Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
Submittal/Approval LetterTo: Patrick Muench, P.E. Date: May 1, 2017 Turnpike Design Engineer
Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( )Federal Aid Number: Not ApplicableProject Name: Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM169.320State Road Number: 91 Co./Sec./Sub.: 94/470/000Begin Project MP: 153.230 End Project MP: 169.320 Full Federal Oversight: Yes ( ) No ( )Request for: Design Exception ( ), Design Variation ( )
Community Aesthetic Feature: Conceptual ( ), Final ( )Re-submittal: Yes ( ) No( ) Original Ref# - -
Requested for the following element(s):( ) Design Speed ( ) Lane Width ( ) Shoulder Width ( ) Cross Slope( ) Design Loading Structural Capacity ( ) Vertical Clearance ( ) Maximum Grade ( ) Stopping Sight Distance( ) Superelevation ( ) Horizontal Curve Radius ( ) Other
This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings.
SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions.
The seven bridges within the project limits meet AASHTO criteria for total bridge width. Three of the bridges along SR 91 mainline: the northbound bridge over Angle Road/Belcher Canal (Structure No. 940073), and the northbound and southbound bridges over the L-20 Canal (Structure Nos. 940083 and 940058), meet FDOT criteria. The four remaining bridges: the southbound bridge over Angle Road/Belcher Canal (Structure No. 940057), Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) do not meet FDOT total bridge width criteria.
Since the overall width of the existing southbound SR 91 bridge over Angle Road/Belcher Canal (Structure No. 940057) is 39’-11 1/8”, which is less than the FDOT required minimum of 40’-0”, the outside shoulder width on the bridge will only be 9’-11 1/8”, and therefore noncompliant with FDOT requirement of 10 ft. In addition, the shoulder widths on both sides of the roadway at the three bridges crossing over SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) do not meet FDOT criteria. As discussed in the progress meeting of 01/24/17, the design year AADT for the three roads crossing over SR 91 is not available. The only traffic information available is raw traffic data from the PTMS sites in the vicinity of the project. Furthermore, the design speed for the three facilities, has been estimated based on the posted speeds
along the corridor. Due to the lack of available information, the use of low volumes for the three roadways was recommended in the meeting. As indicated in Table 2.1, the required bridge shoulder widths for undivided collector highways is eight (8) feet on both sides for facilities with low traffic volumes. The existing shoulder widths of three (3) feet for both sides of Structures Nos. 940055 and 940059, and two (2) feet for both sides of Structure No. 940056, are not compliant with FDOT requirement of eight (8) feet. For these bridges to remain in place without improvements, a Design Variation will be required. Since total bridge width and bridge shoulder width are closely related, the deficiency in total bridge width will be addressed under this Design Variation request for noncompliant bridge shoulder widths.
No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing any of the improvements discussed in this report. Furthermore, maintaining the current shoulder widths will eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Variation is requested for the bridge shoulder widths for the outside shoulder for the southbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940057), as well as the shoulders for the Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) Bridges, as identified in Table 2.1 of this document, to remain as existing.
Recommended by:
Date 5/1/2017Houman Assari, P.E., Responsible Professional Engineer
Approvals:
Date Date Patrick Muench, P.E., Turnpike Design Engineer Russ Snyder, P.E., Turnpike Structures Design Engineer
N/A Date N/A Date Michael Shepard, P.E., State Roadway Design Engineer State Structures Design Engineer
N/A Date N/A Date State Chief Engineer FHWA Division Administrator
5/11/1705/22/17
Houman Assari Digitally signed by Houman Assari Date: 2017.05.01 14:22:43 -04'00'
Russell D SnyderDigitally signed by Russell D Snyder DN: c=US, o=IdenTrust ACES Business Representative, ou=FLORIDA DEPARTMENT OF TRANSPORTATION, cn=Russell D Snyder, 0.9.2342.19200300.100.1.1=A01097C00000144FEE2E1C900002D8F Date: 2017.05.11 08:12:13 -04'00'
Patrick Muench
Digitally signed by Patrick Muench DN: cn=Patrick Muench, o=Florida Department of Transportation, ou=Florida's Turnpike Enterprise, [email protected], c=US Date: 2017.05.22 12:30:14 -04'00'
Page | 1
Request for FTE Design Exceptions & Variations Checklist
Date:
BMP: EMP: EMP:
New Construction
District: Project Name: Project Section Exemption FPID: Requested Control Element(s):
Design Speed* Horizontal Curve Radius
Other __________
Lane Width Vertical Clearance** Superelevation
Shoulder Widths Maximum Grade Stopping Sight Distance
RRR
Design Loading Structural Capacity* Cross Slopes
*Requires supplementary review (i.e. Planning/Structures/etc)**Requires Utility Accommodation Manual (UAM) Exception Submittals
Page #/ NA
Submittal/Approval Letter (independent file from report) Short description of project, applicable criteria and reason for variation requestApplicable signature fields, names, and titles listed
Design Exception/Variation Report Report Cover
Project Title, FPID, digital sign, seal and date Project description
General project information, typical section, begin/end milepost, county section number Include Work Mix, To – From, Objectives, Obstacles and Schedule.
Description of the variation element and applicable criteria (AASHTO and Department value or standard)
Detailed explanation of why the criteria or standard cannot be complied with or is not applicable Description of any proposed value for project and why it is appropriate
Amount and character of traffic using the facility Description of the anticipated impact on Operations, Adjacent Sections, Level Of Service, Safety, Long and Short Term Effects
Is the variation temporary or permanent? Description of the anticipated Cumulative Effects
A plan view or aerial photo of the variation location Showing right of way lines, and property lines of adjacent property.
A photo of the area. Typical section or cross‐section of variation/exception location The milepost and station location of the variation/exception Any related work programmed or in future work plans
BMP:
Florida's Turnpike Enterprise
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.32015.078
05/01/2017
31.168
436517-1-52-01 & 436517-3-52-01 ✔
✔
S/A Letter
✔
✔
✔
✔ 1
Cover
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
1, 2, 3
4, F
A
D B
A w/ MM
4
✔
✔
Page | 2
The Project Schedule Management (PSM) Project Schedule Activities submitted
< Phase I Phase I – Phase II Phase II – Phase III Phase III – Phase IV > Phase IV
Letting: All mitigating efforts
An explanation of what if any associated existing or future Limitations as a result of public or legal commitments. Description and explanation of any practical alternatives, the selected treatment and why.
Comments on the most recent 5‐year crash history Including all pertinent crash reports Is the location of the variation on the High Crash List?
Description of the anticipated Cost (Social and to the Department – Benefit/Cost) Summary Conclusions
Summary description of included support documentation such as: Location map or description Typical section Aerial or Photo logs when they best illustrate the element issues Crash History and analysis Plan sheets in the area of the variation elements Profiles in the area of vertical alignment variation elements Tabulation of pole offsets for horizontal clearance variation Applicable Signed and Sealed Engineering Support Documents
For the specified conditions the following additional documentation is required: For design speed on FIHS/SIS
Provide typical sections at mid blocks and at intersections. For lane width
Provide locations of alternative routes that meet criteria Proposal for handling drainage Proposed signing and pavement markings
For shoulder width Proposal for handling stalled vehicles Proposal for handling drainage
For bridge width Plan view of the approaching roadways Existing bridge plans (these may be submitted electronically)
For a bridge with a design inventory load rating less than 1.0 Written evaluation and recommendation by the Office of Maintenance is required Load rating calculations for the affected structure
For vertical clearance Locations of alternative routes that meet criteria
Page #/ NA
✔ I
7
5, E
6, H
N/A
N/A
6
N/A
N/A
N/A
✔
✔
✔
✔
✔
✔
✔
✔
✔
8
✔
✔
A, B, D, E
✔
✔
✔
✔
Page | 3
For cross‐slopeProposal for handling drainage
Details on how the cross slope impacts intersections
For conditions that may adversely affect the roadway’s capacity
Provide the comments on compatibility of the design and operation with the adjacent sections Effects on capacity (proposed criteria vs. AASHTO) using an acceptable capacity analysis procedure Calculate reduction for design year, level of service
For superelevation Provide the side friction factors for the curve for each lane of different cross‐slope at the PC of the curve, the point of maximum cross‐slope, and the PT of the curve using the following equation. f = (V2 – 15Re)/(V2e+15R)
For areas with crash histories or when a benefit to cost analysis is requested Provide a time value analysis between the benefit to society quantified in dollars and the costs to society quantified in dollars over the life of the Exception/Variation.
Roadside Safety Analysis Program (RSAP) Historical Crash Method (HCM)
Page #/ NA
N/A
N/A
N/A
N/A
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
St. Lucie County, Florida
FPID Numbers 436517-1-52-01 and 436517-3-52-01 Contract Number C9R86
BRIDGE SHOULDER WIDTH DESIGN VARIATION
Prepared For:
Florida Department of Transportation Florida’s Turnpike Enterprise
MAY 2017
Prepared By: Propel Engineering, Inc. 6685 Forest Hill Boulevard, Suite 205 Responsible Engineer: Greenacres, FL 33413 Houman Assari, PE Certification of Authorization No. 31050 State of Florida, Professional Engineer Vendor No. F463316950 License No. 49029
This item has been electronically signed and sealed by Houman Assari, PE on 05/01/2017 using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Houman Assari Digitally signed by Houman Assari Date: 2017.05.01 14:20:43 -04'00'
TABLE OF CONTENTS 1.0 Project Description ....................................................................................................................................................... 1
2.0 Description of the Design Variation .............................................................................................................................. 1 3.0 Design Criteria .............................................................................................................................................................. 3
3.1 American Association of State Highway and Transportation Officials (AASHTO) .................................................... 3
3.2 Florida Department of Transportation (FDOT) ....................................................................................................... 3 4.0 Proposed Criteria .......................................................................................................................................................... 3
5.0 Justification .................................................................................................................................................................. 4
5.1 Operational Conditions .......................................................................................................................................... 4
5.2 Crash History Analysis ............................................................................................................................................ 5 5.3 Benefit/Cost Analysis ............................................................................................................................................. 6
5.4 Accommodation of Disabled Vehicles .................................................................................................................... 6
5.5 Spread Analysis ...................................................................................................................................................... 6 5.6 Right-of-Way Impacts ............................................................................................................................................ 6
5.7 Community Impacts ............................................................................................................................................... 6
5.8 Environmental Impacts .......................................................................................................................................... 7
5.9 Mitigation .............................................................................................................................................................. 7 6.0 Summary Conclusions ................................................................................................................................................... 8
APPENDICES
Appendix A: Location Map Appendix B: Typical Sections Appendix C: As-Built Plans Appendix D: Photo Log Appendix E: Crash History Appendix F: Traffic Data Appendix G: Spread Analysis Appendix H: Cost Estimate Appendix I: Project Schedule
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 1
1.0 Project Description This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings. SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions. The project is currently scheduled for letting on 01/09/2018, with a production date of 10/06/2017. There are currently no major obstacles to meeting this schedule. The project schedule is included in Appendix I of this document. 2.0 Description of the Design Variation There are seven bridges within the project limits, four of which are a part of SR 91 Mainline. The SR 91 northbound and southbound travel ways have separate bridges at the Angle Road/Belcher Canal and the L-20 Canal crossings. Structure Nos. 940057 and 940073 cross the Angle Road/Belcher Canal and, and Structure Nos. 940058 and 940083 cross over the L-20 Canal. The remaining bridges on the project are the three overpasses across SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). Based on information gathered from field reviews, the design survey for the project, and a review of the as-built plans, the bridges were evaluated for compliance with American Association of State Highway and Transportation Officials (AASHTO), and Florida Department of Transportation (FDOT) criteria for bridge shoulder width. The results of the evaluation have been summarized in Table 2.1. The seven bridges within the project limits meet AASHTO criteria for total bridge width. Three of the bridges along SR 91 mainline: the northbound bridge over Angle Road/Belcher Canal (Structure No. 940073), and the northbound and southbound bridges over the L-20 Canal (Structure Nos. 940083 and 940058), meet FDOT criteria. The four remaining bridges: the southbound bridge over Angle Road/Belcher Canal (Structure No. 940057), Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) do not meet FDOT total bridge width criteria. Since the overall width of the existing southbound SR 91 bridge over Angle Road/Belcher Canal (Structure No. 940057) is 39’-11 1/8”, which is less than the FDOT required minimum of 40’-0”, the outside shoulder width on the bridge will only be 9’-11 1/8”, and therefore noncompliant with FDOT requirement of 10 ft.
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 2
In addition, the shoulder widths on both sides of the roadway at the three bridges crossing over SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) do not meet FDOT criteria. As discussed in the progress meeting of 01/24/17, the design year AADT for the three roads crossing over SR 91 is not available. The only traffic information available is raw traffic data from the PTMS sites in the vicinity of the project. Furthermore, the design speed for the three facilities, has been estimated based on the posted speeds along the corridor. Due to the lack of available information, the use of low volumes for the three roadways was recommended in the meeting. As indicated in Table 2.1, the required bridge shoulder widths for undivided collector highways is eight (8) feet on both sides for facilities with low traffic volumes. The existing shoulder widths of three (3) feet for both sides of Structures Nos. 940055 and 940059, and two (2) feet for both sides of Structure No. 940056, are not compliant with FDOT requirement of eight (8) feet. For these bridges to remain in place without improvements, a Design Variation will be required. Since total bridge width and bridge shoulder width are closely related, the deficiency in total bridge width will be addressed under this Design Variation request for noncompliant bridge shoulder widths. The Design Variation locations have been included in Appendix A of this document.
Table 2.1 – Summary of Bridge Shoulder Widths
Bridge No.
Mile Marker Road Name
Bridge Length
(ft.)
Existing/*Proposed Shoulder Width
Required Shoulder Width (ft.) Recommendation
AASHTO FDOT
940055 154.938 Picos Road
over SR 91
227.12 3’-0” (LT) 2
(LT & RT) (2)
8 (LT & RT)
(4)
Design Variation
3’-0” (RT) Design Variation
940056 156.091 CR 68 over SR 91
191.06 2’-0” (LT) 2
(LT & RT) (2)
8 (LT & RT)
(4)
Design Variation
2’-0” (RT) Design Variation
940073 157.975 SR 91 NB over Belcher Canal 486.48
*6’-4” Median 4 Median 4 Outside
(1)
6 Median 10 Outside
(3)
Shoulder to Remain
*10’-0” Outside Shoulder to Remain
940057 157.975 SR 91 SB
over Belcher Canal
486.94 *6’-0” Median 4 Median
4 Outside (1)
6 Median 10 Outside
(3)
Shoulder to Remain
*9’-11 1/8” Outside Design Variation
940083 158.657 SR 91 NB over L-20 Canal 290.94
*6’-1” Median 4 Median 4 Outside
(1)
6 Median 10 Outside
(3)
Shoulder to Remain
*10’-0” Outside Shoulder to Remain
940058 158.657 SR 91 SB
over L-20 Canal
291.23 *6’-0” Median 4 Median
4 Outside (1)
6 Median 10 Outside
(3)
Shoulder to Remain
*10’-0” Outside Shoulder to Remain
940059 165.420 Minute Maid
Rd. over SR 91
398.09 3’-0” (LT) 2
(LT & RT) (2)
8 (LT & RT)
(4)
Design Variation
3’-0” (RT) Design Variation
(1) AASHTO – A Policy on Design Standards – Interstate System (2005), Cross Section, Page 5 (2) AASHTO – A Policy on Geometric Design of Highways and Streets (2011), Section 7.2.5, Bridges to Remain in Place,
Page 7-6 (3) FDOT – Plans Preparation Manual, Volume 1, Chapter 2, Figure 2.11.1 (4) FDOT – Plans Preparation Manual, Volume 1, Chapter 2, Figure 2.11.2
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 3
3.0 Design Criteria 3.1 American Association of State Highway and Transportation Officials (AASHTO)
A Policy on Design Standards – Interstate System – (2005) (AASHTO IS) Bridges and Other Structures, Cross Section, Page 5:
“The width of all bridges, including grade separation structures, measured between rails, parapets, or barriers shall equal the full paved width of the approach roadways. The approach roadway includes the width of paved shoulders. Long bridges, defined as bridges having an overall length in excess of 200 ft., may have a lesser width. Such bridges shall be analyzed individually. On long bridges, offsets to parapet, rail or barrier shall be at least 4 ft. measured from the edge of the nearest traffic lane on both the left and the right.”
