36
Brownfield Reference ESCRAVOS GAS PROJECT PHASE 3B Project Information KHAN’s Scope of Work Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation (w/Marine Spread) Pre. Commissioning 1 KHAN Co., Ltd.

Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Brownfield Reference

ESCRAVOS GAS PROJECT PHASE 3B

Project Information

KHAN’s Scope of Work

Site survey

Detail Design

Interface Engineering

Shop Drawing

Procurement

Pre. Fabrication

Installation (w/Marine Spread)

Pre. Commissioning

1 KHAN Co., Ltd.

Page 2: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

2 KHAN Co., Ltd.

Reference of R&D Center

Year Project Name Client Work Description Remarks

2009-

2012

Development of Sea Water

Lift Pump Package

Leading

Industry

Development

for Economic

Region

Development of Cooling Oil Circulation System Control

System, Package Control System, Package Equipment Design,

Package Engineering

2009-

2012

Condition Management

System for Offshore Plant

Leading

Industry

Development

for Economic

Region

Development of vibration sensor, Trouble shooting program,

and Vibration analysis algorithm

2010-

2015

Development of Heave

Compensator

Ministry of

Knowledge

Economy

Development of AHC(Active Heaver Compensator) Cylinder,

DSC(Drill String Compensator) Package Design Ongoing

2011-

2014

Development of 1000hp

grade Top Drive Machine

and Drill Bit and Collar of

Offshore drilling rig

Korea

Evaluation

Institute of

Industrial

Technology

Development of TDM(Top Drive Machine) Control System,

System Drawing, Control Logic, Control Philosophy, PLC

Programming

Ongoing

2012-

2018

Development of Dualized

Control System for The

Topside and Subsea Plant

Ministry of

Knowledge

Economy

Development of SEM(Subsea Electrical Module) and

POD(Electro-Hydraulic Module) Ongoing

2012-

2018

Development of SIL3

Manifold

Ministry of

Knowledge

Economy

Development of Marine Growth Prevention Technology,

Manifold Sizing Technology, Manifold Construction Design, and

Leak Monitoring Interception Technique

Ongoing

2012-

2018

Development of High

Precision Dynamic

Positioning Control and

Analysis Technology

Ministry of

Knowledge

Economy

Development of High Precision Dynamic Positioning Control

and Interpretation Technology and Educational Simulator for

DP operator

Ongoing

Page 3: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Year Project Name Client Work Description SOW

2007 West Hercules

Semi-Rig Seadrill Commissioning Procedure E

2007 Transocean

Drillship TOI Commissioning Procedure E

2007 Awilco Willpioneer

Semi-Rig COSL E&I System design, FDS, P&ID, Basic calculations ED

2007 D90

Semi-Rig SAIPEM E& I system design, P&ID, Basic Calculations ED

2007 Deep Sea Atlantic

Semi-Rig Odfjell Commissioning Procedure E

2008 Petroserv

Semi-Rig Petroserv Commissioning Procedure C

2008 SSCV

Semi-crane vessel CONSAFE Piping, FDS, TBA, P&ID, Basic Calculation, Vendor

Coordination ED

2008 Drilling Rig Schahin E& I system Design, FDS, TBA, P&ID, Basic Calculation E

2008 PLV

Pipe Layer SAIPEM Pipe laying vessel, E&I system design, P&ID,

Design vendor Coordination, Basic Calculation E

E: Engineering, P: Procurement, C: Commissioning/ Construction, D: Design, M: Management

KHAN Co., Ltd. 3

Reference of Engineering Team

Page 4: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Year Project Name Client Work Description SOW

