Headcount Enrolment Yale Family of Schools

Enrolment Functional Capacity

Page 6: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

0

200

400

600

800

1000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

McMillan, Mountain Elementary - Current & Projected Enrolment

Current & Projected Enrolment Capacity

Review of Enrolment

0

500

1000

1500

2000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

Auguston, Prince Charles & Sandy Hill – Current & Projected Enrolment

Current & Projected Enrolment Capacity

Page 7: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Boundary Review

Policy 18 School Catchment Areas

• The Board establishes school catchment areas:

• Considerations:• Long term planning• Minimize future boundary adjustments• Minimizing walking distances and safety hazards• Using geographical features as boundaries • Balance of school enrolment/capacity

Page 8: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Long-Term Facilities Plan Recommendations

Eastside Schools

• Boundary review• Expedite the construction of a new Eagle Mountain

elementary school• Restrict out of catchment enrolments• Review the feasibility of additions to Auguston, Sandy

Hill, Clayburn, WA Fraser and Yale Secondary• Explore options for a new elementary, a new middle and

a future secondary school location in the region.

Page 9: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

EASTSIDE ELEMENTARY SCHOOL CATCHMENTS

Current NeighbourhoodCatchments

Page 10: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Eastside Elementary Catchments

FAST FACTS

• Capacity Utilization

• McKee Peak Neighbourhood Plan

• Vicarro Ranch Development

• Eagle Mountain Property

Auguston

140%

Mountain

122%McMillan

114%

Prince Charles

97%

Page 11: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Proposed Eagle Mountain Elementary Study Area

School Capacity 2017 2018 2023

Mountain Elem 350 428 467 817

Page 12: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Proposed Eagle Mountain Elementary

Page 13: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

• Splits existing Mountain catchment

• Vicarro Ranch Development Areas• Sub Area 1, 3, 4 – Eagle Mountain Expansion• Sub Area 5 East of Whatcom Road• Highline Development

Option 1

School Capacity 2020 2025

Mountain Elem 350 312 421

Eagle Mountain 455 354 423

Page 14: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Option 2

• Move Glen Mountain area from McMillan to Eagle Mountain catchment

• 55 K-5 students

• Move Delair area from Mountain to McMillan catchment

• 57 K-5 students

School Capacity 2020 2025

Mountain Elem 350 395 541

Eagle Mountain 455 191 292

Page 15: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Proposed Auguston/Prince Charles Boundary Adjustment

• Development around Auguston• City’s Urban Boundary• Fraser Valley Regional District Area G

Page 16: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

• Move area northeast of Augustonfrom Prince Charles to Augustoncatchment

• Proximity to school• Affects 28 students

Move into Augustoncatchment

Proposed Auguston/Prince Charles Boundary Adjustment

Page 17: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

• Revised Auguston & Prince Charles catchment areas

Proposed Auguston/Prince Charles Boundary Adjustment

Page 18: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Other Boundary Adjustments

• Terry Fox/Dr R Bondar Boundary – Northern Portion of Horne Street

• Sandy Hill/Margaret Stenersen French Immersion Catchment –High Drive

Page 19: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Terry Fox/Dr R BondarBoundary Adjustment

• Horne Street is a no exit street off Old Riverside Road.

• Roadways to Bondar are a more direct path• Drive to Bondar is 1.6 km • Drive to Terry Fox is 2.9 km • In 2017 there is 1 K-5, Regular Program

student in this area (Bondar).

Page 20: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Margaret Stenersen/Sandy Hill French Immersion Boundary Adjustment

• Move High Drive into Sandy Hill Catchment

• Is in Margaret StenersenRegular catchment and Sandy Hill French Immersion catchment

• 5 - K-5 French Immersion students in the study area; all attend Sandy Hill.

Page 21: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Boundary Review

Process

• Development of Options• Community Input

• Public Meeting• Online information (feedback until end of March)

• Evaluation of Options• Recommendation to Board of Education

Page 22: Boundary Review - Abbotsford School District · PowerPoint Presentation Author: Ray Velestuk Created Date: 2/15/2018 6:12:18 PM

Boundary Review

QUESTIONS