A Policy on Geometric Design of Highways and Streets (2011) Section 7.2.5, Structures, Bridges to remain in place:
“For an existing bridge to remain in place, it should have adequate structural strength and a width at least equal to the width of the traveled way plus 2 ft. clearance on each side.”
3.2 Florida Department of Transportation (FDOT) Plans Preparation Manual (PPM) (January 2017) Volume 1, Chapter 2, Figure 2.11.1, Partial Bridge Sections:
The required bridge shoulder widths for a divided highway with two lanes are six (6) feet for the inside shoulder and ten (10) feet for the outside shoulder.
Volume 1, Chapter 2, Figure 2.11.2, Bridge Section: The required bridge shoulder widths for undivided collector highways is eight (8) feet on both sides for facilities with low traffic volumes.
Volume 1, Chapter 2, Table 2.3.1 - Shoulder Widths and Cross Slopes – Freeways The required shoulder widths for the approach roadways to the bridges on two-lane freeways without shoulder gutter, are eight (8) feet for the median shoulder with four (4) feet paved, and twelve (12) feet for the outside shoulder with ten (10) feet paved.
Volume 1, Chapter 2, Table 2.3.4 - Shoulder Widths and Cross Slopes – Undivided Collectors
The required shoulder widths for the approach roadways to the bridges on two-lane, two-way undivided collectors are eight (8) feet with five (5) feet paved for facilities with low traffic volumes.
4.0 Proposed Criteria The proposed design is to allow the outside shoulder width for the southbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940057) to be at a width of 9’-11 1/8”. Furthermore, the shoulder widths for the bridges on Picos Road (Structure No. 940055) and Minute Maid Road (Structure No. 940059) will be 3’-0”, and County Road 68 Bridge (Structure No. 940056) will have shoulder widths of 2’-0”. Additionally, the proposed design will allow the existing bridge widths for the southbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940057), Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) to remain as existing.
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 4
5.0 Justification The main objective of the project is to extend the service life of the existing asphalt pavement and improve safety related features along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public.
5.1 Operational Conditions A project Traffic Data Report was provided by FTE. The Traffic Data results were as follows:
Table 5.1.1 – SR 91 Traffic Data
Two-Way AADT Trucks (DDHV) Traffic Factors
2016 2018 2038 2016 2018 2028 KSTD (%) D (%) T24 (%) DHT (%)
32,500 33,900 45,200 145 151 202 10.5 60.7 14.0 7.0 The design and posted speed within the project limits is 70 mph. The Traffic Data is included in Appendix F of this document. The extent of the substandard shoulder width along SR 91 mainline, as identified in this variation, is limited to one segment of 486.94 ft. with an actual deficiency of less than one inch. As indicated in the FHWA publication Mitigation Strategies for Design Exceptions, dated July 2007, shoulder width may have an impact on traffic operations and highway capacity on high-speed facilities, since narrow shoulder widths may reduce free-flow speeds and driver comfort. There will be a reduction in free-flow speed when the lateral clearance for outside shoulders is less than six (6) feet. Since the narrow shoulder width is greater than six (6) feet within the variation limits, no adverse impacts on the existing capacity and operation of the facility are anticipated if the 9’-11 1/8” outside shoulder on Structure No. 940057 remains in place. The remaining segments of the substandard design elements referenced in this variation are at three crossings over SR 91 at Picos Road (structure no. 940055), County Road 68 (structure no. 940056), and Minute Maid Road (structure no. 940059). As illustrated in Table 2.1, the lengths of the substandard bridge widths and bridge shoulder widths on the crossover bridges range between 191.06 ft. and 398.09 ft. Since the narrow bridge and shoulder widths are an existing condition, no additional adverse impacts on the existing capacity and operation of the facility are anticipated if the current bridge widths and shoulder widths are maintained. The capacity of roadway is dependent on the number of lanes and the posted speed limit along the corridor. The scope of this project is limited to milling and resurfacing, therefore these elements will remain the same. Furthermore, the limited length of the substandard segments will not impede maintenance, law enforcement, and disabled vehicles from locating a suitable refuge area. There are additional design elements that are not in compliance with AASHTO and FDOT criteria, namely Vertical Clearance and Cross slope/Superelevation, that occur in the vicinity of the areas established for this design variation, however, no cumulative effects impacting the operation of the facility are expected. Based on the analysis performed, no long or short term adverse impacts are anticipated on operations, Level of Service, or adjacent roadway sections for the areas identified in this Design Variation, which is expected to be in place through the design life of the project. SR 91 from MM 152 to MM 193 is to be evaluated for widening by year 2035 which may ultimately eliminate the substandard shoulder widths along SR 91. A Project Development and Environment (PD&E) study would be required, which may address the shoulder width deficiency, prior to design and construction.
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 5
5.2 Crash History Analysis Safety considerations associated with narrow shoulder widths on bridges are reduced recovery areas and storage space for disabled vehicles, maintenance operations, law enforcement activities, and stormwater management. The most recent 5-year crash history from the years 2011 through 2015 was reviewed. The crash data is included in Appendix E of this document. This report covers crash data, field investigations, and assessments of the existing conditions along the corridor. The data provided includes the location of each crash, the type of crash, the date, and the existing conditions.
The analysis of the crash history revealed a total of 376 crashes along SR 91 within the project limits. There have been 15 crashes on SR 91 mainline that have occurred within the limits established for this design variation, including one with a fatality. Four of the crashes involved collisions with the roadside barriers, however, none of these crashes were within the limits of bridge over Angle Road/Belcher Canal (Structure No. 940057). Furthermore, all these crashes were with barriers on the median side, however, the only location identified as requiring a variation for bridge shoulder width along the mainline is the outside shoulder on Structure No. 940057. The long form crash reports for these four crashes were reviewed to determine whether the narrow bridge shoulder width may have been a contributing factor to any of the crashes. In addition, the long form crash report for the accident with the fatality was reviewed to ensure that the narrow bridge shoulder width was not involved in the crash in any way. A summary of the crash is provided below:
Table 5.2.1 - Summary of Detailed Crash Report
Based on the available information, a correlation between the crashes and narrow bridge shoulder width could not be found. The analysis further revealed that the narrow shoulder locations, as identified in this Design Variation, are not on the Turnpike’s Top 30 Crash List. From the foregoing information presented, it is reasonable to conclude that the crashes would not be mitigated by widening the narrow shoulders, and safety is not compromised.
Crash ID Year Location Summary Remarks
83183054 2013 MM
158.129 (L1)
Vehicle 1 was traveling southbound on State Road 91 in the inside lane. For an unknown reason, Vehicle 1 traveled onto the eastern shoulder and Driver 1 steered the Vehicle 1 back to the right, overcorrected, and subsequently lost control of Vehicle 1. Vehicle 1 traveled across both southbound lanes and onto the western shoulder of southbound State Road 91. Vehicle 1 then rotated counterclockwise and traveled back across both southbound lanes and struck the center median guardrail with the left side of Vehicle 1. Occupant 2 was ejected from Vehicle 1 through the left side window and struck the metal guardrail. Occupant 2 came to final rest in the inside lane facing north. Vehicle 1 continued to rotate counterclockwise and struck the center median guardrail a second and third time before traveling across both southbound lanes and struck the metal guardrail on the western shoulder. Vehicle 1 came to final rest on the western shoulder of southbound State Road 91 facing north. Occupant 2 was pronounced deceased on the scene.
The Crash was not attributed to the narrow bridge shoulders on the outside of the bridge.
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 6
5.3 Benefit/Cost Analysis The widening of the existing bridges to achieve compliant bridge shoulder widths will require improvements at the bridge termini including widening of the shoulders at the bridge approaches, embankment placement with regrading and stabilizing of the slopes, and upgrading of the guardrail and their connection to the proposed bridge railings. The estimated cost to construct these improvements is $2,980,954.51. A cost estimate has been prepared for the widening of each of the bridges which have been included in Appendix H of this document. There are no anticipated social costs associated with the design elements discussed in this report. A Benefit/Cost analysis would result in a B/C ratio of zero since there were no crashes found to be attributed to the narrow bridge shoulder width in the analysis of the most recent 5-year crash history. 5.4 Accommodation of Disabled Vehicles The extent of the substandard shoulder width along SR 91 mainline, as identified in this variation, is limited to one segment of 486.94 ft., and the actual deficiency of less than one inch. The slight deficiency and the limited length of the substandard segment will not impede maintenance, law enforcement, and disabled vehicles from locating a suitable refuge area in the vicinity of the substandard shoulder width. The lengths of the substandard bridge shoulder widths on the crossover bridges range between 191.06 ft. and 398.09 ft. Since the narrow bridge shoulder widths are an existing condition, no additional adverse impacts on the existing capacity and operation of the facility are anticipated if the current bridge widths and shoulder widths are maintained. As is the case with SR 91 mainline, the limited length of the substandard segments will not impede maintenance, law enforcement, and disabled vehicles from easily locating suitable refuge areas beyond the limits of the bridges.
5.5 Spread Analysis Spread calculations were performed to ensure that existing spread calculations meet FTE criteria and no adverse impacts on the operation of the roadways are realized as a result of the narrow shoulder widths. The analysis pertains to the approaches to the southbound SR 91 mainline bridge over Angle Road/Belcher Canal. The spread criteria at this location has been met. This area represents the most critical location as the longest segment with the largest contributing area and with low longitudinal slopes. Spread is not considered to be an issue at Picos Road, CR 68, and Minute Maid Bridges due to the short limit of the curbed section at the crest of the vertical curve, significantly wider shoulders beyond the bridge limits, and steeper longitudinal slopes. The spread analysis results are included in Appendix G of this document. 5.6 Right-of-Way Impacts Whether any of the Improvements to correct the shoulder width deficiency are implemented or the existing bridge shoulder widths are allowed to remain in place, no right-of-way impacts are anticipated. 5.7 Community Impacts Since the substandard shoulder widths are an existing condition, no adverse community impacts are expected if the existing shoulder widths are maintained. However, if any of the Improvements to correct the shoulder width deficiency are implemented, the additional work will impact the maintenance of traffic on SR 91 as well as the three roadways crossing over SR 91, thereby increasing the cost and extending the construction duration of the project. This will ultimately result in additional disturbance to the FTE consumers, and the local community.
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 7
5.8 Environmental Impacts With the implementation of the Improvements to correct the shoulder width deficiency, there may be impacts on the environmentally sensitive areas adjacent to the roadway as a result of placement of required embankment. Furthermore, Gopher tortoise burrows were observed during our field visits which will require coordination with Florida Fish and Wildlife Conservation Commission (FWC). The appropriate habitats must be surveyed during design to confirm whether the burrows are active. If the burrows are impacted, a relocation permit will be required prior to moving the tortoise. Relocation permitting does not typically occur until approximately 90 days prior to the start of construction in the area. Since the substandard shoulder widths are an existing condition, no adverse environmental impacts are expected if the existing shoulder widths are maintained. 5.9 Mitigation There are existing warning signs along the mainline in both northbound and southbound directions to notify the travelling public of reduced shoulder widths. To enhance the safety regarding the narrow bridges and shoulder widths, the existing signs are to be replaced by new signs (W5-2 with supplemental W16-3aP Panels). To reduce crash severity should a driver leave the travel lanes, crashworthy approach guardrail and connections to the existing bridge railings are already in place. Additional mitigation strategies as outlined in the FHWA publication include recessed pavement markings, delineators, object markers, high visibility bridge railing, and bridge lighting are either infeasible for application at the bridges on this project, or impractical based on the scope of this resurfacing project.
There are no associated existing or future limitations as a result of legal or public commitments are known for this project.
Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 8
6.0 Summary Conclusions The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders and the paved median openings. Additional safety related improvements will also be provided along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public. The widening of the existing bridges to achieve bridge shoulder widths that meet the FDOT criteria will increase the construction cost significantly as well as impact the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Widening of the bridges will negatively impact the budget and the schedule, however, since there are no documented crashes citing narrow bridge or bridge shoulder width as the contributing cause, the benefit/cost ratio for widening the bridges will be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing any of the improvements discussed in this report. Furthermore, maintaining the current shoulder widths will eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Variation is requested for the bridge shoulder widths for the outside shoulder for the southbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940057), as well as the shoulders for the Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) Bridges, as identified in Table 2.1 of this document, to remain as existing. The outside shoulder width for the southbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940057) will be 9’-11 1/8”. Furthermore, the shoulder widths for the bridges on Picos Road (Structure No. 940055) and Minute Maid Road (Structure No. 940059) will be 3’-0”, and County Road 68 Bridge (Structure No. 940056) will have shoulder widths of 2’-0”.
Bridge Width and Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from 153.230 to 169.320
Figure 1 - SB SR 91 Mainline (Bridge No. 940057)
Figure 2 - Picos Road Eastbound Shoulder (Bridge No. 940055)
Figure 3 - Picos Road Bridge (Bridge No. 940055)
Figure 4 - Eastbound Picos Road (Bridge No. 940055)
Bridge Width and Bridge Shoulder Width Design Variation FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from 153.230 to 169.320
Figure 5 – Eastbound Shoulder CR 68 (Bridge No. 940056)
Figure 6 - Westbound Shoulder CR 68 (Bridge No. 940056)
Figure 7 - Northbound Shoulder Minute Maid Road (Bridge No. 940059)
Figure 8 - Southbound Shoulder Minute Maid Road (Bridge No. 940059)
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8198
4049
01/
2/20
1118
.869
157.
019
14L
11
12
11
014
141
S1
814
S4
00
8198
6151
01/
2/20
1118
.869
157.
019
9R
21
51
11
09
21
N1
10
281
9784
110
1/5/
2011
30.8
8416
9.03
427
RS
11
21
10
271
1N
771
00
8196
3697
01/
6/20
1120
.871
159.
021
27R
S1
51
11
027
1415
N17
10
081
9748
190
1/6/
2011
20.8
7115
9.02
127
LS
25
11
10
277
15S
121
00
8197
4820
01/
6/20
1120
.871
159.
021
15L
22
51
11
014
148
E2
1S
20
081
9636
990
1/13
/201
121
.876
160.
026
7R
21
11
11
09
01
N1
151
N2
00
8198
2925
01/
20/2
011
24.8
7816
3.02
827
RS
15
41
10
2714
1N
771
00
8197
5263
01/
30/2
011
26.8
8116
5.03
113
L1
15
11
10
1314
1S
11
00
8199
7339
02/
13/2
011
18.8
7615
7.02
627
RS
11
11
10
273
1N
171
00
8200
1260
02/
18/2
011
19.9
0115
8.05
114
L1
15
11
10
142
11S
216
S2
00
8197
5265
02/
21/2
011
15.8
6315
4.01
314
L2
15
11
10
142
11S
2521
1S
20
082
0431
780
2/27
/201
122
.875
161.
025
29R
S1
52
11
029
146
N1
10
081
9990
080
3/5/
2011
27.8
816
6.03
014
L1
11
21
10
1412
14S
773
14S
20
081
9861
570
3/9/
2011
16.5
5815
4.70
827
LS
15
11
10
2710
1S
21
01
8204
3179
03/
9/20
1121
.876
160.
026
27L
S1
51
11
027
141
S26
10
281
9829
280
3/14
/201
116
.058
154.
208
14R
11
11
11
014
714
N2
141
N3
00
8201
7236
03/
16/2
011
29.3
2316
7.47
31
RS
11
11
10
119
1N
251
01
8201
7237
03/
17/2
011
19.9
0115
8.05
127
MM
11
11
10
2714
1S
2621
1S
20
382
0220
510
3/17
/201
121
.876
160.
026
14R
21
51
11
018
11
N12
81
N2
03
8206
4726
03/
22/2
011
27.8
816
6.03
027
MM
15
41
10
2714
1S
251
00
8197
5271
04/
10/2
011
28.8
816
7.03
014
L2
11
11
10
140
1S
71
S2
02
8198
2933
04/
15/2
011
18.8
6915
7.01
927
L1
11
21
770
2714
1S
771
00
8197
4829
04/
27/2
011
18.8
6915
7.01
929
LS
11
11
10
292
1S
21
00
8197
4830
05/
1/20
1123
.931
162.
