Brief Profile
AMS Engineers & Contractors
ISLAMABAD OFFICE
Office no. 01 2nd Floor, 89-Owais Centre-II
Main Commercial Markaz, PWDRoadPakistanTown,
Islamabad
Ph: +92515970852, 2374563 Mob: +923008673445
Fax: 051-2374562
Email: [email protected]
Rahim Yar Khan Office
Street No 1House No 13
ALI PARK
Rahim yar khan
Ph : +92 685874167, 5872634
Mob : +92 3008673031
Email: [email protected]
INTRODUCTION
M/s AMS Engineers & Contractors is a company with a focus on providing quality, high-end
construction works for both home and commercial purposes. AMS Engineers & Contractors based
Rahim YarKhan &in Islamabad, established in early 2005 by a group of highly trained and
experienced professionals. AMS Engineers & Contractors was created to construction services,
project engineering, estimating cost and scheduling control and field supervision, anytime,
anywhere in Pakistan.
AMS Engineers & Contractorsis highly capable in handling, civil& fabrication works and has a
strong team of highly qualified engineers and consultants. The company is glad to receive
continuous substantial support from many of our existing customers and business partners. Please
find below the brief introduction of AMS Engineers & Contractorsand its allied divisions. Themain
dimensions of business are as follow:
Civil works, Mechanical & Electrical Services
Buildings & infrastructure (Industrial, commercial & residential)
Heavy concrete structures including Tunnel Works
Earth works & Roads
Heavy Steel Structures, Pre engineering & Prefeb Structures
AMS Engineers & Contractors is registered with Pakistan Engineering Council in C-3 (uptoRs.
400 Million) Reg. no.4261.
M/s AMS is prequalified with,
Pakistan petroleum Ltd –(PPL )
Nestle Pakistan
Pakistan Atomic Energy Commission (MDP) Da of SPD
National Development Complex (NDC) DA of SPD
Frontier Works Organization (FWO) DA of SPD
C&W Punjab
Behria Town Rawalpindi
Best way Cement Chakwal
Siemens Pakistan
National Highway authority ( NHA )
China National chemical engineering corporation (CNCEC)
International Islamic University – Islamabad
TBEA China
University of Sargodha
Fauji Foundation
Fatima Fertilizer
Management & Expertise
Managing Director
Engr.Mazhar-ul-Islam Zafar (BSc. Civil Engineering)
Director Projects
Engr.Azhar-ul-Islam Zafar (BSc. Civil Engineering)
Sr.Consultant
Engr..Manzoor Ahmad (MSc. Chemical Engineering)
(SI)
AMS Management has been working in Saudi Arabia, UAE & Pakistan on various prestigious projects for
more than two decade .The Management strongly believes in efficient working to produce a quality
project. AMS have expertise of international standards in the following areas.
Buildings & infrastructure (Industrial & residential)
Heavy concrete structures
Earth works & Roads
Heavy Steel Structures& Prefab Buildings/structures
Tabulation of Projects / Work Experience
Project in Hand
Sr. No.
Name of owner
Name and location of
project
Name of main contractor (if
applicable)
Value of works
Completion Period Percentage
Completed
Nature of JOBS
Start Date
Finish Date
1
Wapda/NTDC
500/220/132 kV Grid Station at
SardargarhRahimyarkhan
TBEA-China
335.00 Million
Oct-11
ON-GOING
98%
Earthwork, Control building,
Mechanical service
building,132 kV relay building,
RCC cable.
