1
BTDBlood pump Tester Development
20081841 Jaeyeol Cho
20081774 Donghyun Kim
20091814 Jihoon Kim
20091838 Jisoo Yoon
2
I. Introduction (Goal setting)
II. Functional Requirements & Constraints
III. Concept Selection
IV. Specification
V. Manufacturing Progress
VI. Result & Conclusion
VII. Future Plan
VIII. Gantt Charts
IX. History Log
Contents
3
I. Introduction (Goal setting)
1) Motivation
Development (New device)
4
I. Introduction (Goal setting)
2) Project Design Objective (Goal)
- Measure 3 blood pump performance
FLOW PRESSURE RPM
5
II. Functional Requirements & Design Parameters
1) FRs
- FR1 : Drive blood pump
- FR2 : Measure rpm of motor
- FR3 : Measure the flow rate
- FR4 : Measure the fluid pressure
2) DPs
- DP1 : Install motor
- DP2 : Install rpm sensor
- DP3 : Install flowmeter
- DP4 : Install pressure sensor
6
lll. Concept Selection- Schematic design
7
IV. Specification
1)Detail Properties about each part
- Flowmeter
- pressure sensor
- Pipe
- Motor
- Pump connector
- Daq system
Real size modelDevice Price (won) note
Motor 500,000 Maximum 6000 rpm
Flowmeter 1,000,000 Turbine Type
Pressure sensor 300,000
Frame 400,000 Aluminum (6061)Table
Pipes
DAQ board
Total Price 2,200,000
8
V. Manufacturing Progress
1) Construct pipe
9
2) Pressure distribution
- Check Pressure distribution in whole system
- Find suitable Pressure sensor position
V. Manufacturing Progress
10
3) Velocity components
- Check velocity vector in whole system
- Find flow disturbing spot
- Find suitable flow rate sensor position
V. Manufacturing Progress
11
4) Install sensor
V. Manufacturing Progress
Pressure sensor flow sensor
12
5) Visualize
V. Manufacturing Progress
13
VI. Result & Conclusion
- Data
Time(sec)
Flow rate
(L/min)
14
VI. Result & Conclusion
- Data
Time(sec)
Pres-sure(kPa)
15
VII. Future Plan
1) Use blood or similar blood
2) Measure various type blood pump
3) etc.
16
VIII. Gantt Chart
3 월 4 월 5 월 6 월
3 주차 4 주차 1 주차 2 주차 3 주차 4 주차 1 주차 2 주차 3 주차 4 주차 1 주차
1 Idea
2 Project concept
3 Specification
4 Manufacture
5 Test
6 Feedback
7 Final Report
17
IX. History log
1) Group Meeting schedule
2) Manufacturing process
18
Reference
1) Lecture
2) Books
3) Webpage