081
27R
S1
11
11
027
101
N1
10
181
9829
370
5/7/
2011
17.8
6415
6.01
427
RS
11
11
10
273
1N
11
00
8198
2938
05/
13/2
011
19.9
0115
8.05
114
R2
11
11
10
141
1N
778
1N
20
081
9973
490
5/22
/201
130
.884
169.
034
1R
11
11
11
042
191
N17
10
482
0650
250
5/24
/201
120
.852
159.
002
27L
S1
11
11
227
21
S2
10
181
9748
040
5/30
/201
128
.853
167.
003
27L
S1
11
11
027
21
S2
10
181
9748
050
6/3/
2011
23.9
3116
2.08
127
LS
13
11
10
272
1S
11
00
8200
1275
06/
5/20
1120
.871
159.
021
27M
M1
12
11
027
121
S25
131
N2
00
8197
4806
06/
12/2
011
26.8
8116
5.03
128
RS
11
11
10
284
15N
21
01
8198
2922
06/
23/2
011
27.8
816
6.03
027
MM
21
31
770
2714
1S
771
00
8197
5275
06/
26/2
011
21.8
7616
0.02
614
L2
11
21
110
1413
1S
124
13S
20
182
0431
810
6/26
/201
120
.871
159.
021
27L
S1
12
11
027
141
S1
10
181
9829
350
6/30
/201
117
.864
156.
014
29L
S1
11
11
029
91
S77
10
081
9748
250
7/21
/201
116
.838
154.
988
14R
21
11
11
014
11
N2
211
N2
00
8199
7341
07/
22/2
011
31.8
8617
0.03
614
L2
11
11
10
143
1S
110
1S
20
081
9840
480
7/24
/201
115
.015
153.
165
14L
11
11
11
014
41
S1
101
S2
00
Exem
ptio
n fro
m F
lorid
a Pu
blic
Rec
ords
Sec
tion
119,
Flo
rida
Stat
utes
: Th
e in
form
atio
n co
ntai
ned
in th
e C
rash
An
alys
is R
epor
ting
(C.A
.R.)
syst
em h
as b
een
com
pile
d fro
m in
form
atio
n co
llect
ed fo
r the
pur
pose
of i
dent
ifyin
g,
eval
uatin
g, o
r pla
nnin
g sa
fety
enh
ance
men
ts.
This
sys
tem
and
its
prod
ucts
iden
tify
info
rmat
ion
used
for t
he p
urpo
se o
f de
velo
ping
hig
hway
saf
ety
cons
truct
ion
impr
ovem
ent p
roje
cts
whi
ch m
ay b
e im
plem
ente
d ut
ilizin
g Fe
dera
l-aid
hig
hway
fu
nds.
Sin
ce th
is in
form
atio
n is
col
lect
ed fo
r the
abo
ve-m
entio
ned
purp
ose
it is
exe
mpt
from
dis
clos
ure
as a
pub
lic
reco
rd p
ursu
ant t
o Fe
dera
l law
. Any
doc
umen
t dis
play
ing
this
exe
mpt
ion
from
pub
lic re
cord
s sh
all b
e us
ed o
nly
for
thos
e pu
rpos
es d
eem
ed a
ppro
pria
te b
y th
e D
epar
tmen
t. Se
e Ti
tle 2
3 U
nite
d St
ates
Cod
e Se
ctio
n 40
9.
2011
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8206
5031
08/
4/20
1121
.876
160.
026
27L
S1
11
11
043
141
S30
10
081
9829
440
8/7/
2011
29.8
8116
8.03
129
LS
25
31
10
292
1S
291
00
8200
1282
08/
13/2
011
29.3
2316
7.47
318
R1
12
11
10
400
1N
11
1N
60
081
9752
790
8/25
/201
128
.08
166.
230
1M
M2
12
11
01
41
N12
10
182
0172
510
9/2/
2011
27.8
816
6.03
027
MM
11
11
10
274
1N
261
00
8200
1285
09/
16/2
011
28.8
816
7.03
014
L2
15
11
10
141
6N
221
1S
20
081
9840
620
9/22
/201
114
.862
153.
012
14R
21
51
11
014
11
N2
211
N3
02
8198
2949
09/
26/2
011
28.8
816
7.03
027
LS
11
11
10
2714
11S
11
00
8204
3188
010
/1/2
011
26.8
8116
5.03
127
MM
11
21
10
271
1N
11
02
8198
4431
010
/6/2
011
19.0
5815
7.20
814
R1
11
21
10
148
4N
41
8N
20
081
9748
370
10/8
/201
131
.807
169.
957
27R
12
13
11
027
11
N12
10
081
9840
660
10/1
3/20
1117
.121
155.
271
23L
S1
11
11
023
161
S2
10
081
9829
530
10/1
5/20
1126
.881
165.
031
27L
S1
21
11
027
141
S29
10
081
9861
740
10/1
8/20
1118
.869
157.
019
29L
S2
13
110
09
21
S30
10
081
9861
750
10/2
2/20
1119
.901
158.
051
9R
S1
11
11
040
31
N2
10
182
0431
910
10/3
1/20
1126
.881
165.
031
27M
M2
53
11
027
131
S12
10
081
9840
670
11/3
/201
120
.871
159.
021
27L
S1
12
11
027
715
S2
10
081
9861
770
11/1
6/20
1124
.878
163.
028
9L
S1
11
11
042
1477
S2
121
S2
01
8201
7263
011
/16/
2011
27.8
816
6.03
018
R2
15
11
10
406
1N
11
1N
20
082
0012
900
11/2
7/20
1117
.367
155.
517
27L
S1
11
11
027
141
S25
10
081
9829
610
12/5
/201
124
.878
163.
028
27R
S2
52
11
027
11
N1
10
082
0172
670
12/1
0/20
1114
.862
153.
012
15R
22
12
11
014
13
N2
81
N2
00
8198
6185
012
/15/
2011
29.3
2316
7.47
39
LX
15
21
10
4014
1S
21
00
8200
1291
012
/16/
2011
29.9
9616
8.14
615
L1
15
21
10
1413
77S
2914
1S
20
181
9861
860
12/2
2/20
1120
.871
159.
021
18R
S1
51
11
018
181
N1
10
082
0647
540
12/2
4/20
1121
.871
160.
021
1R
S1
51
11
027
11
N2
10
282
0650
410
12/2
7/20
1116
.871
155.
021
34L
S2
13
11
042
15
S1
10
0
8197
5289
01/
1/20
1219
.901
158.
051
27L
S1
41
11
027
11
S31
10
082
0172
740
1/2/
2012
29.8
8116
8.03
114
R1
11
11
10
141
1N
28
1N
30
181
9861
880
1/8/
2012
17.0
1515
5.16
59
MM
11
11
10
90
10N
61
1N
20
082
0647
600
1/14
/201
217
.058
155.
208
1L
S1
51
11
02
191
S1
10
181
9752
900
1/15
/201
225
.68
163.
830
13R
21
51
11
013
11
N1
10
081
9784
320
2/11
/201
214
.915
153.
065
14L
11
21
11
018
577
S13
1S
30
182
0647
630
2/15
/201
216
.058
154.
208
9R
S1
31
111
01
1977
N30
10
182
0431
960
2/17
/201
215
.158
153.
308
14R
21
42
11
014
106
N3
1N
20
081
9973
680
3/1/
2012
28.8
816
7.03
09
L2
21
21
10
403
1S
11
00
8198
2967
03/
2/20
1217
.864
156.
014
17R
21
11
11
05
01
N77
21
N2
00
8198
2968
03/
6/20
1214
.935
153.
085
27R
S1
12
11
027
16
N77
71
N2
00
8202
0106
03/
29/2
012
26.0
5816
4.20
827
LS
11
11
10
2719
1S
771
11
8204
3198
03/
29/2
012
25.2
2316
3.37
327
LS
11
11
10
2714
1S
771
03
8195
5562
04/
16/2
012
19.9
0115
8.05
127
RS
11
21
10
90
1N
41
N2
00
8197
8446
04/
22/2
012
28.8
816
7.03
018
L1
11
21
10
4013
1S
773
1S
20
182
0013
050
4/27
/201
230
.323
168.
473
27M
M1
21
11
027
21
S1
10
282
0432
020
4/27
/201
216
.681
154.
831
27R
S1
11
177
027
31
N77
10
182
0172
850
5/9/
2012
17.8
7815
6.02
827
L1
11
21
10
271
1N
11
1S
20
081
9973
720
5/14
/201
227
.996
166.
146
14R
12
13
110
014
131
N12
71
N2
00
8197
4848
05/
15/2
012
16.0
5815
4.20
827
MM
11
11
10
2714
1N
291
00
8197
5295
05/
26/2
012
27.1
8116
5.33
129
LS
11
21
10
292
1S
171
03
2012
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8197
4850
05/
29/2
012
26.3
2316
4.47
317
R2
11
11
10
50
1N
11
1N
20
082
0647
760
5/31
/201
217
.058
155.
208
14L
12
52
11
014
277
S2
91
S2
00
8202
0113
06/
15/2
012
22.8
7516
1.02
529
RS
25
21
10
292
1N
11
00
8197
8454
06/
28/2
012
28.8
816
7.03
014
R1
11
11
10
90
77N
111
N3
00
8200
1311
07/
2/20
1230
.996
169.
146
1R
S1
12
11
01
191
N1
10
281
9784
560
7/4/
2012
28.8
816
7.03
014
L2
21
31
100
141
1S
108
1S
20
081
9862
140
7/13
/201
223
.931
162.
081
9L
11
11
177
09
96
S2
21
S2
02
8202
8751
07/
13/2
012
24.2
3116
2.38
128
LS
11
11
10
287
4N
41
00
8198
4080
07/
15/2
012
29.0
5816
7.20
813
R2
25
31
10
1318
1N
11
00
8198
4081
07/
16/2
012
16.0
5815
4.20
814
R2
25
21
10
141
6N
221
1N
20
082
0013
130
7/20
/201
216
.935
155.
085
1R
S1
12
11
01
191
N1
10
481
9784
620
7/29
/201
225
.88
164.
030
18L
11
51
11
018
21
S1
10
081
9784
630
7/29
/201
227
.058
165.
208
18L
21
51
11
018
11
S1
10
081
9753
030
8/7/
2012
22.9
7516
1.12
51
MM
21
21
10
119
14N
261
01
8206
4784
08/
7/20
1229
.323
167.
473
27L
S2
13
11
027
96
S1
10
282
0201
240
8/11
/201
216
.058
154.
208
27L
22
23
110
027
141
S1
10
081
9753
040
8/17
/201
217
.371
155.
521
9L
S1
12
11
09
077
S30
141
S2
00
8204
3205
08/
17/2
012
25.8
2316
3.97
327
RS
11
21
10
271
1N
21
00
8204
3206
08/
21/2
012
19.9
0115
8.05
127
R1
21
31
100
272
1N
11
00
8201
7225
08/
25/2
012
15.8
6315
4.01
327
RS
21
31
10
2714
1N
771
01
8200
1972
09/
1/20
1215
.558
153.
708
14L
21
51
11
314
141
S2
211
S2
01
8206
4792
09/
8/20
1216
.058
154.
208
9L
11
11
11
040
131
S1
10
082
0647
930
9/13
/201
231
.323
169.
473
1R
S1
11
11
01
191
N1
10
281
9784
740
9/14
/201
221
.058
159.
208
27L
S1
12
11
027
141
S29
10
081
9784
750
9/15
/201
226
.996
165.
146
1R
S1
12
11
01
191
N77
10
282
0019
760
9/29
/201
219
.319
157.
469
27M
M2
52
110
09
31
S77
10
081
9748
610
9/30
/201
231
.854
170.
004
27R
S2
13
11
027
11
N12
51
N2
00
8197
5310
010
/1/2
012
24.5
0516
2.65
534
MM
11
21
10
341
77N
261
00
8202
0131
010
/4/2
012
26.8
5416
5.00
414
LS
11
11
10
152
1S
2621
8S
20
181
9753
110
10/8
/201
231
.756
169.
906
27M
M2
13
11
027
141
N12
10
082
0221
080
10/1
1/20
1231
.856
170.
006
14R
21
11
11
014
211
N12
91
N2
00
8201
7253
010
/12/
2012
24.3
2316
2.47
327
LS
15
11
10
274
1S
11
00
8196
3711
010
/13/
2012
15.8
4915
3.99
913
L1
14
11
10
132
1S
11
00
8197
4865
010
/21/
2012
18.9
3515
7.08
514
L2
11
11
10
142
1S
210
1S
20
381
9753
140
10/2
6/20
1227
.953
166.
103
27M
M2
12
11
027
11
N12
10
082
0019
920
12/7
/201
230
.323
168.
473
9R
11
11
11
09
06
N2
11
N3
01
8225
3440
012
/7/2
012
31.3
2316
9.47
327
LS
15
41
10
2719
1S
261
02
8291
0968
012
/11/
2012
16.7
5515
4.90
527
RS
25
21
10
271
1N
21
01
8197
4868
012
/22/
2012
29.3
2316
7.47
314
R2
11
11
10
1419
1N
214
1N
20
381
9753
180
12/2
2/20
1226
.954
165.
104
9M
M1
11
11
00
00
S13
1S
20
081
9878
840
12/3
1/20
1215
.427
153.
577
27R
S1
11
11
027
141
N2
10
1
8196
3719
01/
2/20
1322
.85
161.
000
14R
21
12
11
014
61
N1
10
082
0116
040
1/3/
2013
23.9
0516
2.05
59
RS
15
11
10
4014
1N
11
03
8200
1996
01/
17/2
013
17.0
5815
5.20
814
R1
12
21
10
1414
1N
25
1N
20
081
9784
610
1/20
/201
327
.996
166.
146
27M
M1
11
11
027
141
S26
10
082
0965
720
1/21
/201
321
.852
160.
002
15L
21
51
11
015
21
S77
98
S2
00
8197
8464
01/
22/2
013
20.8
5215
9.00
218
MM
11
11
110
1814
15S
771
00
8200
1999
01/
25/2
013
28.8
5316
7.00
327
MM
15
11
10
2713
1S
301
01
2013
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8201
5375
01/
28/2
013
27.8
5316
6.00
327
MM
15
11
11
2714
15N
11
00
8198
4444
02/
5/20
1318
.058
156.
208
14R
S1
11
11
014
114
N10
814
N2
00
8201
7270
02/
23/2
013
20.8
5215
9.00
214
R2
11
11
10
1410
1N
14
1N
20
182
0172
710
2/23
/201
321
.935
160.
085
27R
S1
51
11
027
11
N1
10
082
0938
620
2/23
/201
318
.058
156.
208
27R
11
11
11
027
141
N1
10
081
9753
260
2/24
/201
317
.948
156.
098
13L
11
11
11
013
11
N1
10
081
9753
270
2/24
/201
329
.053
167.
203
14M
M1
12
11
014
196
S2
31
S2
04
8197
5328
03/
4/20
1320
.752
158.
902
14L
11
11
24
014
11
S2
81
S2
00
8202
0086
03/
8/20
1321
.852
160.
002
14L
21
11
11
014
11
S2
81
S2
02
8201
7294
03/
12/2
013
26.9
2316
5.07
317
R2
11
11
10
170
1N
11
N2
00
8203
5416
03/
18/2
013
14.9
1515
3.06
55
R2
15
11
10
4021
1N
114
1N
20
082
2532
470
3/18
/201
316
.058
154.
208
19M
M2
12
11
028
1877
N6
10
082
0200
910
3/22
/201
328
.853
167.
003
14R
11
12
11
09
06
N77
11
N3
00
8202
0093
03/
31/2
013
26.8
5416
5.00
428
MM
11
11
10
2814
1N
771
00
8282
5746
04/
4/20
1314
.929
153.
079
28L
S2
12
11
028
11
S12
10
182
0201
080
4/15
/201
329
.852
168.
002
27R
S2
12
11
027
21
N2
10
082
0432
260
4/16
/201
324
.323
162.
473
14R
11
51
11
114
1077
N25
36
N2
01
8225
4978
04/
16/2
013
27.2
2816
5.37
81
LS
11
11
10
119
1S
291
01
8291
0985
04/
22/2
013
25.6
5116
3.80
127
RS
21
31
10
271
1S
21
00
8199
9012
04/
27/2
013
20.0
5815
8.20
89
LS
11
11
10
96
1S
11
00
8204
3227
04/
27/2
013
25.3
2316
3.47
327
R2
15
11
10
2714
1N
221
1N
20
083
2476
760
4/28
/201
328
.996
167.
