BRITISH STEAMSHIP P&I ASSOCIATION (BERMUDA) LTD
P&I Condition Survey report, 2011.03
CONDITION SURVEYREPORT
Version 2011.03
GENERAL CARGO VESSELS
TANKERS
INDEXpage
Guidance notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -Cover page . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Section A – certification and documentation. . . . . . . . . . . . . . . . . . . . . . 2Section B – manning and management. . . . . . . . . . . . . . . . . . . . . . . . . 4Section C – bridge and navigation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Section D – accommodation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Section E – safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Section F – hull and deck arrangements. . . . . . .. . . . . . . . . . . . . . . . . . 8
Section G – cargo worthiness. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Section H – ballast tanks. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Section I – machinery spaces. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Comments. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15List of deficiencies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
NAME OF SHIP:
IMO NUMBER:
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 2/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03
CONDITION SURVEY REPORT - GUIDANCE NOTES FOR SURVEYORS
We request surveyors to take good notice of below guidelines prior to attending on board.
Important; The surveyor must always settle the survey fees with the vessel’s Owners directly, however,British Steamship P&I Club remains in full the main Principal to report and answer to for the surveyor
during the survey. We will liaison between parties if a survey fee settlement dispute occurs.
Complete the survey report with the information available and obtained on board. The survey report shouldprimarily represent objective evidence, facts and visual observations made on board only. Surveyors areinstructed to limit any personal comment, opinion or advice in the survey report to the sections in the reportdesignated for these additional personal comments only. In the reported deficiencies no reference is to be madeto any staff or crewmember on board. Surveyors are instructed to refrain from providing any kind of advise or opinion on corrective actions to be taken on deficiencies found during the survey, both in the survey report as tothe Master/staff on board. No time frames for when repairs must be completed are to be made by the surveyor.
In addition to inspecting the vessel as per guidelines, the surveyor will be required to conduct the following tests:
CARGO HOLD HATCHES (bulk carrier & general cargo vessels only)
An ultrasonic test must be carried out under supervision of the surveyor. The results of the test must behanded over to vessel’s Master, preferably in the form of a drawing, which marks the spots (if any) wherethe hatches are not tight or suspect. Be advised that an ultrasonic test must always be carried out if available. Drawings to be attached to the survey report.
HOLDS / CARGO COMPARTMENTS
Bilge wells should be examined for cleanliness and if there is no evidence of a recent hold wash down,bilge suctions should be tested.
BALLAST TANKSSurveyor should internally examine a number of selected ballast tanks of various types (i.e. 1 doublebottom tank, forepeak tank, 1 wing tanks etc). All ballast tanks (without endangering cargo or ship’sstability) should be pressure tested to ensure integrity. The Forepeak tank has highest priority if not alltanks can be inspected.
BRIDGE EQUIPMENTWhich items of the bridge equipment should be tested is left to surveyor’s discretion, pending on visualcondition.
SAFETY
A test of the emergency fire pump is required, during which working pressure is to be ascertained. Surveyors should also request for the emergency generator to be verified running. Furthermore surveyors should have emergency steering gear tested for proper operation. Lifeboat engine is to be tested for proper operation.
If a test or inspection could not be carried out, a clear reason for same should be stated. This non-accomplished inspection must be stated on the deficiency list in the non accomplished item section. The port authorities may impose a fine for discharge of water from the vessel. If you are aware of any regulationthat could make it impossible to carry out one of the above tests, please advise us without delay.
We ask the surveyor to give priority to cargo worthiness, safety management systems and pollution prevention.
