4
575 Alderman Road Charlottesville, VA 22903-2476 434-982-4621 FAX 434-982-4628 http://fmweb.virginia.edu/fpc FACILITIES MANAGEMENT Facilities Planning and Construction Department DATE: March 25, 2020 CONSTRUCTION ALERT Alert No. 43 CONCERNING IMMINENT CONSTRUCTION ACTIVITY Brandon Avenue Green Street & Utilities Project Update ITEMS OF INTEREST: Between Thursday April 2, 2020 and Friday April 10, 2020, traffic patterns to Bice House, Bond House, South Lawn, the K2 parking lots, and the Monroe Apartment Building’s lower garage level will be modified to allow for concrete paver installation in areas ‘B’ and ‘C’ shown in the plan below. Following the completion of work shown in Construction Alert 42 (Phase 1) on Wednesday April 1 st , contractors will start work on phases 2, 3, and 4 shown in the plan below. Phases 2 & 3: On Thursday morning (4/2), contractors will close off area B, and will keep area C open to vehicular traffic. Once the concrete pavers have been installed in area B, the contractor will switch and close off area C, while keeping area B open to vehicular traffic. The contractor is expecting that paver installation in each area will take 2-3 days to complete, however it could be longer or shorter depending on site conditions and potential adverse weather conditions. Signage, barricades, and flaggers will be in place to help direct traffic through the area during this work. Phase 4: Once phases 2 and 3 have been completed, traffic patterns will again be changed to what is shown in the Phase 4 plan below. The project team is expecting that the traffic patterns shown in this scenario will remain in place until the completion of the project. BACKGROUND: In support of the redevelopment of the Brandon Avenue district, this project will install a new central UVA utilities corridor that will serve the district, and will include new electrical ductbank lines, domestic waterlines, chilled waterlines, low-temperature hot waterlines, telecom, and sanitary sewer and stormwater services. This project will also construct a new “Green Street” that will include a bioretention median in the center of the new one-way street around the district. In addition, the southern end of Monroe Lane will be realigned to a straighter road alignment that will allow for better access to the UVA Endoscopy building and also allow for more green space near the South Pond. ISSUED BY: Raleigh Roussos, Project Manager, FP&C, [email protected], Office: 434-924-9600 Cell: 434-987-4637 Charlie Durrer, Senior Construction Administration Manager, FP&C, [email protected], Office: 434-982-4654 Cell: 434-962-4087

Brandon Avenue Green Street & Utilities Project Update...BRANDON AVENUE GREEN STREET & UTILITIES INFRASTRUCTURE Key Plan 04.09.2018 HOPE FURRER ASSOCIATES 501 Fairmont Avenue, Suite

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Brandon Avenue Green Street & Utilities Project Update...BRANDON AVENUE GREEN STREET & UTILITIES INFRASTRUCTURE Key Plan 04.09.2018 HOPE FURRER ASSOCIATES 501 Fairmont Avenue, Suite

575 Alderman Road Charlottesville, VA 22903-2476 434-982-4621 FAX 434-982-4628 http://fmweb.virginia.edu/fpc

FACILITIES MANAGEMENT

Facilities Planning and Construction Department

DATE: March 25, 2020 CONSTRUCTION ALERT Alert No. 43

CONCERNING IMMINENT CONSTRUCTION ACTIVITY

Brandon Avenue Green Street & Utilities Project Update

ITEMS OF INTEREST:

Between Thursday April 2, 2020 and Friday April 10, 2020, traffic patterns to Bice House, Bond House, South

Lawn, the K2 parking lots, and the Monroe Apartment Building’s lower garage level will be modified to allow

for concrete paver installation in areas ‘B’ and ‘C’ shown in the plan below.

Following the completion of work shown in Construction Alert 42 (Phase 1) on Wednesday April 1st,

contractors will start work on phases 2, 3, and 4 shown in the plan below.

Phases 2 & 3: On Thursday morning (4/2), contractors will close off area B, and will keep area C open to

vehicular traffic. Once the concrete pavers have been installed in area B, the contractor will switch and close off

area C, while keeping area B open to vehicular traffic. The contractor is expecting that paver installation in each

area will take 2-3 days to complete, however it could be longer or shorter depending on site conditions and

potential adverse weather conditions. Signage, barricades, and flaggers will be in place to help direct traffic

through the area during this work.

