BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

Embed Size (px)

Citation preview

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    1/14

    4 Day Training Program

    OnFire Fighting, Plumbing Design

    (Codes: NBC, NFPA, IPC, ASPE etc..)

    15th Feb To 18th Feb 2014

    AT VITS HOTEL, Andheri -Kurla Road

    Andheri(E)

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    2/14

    About the Workshop:

    This 4 days training program has been designed to cover

    the following topics:

    Fire-Fighting Design (Day 1 and 2)

    Plumbing Design (Day 3 and 4)

    There would be an interactive question-answer round for

    the benefit of the participants at the end of each day.

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    3/14

    Who should attend:

    Consulting Engineers / Project Managers / Project Engineers

    Facility Managers / Engineers & End Users

    Contract Managers and installers / Commissioning Engineers Fire-Fighting Engineers and Technicians

    HVAC Designers, Consultants and Engineers

    Plumbing Engineers and Professionals in the Industry

    Requisites for the Workshop:

    The above course includes the Training Material.

    Candidates should bring the issued course material, scientific calculator and

    laptop (optional) regularly to the class, as the training will include extensive

    calculations and candidates will be required to participate actively during thetraining sessions.

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    4/14

    Syllabus

    Fire-Fighting Design:

    Introduction, Classification of Fire Manual hand held Fire Cylinders Types, Using Procedure & General

    Maintenance Instructions.(NFPA-10)

    Active and Passive Fire Protection Systems, Refuge Area.

    Stairwell Pressurization System

    Fire Water Sump Sizing, Overhead Tank Sizing,

    Sprinklers Types, Selection, Designing, Pipe sizing (NFPA-13)

    Wet Pipe System, Dry Pipe System, Pre-action System, Deluge System,

    Combined Dry Pipe & Pre-action System, Antifreeze System

    Fire Hose System (NFPA-14)

    Fire Hydrant & underground Piping System(NFPA-24).

    FM200 System Designing [Waterless Fire Protection system]:Capacity, Pipe Sizing, Nozzle Selection (NFPA 2001)

    NFPA (National Fire Protection Association) & NBC (National

    Building code of India) for Fire Fighting System Designing

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    5/14

    Fire-Fighting Design (contd.):

    Fire Fighting Hydraulic Calculations, Head Loss.

    Pump Head Calculations for High Rise Buildings

    Fire Water Pump [Main Pump, Jockey Pump and Diesel Pump]

    Classification Types and Selection (NFPA-10)

    Diesel Fuel Storage Tank capacity calculation for the Diesel pump.

    Foam System (NFPA-11&16)

    Fire Alarm System Designing, Smoke Detector (Ionization Type, Optical) Heat Detector, Linear Heat Detection Cable, Flame Detector

    VESDA - Aspirating System

    ELITE - Fire Hydraulic Calculation Software.

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    6/14

    Syllabus

    Plumbing Design:

    Common Sanitary Fixtures Details: Standard trap pipeand discharge pipe sizes, standard slopes for the discharge pipes:

    (a) wash basin, (b) water closet (c) showers (d) sinks (e) bath tubs

    (f) bidets (g) urinals (h) floor drains (floor gullies)

    Layout of Sanitary Fixtures in Toilets.

    Formula for flow through pipes :(a) Darcy formula (b) Chezys formula (c) Manning formula (d) Hazen formula

    (e) Reynolds Number (Laminar/ Turbulent Flow)

    Piping Material, Types of Valves, NPSH calculations, Pump laws.

    Water supply in buildings: (a) Direct system (b) Pumped system

    Ground level (or) underground reservoir sizing

    Elevated roof tank (storage cistern) sizing

    Pump selection (HP, watts).

    Water pipe sizing in buildings

    Minimum number of smaller diameter water pipes that can be connected to

    bigger diameter pipes. Plumbers chart for pipe sizing, Box formula

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    7/14

    Plumbing Design (contd.):

    Foul water drain in building stack, Branch drain/discharge pipe horizontal

    drain. Fixture unit rating, Maximum number of discharge units allowed in

    stack, Single stack system, Design of horizontal drains by discharge units

    method

    Septic tank, Soak away pits, Dispersion trenches designing

    Designing of Storm Water Drainage in buildings

    Auto pneumatic system, Pressure Tank Sizing External water supply for building. Garden water supply & fountain water

    pipe sizing, Calculation of storage tank, Garden water fountain designing,

    Fountain pump selection.

