Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
1
British Columbia’s Approach to Post Disaster Building Assessments
Steven BibbyDirector, Security and Emergency [email protected]
POST-DISASTER DAMAGE AND SAFETY ASSESSMENT OF THE BUILT ENVIRONMENT PROJECT
CSSP-2016-CP-2268
Funded by:
Post-Disaster Building Assessment
(PDBA)
It’s a“System of Systems”
Key Components:
4
• Recruitment & Training• Pre/Post Event Strategies• Assessment Types• Legislative Framework• Information Management• Administration• Assessment Procedures• Actionable Outcomes
Post DisasterBuilding Assessment
Building Safety
Indicators
Governance and
Administration
Program Management
and Habitability
Applied Technology Council (ATC)Earthquake Engineering Research InstituteEngineers & Geoscientists BCEmerging Technology (e.g. PPR)
Pre-Disaster PlanningProgram DirectionTraining & CertificationPersonnel DeploymentData CollectionSituational AwarenessSupport & Mutual AidBuilding Typology
Authority to EnterPlacard Authority & Change/RemovalTeam Assignment & IntegrationHabitability StandardsHabitability MilestonesInformation ManagementBuilding Prioritization & Assessment Type
Governance and AdministrationBC Housing Establish and lead the Building Damage Assessment Branch
at the PECC/PERRC. Manage Registry & Co-Chair Committee.BC Post-Disaster Building Assessment Advisory Committee Advise, Recommend, Implement, Promote, Integrate Established governance Common Terminology, Forms & Placards Curriculum & Training
Adapting to Changing Goals
Area Assessment
Safety Assessment
Damage Assessment
Personnel Registry & Deployment
Approved Credentials
Essential CurriculumSection Topic Example/Learning Objective /Learning Statement
EMERGENCY MANAGEMENT PROCESS
Incident Command System Basic overview of Operations, Logistics, Planning and Finance; BCEMS objectives; Field command
Orientation & Logistics Sign-in Sheets; Understanding Worksafe, Civil Liability Protection & Coverage; Location to report; Responsibility for reporting; General Forms ; assessment authority
RESPONSE AND RECOVERY STRUCTURE
Assessment Team Structure Team composition (Team leader, Outside person); Job description (Team roles & responsibilities, Minimum skills/requirements);
Big Picture of DA Aspects/Overview
Understanding impact of a displaced population
Tools & Equipment Safety Equipment; ID for assessors; AppRecovery Transition process/Authority
PERSONAL AND TEAM SAFETY
Local Geographical Conditions
Awareness of hazards, risk & personal preparedness; Secondary hazards; Scope of hazards; Transportation Routes
Sample Typology
Considerations Non-complex Complex Very Complex
Height • Up to 3 stories • 4-7 stories • 8 or more stories
Design, Size or Shape
• regular building form; Building code
• up to 5000 sq.ft.
• irregular building form; Building code
Materials • wood • brick • concrete
• multiple structural materials (e.g. brick and steel)
• Innovative/unusual materials (e.g. Mud brick, straw bail) until otherwise classified
• engineered materials (e.g. steel)
Slope & Geotechnical
• low geotechnical risk
• medium geotechnical risk (e.g. liquefaction)
• high geotechrisk (e.g. hillside)
Forms, Processes & TemplatesDefined:
– Placards– Assessment Forms– Mobile App– Code of Conduct
Sample:– Job Descriptions– Deployment Checklists– Kit Contents– Building Typology– Public Communications
Information Management & Common Operating Picture
DATA REPOSITORY
Multiuser, Editable, Central
Spatial Database
Damage Assessment App/Form
ESRI CollectorDynamic/Interactive
Web Map and Dashboardson Desktop
for Clients/Decision MakersFIELD STAFFData Creators
DECISION MAKERSUsers of Data
GIS STAFFApp, Map, Dashboard Creation/Maintenance,
Damage Assessment Coordination
14
ScalabilityATC Standard:• All Communities• All Regions• 5 Canadian Provinces• Canadian Military• 4 Neighboring Countries
Community Leadership
• PDBA Coordination Department • EOC Branch & PDBA Assembly Area• Authority to Enter• Building Typology Inventory• Prioritized Assessment List
• Placards, Forms & Tools• Contracts/Agreements• Identification Cards• Information Management• Public Communications
Anticipated Challenges• Civil Liability Protection• Clarity of PDBA process ownership• Building taxonomies/inventories• PDBA/EM transition to recovery• Placard Management (modifying,
removing)• Overlap of PDBA with USAR and other
rescue/response activities
• Personnel
• BDSA Operations
• Types of personnel involved in PDBA • Desired credentials or certification• Use of non-credentialed personnel in PDBA • Recruitment of personnel for PDBA • Prior training • Just-in-time training and/or preparation for
PDBA • Liability for personnel involved in PDBA
• Overall management of PDBA • Decision-making and priority determination• Logistics and dispatching of PDBA teams• Data collection• Data reporting• Data management• Use of data in subsequent decision-making• Use of technology in data management• Team size and composition
Tools/ResourcesMarch 5-8. 2019EERI 2019 ANNUAL MEETING
18