Phase 4: Once phases 2 and 3 have been completed, traffic patterns will again be changed to what is shown in

the Phase 4 plan below. The project team is expecting that the traffic patterns shown in this scenario will remain

in place until the completion of the project.

BACKGROUND:

In support of the redevelopment of the Brandon Avenue district, this project will install a new central UVA

utilities corridor that will serve the district, and will include new electrical ductbank lines, domestic waterlines,

chilled waterlines, low-temperature hot waterlines, telecom, and sanitary sewer and stormwater services. This

project will also construct a new “Green Street” that will include a bioretention median in the center of the new

one-way street around the district. In addition, the southern end of Monroe Lane will be realigned to a straighter

road alignment that will allow for better access to the UVA Endoscopy building and also allow for more green

space near the South Pond.

ISSUED BY:

Raleigh Roussos, Project Manager, FP&C, [email protected], Office: 434-924-9600 Cell: 434-987-4637

Charlie Durrer, Senior Construction Administration Manager, FP&C, [email protected], Office: 434-982-4654

Cell: 434-962-4087

Page 2: Brandon Avenue Green Street & Utilities Project Update...BRANDON AVENUE GREEN STREET & UTILITIES INFRASTRUCTURE Key Plan 04.09.2018 HOPE FURRER ASSOCIATES 501 Fairmont Avenue, Suite

ro

m

a

n

d

.s

h

x

;E

m

e

r.G

e

n

ABN

JRC, MNM

801582.000

DMK

Sheet

Title

Approved

Checked

Drawn

Job Number

Date

Sheet Information

Copyright © 2017 Perkins+Will

Revisions

STRUCTURAL

1315 Peachtree St NEAtlanta, GA 30309

t 404.873.2300f 404.892.5823

www.perkinswill.com

CIVIL, MECHANICAL & ELECTRICAL

15 234

A

D

B

C

15 234

A

D

B

C

WO# 2519654

APRIL 09, 2018

CoC

COMMENTS #4

BRANDON AVENUE

GREEN STREET

& UTILITIES

INFRASTRUCTURE

Key Plan

04.09.2018

HOPE FURRER ASSOCIATES501 Fairmont Avenue, Suite 205

Towson, MD 21286t 410.583.4874

DEWBERRY ENGINEERS, INC.4805 Lake Brook Dr. Suite 200

Glen Allen, VA 23060t 804.205.3321

1

1

Charlottesville, VA

APRIL 09, 2018

C00-04

SITE LOGISTICS

PLAN

GENERAL NOTES

RND2U
Polygon
RND2U
Polygon
JMiller2
Polygon
jbrown2
PolyLine
jbrown2
Text Box
BMC TRAILER
jbrown2
Text Box
CWC/ IES
jbrown2
Text Box
FCC
JMiller2
PolyLine
JMiller2
Rectangle
JMiller2
PolyLine
JMiller2
Line
JMiller2
PolyLine
JMiller2
PolyLine
JMiller2
Line
RND2U
Callout
Vehicular Access to/from The Monroe Apt. Building
RND2U
Text Box
ELSON STUDENT HEALTH
RND2U
Polygon
RND2U
Text Box
THE MONROE APT BLDG
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Text Box
NEW STUDENT HEALTH CENTER
RND2U
Text Box
JEFFERSON PARK AVENUE
RND2U
Text Box
JEFFERSON PARK AVENUE
RND2U
Text Box
GIBSON HALL
RND2U
Text Box
NAU HALL
RND2U
Text Box
BICE HALL
RND2U
Text Box
BOND HOUSE
RND2U
Text Box
ENDOSCOPY
RND2U
Text Box
MONROE LANE
RND2U
Text Box
MONROE LANE
RND2U
Polygon
RND2U
PolyLine
RND2U
Callout
Vehicular Access to/from Bond House and Endoscopy
RND2U
Polygon
RND2U
Text Box
K2 PARKING LOT
RND2U
Polygon
RND2U
Text Box
K2 PARKING LOT
RND2U
Text Box
BRANDON AVE
RND2U
Polygon
RND2U
Text Box
B
RND2U
PolyLine
RND2U
Polygon
RND2U
Polygon
RND2U
Text Box
ROADWAY CLOSED TO TRAFFIC
RND2U
Polygon
RND2U
Text Box
PHASE 2
RND2U
PolyLine
RND2U
PolyLine
RND2U
Polygon
RND2U
Polygon
RND2U
Text Box
ROADWAY CLOSED TO TRAFFIC
RND2U
Callout
Vehicular Access to Bice/ South Lawn/ K2 Parking Lots
RND2U
PolyLine
RND2U
Polygon
RND2U
Polygon
RND2U
Polygon
RND2U
Polygon
RND2U
Callout
Flagman
RND2U
Ellipse
RND2U
Callout
Flagman
RND2U
Ellipse
RND2U
Callout
Area of Work = Area 'B'
RND2U
Rectangle
RND2U
Callout
Signage: Bice/South Lawn Access via Brandon Ave
RND2U
Rectangle
RND2U
PolyLine
RND2U
Line
RND2U
Polygon
RND2U
Polygon
Page 3: Brandon Avenue Green Street & Utilities Project Update...BRANDON AVENUE GREEN STREET & UTILITIES INFRASTRUCTURE Key Plan 04.09.2018 HOPE FURRER ASSOCIATES 501 Fairmont Avenue, Suite