    Estimating Hot Water Demand, Heater Capacity selection.

    Flush Water & Potable Water Loop sizing - (Software) Designing of common appurtenances, Inspection chambers and Junction

    manholes.

    Water Balancing Calculations Green Buildings

    NBC, IPC, ASPE Standards

    Software: TECs Plumbing System Designing Templates.

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    8/14

    Contact:

    ISHRAE MUMBAI CHAPTER

    Program Coordinator: Ms. Reema Varadkar

    Phone:+91 22 2493 3701, 2493 2611

    Mobile: 09860184542

    Email: [email protected]

    [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    9/14

    About the Faculty:

    Syed Moazzam Ali is M.Tech., IGBC-AP has 15+ years of (Gulf & Indian) MEP

    Designing experience, formerly worked as a faculty in Engineering College,

    Holds Life Membership of FSAI & ISHRAE and trained many Professionals.

    Conducted Trainings for ISHRAE, IEF, Bangalore university & FSAI.

    He is expert in the MEP field and is the Technical Director of TaibaEngineering Consultants[TEC-MEP Institute].

    Syed Moazzam Ali(PhD),M.Tech,

    Life Member FSAI, ISHRAE

    Technical DirectorTEC-MEP Institute

    Taiba Engineering Consultants

    Website: www.TaibaMEP.com

    Phone: +91 40 646 04442

    Mobile: +91 9963 759411, +91 9848 461870

    http://www.taibamep.com/http://www.taibamep.com/
  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    10/14

    About ISHRAE:

    The Indian Society of Heating, Refrigerating and Air ConditioningEngineers was founded in 1981 at New Delhi by a group of eminent

    HVAC&R professionals. ISHRAE has more than 12,000 HVAC&R

    professionals and 5,000+ students as members with over 39

    chapters and sub-chapters in India and abroad. It conducts

    International and National Expositions, Seminars and Workshops

    to achieve its primary objective of furthering the Arts and Sciences

    of Heating, Refrigerating and Air Conditioning.

    ISHRAE has published several Technical Guides and

    Handbooks on subjects related to Air Conditioning,

    Refrigeration and Ventilation, and worked on developing

    Indian Weather Data files (WEDCO) project. ISHRAE is an

    associate of ASHRAE.

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    11/14

    Venue:

    VITS Hotel, Anderi-Kurla Road

    Andheri (E)

    Important Dates:

    Dates of Workshop 15th February, 2014 (Sat) to 18th February, 2014 (Tue)

    Reporting Time 09:00 hrs. to 09:30 hrs. on 15th Feb, 2014

    Program Timings 09:30 hrs. to 18:00 hrs.

    Registrations close on 10th Feb, 2014

    Spot registration at venue subject to availability

    Fees:

    15,000 /- per Individual. (This includes course material and lunch.) 12,000/- ISHRAE and ASHRAE members

    Companies/ organizations sending 5 or more delegates get a

    discount of 10%.

    Discounts cannot be combined.

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    12/14

    Payments options:

    Pre-registration

    Demand Draft/ Pay Order

    Cheque (outstation cheques to include clearing charges @ 50 per cheque)

    To be drawn on ISHRAE Mumbai Chapter

    Spot Registration (subject to availability)

    Credit Cards (VISA/ MasterCard)

    Debit Cards

    Cash

    Schedule Highlights:

    09:00 to 09:30 Registration and Networking (first day only)

    09:30 to 13:00 Sessions 1 & 2 (with a tea break in between)

    13:00 to 13:40 Lunch

    13:40 to 16:30 Sessions 3 & 4 (with a tea break in between)

    16:30to 17:00 Question /Answer session

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    13/14

    ISHRAE Mumbai

    Training Programconducted by

    Taiba Engineering

    Consultants

    Glimpse from the previous successful workshop

  • 8/11/2019 BROCHURE - Fire Fighting Plumbing - 15th-18th Feb 2014.pdf

    14/14

    Looking forward to yourpresence at the workshopThank you