Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
MAY 20, 2019
We Build Futures ~ Communities ~ Confidence ~ We Build Your Business
Bidding This Week...
Builders Bulletin
“We’re Not The Best Because We’re the Oldest…
We’re The Oldest Because We’re the Best!”
Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901
Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122
Lic. #529655
Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road • Sunnyvale, CA 94089
Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098
Bid Time Project Name Location Bid Date
5/20/19 * San Luis Obispo Construction Of The Water Resource Recovery Facility Project (Wrrf) 2:00 PM
5/20/19 Salinas Salinas Storm Water Grant (Phase 1a, Dry Weather Diversion Project) 2:30 PM
5/20/19 Cayucos Rfp - Crawley Residence (Sub-Bids Only) 5:00 PM
5/21/19 San Luis Obispo Science And Agriculture Teaching And Research Complex 2:00 PM
5/21/19 Watsonville Roache Road Sanitary Sewer Replacement 3:00 PM
5/21/19 Arroyo Grande 2019 Concrete Repairs 2:00 PM
5/21/19 Salinas Rfp - Construction Management Services For The Salinas Storm Water Grant Project: Phase 1b
3:00 PM
5/21/19 * Salinas Rfp - City Wide Median/Greenbelts, Parks, And City Facility Landscapes Services
2:00 PM
5/22/19 Santa Cruz Rachel Carson College - Siding Replacement Al & Bl Residence Halls 3:00 PM
5/22/19 Soledad Fy 18/19 Street Maintenance 11:30 AM
5/22/19 Soledad Soledad Well 7 Rehabilitation 11:00 AM
5/23/19 Santa Cruz Santa Cruz High School Re-Roofing Rebid 10:00 AM
5/23/19 Santa Cruz College Nine And Ten Dining Hall Kitchen Hood Drain And Flooring Replacement
3:00 PM
5/23/19 Marina Veterans Housing Rehabilitation 2:00 PM NEW
5/23/19 San Luis Obispo Sinsheimer Court Entrance Hardscape 2:00 PM NEW
5/23/19 * San Luis Obispo Job Order Contract 2019 - Striping, Curb Painting, And Signage Maintenance
2:00 PM
5/23/19 * San Luis Obispo Job Order Contract 2019 - Tree Well Maintenance 2:00 PM
5/23/19 Monterey County 2019 Castroville Seawater Intrusion Project-Well Destruction Project 2:00 PM
5/23/19 Salinas Salinas Storm Water Grant (Phase 1b, Salinas Treatment Facility Storage And Recovery Project)
2:30 PM
5/23/19 Davenport Davenport Landing Restroom 2:30 PM
5/23/19 Paso Robles Geneseo Road Bridge Over Huerhuero Creek 3:00 PM
5/23/19 Santa Cruz La Madrona Drive Guardrail 2:00 PM
5/23/19 San Luis Obispo 2018-19 Asphalt Overlay Various North County Roads 3:00 PM
5/24/19 Salinas Salinas High School Side Roof Replacement And Accessories 2:00 PM NEW
5/24/19 Seaside Surplus Ii Hammerhead Board-Up 3:00 PM NEW
Page 1 of 1
Central Coast Builders Association
242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey
(831) 758-6203 Fax
Board of Directors
President: Kevin McIntosh, Blach Constuction Brian Kenny, Hayward Lumber
Vice President: Miguel Bustos, MIG Electric
Secretary/Treasurer: Anka Hepper, WM. B Saleh Painting Kate Rueter, AON Risk Services
Past President: Clifford Fasnacht, Dougherty Pump & Drill Gabriel Torres, CCRB/CHISPA
Oscar Blancas, Blancas Construction
CCBA STAFFChristie Cromeenes
Executive Director
Merary Rodriguez Finance Coordinator Shelly Verba Office Planroom Manager
Rikki Montejano Public Relations Coordinator
DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of
all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that
you do not share this information
WEDNESDAY, MAY 29, 2019 9:00 A.M.
Cabrillo College, Samper Recital Hall 2769 Cabrillo College Drive, Aptos, CA 95003
*CLICK HERE TO LEARN MORE & REGISTER!*
JOIN US FOR A DAY OF LEARNING & NETWORKING
The 4th Annual Energy Efficiency Standards Training Bloc is Here!