The surveyor must at all times confirm actual attendance on board to BritishSteamship club within24 hours in the form of a brief email message, telephone call or fax notification. Within 48 hours thesurveyor must provide BritishSteamship club with a preliminary report consisting of page 1 of thesurvey report with vessel/company details and page 16 of the survey report with the deficiencies list. All noted deficiencies must be reported regardless if Owners are carrying out repairs or not at the time of survey, reporting known deficiencies is not to be delayed under any circumstances. Reporting must be doneby the surveyor directly to British Steamship P&I Club, it is important that the nature of the deficiency isclearly stated as Very Serious (VS) /Serious (S) /Minor (M) so that it is apparent to owner and the Insurer .
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 3/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03
A recommendation for rectification of any deficiency should also be made by British Steamship Club ( NOTby surveyor ), but in suitable broad terms to allow the operator or owner to make his arrangemnets asappropriate. Each deficiency/recommenda should be indiacted as immediate (within 7 days)/urgent(within 30 days)/ non-urgent (within 90 days)/dry docking or repair period (next dry docking or repair period), the Club will further define these when communicating with the Owner/Operator.
.
The full survey report, with colour photographs and any other supplementary material, copies of certificates,should be forwarded to British Steamship Club within the period of maximum 15 working days.Please note that British Steamship Club requires only ONE copy of the report. The preferred method of receiving the survey report with enclosures and photographs is by digital version only, if same is not possible wekindly ask to provide the survey report in hard copy. Please also send a copy of the report to the Owners.We require at all times photographs from each and every deficiency found and reported, as far aspracticable and reasonable. Moreover, we require various relevant so-called overview photographs in order toassist us with our own image forming.
General guidelines on the quantity of photographs are to be taken as follows;
- Bridge/Accommodation/Galley, 5 overview photographs.- Safety, 5 overview photographs.
- Hull and Deck machinery, 5 overview photographs.- Cargo Worthiness, 5 overview photographs.- Machinery spaces, 5 overview photographs. - each visual deficiency 1 photograph
As such we require a minimum of at least 25 photographs for our review with the survey report.
The condition rating section on page 1 is used to assist British Steamship Club to make our risk assessment.Considerable objectivity is required from the surveyor. To ensure a common basis in completing this section, thefollowing brief guidelines should be followed. Whole numbers only should be used.
1 EXCELLENT 6 NOT SATISFACTORY
2 VERY GOOD 7 NOT ACCEPTABLE3 GOOD 8 POOR
4 FAIR 9 VERY POOR
5 SATISFACTORY 10 DANGEROUS
Page 1 also includes a ‘summary’ section. This should be a brief summary of the vessel’s condition.The last page of the form (page 16) should list any deficiencies, clearly stating the nature and extent of thesedefects. The Master or other Owners’ representative must sign the last page of the form (page 16), with the listof deficiencies. The surveyor must explain that the survey observations made will be forwarded to BritishSteamship Club in Singapore corespondent who will subsequently inform the Brokers or Assured asappropriate.
For almost all items within the guidelines a choice must be made from the 4 columns (satisfactory, deficiency,not inspected or not applicable). In the column ‘deficiency’ the number of the corresponding deficiency / non-accomplished inspection on page 16 must be filled in. The other 3 columns must be marked with X or √.
Example :
S a t i s f a c t
o r y
D e f i c i e n c
y o
i n s p e c t e
o
a p p l i c a b l
Comment
ENGINE ROOM MANNED FULLTIME ?
YES NO
GENERAL CONDITION ENGINEROOM SPACES X
SPARES & TOOLS 12 No spares present.
QUICK CLOSING VALVES X Vessel in operation, no inspection possible
REMOTE STOPS X
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 4/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03
The surveyor is encouraged to provide additional comments, on the comments sheet on page 15.