146
13L
21
31
11
013
21
S1
10
082
2532
540
5/4/
2013
18.9
3515
7.08
514
L2
11
11
10
141
1N
28
3S
20
283
1948
040
5/4/
2013
16.0
5815
4.20
830
MM
25
21
11
3014
1S
251
00
8225
4982
05/
9/20
1325
.323
163.
473
18R
21
11
112
09
211
N1
191
N2
01
8282
5747
05/
10/2
013
27.7
5316
5.90
314
L2
14
11
10
141
1S
28
1S
20
082
2532
570
5/18
/201
324
.323
162.
473
27L
S2
12
11
027
11
S12
10
081
9637
230
5/27
/201
318
.85
157.
000
14R
11
12
11
014
711
N12
21
N2
00
8282
5748
05/
27/2
013
28.0
5316
6.20
314
L2
11
21
10
140
1S
121
S2
00
8204
3234
05/
31/2
013
26.8
2316
4.97
329
RS
11
11
10
292
1N
11
04
8196
3725
06/
3/20
1319
.884
158.
034
27R
S2
23
11
027
21
N12
10
082
0432
350
6/6/
2013
20.8
8415
9.03
427
MM
21
21
10
271
1N
11
02
8204
3236
06/
11/2
013
19.9
8415
8.13
427
MM
21
31
100
271
1N
121
00
8318
3054
06/
18/2
013
19.9
7915
8.12
927
MM
12
11
10
2712
1S
771
12
8318
3055
06/
20/2
013
18.9
3515
7.08
527
MM
11
21
10
271
1S
11
01
8204
3238
06/
23/2
013
23.9
0516
2.05
527
RS
11
21
10
271
1N
21
00
8204
3239
06/
23/2
013
25.8
5116
4.00
127
LS
11
21
10
2714
14S
101
00
8324
7683
06/
25/2
013
19.0
5815
7.20
89
LS
15
11
10
421
15S
771
00
8318
3057
06/
27/2
013
20.8
5215
9.00
214
L2
11
21
11
141
11S
2513
1S
20
182
0432
420
6/28
/201
319
.884
158.
034
14L
21
11
11
014
21
S1
121
S2
00
8318
3059
06/
29/2
013
30.9
9616
9.14
614
R1
11
21
10
1414
1N
24
1N
20
582
0354
220
7/3/
2013
18.0
5815
6.20
814
R1
11
11
10
149
3N
21
1N
30
583
1830
600
7/4/
2013
24.3
2316
2.47
327
MM
21
21
10
271
1E
11
00
8203
5423
07/
9/20
1317
.058
155.
208
14R
12
13
110
014
714
N77
141
N2
00
8203
5424
07/
15/2
013
28.3
2316
6.47
314
R2
11
21
10
143
1N
221
1N
20
082
8257
550
7/17
/201
327
.266
165.
416
27M
M1
12
11
00
06
01
1S
20
083
2476
870
7/18
/201
330
.496
168.
646
14L
21
51
11
014
21
S77
91
S2
00
8206
8079
07/
25/2
013
20.4
5315
8.60
322
MM
21
31
100
221
1S
121
00
8332
7432
08/
1/20
1324
.852
163.
002
9M
M1
11
11
040
131
N1
10
1
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8318
3064
08/
2/20
1316
.657
154.
807
14M
M1
51
11
327
113
S77
141
S2
03
8204
3247
08/
4/20
1328
.323
166.
473
36L
S2
12
110
036
81
S1
1
12
8282
5761
08/
8/20
1314
.947
153.
097
14R
11
42
11
00
210
0
31
N2
02
8366
4737
08/
15/2
013
16.9
3515
5.08
51
RS
21
21
10
4319
15N
2
10
183
1830
650
8/19
/201
326
.854
165.
004
9M
M1
11
11
043
11
N26
1
01
8366
4738
08/
24/2
013
18.0
5815
6.20
814
L1
11
11
10
1410
6S
153
1S
20
083
3403
260
9/1/
2013
20.8
5215
9.00
227
MM
15
11
10
2714
1S
77
10
182
0846
730
9/3/
2013
26.8
2316
4.97
318
L2
15
11
10
921
77O
21
1S
30
082
0846
740
9/3/
2013
26.8
2316
4.97
314
L2
15
11
10
141
1S
28
1S
20
183
2476
920
9/18
/201
319
.884
158.
034
9M
M1
51
11
09
31
S1
1
03
8209
5495
09/
23/2
013
16.0
5815
4.20
814
L2
25
31
100
1421
1S
24
1S
20
083
3274
360
9/23
/201
316
.058
154.
208
14L
S2
53
11
014
46
S2
121
S2
00
8206
7822
010
/5/2
013
18.9
3515
7.08
59
R1
11
21
10
409
1N
1
10
083
1830
750
10/6
/201
330
.996
169.
146
27R
S1
12
11
027
11
N1
1
00
8364
4192
010
/6/2
013
26.8
5416
5.00
434
LS
11
21
10
364
4S
4
10
083
6646
660
10/7
/201
330
.296
168.
446
29L
S2
13
110
042
141
S30
1
00
8366
4667
010
/7/2
013
27.8
0316
5.95
310
RS
25
21
12
152
6N
2510
8N
22
083
1830
760
10/1
4/20
1327
.823
165.
973
1L
21
11
11
01
191
N1
151
S5
02
8366
4671
010
/18/
2013
15.0
7715
3.22
730
MM
13
21
10
301
1S
29
10
083
6728
840
11/2
4/20
1319
.352
157.
502
9M
M1
11
11
09
141
S1
1
02
8332
7448
012
/1/2
013
22.8
516
1.00
014
R2
25
21
10
1414
1N
27
14N
20
083
6646
010
12/1
/201
320
.852
159.
002
14L
12
53
110
014
11
S2
81
S2
00
8367
2887
012
/1/2
013
23.3
516
1.50
014
R1
21
31
100
142
14N
109
1N
20
083
6880
420
12/1
/201
323
.05
161.
200
29R
S2
52
11
042
21
N1
1
01
8366
4605
012
/20/
2013
18.0
5815
6.20
89
MM
11
11
10
4014
1S
212
1S
20
183
6646
070
12/2
6/20
1326
.854
165.
004
27M
M1
11
112
043
141
N1
1
01
8324
7709
012
/29/
2013
21.3
5215
9.50
29
MM
21
21
100
2713
6S
77
10
0
8202
2103
01/
1/20
1417
.848
155.
998
14L
12
42
11
014
11
S1
814
S3
00
8318
3081
01/
1/20
1421
.935
160.
085
27M
M1
12
11
027
131
N1
1
00
8318
3082
01/
1/20
1418
.03
156.
180
14L
12
52
11
014
81
S12
11
S2
02
8366
4608
01/
1/20
1414
.996
153.
146
33L
S2
13
177
042
1015
S1
1
00
8366
4609
01/
1/20
1422
.058
160.
208
14R
12
12
110
014
11
N2
81
N3
00
8366
4614
01/
9/20
1423
.058
161.
208
14L
22
53
110
014
211
S2
91
N2
00
8366
4756
01/
9/20
1430
.856
169.
006
9M
M2
13
110
043
71
N12
1
00
8206
7827
01/
25/2
014
24.3
2316
2.47
36
L1
11
11
10
60
1S
1
10
183
2477
150
1/25
/201
430
.323
168.
473
18L
21
11
11
018
11
S2
913
S4
04
8198
6189
02/
14/2
014
28.3
8416
6.53
427
MM
11
11
10
4014
1N
2
10
181
9861
990
2/14
/201
428
.653
166.
803
14L
11
21
11
014
111
S2
11
S2
00
8368
8048
02/
16/2
014
25.8
5316
4.00
318
R1
13
11
120
181
1N
1
10
083
3274
570
2/23
/201
415
.158
153.
308
14R
21
11
11
014
116
N3
31
N2
04
8332
7458
02/
28/2
014
16.0
5515
4.20
514
R1
12
11
10
1411
6N
26
1N
20
082
0431
900
3/2/
2014
27.4
2316
5.57
314
R2
11
11
10
146
15N
214
15N
20
083
1903
370
3/3/
2014
28.8
5316
7.00
327
MM
11
11
10
273
1N
26
10
283
2477
210
3/6/
2014
30.9
9616
9.14
69
L1
25
21
120
93
1S
1
10
083
2477
220
3/6/
2014
30.9
9616
9.14
69
L2
25
21
120
914
1S
1
10
082
0019
900
3/10
/201
416
.857
155.
007
10R
21
11
11
010
158
N
41
N2
01
8330
0692
03/
22/2
014
18.2
3515
6.38
514
R2
13
11
11
143
1N
2512
1N
20
083
6880
530
3/25
/201
427
.384
165.
534
14L
22
12
11
014
11
S77
81
S2
00
2014
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8204
3193
03/
29/2
014
17.8
3515
5.98
514
L1
25
21
100
141
14S
28
14S
20
183
6646
240
3/30
/201
429
.852
168.
002
9M
M1
51
11
043
1414
S30
1
00
8204
3195
04/
6/20
1419
.884
158.
034
27M
M1
51
11
027
116
S2
1
00
8209
5496
04/
17/2
014
14.9
0115
3.05
130
MM
12
21
10
3018
1S
77
10
182
9035
350
4/21
/201
418
.058
156.
208
27M
M1
11
11
027
141
N2
1
01
8332
7466
05/
2/20
1424
.852
163.
002
14L
11
51
11
014
11
S2
211
S2
02
8368
8057
05/
2/20
1431
.756
169.
906
18L
22
52
112
018
11
S1
1
00
8379
7346
05/
2/20
1420
.852
159.
002
27M
M2
52
11
027
115
S77
1
01
8206
7828
05/
14/2
014
21.8
5216
0.00
210
LS
11
21
10
1021
14S
212
8S
20
183
2397
980
5/14
/201
420
.552
158.
702
27L
S1
12
11
027
21
S1
1
00
8324
7725
05/
16/2
014
30.3
2316
8.47
327
MM
11
11
10
2714
1S
1
10
082
2478
510
5/26
/201
422
.058
160.
208
27L
S1
51
11
027
141
S2
1
02
8366
4630
05/
30/2
014
17.0
5815
5.20
814
R1
21
31
100
141
1N
28
14N
20
182
2478
520
6/8/
2014
28.8
5916
7.00
927
RS
25
31
100
2812
1N
29
10
283
7720
240
6/11
/201
421
.352
159.
502
27L
S2
53
11
027
31
S77
1
00
8366
4694
06/
12/2
014
14.9
7715
3.12
727
RS
21
31
100
272
1N
30
10
083
6646
330
6/23
/201
420
.058
158.
208
9L
S2
13
110
040
91
S1
1
00
8366
4772
06/
24/2
014
21.9
3516
0.08
527
MM
15
11
10
2714
1S
1
10
083
6647
730
6/29
/201
430
.996
169.
146
27L
21
51
11
040
277
S26
11
S2
04
8375
3924
06/
30/2
014
18.8
515
7.00
027
MM
15
11
10
2719
1S
12
10
083
6646
340
7/8/
2014
16.0
5815
4.20
830
MM
21
31
100
432
1S
1
10
082
9035
440
7/10
/201
418
.058
156.
208
39L
S2
13
11
039
131
S2
1
00
8290
3545
07/
18/2
014
29.0
5816
7.20
814
LS
11
11
10
1421
1S
1
10
083
7973
610
7/19
/201
417
.962
156.
112
14R
11
11
11
014
11
N10
81
N2
06
8379
7365
07/
26/2
014
24.7
7616
2.92
627
RS
22
31
100
421
1S
2
10
383
2477
300
7/27
/201
426
.323
164.
473
9R
S1
51
11
042
11
N1
1
04
8379
7277
07/
27/2
014
30.0
5816
8.20
814
L2
11
11
10
1414
1S
107
1N
20
083
8186
920
7/28
/201
416
.281
154.
431
27L
11
11
177
027
191
S77
1
01
8224
7853
08/
3/20
1418
.856
157.
006
27M
M2
12
110
09
11
S2
1
00
8377
2031
08/
16/2
014
23.3
516
1.50
014
LS
21
31
10
426
1S
1214
1S
20
183
7973
720
8/26
/201
424
.851
163.
001
9M
M1
11
11
043
131
S2
1
00
8379
7373
08/
26/2
014
29.3
7116
7.52
17
R2
11
11
10
70
1S
15
1S
20
083
6728
960
9/5/
2014
26.3
5116
4.50
114
R2
21
31
100
142
1N
109
1N
20
081
9990
230
9/13
/201
417
.598
155.
748
27M
M2
12
11
027
110
N6
1
01
8318
8202
09/
18/2
014
19.8
8415
8.03
49
LS
11
41
10
4014
1S
2
10
083
6646
990
9/24
/201
423
.323
161.
473
29R
S2
13
11
09
141
N1
1
00
8381
8702
09/
27/2
014
29.9
9616
8.14
627
RS
13
11
10
271
1N
2
10
283
6749
530
10/9
/201
420
.833
158.
983
28R
S1
11
11
028
377
N30
1
00
8379
7286
010
/9/2
014
19.0
5815
7.20
827
MM
15
11
10
271
1N
1
10
083
6646
420
10/1
2/20
1426
.854
165.
004
27M
M1
11
112
043
141
S1
1
00
8379
7287
010
/15/
2014
31.3
3916
9.48
914
R1
15
11
10
141
1N
28
1N
20
083
7045
530
10/1
8/20
1425
.058
163.
208
14L
21
51
11
014
21
S2
91
S2
08
8290
3552
010
/19/
2014
24.0
5816
2.20
814
R2
11
11
10
1410
6N
153
1N
20
083
7720
340
10/2
0/20
1423
.655
161.
805
18R
11
11
11
09
01
N77
151
N2
00
8290
3553
010
/22/
2014
26.3
2316
4.47
329
MM
11
21
10
294
8O
10
083
7720
360
10/2
7/20
1416
.099
154.
249
14R
21
11
11
014
41
N2
121
N2
00
8366
4701
010
/31/
2014
22.3
2316
0.47
327
R2
12
21
10
93
1N
1021
1N
20
083
1882
030
11/5
/201
429
.852
168.
002
5L
S1
11
11
040
21
S2
1
00
8330
0704
011
/9/2
014
18.9
3515
7.08
527
MM
21
31
40
271
1S
1
10
0
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8323
9808
011
/18/
2014
19.3
115
7.46
014
L2
15
21
11
142
1S
29
1S
20
383
7972
910
11/2
1/20
1428
.058
166.
208
27M
M1
51
11
027
11
N1
1
01
8206
7835
011
/23/
2014
22.8
516
1.00
028
LS
11
21
10
282
6S
2
10
083
6646
450
11/3
0/20
1420
.058
158.
208
37R
S1
11
11
042
11
N1
1
00
8370
4559
012
/2/2
014
30.8
5416
9.00
414
R2
21
31
100
141
1N
778
1N
20
283
3007
110
12/5
/201
418
.011
156.
161
14L
21
51
11
014
211
S2
211
S2
00
8377
4969
012
/5/2
014
30.0
5816
8.20
827
MM
21
21
100
2714
1S
29
10
183
3274
810
12/1
1/20
1428
.853
167.
003
1R
S1
11
11
042
191
N1
1
01
8374
6625
012
/15/
2014
23.3
2316
1.47
313
R2
15
11
10
131
1N
1
10
083
6749
550
12/1
6/20
1417
.886
156.
036
28R
S1
51
11
028
74
S4
1
00
8317
7434
01/
1/20
1516
.058
154.
208
14R
22
13
11
014
21
N2
11
N2
00
8317
7435
01/
2/20
1519
.058
157.
208
14R
11
12
11
014
1414
N77
713
N2
00
8379
7300
01/
2/20
1516
.058
154.
208
34L
S2
13
11
034
1115
W12
1
00
8366
4704
01/
13/2
015
16.0
5815
4.20
89
L2
11
21
10
402
1S
77
10
1983
6646
500
1/18
/201
517
.058
155.
208
1M
M1
11
11
043
131
N1
1
01
8366
4651
01/
21/2
015
16.0
5815
4.20
830
MM
14
11
10
4314
1N
1
10
083
3274
890
1/31
/201
528
.853
167.