(831) 726-4018 www.831Conserve.com/events
Projects Out To Bid
Deadline for submission of materials for our Bulletin is end of day Wednesday each week.
Weekly Projects Bidding 5/16/2019
Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.
Name Bid Date Time Contract # EstimateLocationOPR#
Monterey County
Bidders:
Plan Issuer:
Salinas
The Work of this Contract includes the Dry Weather Diversion Project (Phase 1A) work at the City of Salinas (COS) site identified asSalinas TP1 and known as the Monterey One Water’s (M1W’s) Salinas Pump Station, and also includes some electrical,instrumentation and communication work at the COS IWWTF Influent Pump Station.
Project Contact: Yohana VargasEmail: [email protected]
MAND 4/17 @ 10am- 14811 Del Monte Blvd, Marina
19-01071
4
2:30 PM5/20/19
Addenda:SALINAS STORM WATER GRANT (PHASE 1A, DRY WEATHER DIVERSION PROJECT)
Prebid Conf:
Monterey One Water [email protected] 831-883-6182 831-883-0516
General Contractor Fax: 408-970-9975Office: 408-970-9900Anderson Pacific EngineeringConstruction, Inc.
General Contractor Fax: 000-000-0000Office: 408-355-0951Cal West Construction
General Contractor Fax: 209-392-6147Office: 559-272-8168Clark Bros Inc.
General Contractor Fax: 831-449-0700Office: 831-444-4127Don Chapin Co.
General Contractor Fax: 408-365-9548Office: 408-574-1400Graniterock
General Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering
General Contractor Fax: 925-373-0940Office: 925-373-8370Mountain Cascade Inc.
General Contractor Fax: 800-507-5295Office: 209-768-8297Sierra Mountain Construction, Inc.
General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction Inc.
General Contractor Fax: 805-934-4432Office: 805-937-5859Spiess Construction Co. Inc.
General Contractor Fax: 916-757-6499Office: 916-757-6400Teichert Construction
Supplier Fax: 831-262-9778Office: 831-262-9778Corix Water Products
Supplier Fax: 925-225-9200Office: 925-225-1900Misco
Plan Issuer:
Salinas
The work shall involve the furnishing of all labor, material, equipment, and incidentals to perform the landscape maintenance in theareas identified in Appendix A, B and C in accordance with the, Specifications and Special Provisions for a cost to total 3 years ofmaintenance services. The Specifications are general information only and are for outlining the limits of work and showing the generallayout of the existing landscape. It shall be the Contractor’s responsibility to verify the amounts of trees, lawn, shrubs, and otheritems/areas to be maintained.
Contact: Eda Herrera - 831-758-7438Email: [email protected]
19-01256
1
2:00 PM5/21/19
Addenda:RFP - CITY WIDE MEDIAN/GREENBELTS, PARKS, AND CITY FACILITY LANDSCAPES SERVICES
City of Salinas [email protected] 831-758-7438
Plan Issuer:
Salinas
M1W is seeking proposals from qualified firms to provide Construction Management Services for the Salinas Storm Water GrantProject: Phases 1B -Salinas Treatment Facility Storage and Recovery (Project). The PHASE 1-B: SALINAS TREATMENT FACILITYSTORAGE AND RECOVERY project includes the construction of a new pump station that will connect to the existing 36” Salinas ForceMain Interceptor pipeline and a pump station adjacent to IWTF Pond 3 to convey industrial wastewater and storm water stored at theponds to the RTP. Improvements to other existing storm water and wastewater infrastructure would be constructed to maximize theproject benefits. This phase is vital to maximize the yield of storm water and other source waters that can be recycled.
