Revised May 2017 INSPECTION OF BOILERS Chapter 146: Section 6. Annual inspection; extension of time; first inspection Section 6. All steam boilers and their appurtenances except those specified in the following section shall be thoroughly inspected externally and internally at least once a year. Upon written application made to it by the owner or user of a pressure vessel or boiler, the board may, when the public interest and convenience require, extend the time for the making of such inspection for a period not to exceed six months as the board may determine. A district engineering inspector of the division of inspection of the Department of Fire Services shall perform the first inspection of steam boilers and pressure vessels required by this chapter. Name of Facility Date Submitted Facility Address Contact Name Engineer in Charge Contact Person’s Telephone Number Contact Person’s E-mail Address License Number. Boiler Information Manufacturer National Board Number Year Built Mass Tag Number MAWP Date of Last Inspection Rated Capacity Certificate Expiration Authorized Inspector Duration of Extension Reason for Request : Please attach a statement from the Authorized Inspector of record in regards to this request for an extension of the Certificate of Inspection for this Boiler or Pressure Vessel. The statement must include the Mass Tag Number of the Boiler. COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF FIRE SERVICES Certificate of Inspection Extension Request Please forward this form via email to: [email protected] or mail to Department of Fire Services, Boiler and Pressure Vessel Program, 1 State Rd. Stow, MA 01775-1025 BPV-031

BPV 031 BPV Request for Extension of Inspectional

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BPV 031 BPV Request for Extension of Inspectional

Revised May 2017

INSPECTION OF BOILERS

Chapter 146: Section 6. Annual inspection; extension of time; first inspection

Section 6. All steam boilers and their appurtenances except those specified in the following section shall be thoroughly inspected externally and internally at least once a year. Upon written application made to it by the owner or user of a pressure vessel or boiler, the board may, when the public interest and convenience require, extend the time for the making of such inspection for a period not to exceed six months as the board may

determine. A district engineering inspector of the division of inspection of the Department of Fire Servicesshall perform the first inspection of steam boilers and pressure vessels required by this chapter.

Name of Facility Date Submitted

Facility Address

Contact Name Engineer in Charge

Contact Person’s Telephone Number

Contact Person’s E-mail Address License Number.

Boiler Information Manufacturer National Board Number

Year Built Mass Tag Number

MAWP Date of Last Inspection

Rated Capacity Certificate Expiration

Authorized Inspector Duration of Extension

Reason for Request :

Please attach a statement from the Authorized Inspector of record in regards to this request for an extension of the Certificate of Inspection for this Boiler or Pressure Vessel. The statement must include the Mass Tag Number of the Boiler.

COMMONWEALTH OF MASSACHUSETTS

DEPARTMENT OF FIRE SERVICESCertificate of Inspection Extension Request

Please forward this form via email to: [email protected] or mail toDepartment of Fire Services, Boiler and Pressure Vessel Program, 1 State Rd. Stow, MA 01775-1025BPV-031