Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler

Embed Size (px)

DESCRIPTION

Cut 2 pieces - 45 cm, 2 pieces - 35 cm and 4 pieces - 7 cm

Citation preview

Bridge Project Materials 8 pieces of wood, glue, cutters, masking tape and a ruler Cut 2 pieces - 45 cm, 2 pieces - 35 cm and 4 pieces - 7 cm Measure in 5 cm from the ends of each 45 cm piece and draw a reference line. Tear off 8 pieces of masking tape Carefully begin gluing your bridge together has in the picture Here is what each side will look when they are together Carefully pick up the bridge frame and flip it over and appply tape to the other side. Then you are to divide the sides into equal sections and cut and dry fit them beforee you glue them. This is what the sides look like at this point. Once the sides have dried, remove the masking tape. When cutting the angle for the endsplace the bridge on top of the wood and scribe the angle. Make sure the cut these pieces a little longer and sand them if needed. Now, use the bridge frame to scribe the angles for the interior pieces. Tape the pieces to hold them in place Here is what the sides will look like when completed/ Cut 4 pieces 7 cm long and 4 pieces of tape 15 cm. With one partner holding the sides upright, place the bottom pieces and then top pieces while using the tape to hold the sides together. Once you have glued in all of the connecting braces, you can add pieces to the design. You can even add corner bracing.