2008 BMPP

Power Barge DSME FEED Engineering, E&I System Design, Machinery

& Piping Design, Process Calculation ED

2009 Jack-up Rig Sungjin Geotec

Price & MTO estimation, Project Scheduling, Project Cost estimation E

2009 Windmill Construction Sungjin Geotec

Price & MTO estimation, Project Scheduling, Project Cost estimation E

2009 Neptune

Semi-Rig Sungjun Geotec

Price & MTO estimation, Project Scheduling, Project Cost estimation E

2009 KOSP

Oil Sand Sungjun Geotec Structure, Machinery, electric HVAC/Detail Design ED

2009 Drilling Rig Sea Drill HVAC Design & Engineering, Utility System & Engineering EC

2009 Drilling Module Sungjin Geotec

Price & MTO Estimation, Project Scheduling, Project Cost Estimation E

2009 KOSP

Oil Sand Sungjun Geotec Structure, Machinery, electric HVAC/Detail Design ED

2009 Neptune

Semi-Rig Sungjun Geotec

Price & MTO estimation, Project Scheduling, Project Cost estimation E

E: Engineering, P: Procurement, C: Commissioning/ Construction, D: Design, M: Management

KHAN Co., Ltd. 4

Reference of Engineering Team

Page 5: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Year Project Name Client Work Description SOW

2010 Chung Hae Jin

(Warship) NAVY DP system Integration & Construction EDC

2010 IOOC FSU STX F&G, ESD system E

2011 Jang Bo Go 3

(Sub Marine) NAVY Propulsion Power & Control system E

E: Engineering, P: Procurement, C: Commissioning/ Construction, D: Design, M: Management

KHAN Co., Ltd. 5

Reference of Engineering Team

Page 6: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

6 KHAN Co., Ltd.

Year Project Name Client Work Description SOW

2007 Awilco Willpioneer

Semi-Rig Awilco E&I System Design, FDS, P&ID, Calculations ED

2007 D90 Semi-Rig Saipem E& I System Design, P&ID, Calculations ED

2008 SSCV

Semi-crane vessel Consafe

Piping, FDS, TBA, P&ID, Basic Calculation, Vendor

Coordination ED

2008 Drilling Rig Schahin E& I System Design, FDS, TBA, P&ID, Calculation E

2008 PLV

Pipe Layer Saipem E&I System Design, P&ID, Vendor Coordination, Calculation E

2008 BMPP

Power Barge DSME FEED, E&I System, Machinery & Piping, Process ED

2009 Jack-up Rig SungJin Geotec MTO, Project Scheduling, Project Cost Estimation E

2009 Windmill Construction SungJin Geotec MTO Project Scheduling, Project Cost Estimation E

Reference of Offshore Engineering

Page 7: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

7 KHAN Co., Ltd.

Year Project Name Client Work Description SOW

2009 Neptune

Semi-Rig SungJin Geotec MTO, Project Scheduling, Project Cost Estimation E

2009 KOSP

Oil Sand SungJin Geotec Detail Engineering & Fabrication Design ED

2009 Drilling Rig Sea Drill HVAC & Utility System ED

2009 Drilling Module SungJin Geotec MTO, Project Scheduling, Project Cost Estimation E

2009 Neptune

Semi-Rig SungJin Geotec MTO, Project Scheduling, Project Cost Estimation E

2012 Goliath FPSO Marine

Aluminium Helideck, Handrail & Stairway D

2012 HengAm Oceanus

Reference of Offshore Engineering

Page 8: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

8 KHAN Co., Ltd.

For Naval Ships

Client Project Name Type Period Builder Remark

1 ROK Navy DP2 System Upgrade for Korean

Navy ARS21 ASR 2009. 10 2010. 03 DSME

2 ROK Navy

Propulsion System Integration

Development for Submarine (KSS-

III)