Questions: [email protected]
19-01551
2
3:00 PM5/21/19
Addenda:RFP - CONSTRUCTION MANAGEMENT SERVICES FOR THE SALINAS STORM WATER GRANTPROJECT: PHASE 1B
Monterey One Water [email protected] 831-883-6182 831-883-0516
Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Soledad $190,000
The City seeks to rehabilitate an existing 16-inch diameter, 785 foot-deep well located at Monterey and Park Street (Vosti Park)including furnishing of all labor, materials and equipment ,and performing all work necessary and incidental for Municipal Well No. 7including :-Remove and dispose of the existing pump column from the well site-Remove, furnish and install 200 HP energy efficient motor-Video well to establish visual results of the mechanical and chemical development-Disinfection of the Well per AWWA C-65-13-Perform Coliform Bacteria testing one week after disinfection
PREVAILING WAGE
Project Manager: [email protected]
5/8 @ 10:30am- 248 Main Street, Soledad
19-01488
1
11:00 AM5/22/19
Addenda:SOLEDAD WELL 7 REHABILITATION
Prebid Conf:
City of Soledad 831-223-5000 831-678-3965
General Contractor Fax: 707-584-9198Office: 707-584-9191Bartley Pump Pm, Llc
Plan Issuer:
Soledad
The work to be done shall be along various locations on West Street, Front Street, and Soledad Street, as shown in the Appendix BExhibits. The work includes asphalt concrete repair, crack filling, slurry seal, and roadway striping.
PREVAILING WAGE
Project Contact: Ryan RabbonEmail: [email protected]
19-01580
0
11:30 AM5/22/19
Addenda:FY 18/19 STREET MAINTENANCE
City of Soledad 831-223-5000 831-678-3965
Bidders:
Plan Issuer:
Monterey County
This project is for the destruction of two (2) water wells to prevent degradation of the groundwater by intermixing of aquifers. The wellsites are located approximately six miles west from the City of Salinas, in Monterey County, California, (see Exhibit B - Attachment No.1, for well location map) . The Base Bid for the Project consists of the following: Well destruction design, permitting, mobilization anddemobilization, well borehole cleaning, casing perforation, grout emplacement, casing excavation and removal, and concrete pad andwiring removal. The Contractor shall furnish all labor, materials, equipment, supplies, transportation, all applicable permits, andincidentals to perform all work in accordance with the requirements of the Contract Documents and Monterey County HealthDepartment Well Destruction Permit.
PREVAILING WAGE
Questions: Manuel SaavedraEmail: [email protected]
4/11 @ 2pm- Approximately 1.08 miles south of Castroville on HWY 183
19-01070
1
2:00 PM5/23/19
Addenda:2019 CASTROVILLE SEAWATER INTRUSION PROJECT-WELL DESTRUCTION PROJECT
Prebid Conf:
Monterey County Water Resources Agency 831-755-4860 831-424-7935
General Contractor Fax: 530-674-1525Office: 530-674-5861Nor-Cal Pump & Well Drilling, Inc.
Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Salinas
Project consists: Demolition; Concrete Forming; Concrete Reinforcing; Cast-in-Place Concrete; Concrete Unit Masonry; StructuralSteel Framing; Metal Fabrications; Metal Railings; Rough Carpentry; Thermal & Moisture Protection; Fiberglass Doors; DoorHardware; Glass Glazing; Louvers; Painting and Coating; General Equipment Provisions; Electrical; Earthwork; Asphalt ConcretePaving; Utilities; Automatic Gate Actuators; Hydraulic Gates; Valves and Miscellaneous Piping Appurtenances.
PREVAILING WAGE
Project Contact: Yohana VargasEmail: [email protected]
MAND 4/17 @ 10am- 14811 Del Monte Blvd, Marina
19-01132
1
2:30 PM5/23/19
Addenda:SALINAS STORM WATER GRANT (PHASE 1B, SALINAS TREATMENT FACILITY STORAGE ANDRECOVERY PROJECT)
Prebid Conf:
Monterey One Water [email protected] 831-883-6182 831-883-0516
Concrete/Masonry Contractor Fax: 831-754-1424Office: 831-754-1414Cornerstone Masonry, Inc.
General Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering
General Contractor Fax: 831-274-2519Office: 831-274-2518Silcon, Inc./Silverie Properties
Painting and Coatings Fax: 503-245-5715Office: 503-245-0679The Rodriguez Corporation Dba TheRodriguez Group
Supplier Fax: 831-262-9778Office: 831-262-9778Corix Water Products
Bidders:
Plan Issuer:
Marina
The work is selective interior demolition and renovation at the duplex building including repairs such as, but not limited to: roofs, walls,floors, framing, electrical, energy infrastructure, and remediation of environmental concerns. Once the rehabilitation is complete, thisproject will provide additional bridge / transitional housing for Veteran families. A wide array of supportive services for these Veteranswill be provided by the Veterans Transition Center, who will also provide oversite and security of the buildings and their tenants. Local,Veteran owned contractors are strongly encouraged to bid this project.