2 Gulberg
Trade Center (Pvt.) Ltd
Gulberg Trade Center at Gulberg Green
Islamabad
N/A 300
Million Aug-14
ON-GOING
25% Contraction
of Commercial
3
Pakistan Atomic Energy
Commission
Classified N/A 250.00 Million
Aug-09 ON-Going 96%
Concrete Works Form
Works & Rebar
4
Al-Khidmat Foundation
Pakistan
Al-Kidmat Iman Hospital Talagang
District Chakwal
NA 32
Million Feb -15
ON-GOING
40% 3 Stories Hospital Building
5
Wapda/NTDC
CCPG
Associated Transmission line for Lahore
Central China Power Grid International Economic &
Trade Co. Ltd
40 Million
Jan-15 ON-GOING
65%
Civil works for
Transmission lines
6 Nahakki Tunnel
Concrete Lining Nahakki Tunnel
Yusaf Khail Mahmand
Agency FAATA
FWO 25
Million March-
15 ON-GOING
20%
Concrete Pouring
behind from work/shuttering for bed,
wall & crown
Project Completed
Sr. No
Name Of Owner
Name And Location of
Project
Name of Main
Contractor (if
Applicable)
Value of
Works
Completion Period
Percentage
Completed
Nature of JOBS
Start Date
Finish Date
1
Pakistan Atomic Energy
Commission
Classified N/A 9.076 Million
Dec-11
Sep-12
100%
Construction of
Prefabricated
Accommodation
2
Pakistan Atomic Energy
Commission
Classified N/A 27.00 Million
Feb-13 Dec-2014
100%
Prefab Structure & Fabrication
works 4
prefabration
3
Al-Khidmat Foundation
Pakistan
Raazi Hospital CBR Town Islambad.
NA 32
Million Sep - 13
Nov-2014
100%
5 Stories Hospital
Building (2 basement +
3)
4 Nestle
Pakistan KABIR WALA
Civil works at KABIRWALA
PLANT EKL
37.5 Million
July – 09
10-Jun 100%
Evaporator RCC
Building, Foundations , Officers
Guest house ,
Sewerage
5
Fatima Fertilizer
company Ltd /FFCL
Sadiqabad , Fatima Fertilizer
Project
China National Chemical
Engineering Company /CNCEC
65 Million
Dec-06 June- 2010 100%
Construction of Camp
building Control & Switching building
6
Fatima Fertilizer
company Ltd /FFCL
Fatima Fertilizer Project Sadiq Abad ,
NA 10
Million JUNE -
08 FEB - 2010 100%
Constructio
n of Box Culverts and pipe
culverts----60Nos
7 National
Development Complex NDC
Classified NA
Cumulative Value
101.5 Million
Nov-06 Nov-2011 100%
Concrete works,
Form work & Rebar
8
LOTTEE -PTA Bin Qasim Karachi
CIVL WORKS Catalyst
recovery unit (CRU)
China National Chemical
Engineering Company /CNCEC
5Million May-10
Jan - 2011
100%
Foundations Concrete
works , Form work & Rebar
9
Mirag Rebuild Factory --
MRF KAMARA
Construction of Aero Engine
test bed building - MRF
CENCO-Belgium / EKL
Lahore
24.5 Million
JUNE_08
JUNE- 09 100%
Building works
,Concrete works ,
Form work & Rebar , Acoustic Control Panals
10
Pakistan Petroleum ltd
----PPL/Ranhill
Berhard EPC
ADHI -LPG/NGL
plant 2 adhi
Ran hill berhard
More then
20mill Jan-05 Dec-06 100%
Control room ,
Switch gear room 45 main RCC
11 Bahria Town
ltd
Construction of safari villas at
phase 2 Rawalpindi.
NA 15
Million Apr-06 Feb-07 100% villas
12
National Highway
authority NHA
Resurfacing of N-5
_ 2
Million Feb-07 May-07 100%
Basement & surface treatment
13
Best way
cement ltd chakwal
Construction of Main-cafeteria
NA 1.9
Million Jun-05 Jan-06 100%
main cafeteria building
14
Pakistan
Engineers Forum
Quick build earth quake
resistive home NA
16 Million
Jan -06 Apr-06 100%
Quick build earth quake
resistant home
15
National Highway
authority NHA
Resurfacing of N-5
_ 3 Million Dec-07 Apr-08 100% Bitmac& surface
treatment
16 The Torch
Construction of” The Torch”
Plaza at Civic Center Phase –
4 Islamabad
NA 125
Million
June-13 To July-15