KSS-III 2010.05 2011.10

3 ROK Navy ECS Hardware console for Korean

Navy H.7038 ATS 2011.06 2012.02 DSME

4 ROK Navy ICAS, IPS system for Korean Navy

H.7038 ATS 2011.12 2012.06 DSME

5 ROK Navy ECS Hardware console for Korean

Navy P.135 AGS 2011.12 2012.06 HHI

F&G / ESDS

Client Project Name Type Period Builder Remark

1 Atwood H3614 Drillship 2011.07 2012.07 DSME

2 Aker H3612/ H3613 Drillship 2011.11 2012.11 DSME

Reference of Automation Engineering

Page 9: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

9 KHAN Co., Ltd.

Client SSLCS ESDS Trim & List Sensor

1 7 50 60 31

2 5 14 - 5

3 - 4 24 22

4 - 2 - -

5 2 - - -

TOTAL 14 70 84 58

For LNG Carrier

Reference of Automation Engineering

Page 10: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

10 KHAN Co., Ltd.

Client Project Machinery Period Remark

1 POSCO Plantech Stacker & Claimer 2012. 02 2012. 08

Reference of Machinery Engineering

Page 11: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

11 KHAN Co., Ltd.

Client Project Name Type Period Builder Remarks

1 Seadrill West Hercules/Aquarius Rig 2007. 02 2007. 12 DSME China

2 Odfjell Deepsea Atlantic Rig 2007. 11 2008. 07 DSME North Sea

3 Transocean Discoverer Clear Leader Drillship 2007. 09 2008. 03 DSME GOM

4 Transocean Discoverer Americas Drillship 2008. 04 2008. 08 DSME GOM

5 Heerema H3402 PLV 2012.01 2012. 10 DSME -

6 Chevron H6051 SNX Fixed

Platform 2012. 06 ongoing DSME Angola

7 Allseas H3401 PLV 2012. 07 ongoing DSME -

Commissioning Procedure

CMMS/Simulator

Client Project Name Type Period Builder Remarks

1 Grupo-R H3026 CMMS Rig 2010.10 2011.06 DSME

2 KOMERI LNG Cargo Simulator Simulator 2011.02 2012.08

3 DSME Drilling Simulator Simulator 2011.04 2012.07

Reference of Logistic Engineering

Page 12: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

12 KHAN Co., Ltd.

Client Project Name Type Period Builder Remarks

1 Elcano, S.A. LNG Carrier 2009.02 2010.03 STX

2 Golar H2021~ H2023 LNG Carrier 2012. 06 2013.06 SHI Ongoing

3 Golar H2024 LNG Carrier 2012. 06 2014.12 SHI Ongoing

4 Golar H2026~H2027 LNG Carrier 2012. 06 2014.05 SHI Ongoing

5 Golar H2031 LNG Carrier 2012. 06 2014.12 SHI Ongoing

6 Golar H2047~H2048 LNG Carrier 2012. 06 2015.01 SHI Ongoing

7 Golar H2055~H2056 LNG Carrier 2012. 06 2015.02 SHI Ongoing

Operation Manual

E-SPIR

Client Project Name Type Period Builder Remarks

1 Shell H2030 FLNG 2012.10 2013.10 SHI Ongoing

Reference of Logistic Engineering

Page 13: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Commissioning Reference

Client Project Name Type Period Yard Location

1 Seadrill West Hercules Rig 2008. 02 2008. 10 DSME China

2 Seadrill West Aquarius Rig 2008. 05 2009. 01 DSME Indonesia

3 Transocean Discoverer Clear Leader Drillship 2008. 05 2009. 03 DSME GOM

4 Transocean Discoverer Americas Drillship 2008. 12 2009. 07 DSME GOM

5 Transocean Discoverer Luanda Drillship 2009. 06 2010. 03 DSME Luanda

6 Transocean Discoverer India Drillship 2009. 09 2010.08 DSME India

7 Vantage Sea Dragon Rig 2009. 12 2011.02 Jurong Singapore

8 Vantage TMT 1 (PLATINUM

EXPLORER) Drillship 2010. 04 2010.11 DSME India

9 Odebrecht NORBE IX Drillship 2010. 10 2011.5 DSME Brazil

10 Vantage TMT 2(DRAGON QUEST) Drillship 2011. 01 2012.04 DSME Mexico

11 SeaDrill West Pegasus Rig 2011. 01 2011.04 Jurong Singapore

12 Odebrecht ODN Ⅰ Drillship 2011.06 2012.04 DSME Brazil

13 Odebrecht ODN ⅠⅠ Drillship 2012.02 2012.04 DSME Brazil

14 KNOC Panama Zhambyl Rig 2012.04 2012.08 ERSAI Kazakhstan

15 Corporative

Grupo-R Grupo-R GVA7500 Rig 2012.05 2012.07 DSME Mexico

Page 14: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Commissioning Reference