Our contact details:British Steamship P&I Club
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 5/20
British Steamship P&I Club
P&I Condition Survey report, 2010.02.20 website: www.britishsteamship.com Email: [email protected] 1 of 16
CONDITION SURVEY REPORT
NAME OF VESSEL
IMO NUMBER FLAG
GROSS TONNAGE YEAR OF BUILT
REGISTERED OWNER
MANAGER OR OPERATOR
CLASSIFICATION SOCIETY
PREVIOUS OWNERS
PREVIOUS VESSEL NAMES
TYPE OF VESSEL
PREVIOUS THREE CARGOES CARRIED
TRADING AREA
DIMENSIONS OVERALL (L x B x H)
DATE OF LAST DRYDOCK
DATE OF NEXT DRYDOCK
PLACE OF SURVEY
DATE OF SURVEY
SURVEY COMPANY
NAME OF SURVEYOR
NAME OF MASTER / OWNERS REP.
CONDITION RATING
1= EXCELLENTup to10 = DANGEROUS
SectionA. CERT & DOCUMENTATIONB. MANNING / MANAGEMENTC. BRIDGE &NAVIGATIONE. SAFETY/FIRE PREVENTIONE. SAFETY / LIFE SAVING
Rating SectionF&D. HULL& DECKF. POLLUTION PREVENTIONG. CARGO WORTHINESSH. BALLAST TANKI&F. MACHINERY
Rating
SUMMARY
This entire report, together with its summary of defects and / or recommendations for action (if any), has been prepared conditional upon the clear understanding that in no circumstances whatsoever shall the Insurer be held responsible and/or liable for any inaccuracy in the report, or for any act,omission or negligence of its staff or its appointed surveyor howsoever arising and that it is provided for the sole reference of the Insurer and without
warranty as to the accuracy of any information or advice supplied therein.
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 6/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 2 of 16
SECTION A : CERTIFICATION AND DOCUMENTATION
S a t i s f
a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p p l i c a b l e
Valid until Last inspection
Ship’s certificates
CERTIFICATE OF REGISTRY
INTERNATIONAL LOAD LINE
IOPP
IAPP (AIR POLLUTION CERTIFICATE)
MINIMUM SAFE MANNING CERTIFICATE
CLASSIFICATION CERTIFICATE
CONDITION / RECOMMENDATION OFCLASS ISSUED?
YES NOIF YES : ATTACH COPY OF RELEVANT
CERTIFICATE
EXEMPTION CERTIFICATES ISSUED? YES NOIF YES : ATTACH COPY OF RELEVANT
CERTIFICATE
TRADE LIMITATION IMPOSED BY CLASS AND/OR FLAG STATE?
YES NOIF YES : ATTACH COPY OF RELEVANT
CERTIFICATE
ULTRASONIC STEEL THICKNESS TESTCheck Recorded Diminutions
YES NOIF YES : ATTACH COPY OF RELEVANT
PARTICULARS PAGE/CLASS APPROVAL
LAST PORT STATE INSPECTION YES NOIF YES : ATTACH COPY OF RELEVANT
INSPECTION REPORT
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s p e c t e d
N o t a p p l i c a b l e
Issue date Issued by
Qual ity Assurance
WHO IS THE DESIGNATED PERSON OFOWNERS? DPA
WHO IS COMPANY SECURITYOFFICER? CSO
SAFETY MANAGEMENT CERTIFICATE
DOCUMENT OF COMPLIANCE
INTERNATIONAL SHIP SECURITYCERTIFICATE (ISSC)
SHIP SECURITY PLAN (SSP)
RECORDS OF NON-CONFORMANCE, ACCIDENTS AND CORRECTIVE ACTION
ARE INTERNAL AUDITS CARRIED OUT?
ARE SAFETY MEETINGS HELD?
IS CREW RECEIVING ISM TRAINING?GARBAGE MANAGEMENT PLAN(MARPOL ANNEX v) GARBAGE LOG?
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 7/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 3 of 16
SECTION A : CERTIFICATION AND DOCUMENTATION……cont inued
S a t i s f a c t o
r y
D e f i c i e n c y
N o t i n s p e
c t e d
N o t a p p l i c
a b l e
Comment
Stabi l i ty inform at ion
ARE HYDROSTATIC TABLES ANDSTABILITY BOOKS CLASS APPROVED?
