““Waters of the United Waters of the United States”States”
Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit
Preliminary Site Plan: Plan area of fill
footprint Volume of fill below
OHWM BDM Fig. 208 & 209
Prestressed Beam Prestressed Beam CamberCamber
Plans shall include:Plans shall include: Camber @ release:Camber @ release: (B-C)(B-C) Camber @ erection: Camber @ erection:
(1.8B-1.85C)(1.8B-1.85C) Long term Camber: Long term Camber:
(2.45B-2.40C)(2.45B-2.40C)
Load RatingLoad Rating
Entire Section 900 Entire Section 900 Revised to address:Revised to address:
Buried vs. Non-buried Buried vs. Non-buried BridgesBridges
Major, Minor & Major, Minor & Minimal PDPMinimal PDP
Design-BuildDesign-Build Value Engineering Value Engineering
Change ProposalsChange Proposals Rating requirements:Rating requirements:
PC-Bars for standard PC-Bars for standard bridge typesbridge types
Minimum Design Minimum Design LoadingLoading
Multi-Span Prestressed Multi-Span Prestressed BeamsBeams
Two Loading Conditions:Two Loading Conditions: Simple-span for non-Simple-span for non-
composite loads and composite loads and continuous for live continuous for live load and composite load and composite dead loaddead load HS-25HS-25 FWSFWS
Simple-span for all Simple-span for all loading conditionsloading conditions HS-25HS-25 No FWSNo FWS
MSE WallsMSE Walls
Plan PreparationPlan Preparation Traditional Method Traditional Method
eliminatedeliminated Three-Line Three-Line
Diagram MethodDiagram Method Special ProvisionsSpecial Provisions
New pay itemsNew pay items Square Ft. vs. Lump Square Ft. vs. Lump
SumSum Undercut & BackfillUndercut & Backfill Concrete CopingConcrete Coping
2005 C&MS2005 C&MS
Web version Web version availableavailable
Hard copies available Hard copies available at Office of Contracts at Office of Contracts in May 2005in May 2005
Use for all projects Use for all projects filed April 4, 2005 filed April 4, 2005 and laterand later
Use for all projects Use for all projects sold August 10, 2005 sold August 10, 2005 and laterand later
http://www.dot.state.oh.us/construction/OCA/Specs/http://www.dot.state.oh.us/construction/OCA/Specs/Rewrite2005/default.htmRewrite2005/default.htm
2005 C&MS2005 C&MS
Item 512 – Item 512 – Treating ConcreteTreating Concrete Concrete Sealing Concrete Sealing
(SS 864)(SS 864) HMWM (SS846)HMWM (SS846) SRS (SS 841)SRS (SS 841) Gravity-Fed Resin Gravity-Fed Resin
(PN 515)(PN 515) Epoxy Injection (PN Epoxy Injection (PN
522)522)
2005 C&MS2005 C&MS Item 501.05 – Approval Item 501.05 – Approval
of Construction Plansof Construction Plans One P.E. Stamp for One P.E. Stamp for
plans with railroad plans with railroad involvementinvolvement
Two P.E. Stamps for:Two P.E. Stamps for: Sheeting & BracingSheeting & Bracing Demolition over trafficDemolition over traffic Falsework PlansFalsework Plans Erection PlansErection Plans Jacking & temp. supportJacking & temp. support Construction stressesConstruction stresses Temporary StructuresTemporary Structures
Affects Notes In BDM Affects Notes In BDM Section 603Section 603
Stage 2Stage 2Review Submission RequirementsReview Submission Requirements
Bridge PlansBridge Plans Complete General Complete General
NotesNotes Details show Details show
dimensions, bar marks dimensions, bar marks & spacings& spacings
Retaining Wall PlansRetaining Wall Plans Noise Barrier PlansNoise Barrier Plans Special ProvisionsSpecial Provisions Load Rating ReportLoad Rating Report
Major & Minor PDP Major & Minor PDP onlyonly
Stage 3Stage 3Review Submission RequirementsReview Submission Requirements
Stage 2 Plans in Stage 2 Plans in compliance with compliance with review commentsreview comments
Estimated QuantitiesEstimated Quantities Reinforcing Reinforcing
ScheduleSchedule Estimated Quantity Estimated Quantity
CalculationsCalculations Load Rating ReportLoad Rating Report
Minimal PDP onlyMinimal PDP only
Coming Soon…Coming Soon…
Fatigue PolicyFatigue Policy Fatigue Analysis for Fatigue Analysis for
welded cover plate welded cover plate retrofit:retrofit:
Less SubjectiveLess Subjective Other Fatigue Details Other Fatigue Details
includedincluded
Truck Truck VolumeVolume
Retrofit?Retrofit?
HighHigh YesYes
MediumMedium Analysis Analysis RequiredRequired
LowLow NoNo
Coming Soon…Coming Soon…
Stay-in-place metal Stay-in-place metal formsforms
Limited use basisLimited use basis Project specific Project specific
examples:examples: Environmental or site Environmental or site
restrictionsrestrictions Faster bridgesFaster bridges
Coming Soon…Coming Soon…
Life Cycle Cost Life Cycle Cost AnalysisAnalysis
Additional Additional guidance for:guidance for: When to useWhen to use Interest ratesInterest rates Life expectancyLife expectancy
Coming Soon…Coming Soon…
LD-4 Estimating LD-4 Estimating FormForm
Provide estimated Provide estimated quantities for MSE quantities for MSE Walls:Walls: Wall incidentals (e.g. cast-Wall incidentals (e.g. cast-
in-place concrete, select in-place concrete, select granular fill, unclassified granular fill, unclassified excavation, etc.)excavation, etc.)
Concrete coping Concrete coping incidentals (e.g. concrete, incidentals (e.g. concrete, reinforcing steel, sealer, reinforcing steel, sealer, etc.)etc.)
Coming Soon…Coming Soon…
LRFDLRFD Developing ODOT Developing ODOT
Commentary to Commentary to LRFDLRFD
Pilot ProjectsPilot Projects Training Courses & Training Courses &
SeminarsSeminars Concrete Concrete
SuperstructuresSuperstructures Steel SuperstructuresSteel Superstructures SubstructuresSubstructures
July 1, 2007!!July 1, 2007!!
Coming Soon…Coming Soon…
Bridge Information Bridge Information RequestsRequests
Web based Web based information requestinformation request
Includes:Includes: Specialized bearingsSpecialized bearings Modular jointsModular joints Alternate coating Alternate coating
systemssystems Retired Standard Retired Standard