Client Project Name Type Period Yard Location

16 Vantage Tungsten Explorer Drillship 2012.10 - DSME -

17 Diamond Offshore Diamond Ultra Deep-water

Drillship #1,2,3 Drillship 2012.10 - HHI -

18 Fred Olsen Energy Fred Olsen Drillship #1 Drillship 2012.11 - HHI -

Page 15: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

15 KHAN Co., Ltd.

Client Project Name Type Period Man

power Yard Location

Seadrill West Hercules Rig 2008. 02 2008. 10 30 DSME China

Seadrill West Aquarius Rig 2008. 05 2009. 01 30 DSME Indonesia

Transocean Discoverer Clear Leader Drillship 2008. 05 2009. 03 32 DSME GOM

Transocean Discoverer Americas Drillship 2008. 12 2009. 07 32 DSME GOM

Transocean Discoverer Luanda Drillship 2009. 06 2010. 03 32 DSME Luanda

Transocean Discoverer India Drillship 2009. 09 2010.08 31 DSME India

Vantage Sea Dragon Rig 2009. 12 2011.02 5 Jurong Singapore

Vantage TMT 1 (PLATINUM

EXPLORER) Drillship 2010. 04 2010.11 19 DSME India

Odebrecht NORBE IX Drillship 2010. 10 2011.5 27 DSME Brazil

Techinip H6001 OPS PLV 2010.09 2011.06 - STX Dalian -

Vantage TMT 2(DRAGON QUEST) Drillship 2011. 01 2012.04 23 DSME Mexico

SeaDrill West Pegasus Rig 2011. 01 2011.04 8 Jurong Singapore

Odebrecht ODN Ⅰ Drillship 2011.06 2012.04 20 DSME Brazil

Odebrecht ODN ⅠⅠ Drillship 2012.02 2012.04 5 DSME Brazil

KNOC Panama Zhambyl Rig 2012.04 2012.08 14 ERSAI Kazakhstan

Corporative Grupo-R Grupo-R GVA7500 Rig 2012.05 2012.07 6 DSME Mexico

Commissioning Reference

Commissioning Reference

Page 16: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

16 KHAN Co., Ltd.

Client Project Name Type Period Man

power Yard Location

Vantage Tungsten Explorer Drillship 2012.10 - 26 DSME -

Transocean Edward Drillship #1 Drillship 2013.01 - - DSME -

Diamond Offshore Diamond Ultra Deep-water

Drillship #1 Drillship 2012.10 - 30 HHI -

Fred Olsen Energy Fred Olsen Drillship #1 Drillship 2012.11 - 30 HHI -

Ongoing Project

Expected Project

Client Project Name Type Period Man

power Yard Location

Songa Offshore Songa Offshore #1 Rig 2013.06 - - DSME -

Diamond Offshore Diamond Ultra Deep-water

Drillship #2,3 Drillship Mid of 2013 - 30 HHI -

Commissioning Reference

Page 17: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Client Project Name Type Period Yard Location