003
17L
11
51
11
05
01
S77
21
S2
00
8366
4652
02/
13/2
015
21.8
5216
0.00
214
R2
15
11
10
00
00
9
14N
30
083
6646
530
2/14
/201
521
.852
160.
002
14L
21
51
11
014
11
S2
91
S2
00
8323
5638
02/
22/2
015
15.1
5815
3.30
814
R1
11
11
10
1413
17N
33
1N
30
083
7973
950
2/23
/201
519
.96
158.
110
18L
11
11
11
018
181
S1
1
00
8374
6629
02/
28/2
015
15.1
1515
3.26
514
R2
21
21
10
141
6N
7710
1N
20
083
8146
190
3/7/
2015
31.0
5816
9.20
827
L2
11
21
10
90
6S
1
1S
20
083
7720
490
3/13
/201
527
.354
165.
504
27L
S2
52
11
027
31
S77
1
00
8323
5641
03/
16/2
015
20.8
3315
8.98
317
L2
11
11
120
1715
1S
1
10
083
7466
330
3/23
/201
529
.323
167.
473
14R
21
52
11
014
11
N2
81
N2
03
8374
6634
03/
24/2
015
14.9
215
3.07
030
L1
21
21
10
301
17S
778
1S
30
283
6646
550
3/26
/201
526
.055
164.
205
9R
S1
12
11
027
71
N77
1
00
8323
9821
03/
29/2
015
21.8
6716
0.01
727
RS
11
21
10
2714
1S
2
10
083
6646
580
3/29
/201
517
.055
155.
205
15R
11
11
11
015
50
N2
1013
N2
00
8377
4334
03/
29/2
015
21.8
5216
0.00
214
R1
15
11
10
1414
10N
772
1N
20
083
2002
940
4/1/
2015
15.0
6115
3.21
114
R1
15
11
10
1412
1N
4
1N
20
282
0678
450
4/3/
2015
19.8
8415
8.03
414
R1
11
11
10
142
14N
29
14N
20
083
3274
920
4/3/
2015
31.8
5617
0.00
614
L1
11
11
10
1413
1S
293
1S
20
382
0938
770
4/14
/201
524
.323
162.
473
27L
S2
31
11
027
11
S2
1
00
8199
9033
04/
15/2
015
17.3
5715
5.50
732
RS
11
11
10
428
1N
1
10
083
7720
540
4/19
/201
519
.384
157.
534
14R
21
11
11
027
131
S77
141
N2
01
8381
4621
04/
19/2
015
18.0
5815
6.20
827
MM
25
21
10
2714
1S
2
10
083
2748
320
5/14
/201
520
.86
159.
010
5R
21
11
11
040
181
S77
111
S2
00
8381
4622
05/
23/2
015
15.0
8615
3.23
627
RS
15
11
10
271
1N
10
183
6729
170
5/24
/201
528
.353
166.
503
14R
21
12
11
09
477
S31
131
S2
01
8367
2918
05/
27/2
015
29.3
5216
7.50
215
L2
11
11
770
152
77S
29
13S
20
383
7010
000
5/27
/201
528
.353
166.
503
28M
M1
11
11
028
84
S4
1
00
8323
9824
05/
28/2
015
23.5
516
1.70
014
L2
11
21
12
1421
1S
771
1S
21
484
5159
480
5/28
/201
518
.058
156.
208
27M
M1
51
11
045
01
N
211
N2
00
8451
5949
05/
31/2
015
15.0
8615
3.23
613
L2
15
11
10
131
1S
1
10
083
7720
570
6/2/
2015
18.7
5515
6.90
529
LS
12
11
10
428
1S
77
10
083
6729
190
6/3/
2015
23.4
0516
1.55
528
MM
15
11
10
280
10U
10
0
2015
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Accid
ent
Side
Of
Road
Lane
Of
Accid
ent
Code
Road
Su
rface
Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r Of
Veh
icle
Tota
l Nu
mbe
r Of
Fat
ality
Tota
l of
Inju
ries
Num
ber
8206
7832
06/
13/2
015
20.3
8415
8.53
427
MM
11
11
10
2714
1S
2
10
083
6729
260
7/13
/201
524
.405
162.
555
13L
21
51
111
013
11
S1
1
00
8206
7837
07/
18/2
015
21.8
5216
0.00
227
L1
11
21
10
279
1S
1
10
083
7466
410
7/18
/201
518
.03
156.
180
18R
S1
51
11
018
211
N77
11
N2
00
8366
4721
07/
19/2
015
15.0
7115
3.22
118
R2
15
21
120
1818
1N
1
10
183
7973
140
7/19
/201
516
.058
154.
208
18R
11
51
11
018
11
N1
1
00
8379
7315
07/
19/2
015
17.0
5815
5.20
818
R1
15
11
10
1818
1N
1
10
083
7720
620
7/24
/201
524
.155
162.
305
14L
11
51
11
00
00
S
31
S2
00
8377
2064
07/
28/2
015
26.6
0416
4.75
414
L1
15
11
10
1421
1S
3
1S
20
082
0678
460
7/29
/201
517
.735
155.
885
29L
S2
13
110
029
141
S1
1
00
8377
2068
08/
9/20
1524
.602
162.
752
27L
S1
51
11
027
11
S77
1
00
8374
6645
08/
16/2
015
25.3
2316
3.47
328
MM
11
21
10
2714
1N
25
10
083
7539
560
8/20
/201
517
.849
155.
999
14L
11
51
11
014
21
S29
81
S2
00
8328
5221
08/
21/2
015
18.3
515
6.50
029
R1
11
11
10
4018
1N
14
1N
20
283
2852
230
9/5/
2015
20.8
5215
9.00
227
MM
21
31
100
271
6N
1220
1S
20
183
3392
210
9/5/
2015
20.3
5815
8.50
827
MM
21
21
100
271
1S
30
10
083
6729
330
9/5/
2015
20.3
5215
8.50
29
L2
21
31
100
91
11S
214
1S
20
183
7466
470
9/5/
2015
18.9
3515
7.08
527
MM
21
31
10
278
1N
10
10
083
7539
580
9/9/
2015
31.8
5617
0.00
614
R1
15
11
12
1410
6N
252
77N
20
083
8120
910
9/9/
2015
20.0
5815
8.20
814
LS
188
771
10
144
1S
11
8S
20
084
5675
480
9/12
/201
520
.852
159.
002
18R
11
12
11
018
151
N1
1
00
8381
2094
09/
26/2
015
19.0
5815
7.20
813
R2
12
11
10
131
1N
1
10
083
6729
350
10/7
/201
520
.852
159.
002
9M
M1
51
11
145
16
N2
1
01
8333
9227
010
/12/
2015
31.7
9916
9.94
914
R1
11
11
10
010
00
3
1N
20
083
7466
500
10/1
5/20
1516
.935
155.
085
9R
S1
11
11
040
31
N1
1
00
8328
5227
010
/17/
2015
23.3
2316
1.47
314
L1
15
11
10
141
1S
221
1S
20
083
3392
300
10/2
2/20
1527
.423
165.
573
13L
S1
11
11
013
21
S1
1
01
8367
2937
010
/25/
2015
17.3
5715
5.50
79
MM
15
11
10
914
1S
2
10
084
8706
170
10/2
5/20
1522
.935
161.
085
14L
11
11
11
014
11
S2
81
S4
00
8374
6654
010
/30/
2015
21.9
3516
0.08
518
L1
15
21
10
181
1S
1
10
083
6567
390
11/6
/201
520
.377
158.
527
9M
M1
11
11
040
141
N1
1
03
8365
6742
011
/13/
2015
27.2
2316
5.37
329
LS
21
31
100
422
1S
26
10
083
6729
420
11/1
7/20
1521
.352
159.
502
14L
22
53
188
014
088
U
131
S2
03
8367
2943
011
/19/
2015
15.3
4715
3.49
74
R2
25
31
100
46
15N
12
10
183
2852
300
11/2
7/20
1516
.981
155.
131
36M
M1
12
11
027
114
N2
1
00
8328
5231
011
/28/
2015
15.1
5815
3.30
814
R1
11
11
10
1413
6N
34
1N
30
083
7466
650
11/3
0/20
1529
.323
167.
473
27L
S2
12
11
027
141
S77
1
00
8370
6455
012
/3/2
015
14.9
1515
3.06
59
MM
24
31
100
301
1S
29
10
083
7545
290
12/3
/201
518
.935
157.
085
29L
S2
12
110
042
25
S30
1
00
8370
6456
012
/4/2
015
31.2
8216
9.43
214
R1
25
21
10
1412
77N
254
11N
20
083
7466
660
12/7
/201
526
.323
164.
473
27R
S1
12
11
027
177
S1
1
00
8375
4531
012
/10/
2015
31.4
9616
9.64
69
RS
11
11
10
4010
1N
29
10
183
7545
360
12/1
8/20
1529
.852
168.
002
9R
S2
52
110
09
31
N2
1
02
8513
7361
012
/22/
2015
17.9
6315
6.11
327
MM
11
11
10
431
1S
26
10
185
2479
970
12/2
4/20
1528
.853
167.
003
14R
11
31
11
014
11
N1
1
00
8381
8036
012
/25/
2015
27.2
2816
5.37
827
MM
11
11
10
279
15S
7710
15S
20
1
Traffic and Revenue ConsultantFlorida’s Turnpike Enterprise
Florida Department of Transportation
AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com
MEMORANDUM Date:
To:
From:
Copies:
Subject: Typical Section Traffic Data and Equivalent Single Axle Loading (ESAL) Calculations_Update
FPN:
State Road:
Counties:
FY 2016 Turnpike Annual Traffic Trends Report
Lane Closure Traffic Data Page 2
AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com
U.S. DOT Mitigation Strategies for Design Expectations
Typical Section Traffic Data and Trucks Directional Design Hour Volume
2016 2018 2038 KSTD D T24 (%) DHT (%) 2016 2018 2038
South of Fort Drum Service Plaza (MP 184)
32,500 33,900 45,200 10.5% 60.7% 14.0 7.0 145 151 202
Trucks (DDHV)Segment
Two-Way AADT Traffic Factors
Year AADT Lane Factor ESAL (1000S)
CUM-ESAL(1000S)
2018 33,900 0.763 694 6942019 34,600 0.761 706 1,4002020 35,400 0.759 721 2,1212021 35,900 0.758 730 2,8512022 36,600 0.756 743 3,5942023 37,300 0.755 755 4,3492024 37,900 0.753 766 5,1152025 38,500 0.752 777 5,8922026 39,000 0.751 786 6,6782027 39,600 0.750 797 7,4752028 40,100 0.749 806 8,2812029 40,700 0.748 816 9,0972030 41,200 0.747 825 9,9222031 41,700 0.746 834 10,7562032 42,200 0.745 843 11,5992033 42,700 0.744 852 12,4512034 43,200 0.743 861 13,3122035 43,700 0.742 869 14,1812036 44,200 0.741 878 15,0592037 44,700 0.740 887 15,9462038 45,200 0.739 896 16,842
14.0%
0.5
(1.567 - 0.0826 x Ln(One-Way AADT)-0.12368 x LV)
1.050 *Freeway - Urban - Flexible Pavement
LV = 0.000
ESAL = AADT x T24 x DF x LF x EF x 365
Opening to Mid-Design Year (2025) ESAL Accumulation: 5,198
Opening to Design Year (2032) ESAL Accumulation: 10,905
Opening to Mid-Design Year (2028) ESAL Accumulation: 7,587
Opening to Design Year (2038) ESAL Accumulation: 16,14820-year design
(Years 2018-2038)
14-year design (Years 2018-2032)
Florida's Turnpike - Ticket System
FPN 436517-1 Mainline Resurfacing from MP 153.2 to MP 169.3
Mainline - South of Fort Drum Service Plaza
Two (2) Lanes
(Daily Truck Factor) T24 =
(Directional Distribution Factor) DF =
(Lane Factor) LF =
(Load Equivalency Factor) EF* =
PAY
ITEM
NU
MBE
RIT
EM D
ESCR
IPTI
ON
UNIT
UNIT
PRI
CEQ
UANT
ITY
COST
110-
1-1
CLEA
RIN
G AN
D GR
UBBI
NG
AC5,
250.
00$
0.15
787.
50$
12
0-6
EMBA
NKM
ENT
CY6.
25$
200
1,25
0.00
$
16
0-4
TYPE
B S
TABI
LIZA
TIO
NSY
3.25
$
70
227.
50$
28
5-70
1O
PTIO
NAL
BAS
E GR
OUP
1SY
7.50
$
70
525.
00$
33
4-1
SUPE
RPAV
E AS
PHAL
TIC
CON
CTN
95.0
0$
4.
038
0.00
$
339-
1M
ISCE
LLAE
OUS
ASP
HALT
PAV
EMEN
TTN
210.
00$
9.5
1,99
5.00
$
53
6-1-
1GU
ARDR
AIL
LF18
.00
$
300
5,40
0.00
$
57
0-1-
2PE
RFO
RMAN
CE T
URF,
SO
DSY
2.
50$
535
1,33
7.50
$
BR
IDGE
WID
ENIN
GSF
150.
00$
860
129,
000.
00$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTE
NAN
CE O
F TR
AFFI
C
P.E.
C.E.
I.15
%21
,135
.38
$
Tota
l Cos
t21
1,35
3.75
$
UTIL
ITY
IMPA
CTS
10%
-$
CO
NTI
NGE
NCY
10%
14,0
90.2
5$
15%
21,1
35.3
8$
Cons
truc
tion
Cost
Est
imat
e fo
r SR
91 (9
4005
7) B
ridge
Wid
enin
gTu
rnpi
ke M
ainl
ine
(SR
91) R
esur
faci
ng a
nd S
afet
y Im
prov
emen
ts
from
M 1
53.2
30 to
M 1
69.3
20St
. Luc
ie C
ount
y, F
lorid
a FP
ID N
umbe
rs 4
3651
7-1-
52-0
1 an
d 43
6517
-3-5
2-01
Cont
ract
Num
ber C
9R86 Su
btot
al14
0,90
2.50
$
10
%14
,090
.25
$
PAY
ITEM
NU
MBE
RIT
EM D
ESCR
IPTI
ON
UNIT
UNIT
PRI
CEQ
UANT
ITY
COST
110-
1-1
CLEA
RIN
G AN
D GR
UBBI
NG
AC5,
250.
00$
0.35
1,83
7.50
$
12
0-6
EMBA
NKM
ENT
CY6.
25$
2,14
013
,375
.00
$
160-
4TY
PE B
STA
BILI
ZATI
ON
SY3.
25$
535
1,73
8.75
$
28
5-70
1O
PTIO
NAL
BAS
E GR
OUP
1SY
7.50
$
53
54,
012.
50$
334-
1SU
PERP
AVE
ASPH
ALTI
C CO
NC
TN95
.00
$
29.4
2,79
3.00
$
33
9-1
MIS
CELL
AEO
US A
SPHA
LT P
AVEM
ENT
TN21
0.00
$
18
.33,
843.
00$
536-
1-1
GUAR
DRAI
LLF
18.0
0$
60
010
,800
.00
$
570-
1-2
PERF
ORM
ANCE
TUR
F, S
OD
SY
2.50
$
1,
070
2,67
5.00
$
BR
IDGE
WID
ENIN
GSF
150.
00$
4,55
068
2,50
0.00
$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTE
NAN
CE O
F TR
AFFI
C
15%
108,
536.
21$
CON
TIN
GENC
Y
Cons
truc
tion
Cost
Est
imat
e fo
r Pic
os R
oad
Brid
ge W
iden
ing
Turn
pike
Mai
nlin
e (S
R 91
) Res
urfa
cing
and
Saf
ety
Impr
ovem
ents
fr
om M
153
.230
to M
169
.320
St. L
ucie
Cou
nty,
Flo
rida
FPID
Num
bers
436
517-
1-52
-01
and
4365
17-3
-52-
01Co
ntra
ct N
umbe
r C9R
86
Tota
l Cos
t1,
085,
362.
13$
Subt
otal
723,
574.
75$
10%
UTIL
ITY
IMPA
CTS
72,3
57.4
8$
15%
10%
10%
108,
536.
21$
-$
72
,357
.48
$
P.
E.C.
E.I.
PAY
ITEM
NU
MBE
RIT
EM D
ESCR
IPTI
ON
UNIT
UNIT
PRI
CEQ
UANT
ITY
COST
110-
1-1
CLEA
RIN
G AN
D GR
UBBI
NG
AC5,
250.