Project Contact: Lou BartlettEmail: [email protected]
MAND 5/16 @ 10am- site
19-01699
0
2:00 PM5/23/19
Addenda:VETERANS HOUSING REHABILITATION
Prebid Conf:
Veterans Transition Center of Monterey Co 831-883-8387
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Asbestos Abatement /Hazardous Materials Contract
Fax: 000-000-0000Office: 831-333-6431Monterey Environmental Solutions +Services
General Contractor Fax: 831-274-2519Office: 831-274-2518Silcon, Inc./Silverie Properties
Plan Issuer:
Salinas
Replace designated roofs and perform miscellaneous work as outlined in the drawings and specs. New roof system shall be a ULClass A Fire Rated System.Type of Occupancy: Students, Teachers, Administration.
PREVAILING WAGE
Questions: [email protected]
MAND 5/17 @ 10am- site
19-01692
0
2:00 PM5/24/19
Addenda:SALINAS HIGH SCHOOL SIDE ROOF REPLACEMENT AND ACCESSORIES
B-19-033
Prebid Conf:
Salinas Union High School District [email protected] 831-796-7080
NEW
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Seaside
The works includes, but is not necessarily limited to, the furnishing of all labor, materials, equipment, and services necessary for, andreasonably incidental to board up 8 buildings from the first floor down including any basement access, reinforcing and/or replacingexisting boards for 8 buildings as indicated in the attached map (attachment 1). Project site is bounded by 6th St & 7th St and GiglingRd and Colonel Durham St as identified on the attached map, in Seaside, California. An executed contract, attachment 2, is expectedwithin 5 days of notice of award. Project completion is expected on or before June 30, 2019.
PREVAILING WAGE
19-01697
0
3:00 PM5/24/19
Addenda:SURPLUS II HAMMERHEAD BOARD-UP
City of Seaside 831-899-6825 831-899-6211
NEW
General Contractor Fax: 831-275-4188Office: 831-275-2103California Premier Restoration
Bidders:
Plan Issuer:
Castroville $6,300,000 $6,900,000
Hartnell Community College District seeks a design-build entity to produce final designs for, and construct, the North Monterey CountyEducation Center Project, at 10241 Tembladera Street (intersection of Merritt St. and Mead St.), Castroville, California 95012 (the“Project”). The Project will be an approximately 13,500 square foot education center comprised of: three (3) classrooms; two (2)laboratories; lab support room; community room; student success center; administrative area; and main lobby, circulation, restroomsand building support areas. The Project will also include related site improvements, including all utilities, parking,hardscape/landscape, outdoor waiting area, and other site elements. Additional details about the Project are set forth in Attachment A,and a Conceptual Site Plan for the Project attached as Exhibit B. As set forth herein, the design-build entity will be responsible for thefinal design and transmission of their final design to the Division of the State Architect (“DSA”), and for obtaining final DSA approval. Noconstruction work shall be performed until the design-build entity receives written approval of the plans, as to the safety of design andconstruction, from the DSA.
Questions: Joseph ReyesEmail: [email protected]
19-01626
3
3:00 PM5/28/19
Addenda:RFQ TO PROVIDE DESIGN-BUILD SERVICES FOR NORTH MONTEREY COUNTY EDUCATION CENTER
to
Hartnell College - Planning & Construciton [email protected]
831-755-6950 831-759-6024
Excavation/SiteWork/Irrigation/Drainage/Landscape
Fax: 831-457-1606Office: 831-750-0585Ecological Concerns Incorporated
Bidders:
Plan Issuer:
Marina
RENOVATION OF EXISTING CONCRETE CLASSROOM BUILDING 3A AND ATTACHED WOOD STUD CONSTRUCTIONRESTROOMS, AND ADJACENT COURTYARD. CONSTRUCTION OF ONE NEW 30'X30'X12' SHADE STRUCTURE. TWO NEWCMU BUILDINGS, 3A.1 AND 3A.2, TO BE CONSTRUCTED WITH STANDING SEAM METAL ROOFING. VOLUNTARY SEISMICUPGRADE TO OCCUR FOR CONCRETE ROOF STRUCTURE AT BUILDING 3A. NEW FIRE SPRINKLER SYSTEM THROUGHOUT.