ARE LATEST STABILITY CALCULATIONSPERFORMED ON BOARD?
IS AN APPROVED STABILITYCOMPUTER ON BOARD?
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s p e c t e d
N o t a p p l i c a b l e
Comment
Records
DECK / ENGINE ROOM LOG BOOKS
MASTER’S STANDING ORDERS
CHIEF ENGINEER’S STANDING
ORDERSPLANNED MAINTENANCEPROGRAMME ON BOARD.
OIL RECORD BOOK / ENTRIES
BUNKER OPERATION INSTRUCTIONS
SOPEP MANUAL + IMO CONTACT LIST
RECORDS OF HOT WORK/ENCLOSEDSPACE ENTRY AND SAFETY DRILLS
MINUTES OF MEETING SAFETYCOMMITTEE TEAM ON BOARD?
SOLAS SAFETY TRAINING MANUAL
REMARKS SECTION A
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 8/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 4 of 16
SECTION B : MANNING AND MANAGEMENT
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a
p p l i c a b l e
Comment
Manning
COMPLIANCE MANNING WITH SAFEMANNING CERTIFICATE
STCW CREW CERTIFICATES ANDENDORSEMENTS IN ORDER AND VALID
IS COMMUNICATION IN WORKINGLANGUAGE EFFECTIVE ON BOARD?
IS CREW’S TRAINING AND EXPERIENCECHECKED AND MAINTAINED ON BOARD
CREW EMPLOYED VIA CREW AGENCY? YES NO NAME OF CREWING AGENTS/NATIONALITYOF CREW
IS COMPETENCE TESTING CARRIEDOUT DURING RECRUITMENT?
YES NO
IS CREW FAMILIAR WITH TASKS?
Attach copy of the crew l is t .
S a
t i s f a c t o r y
D e
f i c i e n c y
N o
t
i n s
p e c t e d
N o
t
a p p l i c a b l e
Comment
Management
KNOWLEDGE OF MARITIME ENGLISHOF OFFICERS
ALCOHOL AND DRUG POLICY
CREW’S PERSONAL PROTECTION(HELMET, SAFETY SHOES ETC.)
IS CREW’S SAFETY AND SECURITY AWARENESS EFFECTIVE?
CREW WORKING HOURS REGISTERED AND IN ACCORDANCE WITH ILO RULES
IS CREW FATIGUE TAKEN INTO ACCOUNT ON BOARD? (REST HOURS)
IS CREW MEDICALLY FIT?
ARE LIVING CONDITIONS UP TOMODERN STANDARDS?
VCR/DVD / movies / books / gamesavailable to crew in messroom. Is emailcommunication with family possible?
REMARKS SECTION B
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 9/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 5 of 16
SECTION C : BRIDGE AND NAVIGATION
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s
p e c t e d
N o t a p p l i c a b l e
Comment
Equipment
RADAR(S)/ARPA OPERATIONAL Is operation/test logbook maintained?
ELECTRONIC SEACHARTEQUIPMENT/ECDIS
Is familiarization training provided for on board?
AIS TRANSPONDER WORKING
VOYAGE DATA RECORDER
COMPLIANCE WITH GMDSS(STATE SEA AREA A1/A2/A3/A4)
GYRO COMPASS/MAGNETICCOMPASS
DEVIATION CARD Date:
ECHO SOUNDER
NAVTEX/WEATHER FACSIMILE
EPIRB/SART
AUTOPILOT SYSTEM
CHANGEOVER INSTRUCTIONS FOREMERGENCY STEERING
MAIN ENGINE CONTROL ON BRIDGE
MAIN ENGINE EMERGENCY STOP
BRIDGE LOOKOUT AVAILABLEDURING DARK HOURS?