00$
0.40
2,10
0.00
$
12
0-6
EMBA
NKM
ENT
CY6.
25$
2,90
018
,125
.00
$
160-
4TY
PE B
STA
BILI
ZATI
ON
SY3.
25$
670
2,17
7.50
$
28
5-70
1O
PTIO
NAL
BAS
E GR
OUP
1SY
7.50
$
67
05,
025.
00$
334-
1SU
PERP
AVE
ASPH
ALTI
C CO
NC
TN95
.00
$
36.9
3,50
5.50
$
33
9-1
MIS
CELL
AEO
US A
SPHA
LT P
AVEM
ENT
TN21
0.00
$
18
.33,
843.
00$
536-
1-1
GUAR
DRAI
LLF
18.0
0$
60
010
,800
.00
$
570-
1-2
PERF
ORM
ANCE
TUR
F, S
OD
SY
2.50
$
1,
070
2,67
5.00
$
BR
IDGE
WID
ENIN
GSF
150.
00$
2,97
044
5,50
0.00
$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTE
NAN
CE O
F TR
AFFI
C
P.E.
C.E.
I.15
%74
,062
.65
$
Tota
l Cos
t74
0,62
6.50
$
UTIL
ITY
IMPA
CTS
10%
-$
CO
NTI
NGE
NCY
10%
49,3
75.1
0$
15%
74,0
62.6
5$
Cons
truc
tion
Cost
Est
imat
e fo
r CR
68 B
ridge
Wid
enin
gTu
rnpi
ke M
ainl
ine
(SR
91) R
esur
faci
ng a
nd S
afet
y Im
prov
emen
ts
from
M 1
53.2
30 to
M 1
69.3
20St
. Luc
ie C
ount
y, F
lorid
a FP
ID N
umbe
rs 4
3651
7-1-
52-0
1 an
d 43
6517
-3-5
2-01
Cont
ract
Num
ber C
9R86 Su
btot
al49
3,75
1.00
$
10
%49
,375
.10
$
PAY
ITEM
NU
MBE
RIT
EM D
ESCR
IPTI
ON
UNIT
UNIT
PRI
CEQ
UANT
ITY
COST
110-
1-1
CLEA
RIN
G AN
D GR
UBBI
NG
AC5,
250.
00$
0.35
1,83
7.50
$
12
0-6
EMBA
NKM
ENT
CY6.
25$
2,14
013
,375
.00
$
160-
4TY
PE B
STA
BILI
ZATI
ON
SY3.
25$
535
1,73
8.75
$
28
5-70
1O
PTIO
NAL
BAS
E GR
OUP
1SY
7.50
$
53
54,
012.
50$
334-
1SU
PERP
AVE
ASPH
ALTI
C CO
NC
TN95
.00
$
29.4
2,79
3.00
$
33
9-1
MIS
CELL
AEO
US A
SPHA
LT P
AVEM
ENT
TN21
0.00
$
18
.33,
843.
00$
536-
1-1
GUAR
DRAI
LLF
18.0
0$
60
010
,800
.00
$
570-
1-2
PERF
ORM
ANCE
TUR
F, S
OD
SY
2.50
$
1,
070
2,67
5.00
$
BR
IDGE
WID
ENIN
GSF
150.
00$
3,92
058
8,00
0.00
$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTE
NAN
CE O
F TR
AFFI
C
P.E.
C.E.
I.15
%94
,361
.21
$
Tota
l Cos
t94
3,61
2.13
$
UTIL
ITY
IMPA
CTS
10%
-$
CO
NTI
NGE
NCY
10%
62,9
07.4
8$
15%
94,3
61.2
1$
Cons
truc
tion
Cost
Est
imat
e fo
r Min
ute
Mai
d Ro
ad B
ridge
Wid
enin
gTu
rnpi
ke M
ainl
ine
(SR
91) R
esur
faci
ng a
nd S
afet
y Im
prov
emen
ts
from
M 1
53.2
30 to
M 1
69.3
20St
. Luc
ie C
ount
y, F
lorid
a FP
ID N
umbe
rs 4
3651
7-1-
52-0
1 an
d 43
6517
-3-5
2-01
Cont
ract
Num
ber C
9R86 Su
btot
al62
9,07
4.75
$
10
%62
,907
.48
$
Activ
ity ID
PSM
Activ
ity N
ame
Orig Dur
Rem Dur
Star
tFi
nish
Dur
atio
n %
Com
plet
eC
alen
dar
Tota
lFl
oat
Free
Floa
t
4365
17-1
RES
4365
17-1
RES
UR
FAC
4365
17-1
RES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST
LUC
IE C
OU
NTY
, (M
P 15
3.23
- 16
9.32
)71
933
605
-Sep
-15
A01
-Jul
-18
53.2
7%0
0
RESU
RFAC
E TP
RESU
RFAC
E TP
K M
AIRE
SURF
ACE
TPK
MAI
NLIN
E IN
ST.
LUC
IE C
OUN
TY, M
P 15
3.23
- 16
9.32
719
336
05-S
ep-1
5 A
01-J
ul-1
853
.27%
00
PE -
DES
IGN
PE -
DES
IGN
PE -
DES
IGN
534
151
05-S
ep-1
5 A
09-O
ct-1
771
.72%
185
0
PUB
LIC
INVO
LVPU
BLI
C IN
VOLV
EMEN
PUB
LIC
INVO
LVEM
ENT
66
24-A
pr-1
701
-May
-17
0%5-
Day
293
0R
3610
020
610
CO
OR
DIN
ATE
W/ E
MO
REG
ARD
ING
PU
BLIC
INVO
LVEM
ENT
55
24-A
pr-1
7*28
-Apr
-17
0%5-
Day
293
0R
3610
030
610
DO
CU
MEN
T PR
OPO
SED
PU
BLIC
INVO
LVEM
ENT
ACTI
VITI
ES1
101
-May
-17
01-M
ay-1
70%
5-D
ay29
329
3
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
SCO
PFI
NAL
DES
IGN
- SC
OPE
OF
SER
VIC
ES &
MH
EST
IMAT
E67
005
-Sep
-15
A10
-Dec
-15
A10
0%0
R31
6400
016
4PR
EPAR
E D
RAF
T SC
OPE
OF
SER
VIC
ES -
Obt
ain
Scop
e Te
mpl
, dev
el d
raft
SOS
160
05-S
ep-1
5 A
20-S
ep-1
5 A
100%
7 D
ayR
3724
420
724
DIS
CIP
LIN
E R
EVIE
W D
RAF
T SO
S - D
EVEL
OP
MH
EST
IMAT
ES6
006
-Oct
-15
A12
-Oct
-15
A10
0%5-
Day
R39
9002
072
4R
EQU
EST
CR
ASH
DAT
A FR
OM
TR
AFFI
C O
PS1
015
-Oct
-15
A15
-Oct
-15
A10
0%5-
Day
R37
2443
072
4R
EVIS
E D
RAF
T SC
OPE
OF
SER
VIC
ES5
018
-Nov
-15
A22
-Nov
-15
A10
0%7
Day
R37
2444
072
4D
ISC
IPLI
NES
REV
IEW
PR
E-FI
NAL
SO
S6
020
-Nov
-15
A01
-Dec
-15
A10
0%5-
Day
R31
6410
016
4FI
NAL
IZE
SCO
PE O
F SE
RVI
CES
/MAN
HO
UR
EST
IMAT
E5
004
-Dec
-15
A10
-Dec
-15
A10
0%5-
Day
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
CO
NS
FIN
AL D
ESIG
N -
CO
NSU
LTAN
T C
ON
TRAC
T AC
QUIS
ITIO
N21
40
04-J
an-1
6 A
01-N
ov-1
6 A
100%
0R
3724
101
724
CO
NFI
RM
AD
INFO
RM
ATIO
N (M
ajor
& M
inor
Wor
k Ty
pes
Verif
ied)
50
04-J
an-1
6 A
08-J
an-1
6 A
100%
5-D
ayR
3724
105
724
MEE
T W
ITH
TR
C/T
RC
KIC
KOFF
MEE
TIN
G1
009
-Jan
-16
A09
-Jan
-16
A10
0%7
Day
R37
2408
072
4TP
K R
EVIE
W F
INAL
DR
AFT
SOS
(Kat
hy/B
riann
a)5
011
-Jan
-16
A15
-Jan
-16
A10
0%7
Day
R37
2409
072
4SU
BMIT
FIN
AL D
RAF
T SO
S TO
PSU
10
18-J
an-1
6 A
18-J
an-1
6 A
100%
7 D
ayR
3724
100
724
POST
PLA
NN
ED A
D O
N F
DO
T W
EB S
ITE
*1
025
-Jan
-16
A25
-Jan
-16
A10
0%M
onR
3990
000
990
DES
IGN
CO
NSU
LTAN
T C
ON
TRAC
T AC
QU
ISIT
ION
(H
amm
ock)
198
025
-Jan
-16
A01
-Nov
-16
A10
0%5-
Day
R37
2420
572
4H
OLD
TEC
H P
ANEL
MEE
TIN
GS
*2
004
-Feb
-16
A05
-Feb
-16
A10
0%5-
Day
R32
3210
023
2FO
RM
AL A
D A
PPEA
RS
ON
FD
OT
WEB
PAG
E (C
one
of S
ilenc
e)*
10
22-F
eb-1
6 A
22-F
eb-1
6 A
100%
Mon
R39
9005
072
4LE
TTER
S O
F R
ESPO
NSE
LO
Rs
DU
E D
ATE
*1
007
-Mar
-16
A07
-Mar
-16
A10
0%M
onR
3724
130
724
PREP
ARE
LON
G L
IST
PAC
KAG
E *
50
08-M
ar-1
6 A
14-M
ar-1
6 A
100%
5-D
ayR
3724
140
724
TEC
H. R
EV. C
OM
MIT
TEE
EVAL
UAT
E LO
NG
LIS
T PK
G. *
50
15-M
ar-1
6 A
21-M
ar-1
6 A
100%
5-D
ayR
3990
040
724
LON
GLI
ST T
RC
MEE
TIN
G *
10
28-M
ar-1
6 A
28-M
ar-1
6 A
100%
Mon
R34
0110
040
1SE
LEC
TIO
N C
OM
MIT
TEE
SHO
RT
LIST
CO
NSU
LTAN
TS *
10
08-A
pr-1
6 A
08-A
pr-1
6 A
100%
Fri
R37
2418
072
4SE
ND
RFP
*1
018
-Apr
-16
A18
-Apr
-16
A10
0%M
onR
3230
000
230
SCO
PE O
F SE
RVI
CES
MEE
TIN
G (
Shor
tlist F
irms)
*1
025
-Apr
-16
A25
-Apr
-16
A10
0%M
onR
3990
060
230
DEA
DLI
NE
FOR
TEC
HIN
ICAL
QU
ESTI
ON
S *
10
02-M
ay-1
6 A
02-M
ay-1
6 A
100%
Mon
R39
9007
023
0C
ON
SULT
ANT
PAC
KETS
DU
E *
10
09-M
ay-1
6 A
09-M
ay-1
6 A
100%
Mon
R32
4900
024
9R
ECV.
WR
ITTE
N P
RO
POSA
LS/C
ON
DU
CT
OR
AL T
ECH
NIC
ALS
*1
027
-May
-16
A27
-May
-16
A10
0%Fr
iR
3724
220
724
TEC
HN
ICAL
EVA
LUAT
ION
*2
027
-May
-16
A31
-May
-16
A10
0%5-
Day
R39
9008
072
4TR
C S
CO
RES
DU
E *
10
03-J
un-1
6 A
03-J
un-1
6 A
100%
Fri
R34
0210
040
2FI
NAL
SEL
ECTI
ON
CO
MM
ITTE
E M
EETI
NG
S *
10
13-J
un-1
6 A
13-J
un-1
6 A
100%
Mon
R37
2433
072
4PR
EPAR
E C
ON
TRAC
T50
022
-Jun
-16
A31
-Aug
-16
A10
0%5-
Day
R37
2429
572
4SC
OPE
CLA
RIF
ICAT
ION
MEE
TIN
G1
029
-Jun
-16
A29
-Jun
-16
A10
0%5-
Day
R37
2402
072
4U
NIT
S M
EETI
NG
10
14-J
ul-1
6 A
14-J
ul-1
6 A
100%
5-D
ayR
3724
300
724
STAF
FHO
UR
NEG
OTI
ATIO
NS
MEE
TIN
GS
10
15-A
ug-1
6 A
15-A
ug-1
6 A
100%
5-D
ayR
3724
310
724
CO
NSU
LTAN
T SU
BMIT
FIN
AL P
RIC
E PR
OPO
SAL/
AUD
IT P
KG5
025
-Aug
-16
A31
-Aug
-16
A10
0%5-
Day
R37
2432
072
4PR
E-AW
ARD
AU
DIT
EVA
LUAT
ION
30
01-S
ep-1
6 A
06-S
ep-1
6 A
100%
5-D
ayR
3990
100
990
AWAR
D C
ON
TRAC
T
(Ham
moc
k)43
001
-Sep
-16
A01
-Nov
-16
A10
0%5-
Day
R37
2433
572
4TU
RN
PIKE
LEG
AL R
EVIE
W C
ON
TRAC
T1
014
-Oct
-16
A14
-Oct
-16
A10
0%5-
Day
R37
2434
072
4SE
ND
CO
NTR
ACT
TO C
ON
SULT
ANT
50
24-O
ct-1
6 A
28-O
ct-1
6 A
100%
5-D
ayR
3299
000
299
REQ
UES
T FU
ND
S1
027
-Oct
-16
A27
-Oct
-16
A10
0%5-
Day
R37
2436
072
4R
ECEI
VED
SIG
NED
CO
NTR
ACT
10
31-O
ct-1
6 A
31-O
ct-1
6 A
100%
5-D
ayR
3233
000
233
EXEC
UTE
CO
NTR
ACT
(DES
IGN
)1
001
-Nov
-16
A01
-Nov
-16
A10
0%5-
Day
PAVE
MEN
T D
EPA
VEM
ENT
DES
IGN
PK
PAVE
MEN
T D
ESIG
N P
KG
& T
YPIC
AL S
ECTI
ON
149
3421
-Sep
-16
A24
-Apr
-17
77.1
8%5-
Day
200
R31
9710
019
7R
EQU
EST
ESAL
(18
KIP)
CAL
CU
LATI
ON
S &
TRAF
FIC
DAT
AFR
OM
PLA
NN
ING
10
21-S
ep-1
6 A
21-S
ep-1
6 A
100%
5-D
ayR
3257
000
257
REC
EIPT
OF
ESAL
& T
RAF
FIC
DAT
A FR
OM
PLA
NN
ING
10
27-O
ct-1
6 A
27-O
ct-1
6 A
100%
5-D
ayR
3106
100
106
DES
IGN
SU
RVE
Y22
002
-Nov
-16
A05
-Dec
-16
A10
0%5-
Day
R31
0203
010
2LA
NE
CLO
SUR
E AN
ALYS
IS/4
5% T
CP
MEE
TIN
G1
007
-Mar
-17
A07
-Mar
-17
A10
0%5-
Day
EXC
EPTI
ON
S EX
CEP
TIO
NS
& V
ARIA
EXC
EPTI
ON
S &
VAR
IATI
ON
S11
134
14-N
ov-1
6 A
24-A
pr-1
769
.37%
5-D
ay20
0
R32
9401
029
4PR
EPAR
E D
RAF
T D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
200
14-N
ov-1
6 A
13-D
ec-1
6 A
100%
5-D
ayR
3294
030
294
REV
IEW
DR
AFT
DES
IGN
EXC
EPTI
ON
S, V
ARIA
TIO
NS
& TE
CH
MEM
O15
014
-Dec
-16
A06
-Jan
-17
A10
0%5-
Day
R32
9404
029
4PR
EPAR
E FI
NAL
DES
IGN
EXC
EPTI
ON
S, V
ARIA
TIO
NS
& TE
CH
MEM
O60
1809
-Jan
-17
A31
-Mar
-17
70%
5-D
ay20
0R
3294
050
294
REV
IEW
FIN
AL D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
1515
03-A
pr-1
721
-Apr
-17
0%5-
Day
200
R31
9721
019
7SU
BMIT
SIG
N &
SEA
LED
EXC
EPTI
ON
S, V
ARIA
TIO
NS,
& T
ECH
MEM
O &
APP
RO
VE1
124
-Apr
-17
24-A
pr-1
70%
5-D
ay20
0
PAVE
MEN
T D
EPA
VEM
ENT
DES
IGN
PAVE
MEN
T D
ESIG
N87
606
-Dec
-16
A10
-Apr
-17
93.1
%5-
Day
300
R31
9700
019
7PR
EPAR
E D
RAF
T PA
VEM
ENT
DES
IGN
200
06-D
ec-1
6 A
05-J
an-1
7 A
100%
5-D
ayR
3197
060
260
REV
IEW
DR
AFT
PAVE
MEN
T D
ESIG
N15
006
-Jan
-17
A26
-Jan
-17
A10
0%5-
Day
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JFM
2016
2017
2018
2019
2020
2021
CO
OR
DIN
ATE
W/ E
MO
REG
ARD
ING
PU
BLIC
INVO
LVEM
ENT
DO
CU
MEN
T PR
OPO
SED
PU
BLIC
INVO
LVEM
ENT
ACTI
VITI
ES
PREP
ARE
DR
AFT
SCO
PE O
F SE
RVI
CES
- O
btai
n Sc
ope
Tem
pl, d
evel
dra
ft SO
SD
ISC
IPLI
NE
REV
IEW
DR
AFT
SOS
- DEV
ELO
P M
H E
STIM
ATES
REQ
UES
T C
RAS
H D
ATA
FRO
M T
RAF
FIC
OPS
REV
ISE
DR
AFT
SCO
PE O
F SE
RVI
CES
DIS
CIP
LIN
ES R
EVIE
W P
RE-
FIN
AL S
OS
FIN
ALIZ
E SC
OPE
OF
SER
VIC
ES/M
ANH
OU
R E
STIM
ATE
CO
NFI
RM
AD
INFO
RM
ATIO
N (M
ajor
& M
inor
Wor
k Ty
pes
Verif
ied)
MEE
T W
ITH
TR
C/T
RC
KIC
KOFF
MEE
TIN
GTP
K R
EVIE
W F
INAL
DR
AFT
SOS
(Kat
hy/B
riann
a)SU
BMIT
FIN
AL D
RAF
T SO
S TO
PSU
POST
PLA
NN
ED A
D O
N F
DO
T W
EB S
ITE
*D
ESIG
N C
ON
SULT
ANT
CO
NTR
ACT
ACQ
UIS
ITIO
N
(Ham
moc
k)H
OLD
TEC
H P
ANEL
MEE
TIN
GS
*FO
RM
AL A
D A
PPEA
RS
ON
FD
OT
WEB
PAG
E (C
one
of S
ilenc
e)*
LETT
ERS
OF
RES
PON
SE L
OR
s D
UE
DAT
E *
PREP
ARE
LON
G L
IST
PAC
KAG
E *
TEC
H. R
EV. C
OM
MIT
TEE
EVAL
UAT
E LO
NG
LIS
T PK
G. *
LON
GLI
ST T
RC
MEE
TIN
G *
SELE
CTI
ON
CO
MM
ITTE
E SH
OR
T LI
ST C
ON
SULT
ANTS
*SE
ND
RFP
*SC
OPE
OF
SER
VIC
ES M
EETI
NG
(Sh
ortlis
t Firm
s) *
DEA
DLI
NE
FOR
TEC
HIN
ICAL
QU
ESTI
ON
S *
CO
NSU
LTAN
T PA
CKE
TS D
UE
*R
ECV.