PREVAILING WAGE
Questions: Tom Millman at [email protected]
5/8 @ 4pm- site
19-01584
4
3:00 PM5/29/19
Addenda:MARINA HIGH SCHOOL CULINARY ARTS CLASSROOM RENOVATION - BID #2
Prebid Conf:
Monterey Peninsula Unified School District 831-645-1200 831-649-4175
Asbestos Abatement /Hazardous Materials Contract
Fax: 707-584-1911Office: 707-326-3128Cve Contracting Group, Inc. Dba CentralValley Environmental, Northbay Division
Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction
General Contractor Fax: 000-000-0000Office: 831-656-1600Dmc Commercial Inc.
General Contractor Fax: 831-372-1644Office: 831-521-0131Murrer Construction, Inc.
General Contractor Fax: 831-722-9360Office: 831-722-9949Selden & Son
General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc
HVAC Contractor Fax: 831-384-1989Office: 831-384-1988Advanced Air Inc
HVAC Contractor Fax: 831-754-5514Office: 831-424-1633Val's Plumbing & Heating
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plumbing & Piping Contractor Fax: 916-859-0993Office: 916-631-1315American Plumbing Systems, Inc.
Steel Contractor Fax: 831-768-1352Office: 831-768-1277Monterey Structural Steel
Plan Issuer:
Monterey
M1W is seeking proposals from qualified firms to provide Cybersecurity Services for the Pure Water Monterey SCADA IntegrationProject. The Scope of Services is to provide system security compliance, system security assessment and auditing, system securitytesting, system evaluation, system baseline security assessment, and system security configuration.
Questions: Yohana Vargas at [email protected]
19-01690
0
3:00 PM5/29/19
Addenda:RFP FOR CYBERSECURITY SERVICES FOR THE PURE WATER MONTEREY SCADA INTEGRATIONPROJECT
Monterey One Water [email protected] 831-883-6182 831-883-0516
NEW
Bidders:
Plan Issuer:
Marina
New Construction / Wood Framed Three Story Building / 5,500 sq. ft./11 - 1Bedroom and Studio.Scope of work: Site Clearing, Survey, SWPPP, Earthwork, Off-site Improvements, Utilities, Fencing, AC Paving/Striping/Signage,Landscaping, Re-bar, Structural and Site Concrete, Masonry, Stone Veneer, Structural Steel, Metal Fabrication, Rough Carpentry,Finish Carpentry, Cabinets, Countertops, Waterproofing, Insulation, Roofing, Sheet Metal, Standing Seam Metal Roof, Gutters &Downspouts, Fire Stopping, Joint Sealants, Hollow Metal Doors/Frames/Hardware, Wood Doors, Access Doors, Overhead CoilingDoors, Storefront, Glass and Glazing, Shutters, Lath and Plaster, Foam Trim, Drywall, Floor Coverings, Ceramic Tile, Painting,Ladders, Roof Hatches, Skylights, Toilet Partitions, Toilet Accessories, Carports, Signage, Fire Extinguishers, Postal Specialties,Appliances, Window Coverings, Swimming Pool, Fire Sprinklers, Plumbing, HVAC, Electrical, Fire Alarm, Access Control Systems.Estimated start date: July 2019Questions: Etheline V. Cimatu, 831-384-4081 or by email at [email protected]
19-01582
0
2:00 PM5/30/19
Addenda:SEACREST APARTMENTS (SUB-BIDS ONLY)
Monterey Peninsula Engineering [email protected] 831-384-4081 831-384-5078
Glass & Glazing Contractor Office: 775-378-2473Accent Products Inc.
Supplier Fax: 831-899-5374Office: 831-899-7544Ced-Monterey
Plan Issuer:
Soledad
The California Prison Industry Authority requires turnkey well refurbishment services for its viticulture enterprise located at theCorrectional Training Facility (CTF) in Soledad, California.