CHARTS (SUFFICIENT FOR TRADING AREA)
PASSAGE PLANNING FROM BERTHTO BERTH
VESSELS DETAILS ANDMANOEUVRING CHARACTERISTICSDISPLAYED
NOTICES TO MARINERS RECEIVEDUP TO DATE (HARDCOPY/ELECTRONIC)
Last NTM received?Last correction applied?
NAUTICAL PUBLICATIONS AVAILABLE
COLLISION REGULATIONS
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 10/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 6 of 16
SECTION D : ACCOMMODATION
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Cleanlines s, Safety
and Hygiene
CLEANLINESS AND HYGIENE INORDER IN ACCOMODATION?
CLEANLINESS OF GALLEY / STORES
MEDICAL LOCKER/STORES
FIRST AID GUIDE/STRETCHER
REMARKS SECTION D
SECTION E: SAFETY
S a t i s
f a c t o r y
D e f i c
i e n c y
N o t i n s p e c t e d
N o t a
p p l i c a b l e
Comment
Fire f ight in g
FIRE MAIN, HOSES AND HYDRANTS
FIRE MAN’S OUTFIT WITH BREATHING APPARATUS
NUMBER OF SETS:
INTERNATIONAL SHORE CONNECTION
EXTERNAL FIRE PLAN(in weathertight container)
PORTABLE FIRE EXTINGUISHERS
FIXED FIRE EXTINGUISHING SYSTEM
FIRE DETECTION SYSTEM
FIRE PUMPS/G.S PUMP
EMERGENCY FIRE PUMP Location?
MUSTER STATION INDICATIONS ANDSAFETY PLANS
FIRE/LIFESAVING/EMERGENCY DRILLSREGULARLY CARRIED OUT?
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 11/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 7 of 16
SECTION E : SAFETY ……..cont inued
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Live saving
LIFEJACKETS Number available.
LIFEBUOYS/MOB BUOYS/LIGHTS
CONDITION LIFEBOAT EQUIPMENT
LIFERAFTS
HYDROSTATIC RELEASE OF LIFERAFT Valid until:
LIFEBOATS/LIFEBOAT ENGINE
LIFEBOAT LAUNCHING EQUIPMENT
LIFEBOAT LAST LAUNCHED DATE:
RESCUE BOAT
RESCUE BOAT LAUNCHINGEQUIPMENT
RESCUE BOAT LAST LAUNCHED DATE:
EMERGENCY LIGHTING
IS THERE A BOAT DRILL SCHEDULE INUSE ON BOARD?
ARE THERE EEBD UNITS AVAILABLE?
EXPLOSION / OXYGEN METERS AVAILABLE?
Calibration date on certificate?
OXYGEN RESCUCITATOR/O2 BOTTLE
REMARKS SECTION E, FIREFIGHTINGLIVE SAVING
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 12/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 8 of 16
SECTION F: HULL AND DECK ARRANGEMENTS
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Hull
CONDITION OF HULL & ANODES, as far as visible
CONDITION OF ALLDECKS/SUPERSTRUCTURE
BULWARKS, SIDE RAILS ANDLADDERS ON DECK
DECK LINES
HYDRAULIC LINES
WATERTIGHT OPENINGS,DOORS AND PORTS
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s p e c t e d
N o t a p p l i c a b l e
Comment
Deck arrangemen t
GANGWAY AND NET
PILOT LADDER
VENTILATORS / CLOSINGDEVICES
AIR PIPES / SOUNDING PIPES(INCLUDING LABELLING)
DECK LIGHTING
DECK/PAINT STORES
STOWAGE OF GAS CYLINDERS
REMARKS SECTION F
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 13/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 9 of 16
SECTION F: HULL AND DECK ARRANGEMENTS……..cont inued
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Deck machinery
CARGO HANDLINGEQUIPMENT
MOORING EQUIPMENT
MOORING ROPES
FAIRLEADS AND HAWSEHOLES
ANCHORING EQUIPMENT
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s p e c t e d
N o t a p p l i c a b l e
Comment
Pollut ion prevent ion
SOPEP LOCKER
BUNKERING CONNECTIONS
FUEL AIR VENTS
SAVE-ALLS
SCUPPER PLUGS
OIL ABSORBENTS
PROCEDURES / CHECKLISTFOR BUNKERING
REMOVAL OF WASTE, MANNER
OF STORAGE?