ro

m

a

n

d

.s

h

x

;E

m

e

r.G

e

n

ABN

JRC, MNM

801582.000

DMK

Sheet

Title

Approved

Checked

Drawn

Job Number

Date

Sheet Information

Copyright © 2017 Perkins+Will

Revisions

STRUCTURAL

1315 Peachtree St NEAtlanta, GA 30309

t 404.873.2300f 404.892.5823

www.perkinswill.com

CIVIL, MECHANICAL & ELECTRICAL

15 234

A

D

B

C

15 234

A

D

B

C

WO# 2519654

APRIL 09, 2018

CoC

COMMENTS #4

BRANDON AVENUE

GREEN STREET

& UTILITIES

INFRASTRUCTURE

Key Plan

04.09.2018

HOPE FURRER ASSOCIATES501 Fairmont Avenue, Suite 205

Towson, MD 21286t 410.583.4874

DEWBERRY ENGINEERS, INC.4805 Lake Brook Dr. Suite 200

Glen Allen, VA 23060t 804.205.3321

1

1

Charlottesville, VA

APRIL 09, 2018

C00-04

SITE LOGISTICS

PLAN

GENERAL NOTES

RND2U
Polygon
RND2U
Polygon
RND2U
Polygon
JMiller2
Polygon
jbrown2
PolyLine
jbrown2
Text Box
BMC TRAILER
jbrown2
Text Box
CWC/ IES
jbrown2
Text Box
FCC
JMiller2
PolyLine
JMiller2
Rectangle
JMiller2
PolyLine
JMiller2
Line
JMiller2
PolyLine
JMiller2
PolyLine
JMiller2
Line
RND2U
Callout
Vehicular Access to/from The Monroe Apt. Building
RND2U
Text Box
ELSON STUDENT HEALTH
RND2U
Polygon
RND2U
Text Box
THE MONROE APT BLDG
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Text Box
NEW STUDENT HEALTH CENTER
RND2U
Text Box
JEFFERSON PARK AVENUE
RND2U
Text Box
JEFFERSON PARK AVENUE
RND2U
Text Box
GIBSON HALL
RND2U
Text Box
NAU HALL
RND2U
Text Box
BICE HALL
RND2U
Text Box
BOND HOUSE
RND2U
Text Box
ENDOSCOPY
RND2U
Text Box
MONROE LANE
RND2U
Text Box
MONROE LANE
RND2U
Callout
Area of Work = Area 'C'
RND2U
Polygon
RND2U
PolyLine
RND2U
Callout
Vehicular Access to/from Bond House and Endoscopy
RND2U
Polygon
RND2U
Text Box
K2 PARKING LOT
RND2U
Polygon
RND2U
Text Box
K2 PARKING LOT
RND2U
Text Box
BRANDON AVE
RND2U
Polygon
RND2U
Text Box
PHASE 3
RND2U
PolyLine
RND2U
PolyLine
RND2U
Polygon
RND2U
Polygon
RND2U
Text Box
ROADWAY CLOSED TO TRAFFIC
RND2U
Callout
Vehicular Access to Bice/ South Lawn/ K2 Parking Lots
RND2U
Callout
Flagman
RND2U
Callout
Flagman
RND2U
Ellipse
RND2U
Text Box
C
RND2U
PolyLine
RND2U
Line
RND2U
Polygon
RND2U
PolyLine
RND2U
Polygon
RND2U
PolyLine
RND2U
Polygon
RND2U
Rectangle
RND2U
Callout
Signage: Bice/South Lawn Access via Brandon Ave
RND2U
Rectangle
RND2U
Ellipse
Page 4: Brandon Avenue Green Street & Utilities Project Update...BRANDON AVENUE GREEN STREET & UTILITIES INFRASTRUCTURE Key Plan 04.09.2018 HOPE FURRER ASSOCIATES 501 Fairmont Avenue, Suite