PREVAILING WAGE
Project Contact: Samantha PatrickEmail: [email protected]
MAND 5/20 @ 10am- Correctional Training Facility (CTF) Highway 101 Soledad, CA 93960
19-01739
2
3:00 PM5/30/19
Addenda:RFP - TURNKEY WELL REFURBISHMENT SERVICES
P05081824
Prebid Conf:
California Prison Industry Authority [email protected] 916-358-2090
NEW
Plan Issuer:
Monterey County
The Salinas Valley Solid Waste Authority (Authority) seeks to purchase concrete and concrete pumping services for the construction ofour aerated static pile compost facility. The concrete will be used to contain pipe used for aeration.
Questions: Rosie RamirezEmail: [email protected]
19-01765
0
2:00 PM5/30/19
Addenda:RFB TO PROVIDE READY MIX CONCRETE
Salinas Valley Solid Waste Authority 831-775-3000 831-755-1322
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Pacific Grove
Apply crack seal, remove existing striping and markings, place type II slurry seal, layout and restore painted traffic striping andmarkings.
PREVAILING WAGE
Questions: Daniel Gho at 831-648-5722
19-01717
0
2:00 PM5/31/19
Addenda:2019 CRACK SEAL & SLURRY SEAL
City of Pacific Grove Public Works dgho@cityof pacificgrove.org 831-648-5722 831-375-0627
NEW
Bidders:
Plan Issuer:
Marina
*** BID DOCS WILL BE UPLOADED ONCE AVAILABLE ***
Questions: Tom Millman at [email protected]
MAND 5/21 @ 3pm- site
19-01702
0
3:00 PM6/3/19
Addenda:ENROUTE - CRUMPTON ELEMENTARY SCHOOL - NEW CLASSROOMS, PORTABLE REPLACEMENTS
8239
Prebid Conf:
Monterey Peninsula Unified School District 831-645-1200 831-649-4175
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Plan Issuer:
Salinas
New greenhouse building (20x40). Associated site work.
PREVAILING WAGE
MAND 5/13 @ 9am- site
19-01715
2
9:00 AM6/5/19
Addenda:NEW GREENHOUSE AT NORTH SALINAS HIGH SCHOOL
Prebid Conf:
Salinas Union High School District [email protected] 831-796-7074
NEW
Plan Issuer:
Monterey
The Monterey Bay Air Resources District, Exterior Painting scope of work consists of repairs to existing building stucco plaster walls,clean-up of the roof top trellis, and prep and paint of entire building.
PREVAILING WAGE
MAND 5/23 @ 2pm- site
19-01743
0
2:00 PM6/12/19
Addenda:MONTEREY BAY AIR RESOURCES DISTRICT - EXTERIOR PAINTING
Prebid Conf:
Monterey Bay Air Resources District 831-647-9411
NEW
Plan Issuer:
Monterey $200,000 $250,000
In general, the work consists of, but is not limited to, the fabrication and installations of 63 wayfinding signs. This work shall include, butnot be limited to, the demolition of existing sidewalk, the construction of sidewalk, fabrication of wayfinding signage, and the installationof support posts.
Project Contact: Alyssa HuertaEmail: [email protected]
19-01768
0
2:00 PM6/25/19
Addenda:WAYFINDING SIGN FABRICATION AND INSTALLATION, PHASE 1
to
City Of Monterey 831-646-3877 831-646-3405
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
San Benito County
Bidders:
Plan Issuer:
Hollister
Demo existing kiosk and remove existing pavement, concrete, and fencing. Provide new kiosk at new location including flagpole andautomatic pay machine (APM). Site improvements include grading and drainage, accessible parking, accessible path of travel,concrete curb, asphalt and concrete paving, signage and striping, fencing, relocate air station, and other site features. Provide power,phone, and data to new kiosk. Provide site and building lighting at HOLLISTER HILLS SVRA in San Benito County, California.