WR
ITTE
N P
RO
POSA
LS/C
ON
DU
CT
OR
AL T
ECH
NIC
ALS
*TE
CH
NIC
AL E
VALU
ATIO
N *
TRC
SC
OR
ES D
UE
*FI
NAL
SEL
ECTI
ON
CO
MM
ITTE
E M
EETI
NG
S *
PREP
ARE
CO
NTR
ACT
SCO
PE C
LAR
IFIC
ATIO
N M
EETI
NG
UN
ITS
MEE
TIN
GST
AFFH
OU
R N
EGO
TIAT
ION
S M
EETI
NG
SC
ON
SULT
ANT
SUBM
IT F
INAL
PR
ICE
PRO
POSA
L/AU
DIT
PKG
PRE-
AWAR
D A
UD
IT E
VALU
ATIO
NAW
ARD
CO
NTR
ACT
(H
amm
ock)
TUR
NPI
KE L
EGAL
REV
IEW
CO
NTR
ACT
SEN
D C
ON
TRAC
T TO
CO
NSU
LTAN
TR
EQU
EST
FUN
DS
REC
EIVE
D S
IGN
ED C
ON
TRAC
TEX
ECU
TE C
ON
TRAC
T (D
ESIG
N)
REQ
UES
T ES
AL (1
8 KI
P) C
ALC
ULA
TIO
NS
& TR
AFFI
C D
ATAF
RO
M P
LAN
NIN
GR
ECEI
PT O
F ES
AL &
TR
AFFI
C D
ATA
FRO
M P
LAN
NIN
GD
ESIG
N S
UR
VEY
LAN
E C
LOSU
RE
ANAL
YSIS
/45%
TC
P M
EETI
NG
PREP
ARE
DR
AFT
DES
IGN
EXC
EPTI
ON
S, V
ARIA
TIO
NS
& TE
CH
MEM
OR
EVIE
W D
RAF
T D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
PREP
ARE
FIN
AL D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
REV
IEW
FIN
AL D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
SUBM
IT S
IGN
& S
EALE
D E
XCEP
TIO
NS,
VAR
IATI
ON
S, &
TEC
H M
EMO
& A
PPR
OVE
PREP
ARE
DR
AFT
PAVE
MEN
T D
ESIG
NR
EVIE
W D
RAF
T PA
VEM
ENT
DES
IGN
4365
17-1
ReD
oRES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST.
LU
CIE
CO
UN
TY, M
P 15
3.23
- 16
9.32
Dat
a D
ate:
07-
Mar
-17
P
age
1 of
3
R
un D
ate:
29-
Mar
-17
Rem
aini
ng L
evel
of E
ffort
Actu
al L
evel
of E
ffort
Rem
aini
ng W
ork
Actu
al W
ork
Crit
ical
Rem
aini
ng W
ork
Layo
ut: ~
Proj
ect S
ched
ule_
1 F
ilter
s: T
ASK
filte
r: Al
l Act
iviti
es©
Prim
aver
a S
yste
ms,
Inc.
Activ
ity ID
PSM
Activ
ity N
ame
Orig Dur
Rem Dur
Star
tFi
nish
Dur
atio
n %
Com
plet
eC
alen
dar
Tota
lFl
oat
Free
Floa
t
R31
9703
019
7PR
EPAR
E FI
NAL
PAV
EMEN
T D
ESIG
N9
027
-Jan
-17
A08
-Feb
-17
A10
0%5-
Day
R31
9707
026
0R
EVIE
W F
INAL
PAV
EMEN
T D
ESIG
N5
503
-Apr
-17
07-A
pr-1
70%
5-D
ay30
0R
3197
200
197
SUBM
IT F
INAL
SIG
N &
SEA
LED
PAV
EMEN
T D
ESIG
N &
APPR
OVE
11
10-A
pr-1
710
-Apr
-17
0%5-
Day
300
TYPI
CAL
SEC
TTY
PIC
AL S
ECTI
ON
TYPI
CAL
SEC
TIO
N87
2406
-Dec
-16
A10
-Apr
-17
72.4
1%5-
Day
300
R32
6001
026
0PR
EPAR
E D
RAF
T TY
PIC
AL S
ECTI
ON
S19
006
-Dec
-16
A04
-Jan
-17
A10
0%5-
Day
R32
6000
026
0R
EVIE
W D
RAF
T TY
PIC
AL S
ECTI
ON
S15
005
-Jan
-17
A25
-Jan
-17
A10
0%5-
Day
R32
6003
026
0PR
EPAR
E FI
NAL
TYP
ICAL
SEC
TIO
NS
60
26-J
an-1
7 A
02-F
eb-1
7 A
100%
5-D
ayR
3260
040
260
REV
IEW
FIN
AL T
YPIC
AL S
ECTI
ON
S40
1703
-Feb
-17
A30
-Mar
-17
57.5
%5-
Day
366
R32
6005
026
0SU
BMIT
FIN
AL S
IGN
& S
EALE
D T
YPIC
AL S
ECTI
ON
S &
APPR
OVE
11
10-A
pr-1
710
-Apr
-17
0%5-
Day
3010
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
RO
ADFI
NAL
DES
IGN
- R
OAD
WAY
230
145
02-N
ov-1
6 A
29-S
ep-1
736
.96%
5-D
ay18
70
R32
3410
023
4IS
SUE
NTP
AN
D S
CH
EDU
LE K
ICKO
FF M
TG (D
ESIG
N)
10
02-N
ov-1
6 A
02-N
ov-1
6 A
100%
5-D
ayR
3990
090
168
CO
NSU
LTAN
T SU
BMIT
QC
PLA
N1
011
-Nov
-16
A11
-Nov
-16
A10
0%5-
Day
R36
1005
029
0PM
LET
TER
TO
PIO
w/L
ETTI
NG
DAT
E &
CO
NST
. DU
R.10
1019
-Jul
-17
01-A
ug-1
70%
5-D
ay65
45R
3380
000
380
PRO
DU
CTI
ON
REA
DY
55
25-S
ep-1
729
-Sep
-17
0%5-
Day
200
60%
DES
IGN
60%
DES
IGN
60%
DES
IGN
7857
07-F
eb-1
7 A
25-M
ay-1
726
.92%
5-D
ay27
50
R31
1310
011
3PR
EPAR
E 60
% P
LAN
S54
3307
-Feb
-17
A21
-Apr
-17
38.8
9%5-
Day
200
R31
6810
016
8Q
A/Q
C A
UD
IT (6
0% P
LAN
S)1
124
-Apr
-17
24-A
pr-1
70%
5-D
ay20
0R
3235
200
235
CO
NSU
LTAN
T SU
BMIT
60%
PLA
NS
FOR
REV
IEW
11
25-A
pr-1
725
-Apr
-17
0%5-
Day
200
R33
0296
030
2C
ENTR
AL O
FFIC
E R
EVIE
W T
TMS
1010
26-A
pr-1
709
-May
-17
0%5-
Day
255
R34
6525
046
5Q
UAN
TITI
ES A
ND
REQ
UES
T FO
R IN
FO T
O C
ON
STR
UC
TIO
N1
126
-Apr
-17
26-A
pr-1
70%
5-D
ay25
0R
3302
002
302
REV
IEW
60%
PAY
ITEM
LIS
T10
1026
-Apr
-17
09-M
ay-1
70%
5-D
ay31
11R
3302
900
302
REV
IEW
60%
PLA
NS
1515
26-A
pr-1
716
-May
-17
0%5-
Day
200
R35
0719
150
7PR
EPAR
E C
ON
STR
UC
TIO
N D
UR
SC
HED
ULE
(CO
NST
RU
CTI
ON
)15
1527
-Apr
-17
17-M
ay-1
70%
5-D
ay25
5R
3302
100
302
SUBM
IT 6
0% C
OM
MEN
TS T
O C
ON
SULT
ANT
11
17-M
ay-1
717
-May
-17
0%5-
Day
200
R35
2200
552
2R
EVIS
E 60
% P
LAN
SH
EETS
FO
R U
TILI
TIES
55
18-M
ay-1
724
-May
-17
0%5-
Day
276
276
R31
6910
016
9FI
ELD
REV
IEW
11
18-M
ay-1
718
-May
-17
0%5-
Day
200
R31
6915
016
9IN
CO
RPO
RAT
E C
OM
MEN
TS F
RO
M F
IELD
REV
IEW
55
19-M
ay-1
725
-May
-17
0%5-
Day
200
100%
DES
IGN
100%
DES
IGN
100%
DES
IGN
3838
25-M
ay-1
718
-Jul
-17
0%5-
Day
340
R31
1330
011
3PR
EPAR
E 10
0% P
LAN
S20
2025
-May
-17
22-J
un-1
70%
5-D
ay20
0R
3235
400
235
CO
NSU
LTAN
T SU
BMIT
100
% P
LAN
S FO
R R
EVIE
W1
126
-Jun
-17
26-J
un-1
70%
5-D
ay34
0R
3310
910
310
CEN
TRAL
OFF
ICE
REV
IEW
TTM
S15
1527
-Jun
-17
17-J
ul-1
70%
5-D
ay34
0R
3310
002
310
REV
IEW
100
% P
LAN
SU
MM
ARY
BOXE
S15
1527
-Jun
-17
17-J
ul-1
70%
5-D
ay34
0R
3310
900
310
REV
IEW
100
% P
LAN
S15
1527
-Jun
-17
17-J
ul-1
70%
5-D
ay34
0R
3310
100
310
SUBM
IT 1
00%
CO
MM
ENTS
TO
CO
NSU
LTAN
T1
118
-Jul
-17
18-J
ul-1
70%
5-D
ay34
0
FIN
AL -
SIG
NE
FIN
AL -
SIG
NED
& S
EFI
NAL
- SI
GN
ED &
SEA
LED
3232
19-J
ul-1
731
-Aug
-17
0%5-
Day
340
R31
1340
011
3PR
EPAR
E FI
NAL
PLA
NS
1515
19-J
ul-1
708
-Aug
-17
0%5-
Day
340
R31
9004
011
3C
ON
SULT
ANT
SUBM
IT F
INAL
PLA
NS
11
09-A
ug-1
709
-Aug
-17
0%5-
Day
340
R32
4500
024
5FI
NAL
PLA
NS
REV
IEW
55
10-A
ug-1
716
-Aug
-17
0%5-
Day
340
R32
4510
024
5IN
CO
RPO
RAT
E FI
NAL
CO
MM
ENTS
& R
ESPO
NC
ES10
1017
-Aug
-17
30-A
ug-1
70%
5-D
ay34
0R
3235
500
235
CO
NSU
LTAN
T SU
BMIT
FIN
AL S
IGN
ED &
SEA
LED
PLA
NS1
131
-Aug
-17
31-A
ug-1
70%
5-D
ay34
0
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
UTI
LIT
FIN
AL D
ESIG
N -
UTI
LITI
ES11
054
07-F
eb-1
7 A
11-J
ul-1
750
.91%
5-D
ay80
0R
3990
110
522
UTI
LITY
CO
OR
DIN
ATIO
N K
ICK
OFF
MEE
TIN
G1
007
-Feb
-17
A07
-Feb
-17
A10
0%5-
Day
R35
2221
052
2D
IST.
