Buckeye FRS No.1 Rehabilitation Project

  • Upload
    shania

  • View
    37

  • Download
    2

Embed Size (px)

DESCRIPTION

Buckeye FRS No.1 Rehabilitation Project . Tom Renckly, P.E. Branch Manager Structures Management Branch. Flood Control Dams. Dam Safety Program . Recurrent Dam Safety Structures Assessment and Repairs Dam Rehabilitation. Buckeye FRS No. 1 looking west. - PowerPoint PPT Presentation

Citation preview

Page 1: Buckeye FRS No.1 Rehabilitation Project

Supervisor Max Wilson, District 4Supervisor Mary Rose Wilcox, District 5

Buckeye FRS No.1Buckeye FRS No.1Rehabilitation Project Rehabilitation Project

Tom Renckly, P.E.Tom Renckly, P.E.Branch ManagerBranch Manager

Structures Management BranchStructures Management Branch

Page 2: Buckeye FRS No.1 Rehabilitation Project

Flood Control DamsFlood Control Dams

Page 3: Buckeye FRS No.1 Rehabilitation Project

Dam Safety Program Dam Safety Program • Recurrent Dam Recurrent Dam

SafetySafety• Structures Structures

Assessment and Assessment and RepairsRepairs

• Dam RehabilitationDam RehabilitationBuckeye FRS No. 1 looking west

Page 4: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation Project

Background Background • Earthfill Flood Retarding Earthfill Flood Retarding

Structure (FRS)Structure (FRS)• Constructed by SCS (NRCS) Constructed by SCS (NRCS)

1974 and Modified in 19801974 and Modified in 1980• Operated & Maintained by Operated & Maintained by

FCDMCFCDMC• ADWR is Regulatory AgencyADWR is Regulatory Agency• Crest Length is 7.1 milesCrest Length is 7.1 miles• Height is 26 ft.Height is 26 ft. Buckeye FRS No. 1

Page 5: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectBuckeye Watershed ProjectBuckeye Watershed Project

Page 6: Buckeye FRS No.1 Rehabilitation Project

Floodways

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectFloodwaysFloodways

Page 7: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectOutlets for DamsOutlets for Dams

60” Pipe Outlet

48” Pipe Outlet

30” Pipe Outlet

Page 8: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Outlet

Page 9: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectEmergency SpillwaysEmergency Spillways

Emergency Spillway

Page 10: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.2 Emergency Spillway

Page 11: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectTransverse Cracks Transverse Cracks Investigation and Repair Investigation and Repair

Page 12: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectAlternatives Analysis StudyAlternatives Analysis Study• Correct Dam Safety DeficienciesCorrect Dam Safety Deficiencies• Identify Opportunities for:Identify Opportunities for:

Incorporate Multi-use for the Incorporate Multi-use for the CommunityCommunity

Improved Landscaping and AestheticsImproved Landscaping and Aesthetics Enhance EnvironmentEnhance Environment Public and Stakeholder InvolvementPublic and Stakeholder Involvement

Page 13: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation ProjectBuckeye FRS No.1 Rehabilitation ProjectAlternatives Analysis Study Alternatives Analysis Study (continued)(continued)

• Possible AlternativesPossible Alternatives Floodway and LeveeFloodway and Levee Flood Control BasinsFlood Control Basins Rehabilitate Dam Rehabilitate Dam Combination Combination

Page 14: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation Project Buckeye FRS No.1 Rehabilitation Project PartnersPartnersNatural Resources Natural Resources Conservation Service Conservation Service (NRCS)(NRCS)• Federal Workplan and Environmental Federal Workplan and Environmental

AssessmentAssessment• Dam Rehabilitation Program Dam Rehabilitation Program

(PL-462: 65-35 cost share)(PL-462: 65-35 cost share)• Multi-use Recreational Component Multi-use Recreational Component

(50-50 cost share)(50-50 cost share) District Encourages Recreational District Encourages Recreational

Cost Share By OthersCost Share By Others

Page 15: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation Project Buckeye FRS No.1 Rehabilitation Project PartnersPartnersFlood Control District Flood Control District FundingFunding

• Capital Improvement ProgramCapital Improvement Program• Compete with Other Flood Control Compete with Other Flood Control

Projects Projects

Page 16: Buckeye FRS No.1 Rehabilitation Project

Buckeye FRS No.1 Rehabilitation Project Buckeye FRS No.1 Rehabilitation Project PartnersPartnersScheduleSchedule

Janu

ary

Janu

ary

Janu

ary

Janu

ary

Mar

chM

arch

Mar

chM

arch

MayMay

MayMayJuly

July

July

July

Sept

embe

rSe

ptem

ber

Sept

embe

rSe

ptem

ber

Nove

mbe

rNo

vem

ber

Nove

mbe

rNo

vem

ber

Planning and Pre-design Planning and Pre-design

Alternatives AnalysisAlternatives Analysis

Final DesignFinal DesignConstruction (Potentially to be phased)Construction (Potentially to be phased)

20072007 20082008

*

TBD

*

* Public Meeting