Garbage log maintained?
DISPOSAL RECEIPTS FILED?
AIR POLLUTION REDUCTIONMEASURES IN FORCE?
REMARKS SECTION F
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 14/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 10 of 16
SECTION G : CARGOWORTHINESS
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Cargo vessels
NUMBER OF HOLDS /HATCHES
HOLDS : HATCHES:
OPERATION OF HATCHES
CONDITION HYDRAULICSYSTEM HATCHES
CONDITION HATCH COVER AND OPERATING CONSOLES
CONDITION COMPRESSIONBARS
CONDITION COAMING TABLE /BEARING PADS AND DRAINS
CONDITION WHEELS &CHAINS
ARE TARPAULINS USED AT ANY TIME
YES NO
INTERIOR OF HOLDS
BULKHEADS
MOVEABLE BULKHEADS
TWEEN DECKS
TEST OF HOLD BILGESBeware of pollution regulations!
Inspection/test of non return valve.
BILGE WELLS CLEAN/DRY?
BILGE WELLS PROVIDED WITHCOVERPLATE?
VENTILATION CARGO HOLD Forced or natural?
VENTILATION COVERS
LIGHTING CARGO HOLD Approved design/gastight
HOLD ACCESSES/LIGHTING
TANK TOP
CARGO SECURING MANUAL Approved by Administration?
TESTING OF HATCHESULTRASONIC / HOSE TEST
Copy results to be provided!Hose test only when no ultrasonic equipmentis available to surveyor .
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 15/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 11 of 16
SECTION G : CARGOWORTHINESS…….cont inued
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Tanker vessels only
NUMBER OF TANKS
DOUBLE HULL / SINGLE HULL: DOUBLE SINGLE
COATING OF TANKS (IF APPLICABLE)
TANK VENTILATION SYSTEM
HEATING COILS
CARGO PIPE LINES
MANIFOLD / DRIPTRAYS /SAVEALLS
OIL DISPERSANTS
LABELS / IDENTIFICATION OFMANIFOLD / VALVES / PORTS
TANK ENTRANCES (SEALING)
PV-VALVES
OIL DISCHARGE MONITORING(if applicable)
DECK FOAM SYSTEM (if applicable)
PROTECTIVE EQUIPMENT
PUMP ROOM VENTILATION /FIRE DAMPERS
PUMP ROOM BILGES
PUMP ROOM RAILING ANDLADDERS
PUMP ROOM LIGHTING
REMARKS SECTION G / TANKER VESSELS
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 16/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 12 of 16
SECTION H : BALLAST TANKS
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Ballast
BALLAST TANKS (VISUAL) Type/seriousness of corrosion.
INNER TANKS COATED?
SACRIFICIAL PROTECTIONMEASURES PRESENT?
Anodes?
BALLAST TANK MANHOLESCOVERS/NUTS/RUBBERSEALS
BALLAST TANK VENTPIPES/SOUNDING PIPES
Labelled?
BALLAST TANKS (PRESSURETEST)Beware of pollution regulations!
BALLAST SOUNDING SYSTEM Local/remote?
BALLAST MANAGEMENT PLAN AVAILABLE?
BALLAST OPERATIONSRECÒRDED?
REMARKS SECTION H
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 17/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 13 of 16
SECTION I : MACHINERY SPACES
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
General
ENGINE ROOM MANNED FULLTIME? (24 hours)
YES NO
GENERAL CONDITION ENGINEROOM SPACES
QUANTITY SPARES & TOOLS Minimum Spare parts list available?
