1

British Columbia’s Approach to Post Disaster Building Assessments

Steven BibbyDirector, Security and Emergency [email protected]

Page 2: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

POST-DISASTER DAMAGE AND SAFETY ASSESSMENT OF THE BUILT ENVIRONMENT PROJECT

CSSP-2016-CP-2268

Funded by:

Page 3: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Post-Disaster Building Assessment

(PDBA)

It’s a“System of Systems”

Page 4: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Key Components:

4

• Recruitment & Training• Pre/Post Event Strategies• Assessment Types• Legislative Framework• Information Management• Administration• Assessment Procedures• Actionable Outcomes

Page 5: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Post DisasterBuilding Assessment

Building Safety

Indicators

Governance and

Administration

Program Management

and Habitability

Applied Technology Council (ATC)Earthquake Engineering Research InstituteEngineers & Geoscientists BCEmerging Technology (e.g. PPR)

Pre-Disaster PlanningProgram DirectionTraining & CertificationPersonnel DeploymentData CollectionSituational AwarenessSupport & Mutual AidBuilding Typology

Authority to EnterPlacard Authority & Change/RemovalTeam Assignment & IntegrationHabitability StandardsHabitability MilestonesInformation ManagementBuilding Prioritization & Assessment Type

Page 6: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Governance and AdministrationBC Housing Establish and lead the Building Damage Assessment Branch

at the PECC/PERRC. Manage Registry & Co-Chair Committee.BC Post-Disaster Building Assessment Advisory Committee Advise, Recommend, Implement, Promote, Integrate Established governance Common Terminology, Forms & Placards Curriculum & Training

Page 7: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Adapting to Changing Goals

Area Assessment

Safety Assessment

Damage Assessment

Page 8: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Personnel Registry & Deployment

Page 9: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Approved Credentials

Page 10: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Essential CurriculumSection Topic Example/Learning Objective /Learning Statement

EMERGENCY MANAGEMENT PROCESS

Incident Command System Basic overview of Operations, Logistics, Planning and Finance; BCEMS objectives; Field command

Orientation & Logistics Sign-in Sheets; Understanding Worksafe, Civil Liability Protection & Coverage; Location to report; Responsibility for reporting; General Forms ; assessment authority

RESPONSE AND RECOVERY STRUCTURE

Assessment Team Structure Team composition (Team leader, Outside person); Job description (Team roles & responsibilities, Minimum skills/requirements);

Big Picture of DA Aspects/Overview

Understanding impact of a displaced population

Tools & Equipment Safety Equipment; ID for assessors; AppRecovery Transition process/Authority

PERSONAL AND TEAM SAFETY

Local Geographical Conditions

Awareness of hazards, risk & personal preparedness; Secondary hazards; Scope of hazards; Transportation Routes

Page 11: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Sample Typology

Considerations Non-complex Complex Very Complex

Height • Up to 3 stories • 4-7 stories • 8 or more stories

Design, Size or Shape

• regular building form; Building code

• up to 5000 sq.ft.

• irregular building form; Building code

Materials • wood • brick • concrete

• multiple structural materials (e.g. brick and steel)

• Innovative/unusual materials (e.g. Mud brick, straw bail) until otherwise classified

• engineered materials (e.g. steel)

Slope & Geotechnical

• low geotechnical risk

• medium geotechnical risk (e.g. liquefaction)

• high geotechrisk (e.g. hillside)

Page 12: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Forms, Processes & TemplatesDefined:

– Placards– Assessment Forms– Mobile App– Code of Conduct

Sample:– Job Descriptions– Deployment Checklists– Kit Contents– Building Typology– Public Communications

Page 13: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Information Management & Common Operating Picture

DATA REPOSITORY

Multiuser, Editable, Central

Spatial Database

Damage Assessment App/Form

ESRI CollectorDynamic/Interactive

Web Map and Dashboardson Desktop

for Clients/Decision MakersFIELD STAFFData Creators

DECISION MAKERSUsers of Data

GIS STAFFApp, Map, Dashboard Creation/Maintenance,

Damage Assessment Coordination

Page 14: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

14

Page 15: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

ScalabilityATC Standard:• All Communities• All Regions• 5 Canadian Provinces• Canadian Military• 4 Neighboring Countries

Page 16: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Community Leadership

• PDBA Coordination Department • EOC Branch & PDBA Assembly Area• Authority to Enter• Building Typology Inventory• Prioritized Assessment List

• Placards, Forms & Tools• Contracts/Agreements• Identification Cards• Information Management• Public Communications

Page 17: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Anticipated Challenges• Civil Liability Protection• Clarity of PDBA process ownership• Building taxonomies/inventories• PDBA/EM transition to recovery• Placard Management (modifying,

removing)• Overlap of PDBA with USAR and other

rescue/response activities

• Personnel

• BDSA Operations

• Types of personnel involved in PDBA • Desired credentials or certification• Use of non-credentialed personnel in PDBA • Recruitment of personnel for PDBA • Prior training • Just-in-time training and/or preparation for

PDBA • Liability for personnel involved in PDBA

• Overall management of PDBA • Decision-making and priority determination• Logistics and dispatching of PDBA teams• Data collection• Data reporting• Data management• Use of data in subsequent decision-making• Use of technology in data management• Team size and composition

Page 18: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Tools/ResourcesMarch 5-8. 2019EERI 2019 ANNUAL MEETING

18

Page 19: British Columbia’s Approach to Post Disaster Building ...€¦ · post-disaster damage and safety assessment of the built environment project cssp-2016-cp-2268. funded by:

Questions?

Steven BibbyDirector, Security & Emergency [email protected]

EERI 2019 ANNUAL MEETING