1 Seadrill West Hercules Rig 2008. 02 2008. 10 DSME China

2 Seadrill West Aquarius Rig 2008. 05 2009. 01 DSME Indonesia

3 Transocean Discoverer Clear Leader Drillship 2008. 05 2009. 03 DSME GOM

4 Transocean Discoverer Americas Drillship 2008. 12 2009. 07 DSME GOM

5 Transocean Discoverer Luanda Drillship 2009. 06 2010. 03 DSME Luanda

6 Transocean Discoverer India Drillship 2009. 09 2010.08 DSME India

7 Vantage Sea Dragon Rig 2009. 12 2011.02 Jurong Singapore

8 Vantage TMT 1 (PLATINUM

EXPLORER) Drillship 2010. 04 2010.11 DSME India

9 Odebrecht NORBE IX Drillship 2010. 10 2011.5 DSME Brazil

10 Vantage TMT 2(DRAGON QUEST) Drillship 2011. 01 2012.04 DSME Mexico

11 SeaDrill West Pegasus Rig 2011. 01 2011.04 Jurong Singapore

12 Odebrecht ODN I Drillship 2011.06 2012.04 DSME Brazil

13 Odebrecht ODN I I Drillship 2012.02 2012.04 DSME Brazil

14 KNOC Panama Zhambyl Rig 2012.04 2012.08 ERSAI Kazakhstan

15 Corporative Grupo-

R Grupo-R GVA7500 Rig 2012.05 2012.07 DSME Mexico

Commissioning Reference

Page 18: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Client Project Name Type Period Yard Location

16 Vantage Tungsten Explorer Drillship 2012.10 2013.07 DSME -

17 Diamond Offshore Diamond Ultra Deep-water

Drillship #1 Drillship 2012.10 - HHI -

18 Fred Olsen Energy Fred Olsen Drillship #1 Drillship 2012.11 - HHI -

19 Transocean Atwood Drillship #1 Drillship 2013.01 - DSME -

20 Exxon Mobile ArkutunDagi Fixed

Platform 2013.07 - DSME -

21 Diamond Offshore Diamond Ultra Deep-water

Drillship #2 Drillship 2013.05 - HHI

22 Diamond Offshore Diamond Ultra Deep-water

Drillship #3 Drillship 2013.11 - HHI

Commissioning Reference

Page 19: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Client Project Name Type Period Yard Location