ro

m

a

n

d

.s

h

x

;E

m

e

r.G

e

n

ABN

JRC, MNM

801582.000

DMK

Sheet

Title

Approved

Checked

Drawn

Job Number

Date

Sheet Information

Copyright © 2017 Perkins+Will

Revisions

STRUCTURAL

1315 Peachtree St NEAtlanta, GA 30309

t 404.873.2300f 404.892.5823

www.perkinswill.com

CIVIL, MECHANICAL & ELECTRICAL

15 234

A

D

B

C

15 234

A

D

B

C

WO# 2519654

APRIL 09, 2018

CoC

COMMENTS #4

BRANDON AVENUE

GREEN STREET

& UTILITIES

INFRASTRUCTURE

Key Plan

04.09.2018

HOPE FURRER ASSOCIATES501 Fairmont Avenue, Suite 205

Towson, MD 21286t 410.583.4874

DEWBERRY ENGINEERS, INC.4805 Lake Brook Dr. Suite 200

Glen Allen, VA 23060t 804.205.3321

1

1

Charlottesville, VA

APRIL 09, 2018

C00-04

SITE LOGISTICS

PLAN

GENERAL NOTES

RND2U
Polygon
RND2U
Polygon
JMiller2
Polygon
jbrown2
PolyLine
jbrown2
PolyLine
jbrown2
Text Box
BMC TRAILER
jbrown2
Text Box
CWC/ IES
jbrown2
Text Box
FCC
JMiller2
PolyLine
JMiller2
PolyLine
JMiller2
Rectangle
JMiller2
PolyLine
JMiller2
PolyLine
JMiller2
Line
JMiller2
PolyLine
JMiller2
PolyLine
JMiller2
Line
RND2U
Callout
Vehicular Access to/from The Monroe Apt. Building
RND2U
Text Box
ELSON STUDENT HEALTH
RND2U
PolyLine
RND2U
Line
RND2U
Polygon
RND2U
Polygon
RND2U
Polygon
RND2U
PolyLine
RND2U
PolyLine
RND2U
Polygon
RND2U
Polygon
RND2U
PolyLine
RND2U
Text Box
THE MONROE APT BLDG
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Line
RND2U
Text Box
NEW STUDENT HEALTH CENTER
RND2U
Callout
Vehicular Access to/from South Lawn, K2 Parking Lots, Bice, and Bond
RND2U
Text Box
JEFFERSON PARK AVENUE
RND2U
Text Box
JEFFERSON PARK AVENUE
RND2U
Text Box
GIBSON HALL
RND2U
Text Box
NAU HALL
RND2U
Text Box
BICE HALL
RND2U
Text Box
BOND HOUSE
RND2U
Text Box
ENDOSCOPY
RND2U
Text Box
MONROE LANE
RND2U
Text Box
MONROE LANE
RND2U
Polygon
RND2U
PolyLine
JMiller2
PolyLine
RND2U
Polygon
RND2U
Callout
Brandon Ave/Monroe Ln Connector road permanently closed
RND2U
Callout
Vehicular Access to/from Bond House and Endoscopy
RND2U
Polygon
RND2U
Text Box
K2 PARKING LOT
RND2U
Polygon
RND2U
Text Box
K2 PARKING LOT
RND2U
PolyLine
RND2U
Text Box
BRANDON AVE
RND2U
PolyLine
RND2U
PolyLine
RND2U
Text Box
PHASE 4