60%
PLA
N S
HEE
TS to
UTI
LITI
ES1
126
-Apr
-17
26-A
pr-1
70%
5-D
ay56
0R
3522
220
522
ALL
UTI
LITY
MAR
KUPS
RET
UR
NED
11
25-M
ay-1
725
-May
-17
0%5-
Day
560
R32
2800
022
8D
ISTR
IB. R
EVIS
ED P
LAN
SH
EETS
TO
UTI
LITI
ES1
123
-Jun
-17
23-J
un-1
70%
5-D
ay56
0R
3523
300
523
REC
EIVE
MAR
KUP
CO
RR
ECTI
ON
S FR
OM
UTI
LITI
ES1
110
-Jul
-17
10-J
ul-1
70%
5-D
ay56
0R
3266
000
266
UTI
LITI
ES C
ERTI
FIED
11
11-J
ul-1
711
-Jul
-17
0%5-
Day
840
CO
NSU
LTAN
T E
CO
NSU
LTAN
T EV
ALU
AC
ON
SULT
ANT
EVAL
UAT
ION
S11
611
626
-Apr
-17
09-O
ct-1
70%
5-D
ay59
0R
3238
110
238
PHAS
E II
CO
NSU
LTAN
T G
RAD
ES5
526
-Apr
-17
02-M
ay-1
70%
5-D
ay36
16R
3236
000
236
FIN
AL C
ON
SULT
ANT
GR
ADES
11
09-O
ct-1
709
-Oct
-17
0%5-
Day
5959
ENVI
RO
NM
ENT
ENVI
RO
NM
ENTA
L C
EREN
VIR
ON
MEN
TAL
CER
TIFI
CAT
ION
S18
096
03-N
ov-1
6 A
20-J
ul-1
746
.67%
5-D
ay64
0R
3990
030
328
NM
SA C
HEC
KLIS
T1
003
-Nov
-16
A03
-Nov
-16
A10
0%5-
Day
R33
3300
033
3C
ULT
UR
AL R
ESO
UR
CE
& AR
CH
AEO
LOG
ICAL
SU
RVE
Y61
3320
-Jan
-17
A21
-Apr
-17
45.9
%5-
Day
940
R36
1010
061
0N
OIS
E IN
VEST
IGAT
ION
2020
24-A
pr-1
719
-May
-17
0%5-
Day
105
41R
3174
000
174
CO
NTA
MIN
ATIO
N IN
VEST
IGAT
ION
2020
24-A
pr-1
719
-May
-17
0%5-
Day
105
41R
3328
000
328
FCC
CER
TIFI
CAI
TON
REQ
UIR
ED
Y/N
11
08-J
un-1
708
-Jun
-17
0%5-
Day
9474
R33
3310
033
3C
ERTI
FY C
ULT
UR
AL R
ESO
UR
CES
& A
RC
HAE
OLO
GIC
AL1
119
-Jul
-17
19-J
ul-1
70%
5-D
ay64
0R
3610
200
610
CER
TIFY
PU
BLIC
INVO
LVEM
ENT
11
19-J
ul-1
719
-Jul
-17
0%5-
Day
640
R36
1030
061
0C
ERTI
FY N
OIS
E1
119
-Jul
-17
19-J
ul-1
70%
5-D
ay64
0R
3174
100
174
CER
TIFY
CO
NTA
MIN
ATIO
N1
119
-Jul
-17
19-J
ul-1
70%
5-D
ay64
0R
3610
900
610
INC
LUD
E EN
VIR
ON
. CER
TIFI
CAT
ION
IN P
RO
JEC
T FI
LE1
120
-Jul
-17
20-J
ul-1
70%
5-D
ay64
0
* * R
IGH
T O
F W
A* *
RIG
HT
OF
WAY
* * R
IGH
T O
F W
AY1
123
-Jun
-17
23-J
un-1
70%
5-D
ay83
0
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JFM
2016
2017
2018
2019
2020
2021
PREP
ARE
FIN
AL P
AVEM
ENT
DES
IGN
REV
IEW
FIN
AL P
AVEM
ENT
DES
IGN
SUBM
IT F
INAL
SIG
N &
SEA
LED
PAV
EMEN
T D
ESIG
N &
APPR
OVE
PREP
ARE
DR
AFT
TYPI
CAL
SEC
TIO
NS
REV
IEW
DR
AFT
TYPI
CAL
SEC
TIO
NS
PREP
ARE
FIN
AL T
YPIC
AL S
ECTI
ON
SR
EVIE
W F
INAL
TYP
ICAL
SEC
TIO
NS
SUBM
IT F
INAL
SIG
N &
SEA
LED
TYP
ICAL
SEC
TIO
NS
& AP
PRO
VE
ISSU
E N
TP A
ND
SC
HED
ULE
KIC
KOFF
MTG
(DES
IGN
)C
ON
SULT
ANT
SUBM
IT Q
C P
LAN
PM L
ETTE
R T
O P
IO w
/LET
TIN
G D
ATE
& C
ON
ST. D
UR.
PRO
DU
CTI
ON
REA
DY
PREP
ARE
60%
PLA
NS
QA/
QC
AU
DIT
(60%
PLA
NS)
CO
NSU
LTAN
T SU
BMIT
60%
PLA
NS
FOR
REV
IEW
CEN
TRAL
OFF
ICE
REV
IEW
TTM
SQ
UAN
TITI
ES A
ND
REQ
UES
T FO
R IN
FO T
O C
ON
STR
UC
TIO
NR
EVIE
W 6
0% P
AY IT
EM L
IST
REV
IEW
60%
PLA
NS
PREP
ARE
CO
NST
RU
CTI
ON
DU
R S
CH
EDU
LE (C
ON
STR
UC
TIO
N)
SUBM
IT 6
0% C
OM
MEN
TS T
O C
ON
SULT
ANT
REV
ISE
60%
PLA
N S
HEE
TS F
OR
UTI
LITI
ESFI
ELD
REV
IEW
INC
OR
POR
ATE
CO
MM
ENTS
FR
OM
FIE
LD R
EVIE
W
PREP
ARE
100%
PLA
NS
CO
NSU
LTAN
T SU
BMIT
100
% P
LAN
S FO
R R
EVIE
WC
ENTR
AL O
FFIC
E R
EVIE
W T
TMS
REV
IEW
100
% P
LAN
SU
MM
ARY
BOXE
SR
EVIE
W 1
00%
PLA
NS
SUBM
IT 1
00%
CO
MM
ENTS
TO
CO
NSU
LTAN
T
PREP
ARE
FIN
AL P
LAN
SC
ON
SULT
ANT
SUBM
IT F
INAL
PLA
NS
FIN
AL P
LAN
S R
EVIE
WIN
CO
RPO
RAT
E FI
NAL
CO
MM
ENTS
& R
ESPO
NC
ESC
ON
SULT
ANT
SUBM
IT F
INAL
SIG
NED
& S
EALE
D P
LANS
UTI
LITY
CO
OR
DIN
ATIO
N K
ICK
OFF
MEE
TIN
GD
IST.
60%
PLA
N S
HEE
TS to
UTI
LITI
ESAL
L U
TILI
TY M
ARKU
PS R
ETU
RN
EDD
ISTR
IB. R
EVIS
ED P
LAN
SH
EETS
TO
UTI
LITI
ESR
ECEI
VE M
ARKU
P C
OR
REC
TIO
NS
FRO
M U
TILI
TIES
UTI
LITI
ES C
ERTI
FIED
PHAS
E II
CO
NSU
LTAN
T G
RAD
ESFI
NAL
CO
NSU
LTAN
T G
RAD
ES
NM
SA C
HEC
KLIS
TC
ULT
UR
AL R
ESO
UR
CE
& AR
CH
AEO
LOG
ICAL
SU
RVE
YN
OIS
E IN
VEST
IGAT
ION
CO
NTA
MIN
ATIO
N IN
VEST
IGAT
ION
FCC
CER
TIFI
CAI
TON
REQ
UIR
ED
Y/N
CER
TIFY
CU
LTU
RAL
RES
OU
RC
ES &
AR
CH
AEO
LOG
ICAL
CER
TIFY
PU
BLIC
INVO
LVEM
ENT
CER
TIFY
NO
ISE
CER
TIFY
CO
NTA
MIN
ATIO
NIN
CLU
DE
ENVI
RO
N. C
ERTI
FIC
ATIO
N IN
PR
OJE
CT
FILE
4365
17-1
ReD
oRES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST.
LU
CIE
CO
UN
TY, M
P 15
3.23
- 16
9.32
Dat
a D
ate:
07-
Mar
-17
P
age
2 of
3
R
un D
ate:
29-
Mar
-17
Rem
aini
ng L
evel
of E
ffort
Actu
al L
evel
of E
ffort
Rem
aini
ng W
ork
Actu
al W
ork
Crit
ical
Rem
aini
ng W
ork
Layo
ut: ~
Proj
ect S
ched
ule_
1 F
ilter
s: T
ASK
filte
r: Al
l Act
iviti
es©
Prim
aver
a S
yste
ms,
Inc.
Activ
ity ID
PSM
Activ
ity N
ame
Orig Dur
Rem Dur
Star
tFi
nish
Dur
atio
n %
Com
plet
eC
alen
dar
Tota
lFl
oat
Free
Floa
t
R/W
RIG
HT
OF
R/W
RIG
HT
OF
WAY
AC
R/W
RIG
HT
OF
WAY
AC
QU
ISIT
ION
11
23-J
un-1
723
-Jun
-17
0%5-
Day
830
R31
8700
018
7**
*** N
O R
/W R
EQU
IRED
CER
TIFI
CAT
ION
****
*1
123
-Jun
-17
23-J
un-1
70%
5-D
ay83
63
* * C
ON
STR
UC
T* *
CO
NST
RU
CTI
ON
* * C
ON
STR
UC
TIO
N30
230
225
-Apr
-17
01-J
ul-1
80%
00
CC
-7 F
INAL
PLA
CC
-7 F
INAL
PLA
NS
PRC
C-7
FIN
AL P
LAN
S PR
OC
ESSI
NG
101
101
05-J
un-1
725
-Oct
-17
0%5-
Day
200
R30
5004
024
2C
OM
PILE
CO
NTR
ACT
IND
EX F
ILE
7878
05-J
un-1
722
-Sep
-17
0%5-
Day
200
R32
0400
020
4PR
OD
UC
TIO
N D
ATE
11
06-O
ct-1
7*06
-Oct
-17
0%5-
Day
200
R33
0511
530
5TU
RN
PIKE
OFF
ICE
FIN
AL R
EVIE
W &
PR
OC
ESSI
NG
66
09-O
ct-1
716
-Oct
-17
0%5-
Day
200
R32
4240
024
2R
EVIE
W F
INAL
SPE
C P
ACKA
GE
55
09-O
ct-1
713
-Oct
-17
0%5-
Day
200
R32
4250
024
2LE
GAL
REV
IEW
OF
SPEC
PKG
55
09-O
ct-1
713
-Oct
-17
0%5-
Day
200
R33
7012
037
0TU
RN
PIKE
OFF
ICE
SIG
N &
TR
ANSM
IT P
LAN
S PA
CKA
GE
33
17-O
ct-1
719
-Oct
-17
0%5-
Day
200
R33
7000
037
0PL
ANS
TO T
UR
NPI
KE C
ON
TRAC
TS1
125
-Oct
-17
25-O
ct-1
70%
5-D
ay20
0
CC
-7 D
ISTR
ICT
CC
-7 D
ISTR
ICT
CO
NTR
CC
-7 D
ISTR
ICT
CO
NTR
ACT
248
248
12-J
ul-1
729
-Jun
-18
0%0
0R
3524
100
524
* * P
OST
UTI
LITY
AG
REE
MEN
TS O
N W
EB S
ITE
11
12-J
ul-1
712
-Jul
-17
0%5-
Day
9237
R32
1900
121
9**
****
PO
ST P
ERM
ITS
ON
WEB
SIT
E1
121
-Jul
-17
21-J
ul-1
70%
5-D
ay85
65R
3580
100
580
BUIL
D W
P50
SCR
EEN
11
01-S
ep-1
701
-Sep
-17
0%5-
Day
5636
R33
0511
030
5TU
RN
PIKE
CO
NTR
ACTS
PR
OC
ESSI
NG
99
26-O
ct-1
707
-Nov
-17
0%5-
Day
202
R32
2900
022
9AD
VER
TISE
FO
R T
UR
NPI
KE C
ON
TRAC
T (
30 D
AYS)
(FR
IDAY
)5
510
-Nov
-17
08-D
ec-1
70%
Fri
44
R32
8000
028
0TU
RN
PIKE
CO
NTR
ACT
LETT
ING
(TU
ESD
AY)
11
09-J
an-1
8*09
-Jan
-18
0%Tu
e0
0R
3585
150
585
POST
BID
S (T
UES
DAY
)1
116
-Jan
-18
16-J
an-1
80%
Tue
1717
R35
2420
052
4* *
REM
OVE
UTI
LITY
AG
REE
MEN
TS fr
om W
EB S
ITE
11
03-M
ay-1
803
-May
-18
0%Th
u0
0R
3219
002
219
****
**
REM
OVE
PER
MIT
S FR
OM
WEB
SIT
E1
107
-May
-18
07-M
ay-1
80%
Mon
00
R35
8518
058
5AW
ARD
CO
NTR
ACT
11
22-M
ay-1
822
-May
-18
0%5-
Day
00
R35
8519
058
5EX
ECU
TE T
UR
NPI
KE C
ON
TRAC
T BY
CO
NTR
ACTO
R1
114
-Jun
-18
14-J
un-1
80%
5-D
ay0
0R
3585
400
585
EXEC
UTE
TU
RN
PIKE
CO
NTR
ACT
BY D
.O.T
.1
129
-Jun
-18
29-J
un-1
80%
5-D
ay0
0
CO
NST
RU
CTI
OC
ON
STR
UC
TIO
NC
ON
STR
UC
TIO
N43
343
325
-Apr
-17
01-J
ul-1
80%
7 D
ay0
0R
3202
001
202
SCO
PE &
NEG
OTI
ATE
POST
DES
IGN
SER
VIC
ES1
125
-Apr
-17
25-A
pr-1
70%
7 D
ay13
384
R33
1200
031
2C
ON
STR
UC
TIO
N N
OTI
CE
TO P
RO
CEE
D1
130
-Jun
-18
30-J
un-1
80%
7 D
ay0
0R
3202
000
202
POST
DES
IGN
EFF
OR
TS1
101
-Jul
-18
01-J
ul-1
80%
7 D
ay0
0
* * C
Ei* *
CEi
* * C
Ei10
210
209
-Oct
-17
08-M
ar-1
80%
5-D
ay60
0
CEI
- C
ON
SULT
CEI
- C
ON
SULT
ANT
ACC
EI -
CO
NSU
LTAN
T AC
QU
ISIT
ION
102
102
09-O
ct-1
708
-Mar
-18
0%5-
Day
600
R34
0500
040
5AD
VER
TISE
FO
R C
EI1
109
-Oct
-17
09-O
ct-1
70%
5-D
ay59
0R
3203
000
203
CEI
CO
NSU
L C
ON
T EX
EC1
108
-Mar
-18
08-M
ar-1
80%
5-D
ay60
60
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JFM
2016
2017
2018
2019
2020
2021
****
* NO
R/W
REQ
UIR
ED C
ERTI
FIC
ATIO
N **
***
CO
MPI
LE C
ON
TRAC
T IN
DEX
FIL
EPR
OD
UC
TIO
N D
ATE
TUR
NPI
KE O
FFIC
E FI
NAL
REV
IEW
& P
RO
CES
SIN
GR
EVIE
W F
INAL
SPE
C P
ACKA
GE
LEG
AL R
EVIE
W O
F SP
EC P
KGTU
RN
PIKE
OFF
ICE
SIG
N &
TR
ANSM
IT P
LAN
S PA
CKA
GE
PLAN
S TO
TU
RN
PIKE
CO
NTR
ACTS
* * P
OST
UTI
LITY
AG
REE
MEN
TS O
N W
EB S
ITE
****
**
POST
PER
MIT
S O
N W
EB S
ITE
BUIL
D W
P50
SCR
EEN
TUR
NPI
KE C
ON
TRAC
TS P
RO
CES
SIN
GAD
VER
TISE
FO
R T
UR
NPI
KE C
ON
TRAC
T (
30 D
AYS)
(FR
IDAY
)TU
RN
PIKE
CO
NTR
ACT
LETT
ING
(TU
ESD
AY)
POST
BID
S (T
UES
DAY
)* *
REM
OVE
UTI
LITY
AG
REE
MEN
TS fr
om W
EB S
ITE
****
**
REM
OVE
PER
MIT
S FR
OM
WEB
SIT
EAW
ARD
CO
NTR
ACT
EXEC
UTE
TU
RN
PIKE
CO
NTR
ACT
BY C
ON
TRAC
TOR
EXEC
UTE
TU
RN
PIKE
CO
NTR
ACT
BY D
.O.T
.
SCO
PE &
NEG
OTI
ATE
POST
DES
IGN
SER
VIC
ESC
ON
STR
UC
TIO
N N
OTI
CE
TO P
RO
CEE
DPO
ST D
ESIG
N E
FFO
RTS
ADVE
RTI
SE F
OR
CEI
CEI
CO
NSU
L C
ON
T EX
EC
4365
17-1
ReD
oRES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST.
LU
CIE
CO
UN
TY, M
P 15
3.23
- 16
9.32
Dat
a D
ate:
07-
Mar
-17
P
age
3 of
3
R
un D
ate:
29-
Mar
-17
Rem
aini
ng L
evel
of E
ffort
Actu
al L
evel
of E
ffort
Rem
aini
ng W
ork
Actu
al W
ork
Crit
ical
Rem
aini
ng W
ork
Layo
ut: ~
Proj
ect S
ched
ule_
1 F
ilter
s: T
ASK
filte
r: Al
l Act
iviti
es©
Prim
aver
a S
yste
ms,
Inc.