1 Seadrill West Hercules/Aquarius Rig 2007. 02 2007. 12 DSME China

2 Odfjell Deepsea Atlantic Rig 2007. 11 2008. 07 DSME North Sea

3 Transocean Discoverer Clear Leader Drillship 2007. 09 2008. 03 DSME GOM

4 Transocean Discoverer Americas Drillship 2008. 04 2008. 08 DSME GOM

5 DSME Heerema Aegir Pipe Laying Vessel 2011.11 2013.01 DSME -

6 DSME South Nemba Auxiliary Fixed Platform 2012.06 On-going DSME Angola

7 DSME Allseas Pieter Schelte

Platform

decommissioning

and Pipe laying

vessel

2012.09 On-going DSME -

Commissioning Procedure Reference

Page 20: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

No. Client Project Name Type No of vessel Year Location

1 HHI/HMD/HSHI Bulk, PC, PCTC, Container, LNG Marine 68 2007 Korea

2 HHI/HMD/HSHI Bulk, PC, PCTC, Container, LNG Marine 73 2008 Korea

3 HHI/HMD/HSHI Bulk, PC, PCTC, Container, LNG Marine 68 2009 Korea

KHAN Co., Ltd. 20

Production Reference

Page 21: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

No. Client Project Name Type Year Location

1 HHI TaeKwang, PTA H8PU-S1 Onshore 2007 Korea

2 HHI Hinix 6.6KV SWGR Onshore 2007 Korea

3 HHI KOGAS-AKPE Ulsan Factory Onshore 2007 Korea

4 HHI Hinix Air product 6.6KV SWGR Onshore 2007 Korea

5 HHI KoryuAnyun, 154KV, 22KV SWGR Onshore 2007 Korea

6 HHI Daehan steel, 2,2KV SWGR Onshore 2007 Korea

7 HHI Daehan steel, LV SWGR Onshore 2007 Korea

8 HHI O Mon Thermal Power Plant Onshore 2007 Korea

9 HHI O Mon WACP Onshore 2007 Korea

10 HHI Hinix Air product 6.6KV SWGR Onshore 2007 Korea

11 Byuck San Jung Gok, 22.9KV SWGR Onshore 2008 Korea

12 HMC R Engine Factory 13.8KV SWGR Onshore 2008 Korea

13 GSELL NHTK/TG-K2 Onshore 2008 Korea

14 HHI 345KV Transformer Factory Onshore 2008 Korea

15 HHI Dock gate Onshore 2008 Korea

KHAN Co., Ltd. 21

Production Reference

Page 22: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

No. Client Project Name Type Year Location

16 HHI KCC P2 Onshore 2008 Korea

17 HHI Solar Power 154KV Onshore 2009 Korea

18 HHI SK Energy LIBS #4,5 Onshore 2009 Korea

19 HHI Exxon mobil BSF Onshore 2009 Korea

20 HHI Sung-am Crematory 3.3KV Onshore 2009 Korea

21 HHI HueDaim/Luxem 3.3KV & 6.6KV Onshore 2009 Korea

22 HHI Hyundai steel 3.3KV Onshore 2009 Korea

23 HHI Lowtec/3.3KV Onshore 2009 Korea

24 HHI Aseapower & Samkwang SKNP Onshore 2010 Korea

25 HHI HanHwa Jordan samra Onshore 2010 Korea

26 HHI Koryo ayen #2 TSL Onshore 2010 Korea

27 HHI Koryo ayen #3 TSL Onshore 2010 Korea

28 HHI Koryo ayen #4 TSL Onshore 2010 Korea

29 HHI Hinix Yi-cheon shop Onshore 2010 Korea

30 HHI STX Energy Onshore 2010 Korea

KHAN Co., Ltd. 22

Production Reference

Page 23: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

No. Client Project Name Type Year Location

31 HHI HMC Engine shop Onshore 2010 Korea

32 HHI Samsung Skida Onshore 2010 Korea

33 HHI HMC Gamma Engine shop Onshore 2010 Korea

34 HHI KCC Yeo-Ju shop Onshore 2010 Korea

KHAN Co., Ltd. 23

Production Reference

Page 24: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

24 KHAN Co., Ltd.

Reference of Hydro Package PROJECT NAME DESCRIPTION

SEADRILL WEST HERCULES (DSME)

Piping For Air Purging Line To Surge Tank, Cement Unit

Test Line For HP Test Pumps

Mud/Gas Separator U Tube Flushing Line

ODFJELL DEEP SEA ATLANTIC (DSME) Hook Up Of Utilities For WOCS

ODFJELL DEEP SEA STANVANGAR

(DSME) Base Oil System Modification

TRANSOCEAN DEEPWATER CHAMPION

(HHI)

Main & Aux Drill Line Spoolers

Lifeboat Breathing Air Supply Filling Facility/Lifeboat Maintenance

Cooling Lines On Aux/Main DRWKS

PACIFIC DRILLING BORA (SHI)

Nitrogen Generator Installation

Additional H.P Hydraulic Lines For EXPRO Equipment-From The HPU(Port Side) To The Reel Station

Installation Of Drilling Line Spooler (15,000ft Of 2" Wire) And Local Structural Reinforcement

Installation Of Two Palfiger Cranes

Installation Of Subsea Winch At Moonpool Area

Installation Of Mud VAC Lines

Installation Of Bucking Machine

Replacement Of 5 Ton Winch To 10 Ton Winch

COSL PIONEER (CIMC CHINA)

Install Pump For Slipjoint

HP Wash Down System

Installation Of Bunner Boom & Piping

VANTAGE #2 DRAGONQUEST (DSME) MUX Reel Control Stand Re-Location (Re-Location Tubing)

High Pressure Pipe Line

ODFJELL DEEPSEA METRO (HHI)

Additional ROV

Water Maker System

Fixed Fuel Supply Line To Cement Unit

Installation Of Compactor Air Line

Modification Cement System LAS Pipe Work

Fugro Current Meter And Monitoring Hardware

OCEAN RIG#4-MYKONOS (SHI) Installation Of Utility Line For Rig Air And Drill Water

Page 25: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

25 KHAN Co., Ltd.

No. Project Name Pipe Client Period Method

Scope of Work

A B C D

1

KOC-1 Onshore

Pipeline

Project (Kuwait)

48" x 12.7mmt x 39km

24" x 14.3mmt x 39km

24" x 11.1mmt x 39km

KOC Apr. 2012 ~

Oct. 2012 Automatic O O O

2

Foroozan Offshore

Pipeline

Project (Iran)