QUICK CLOSING VALVES
REMOTE STOPS
OIL WATER SEPARATOR(INCLUDING 15 ppm)
HANDRAILS & PLATING
BILGES (CLEANLINESS)
BILGE ALARM
EMERGENCY BILGE VALVELABELLED/SECURED?
ESCAPE ROUTES INDICATED?
AUDIBLE/VISUAL ALARMINDICATORS PRESENT IN ER?
LIGHTING/EMERGENCYLIGHTING
MACHINERY GUARDING
COLOUR CODING SYSTEM
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s p e c t e d
N o t a p p l i c a b l e
Comment
Main Engin e
GENERAL APPEARANCE /CONDITION MAIN ENGINE
MAINTENANCE RECORDS Timely preventive maintenance carried out?
IS CONDITION LUBRICATIONOIL CHECKED ON BOARD
MONITORING, ALARMS ANDSHUTDOWN
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 18/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 14 of 16
SECTION I : MACHINERY SPACES…..cont inued
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n
s p e c t e d
N o t a p
p l i c a b l e
Comment
Generator s / electrical
GENERAL APPEARANCE /CONDITION
MAINTENANCE RECORDS Timely preventive maintenance carried out?
MONITORING EQUIPMENT
SWITCHBOARDS Clean/closed/secured/rubber matting?
EMERGENCY GENERATOR Location/Operation;PROCEDURES FOR STARTINGUP AFTER BLACK-OUT
S a t i s f a c t o r y
D e f i c i e n c y
N o t i n s p e c t e d
N o t a p p l i c a b l e
Comment
Steering gear
CONDITION GEAR/PUMPS
CLEANLINESS OF STEERINGGEAR ROOM
LOCAL CONTROL /EMERGENCY STEERING
DISPLAY OF EMERGENCYSTEERING PROCEDURES
CREW TRAINED IN OPERATIONEMERGENCY STEERING GEAR
MEANS OF COMMUNICATIONSPRESENT WITH BRIDGE?
EMERGENCY STEERINGTESTED REGULARLY Date last test;
STEERING GEAR PUMPSTESTED REGULARY?
Running hours/time rudder from board to board?
REMARKS SECTION I
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 19/20
British Steamship P&I Club
P&I Condition Survey report, 2011.03 website: www.britishsteamship.com Email: [email protected] 15 of 16
GENERAL COMMENTS ON SURVEY FINDINGS BY SURVEYOR
Briefly remark on the following subjects;
- Company management system/implementation/verification on board.- Compliance with general marine industry standards.- Crew management (fatigue/safety awareness/training)- Crewing agency/training.- Cargo worthiness.- Preventive maintenance.- Cosmetic maintenance.- Cooperation on board during survey attendance.
7/28/2019 BSM P&I Condition Survey Report(201103)
http://slidepdf.com/reader/full/bsm-pi-condition-survey-report201103 20/20
British Steamship P&I Club
LIST OF DEFICIENCIES
Total deficiencies : Total pages : Page :
Rec. no. Description of deficiency Nature(VS/S/M)
Owner/DOCFollow up
Non accomplished inspections (if any). Start numbering with an ‘X’ (x.1, x.2 etc).
x.
x.
x.
x.
x.
ISSUED BY:
ADRESS :
TELEPHONE :FAX:EMAIL :
For receipt on behalf of the vessel
SURVEYORS NAME : NAME :
SIGNATURE : SIGNATURE :
DATE : POSITION / RANK :
This entire report, together with its summary of defects and / or recommendations for action (if any), has been prepared conditionalupon the clear understanding that in no circumstances whatsoever shall the Insurer be held responsible and/or liable for any inaccuracyin the report, or for any act, omission or negligence of its staff or its appointed surveyor howsoever arising and that it is provided for thesole reference of the Insurer and without warranty as to the accuracy of any information or advice supplied therein.