Upload
sabah8800
View
219
Download
1
Tags:
Embed Size (px)
DESCRIPTION
presenataion cranes in china
Citation preview
Mr. Bryan Pepin-Donat
Director, Contracts/International Business
LAMPSON INTERNATIONAL LLC
Telephone: 509.586.0411
Mobile: 509.528.7177
Email: [email protected]
LAMPSON INTERNATIONAL “Progress Through Innovation”
1. HEALTH OF THE CRANE INDUSTRY
• Pressure on Pricing / ROI
• Equipment utilization
• Consolidation
• Capital Projects Funding
2. THE REGULATORY ENVIRONMENT
• Requirements State/Federal (Moving Target)
• Cost of Record Keeping
• Cost of Training/Training System Investment
• Emissions
3. LIABILITY ISSUES
• Insurance Risk /Benefit Ratio
4. THE ECONOMY
• Rate of Recovery
• Banking Regulations
• Cost / Availability of Capital
• Low Infrastructure Investment
LAMPSON INTERNATIONAL “Progress Through Innovation”
• Rates trending down
• ROI trending down
• Cost of ownership up
• Equipment utilization down
LAMPSON INTERNATIONAL “Progress Through Innovation”
1. Funding availability
2. Natural Gas competition
3. China, Japan, India, USA
Korea Most Active
4. Good Carbon Footprint
Nuclear
Lift Description:
The Lampson Transi-Lift LTL-2600B places a 850t CV3 Containment Ring into position
LAMPSON INTERNATIONAL “Progress Through Innovation”
1. Few Long Term Projects
2. Good Long Term prospects
3. Consolidation of Services
Lift Description:
Lampson LTL-2600 sets a 730t Regenerator Head in a Refinery in New Jersey.
Petro-Chemical
LAMPSON INTERNATIONAL “Progress Through Innovation”
1. Offshore projects
2. Oil Rig fabrication
3. FPSO modularization
LAMPSON LTL-2600 LIFTING 1,275t MODULE
Petroleum
LAMPSON INTERNATIONAL “Progress Through Innovation”
Manufacturing
•Orders down
•Credit availability
•Few Projects
LAMPSON INTERNATIONAL “Progress Through Innovation”
1. Federal Subsidies continue
2. Onshore Site Issues
3. Big Offshore demand
NEED SOME WINDMILL
PICTURES HERE. ON
SHORE OR OFF SHORE
Wind Power
LAMPSON INTERNATIONAL “Progress Through Innovation”
Lift Description:
Lampson LTL-2600 sets a 1040t Vehicle Bridge over the main rail lines between Boston and New York.
1. Federal Subsidies an issue
2. Debt issues
3. State funding
Infrastructure
LAMPSON INTERNATIONAL “Progress Through Innovation”
1. Added cost of
recordkeeping
2. Cost of training
3. Load Test
requirements
4. Disparity in rules
•The FEDOSHA CDAC –
•Cranes and Derricks in Construction
•WISHA - Washington State
•Industrial Safety and Health
•EN13000
•British Standard 7121
•AS 2550
•ANSI B30.5
LAMPSON INTERNATIONAL “Progress Through Innovation”
• COMPUTER PROGRAMS
• EQUIPMENT COMPONENT
TRACKING
• EQUIPMENT
TAGGING/TRACING
ADDED COST OF
RECORD KEEPING
LAMPSON INTERNATIONAL “Progress Through Innovation”
LOAD TEST REQUIREMENTS
• Excessive Testing (Annual)
1) Testing to 100% of Structural
2) Testing to 100% of Tipping
3) 100% of line pull each drum
4) Each configuration must be
tested
5) Emission requirements
Need to show some kind of
crane testing
LAMPSON INTERNATIONAL “Progress Through Innovation”
1) Excessive Insurance Risk /Benefit
Ratio
2) No cap on liability
3) Pollution risk on site / off site
LAMPSON INTERNATIONAL “Progress Through Innovation”
Site suitability
1) Ground suitability for lifts
2) Geo-Tech
?
LAMPSON INTERNATIONAL “Progress Through Innovation”
• Slow Recovery
1) High Debt to GDP
2) Low Infrastructure
Investment
3) Public Funding
restrictions
LAMPSON INTERNATIONAL “Progress Through Innovation”
High Unemployment
Employment – Total Source : Bloomberg
LAMPSON INTERNATIONAL “Progress Through Innovation”
• Banking Regulations
1) Higher Capital
requirements
2) Availability and basis for
Credit
3) More Loan Covenants
United States Banking Reform Act
Basel III Committee on Banking
Supervision
Revised UK Banking Requirements
LAMPSON INTERNATIONAL “Progress Through Innovation”
• Low Infrastructure
Investment
• High budget projects
cancelled
$9.8 TO $12.7 BILLION NEW JERSEY/NEW YORK RAIL TUNNEL
LAMPSON INTERNATIONAL “Progress Through Innovation”
•BE INVOLVED IN LEGISLATIVE ISSUES
•SUPPORT YOUR INDUSTRY ORGANIZATIONS
•SUPPORT INDUSTRY PUBLICATIONS
•WORK WITH MANUFACTURER’S ON COMMON ISSUES
•MAKE STRATEGIC ALLIANCES
•KNOW YOUR MARKET AREA AND STRENGTHS
•AGGRESSIVELY MARKET YOUR SERVICES
•CONSERVATIVELY MANAGE YOUR FLEET
“A pessimist sees the difficulty in every opportunity;
an optimist sees the opportunity in every difficulty.”Winston Churchill
NEIL FRANKLIN LAMPSON
1917 – 1996
COMPANY FOUNDER
“Progress through Innovation”