24" x 14.3mmt x 103km IOEC Apr. 2011 ~

Aug. 2011 Automatic O O O O

3

Offshore Gas Spur

Lines

(Thailand)

24" X 15.9mmt x 38km

28" X 17.5mmt x 48km

PTT Apr. 2011 ~

July 2011 Automatic O O O

4 Pardip SPM Project

(India) 48" x 22.2mmt x 71km IOCL

Nov. 2010~

Mar. 2011 Automatic O O O

5 Colombo Port

Expansion(Sri Lanka) 36" x 15.6mmt x 9km

Hyundai

E&C

Sep. 2009~

May. 2010

Manual O

6 Bohai Bay Pipeline

(China)

12" x 12.7mmt x 98km

12" x 14.3mmt x 19km

HHI /

COOEC

Feb. 2009 ~

Sep. 2009 Automatic O O O

7 Shanghai LNG

(China) 36" x 20.6mmt x 36km

HHI /

CNOOC

Aug. 2008 ~

Dec. 2008 Automatic O O O

8

SK Crude Oil Unloading

System Relocation

(Korea) 42" 25 4mmt x 10km

HHI /

SK Energy

Mar. 2008 ~

Aug. 2008

Automatic

O O O

A: Full Welding Service, B: Management & Supervision, C: Welding Equipment, D: Consumables & Parts

Reference of Pipe Laying

Page 26: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

26 KHAN Co., Ltd.

No. Project Name Pipe Client Period Method

Scope of Work

A B C D

9

Sisi Nubi Pipeline

Project

(Indonesia)

16" x 20.6mmt x 6.2km

22" x 24.3mmt x

15.2km

26" 27 5mmt x 33km

HHI/TOTAL

INDONESIA

Jan. 2007 ~

Mar. 2007 Automatic O O

10 PGN Gas Pipeline

(Indonesia) 32" x 23.9mmt x 155km

HHI/

Perusahaan

Gas Negara

June 2006

~

Dec. 2006

Automatic O O

11 KOC Crude Export

Facilities (Korea) 56" x 25.4mmt x 71km HHI/KOC

July 2006 ~

Nov. 2006 Automatic O O

12 Rong Doi Pipeline

Project (Vietnam) 18" x 15.9mmt x 58km HHI/KNOC

Apr 2006 ~

Jul. 2006 Automatic O O

13

PTT Third

Transmission

Pipeline (Thailand)

42" x 23.9mmt x 120km HHI/PTT Public

CompanyLimitd

Sep. 2005 ~

Feb. 2006 Automatic O O

14

Chunxiao Gas

Pipeline

Project (China)

28" x 15.9mmt x 225km

16" x 11. mmt x 12km

8" x 9.5mmt x 63km

HHI/CNOOC Sep. 2004 ~

Apr. 2005

Automatic

& Manual O O

A: Full Welding Service, B: Management & Supervision, C: Welding Equipment, D: Consumables & Parts

Reference of Pipe Laying

Page 27: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

No. Client Project Name Type Work Description Year Location

1 RAFFLES Awilco Willpioneer Semi-Rig E&I System design, FDS, P&ID, Basic calculations 2007 China

2 RAFFLES Frigstad D90 Semi-Rig E&I System design, P&ID, Basic calculations 2007 China

3 ODFJELL Deepsea Atlantic Semi-Rig Derrick Assembly Work 2007 China

4 RAFFLES SSCV

(semi Submersible Crane Vessel)