On Going 95%
Multi Stories
(Basement + 7)
M/s AMS Engineers & Contractors
Tabulation of AMS’s Key Personnel Experience
SR. NO
NAME DESIGNATION
TOTAL EXPERIENCE
MATRIC/INTER DEGREE/DIPLOMA (YEARS)
1 Engr.MazharUl Islam Managing Director - Bsc. Civil 24
2 Engr.AzharUl Islam Director Projects - Bsc. Civil/MBA 22
3 Manzoor Ahmad Senior Consultant - Msc. Chemical 35
4 Basharat Islam Zafar Site Incharge - BA 10
5 Muhammad Ishtiaq Malik
Manager Finance & Admin
- MBA Finance &
ICMA Inter - 15
6 Asad Ali Assistant Manager Finance & Admin
- MSC Economics/
Finance 10
7 Sher Afzal Khan Admin / Account - Graduation 33
8 Tariq Ilyas Project Manager Bsc. Civil 16
9 Mohsin Rauf Assistant Manager - BE Mechanical 5
10 Yasir Saleem Asst. Manager Contract & Proposal
- Diploma Civil 15
11 Toqeer Ahmad Const. Manager - Diploma 22
12 Sajid Ali Const. Manager - Diploma 18
13 Abdul Kareem Site Engr - Diploma 9
14 AftabNasir Site Engr - Diploma 16
15 M.Tahir Site Engr - Diploma 8
16 Tariq Islam Site engr - Diploma 8
17 Mudassar Iqbal Site Supervisor - Diploma 6
18 Mohammad Tahir Site Supervisor FA - 4
19 Muhammad Khan Asst. Finance & Admin FA - 20
20 Najibullah Site Supervisor FA - 20
21 Mohammad Nawaz
Site Supervisor Metric -
15
22
Babar Sultan
civil supervisor
Metric
-
19
23 Saqib Tufail Site Supervisor - Diploma 2
24 Abdul Ahad Site Supervisor - Diploma 2
25 Ghayur Abbass Site Supervisor - Diploma 5
26 Saif Ullah Fab. Supervisor FA - 17
27 Zahoor Aziz Foreman Metric - 11
28 M. Ashraf
Foreman Metric - 28
29 M. Aziz
Foreman Metric - 31
30 Ali dad
Foreman Metric - 25
31 M. saber
Foreman Metric - 19
32 Muhammad Usman
Foreman Metric - 8
33 Maqsood Ahmad
Foreman Metric - 7
34 Munir Ahmed Store Keeper Metric - 10
35 SajidFarooq Store Keeper Metric - 7
LIST OF TOOLS & PLANTS
Sr.# Equipment’s ,Tools & Plants Quantity Condition Remarks
1 Concrete Batching Plant 1 Good
2 Concrete Transit Mixer 2 Good
3 Generator 110KV 1 Good
4 Loader 926 1 Good
5 Rooler 1 Ton 1 Good
6 Tractor trolley 3 Fair
7 Water Tankers 2 Fair
8 Water pressure pump with nozzles 3 Good
9 Dewatering pumps 3 Fair
10 Plate compactor/Jumper 2 Good
11 Concrete Mixer machines’’ 0.15 M3’’ 2 Fair
12 Wheel Borrows 20 Fair/Good
13 100mm water well Motor 1 Fair
14 50mm water wells Motors 1 Fair
15 25mm water wells Motors 2 Fair
16 Concrete Vibrators 8 Good
17 Bitumen Heating tank with sprayer 1 Fair
18 Welding Plant 1 Fair
19 Steel plate shuttering(SFT) 15000- SFT Good
20 Grinders, cutters, drill machines (heavy and light) 15 nos. Good
21 C channel forming machine 01 Good
22 Keys, jacks, wrenches and misc tools
Good
23
Capabilities available for press, sandwich panel forming machine and all kinds of fabrication/ machining jobs
Good
24 All types of safety gear
Good
25
Scaffolding pipes (Ft) with joints
45000RFT
Good
26 Joints 17500 NO Good/Fair
27 Wooden batons 1550 Fair
28 Rebar Cutting machine 3 Fair
29 Rebar Bending machine 2 Fair
30 Survey Total station 1 Good
31 Survey Theodolite 2 Good
32 Level equipment 4 Good
33 Office Containers 5 Good
34 Store Containers 2 Good
35 Hilti Concrete Cutter 3 Good
36 Steel Girder Beams for Roofs 53 Good
37 Generator 20KV 2 Good
38 Generator 7.5 KV 1 Fair
39 Cube crushing machine 1 Good
40 Sand equivalent test apparatus 1 Good Lab
41 Test cylinders 6 Good Lab
42 Sulpher capping machine 1 Good Lab
43 Cassegrandeapparatus 1 Good Lab
44
Sand Replacement Compaction test apparatus 1 Good Lab