3/27/2008
1
Bridge Geotechnical Considerations and Designing for ScourPART IVChristopher Byrum, Ph.D., P.E. GeotechnicalSoil and Materials Engineers, Inc.
Brian Barkdoll, PhD, PE ScourMichigan Technological University
Box Culvert Scour Failure ShowingKey Embankment Widening Concepts
3/27/2008
2
3/27/2008
3
3/27/2008
4
“Suitable Material”
Typical Compacted Core Limits
Compacted CoreOf Embank.
Suitable Material
Compacted Core is level lifts under densitySuitable Material can be bad and is just bladed in with a dozer
ORIGINAL GROUND SURFACE
NEW EMBANKMENT
EXISTING FILL
EDGE OF ORIGINAL PCC PAVEMENT
1.51
1
1.5
WIDENING
SUITABLE MATERIAL
NEW UNDERCUTEXISTING UNDERCUT 1
1
NOTES: 1. STRIP EXISTING SIDE SLOPE SOIL TO THE LIMITS SHOWN.2. BENCH NEW COMPACTED ROADWAY CORE INTO THE EXISTING
COMPACTED FILL IN 27-INCH (MAX) BENCHES, 9-INCH LIFTS.3. EXTEND EXISTING UNDERCUTS TO REDUCE DIFFERENTIAL
SETTLEMENT AND USING CLASS III GRANULAR MATERIAL.4. 1.5H:1V CUT SLOPE MAY NEED TO BE FLATTENED BASED ON
GROUNDWATER AND MATERIAL TYPES ENCOUNTERED.5. NEW EMBANKMENT SHOULD BE CLASS III GRANULAR MATERIAL. 6. UPPER LIFT OF NEW EMBANKMENT SHOULD BE CLASS II SAND.
3/27/2008
5
Bridge Geotechnical for RiversFoundation Construction Under Water
-Drilling/Sampling in Open Water.-Construct-ability under Water.-Cofferdams.
BYRUM-2000
Scour During Flood Events-Presence of Piers Causes Holes to Form-Very Site Specific-Must Iterate with Hydraulics EngineersDuring Design
-Often Controls Geotech. Recommendations
3/27/2008
6
3/27/2008
7
Pier 3 Cofferdam
Pier 3 Cofferdam
3/27/2008
8
Pier 3 Cofferdam
Pier 4 Footing Pour
Sheet-Pile Cofferdams
CLAY CLEAN SAND
3/27/2008
9
Sheet-Pile Cofferdams
Mud Mat TREMIE
Pump Water In
CLAY CLEAN SAND
Very Important!
Pumping Water In (Positive Head in Cofferdam) Forces
Liquid Concrete to FlowLiquid Concrete to Flow Outward Into Sheeting Joints
and The Subsoils
3/27/2008
10
TREMIE
Otherwise---Worm Holes, Flow In!
CLEAN SAND
Use Tremie Seals When….
1. For Silt and Clean Sands and Gravels, Head greater than about 2-3 feet.
2. Deep thick Clay Layers, Mud Mat for Head Less than 10-15 feet.
3. When the Geotechnical Engineer Says To.
Other Cofferdam Checks:
1. Seal Bond/Lift (5 psi on sheets, 10 psi on piling)2. Total Bouyancy Uplift- The Boat Effect3. Seal Bending Stress
3/27/2008
11
SCOURNormal Flow
Flood Events
Water Goes Up-Channel Goes DownWater Goes Down-Channel Fills InHigher Flow Velocity-Bigger Particles Suspended
Normal Water Surface
BYRUM-2000
Flood Events500 yr. Surface
100 yr. Surface
500 yr. Channel
100 yr. Channel
CONTRACTION SCOUR
Flood Events500 yr. Surface
100 yr. Surface
SCOUR WITH BRIDGE
BYRUM-2000
LOCAL SCOURThe pier is an obstruction to flow. The eddie currents around the pier (small tornado-like features) chew up the channel bottom locally around the pier
Abutment End Section Global Stability
BYRUM-2000Piles
3/27/2008
12
PIER DESIGN FOR SCOUR
M
Pv Pl (pin connection)
BYRUM-2000
Check:1. Stiff enough laterally?2. How deep below scour?3. How to get that deep?4. Abutment Stability
V
Soil
Piles
SHIP IMPACT ?
M
Pv Pl (pin connection)
BYRUM-2000
Check:1. Stiff enough laterally?2. How deep below scour?3. How to get that deep?4. Abutment Stability
V
Soil
Piles
DESIGN FOR SCOUR
M
Pv Pl (pin connection)
BYRUM-2000
Design Factors:1. Local Scour Depth2. Ship Impact3. Debris Impact4. Ice Impact/Flow5. Vertical/Lateral Loads6. Wind/Earthquake Loading7. Combinations of above
Check:1. Stiff enough laterally?2. How deep below scour?3. How to get that deep?4. Abutment Stability
V
Soil
Piles
3/27/2008
13
½ k Δ2 > F S (½ mv2)
Ship Impact
Use Energy Methods
Pier Strain Energy > (FS)Design Ship Energy
½ kpierΔ2 > F.S.(½ mv2)
Curvature + Axial Loadσtotal = σbending + σaxial
σtotal = My/I + P/A
R
BYRUM-2000
2
2
dyxdEIM =
Rdyxd 12
2
=
R = Radius of the CurvatureR
R
Study the Curvature ProblemSLABS- ALL CURVATURE-3D
BEAMS- CURVATURE AND SHEAR-2D
COLUMNS- CURVATURE AND AXIALEULER BUCKLING THEORY
Curvature Moment
3/27/2008
14
3/27/2008
15
3/27/2008
16
LOG JAM !
3/27/2008
17
Abutment End Sections
3/27/2008
18
3/27/2008
19
3/27/2008
20
Bridge ReplacementHard DirtBig River
M-59 over N. Br. Clinton River
3/27/2008
21