Semi-crane

vessel

FDS, TBA, P&ID, Basic calculations, Vendor

Coordination 2008 China

5 RAFFLES Millennium SA Drilling Rig E&I System design, FDS, TBA, P&ID, Basic

calculations 2008 China

6 RAFFLES PLV

(Pipe Laying Vessel) Pipe Layer

P&ID, Basic calculations, Vendor Coordination, E&I

System design 2008 China

7 DSME BMPP

(Barge Mounted power Plant) Power Barge

FEED Engineering, E&I System design, Machinery &

Piping design, Process calculations 2008 Korea

8 STX LNGC-DF Cargo/Machinery Operation Manual 2009 Korea

9 SHI MPDS

(Multi Purpose Dynamic simulator) LNG FPSO

FEED Engineering of MPDS (Multi Purpose Dynamic

Simulator) 2009 Korea

10 IOOC F1003 FSU C&E Philosophy and Chart of F&G ESD System 2010 Korea

11 ODFJELL Deepsea Stavenger Semi-Rig Post Delivery Modification 2010 Korea

12 ATWOOD H3614 Drill ship F&G and ESD SYSTEM 2011 Korea

13 AKER H3612/H3613 Drill ship F&G and ESD SYSTEM 2011 Korea

14 ODFJELL Deepsea Metro 1 Drill ship Post Delivery Modification 2011 Korea

15 ODFJELL Deepsea Metro 2 Drill ship Post Delivery Modification 2011 Korea

KHAN Co., Ltd. 27

F&G ESD System Reference

Page 28: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Client Project Name Type Period Yard Location

1 Seadrill West Hercules Rig 2008. 02 2008. 10 DSME China

2 Seadrill West Aquarius Rig 2008. 05 2009. 01 DSME Indonesia

3 Transocean Discoverer Clear Leader Drillship 2008. 05 2009. 03 DSME GOM

4 Transocean Discoverer Americas Drillship 2008. 12 2009. 07 DSME GOM

5 Aker Solutions West Hercules etc. Rig etc. 2008. 02 ongoing DSME

6 Transocean Discoverer Luanda Drillship 2009. 06 2010. 03 DSME Luanda

7 Transocean Discoverer India Drillship 2009. 09 ongoing DSME

8 Vantage Sea Dragon Rig 2009. 10 ongoing Jurong

9 Vantage TMT No.1&2 2010. 04 ongoing DSME

10 STX H 6001 Rig 2010. 10 ongoing STX China

11 SeaDrill West Pegasus Rig 2011. 01 ongoing Jurong Singapore

Client Project Name Type Period Yard Location

1 Seadrill West Hercules/Aquarius Rig 2007. 02 2007. 12 DSME China

2 Odfjell Deepsea Atlantic Rig 2007. 11 2008. 07 DSME North Sea

3 Transocean Discoverer Clear Leader Drillship 2007. 09 2008. 03 DSME GOM

4 Transocean Discoverer Americas Drillship 2008. 04 2008. 08 DSME GOM

Commissioning Procedure

Commissioning

Client Project Name Type Period Yard Location

1 Elcano, S.A Cargo / Machinery OP Manual LNGC_DF 2009. 02 2010. 03 STX Jinhae

Operation Manual

28 KHAN Co., Ltd.

Reference of Operation Manual & CP

Page 29: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

Year Project Name Client Work Description

2010 DP2 System Upgrade for Korean

Navy ASR21* R.O.K NAVY DP system Integration & Construction

2010 Propulsion System Integration

Development for Submarine (KSS-III) R.O.K NAVY Propulsion Power & Control system

2011 ECS Hardware console for Korean

Navy ATS II* DSME CCS, SCC, DP, SUB, DAU consoles

2011 ICAS, IPS system for Korean Navy

ATS II* DSME ICAS, IPS system

2012 ECS Hardware console for Korean

Navy AGX II* HHI CCS, SCC, SUB, DAU, NSB, PM-LOP consoles

* Marked Projects have performed or will be performed with CONVERTEAM.

Reference of NAVY Service

KHAN Co., Ltd

29

Page 30: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 30

ESDS Reference

Page 31: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 31

ESDS Reference

Page 32: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 32

ESDS Reference

Page 33: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 33

ESDS Reference

Page 34: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 34

ESDS Reference

Page 35: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 35

ESDS Reference

Page 36: Brownfield Reference · 2015. 9. 14. · Project Information. KHAN’s Scopeof Work. Site survey Detail Design Interface Engineering Shop Drawing Procurement Pre. Fabrication Installation

KHAN Co., Ltd. 36

ESDS Reference