Project Contact: Merrilee ByrnesEmail: [email protected]
MAND 5/7 @ 10:30am- site
19-01557
0
2:00 PM5/28/19
Addenda:HOLLISTER HILLS SVRA - ENTRANCE IMPROVEMENTS
C19E0002
Prebid Conf:
Department of Parks and Recreation [email protected] 916-445-8843 916-445-9027
Fencing Fax: 559-888-0202Office: 559-999-4441Fresno Fence Connection
General Contractor Fax: 831-466-9597Office: 831-426-0743Crw Industries
Bidders:
Plan Issuer:
Hollister $499,200
This project involves the construction of the GLP lift Station Upgrade: Construct new 10-foot diameter wetwell and valve vault (outsideof roadway), new concrete pad for lift station , new gravity diversion to new wetwell, replace existing discharge piping in (new) wetwell,relocate existing pumps to new wetwell, provide new slide rails, coat existing and new wetwell interiors, remove existing bioxide odorcontrol system, provide new biofiltration odor control system, provide new overflow connecting existing and new wetwells, new vent,new concrete pad in area of existing lift station, new fencing and hammer-head driveway, man gate on south side of lift station,electrical panel relocation (outside of travel way), provide new generator and auto transfer switch, sewer bypassing required duringconstruction asphalt surface removal and repair, excavation, backfill and all other incidental work required to make GLP Lift Stationcomplete and operation.
Project Contact: Danny HillstockEmail: [email protected]
5/15 @ 10am- 375 Fifth Street, Hollister
19-01627
1
3:00 PM5/28/19
Addenda:GLP LIFT STATION UPGRADE
Prebid Conf:
City of Hollister 831-636-4340 831-636-4913
Fencing Fax: 559-888-0202Office: 559-999-4441Fresno Fence Connection
General Contractor Fax: 661-398-2279Office: 661-398-2289Sw Construction
Bidders:
Plan Issuer:
Hollister $1,493,655
The work to be performed includes, but is not necessarily limited to: the installation of a roundabout at the intersection of Fourth St andGraf Road, and associated improvements. The approach from the bridge will have a median installed, along with a street lights andpreparation for future landscaping. The area of the roundabout will be lowered, and existing traffic signal will be removed. From thetraffic signal to the east, a median will be installed, new storm drain lines, new tree wells and trees, and with decorative bulbouts andplanters as shown on the plans.
Project Contact: Danny HillstockEmail: [email protected]
5/8 @ 10am- 375 Fifth Street, Hollister
19-01526
0
3:00 PM5/29/19
Addenda:WEST GATEWAY BEAUTIFICATION PHASE 1
C1816
Prebid Conf:
City of Hollister 831-636-4340 831-636-4913
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
General Contractor Fax: 000-000-0000Office: 831-901-0072Teichert Construction
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Hollister
New construct an 11,000 sf church sanctuary and offices description of facility construction steel structure, metal cladding, masonrycolumns with accents. See plans and specs. All CSI divisions provided.Trades requesting bids for: All divisions 3 through 16, Division 2 will be bid separately as details & plans are provided.There is a negotiated general contractor for this project.
Project Contact: Mike Zangara 406-941-2325Email: [email protected]
19-01279
0
3:00 PM5/31/19
Addenda:SUNNYSLOPE CHRISTIAN CENTER (SUB-BIDS ONLY)
Mike Zangara [email protected] 406-941-2325
Plan Issuer:
Paicines $1,000,000 $5,000,000
The National Park Service has a requirement to replace the East Entrance Station near the new Pinnacles National Park boundary,located within Pinnacles National Park in San Benito County, California. The work includes pavement demolition, and construction of anew entrance station and support building, and related grading, sitework and utilities. The project is designed to comply with greenbuilding criteria as specified in the Construction Documents.
5/20 @ 10am- Pinnacles National Park, Paicines, CA
19-01754
0
3:00 PM6/10/19
Addenda:PINNACLES NATIONAL PARK - EAST ENTRANCE STATION
140P8419R0006 to
Prebid Conf:
National Park Service [email protected] 415-464-5197
NEW
Plan Issuer:
Hollister
*** BID DOCS WILL BE UPLOADED ONCE AVAILABLE ***
Project Facility: Tenant Improvements shall be limited to Interior Construction in the Eastern suite of Building no. 2.• Building No. 2 is divided into Eastern and Western Suites, the full building area is 2044 square feet, one story, wood framed, type V-Bconstruction more than 50 years old.• The Eastern suite (Project area) is 1165sf.• The Eastern suite has had some minor demolitions by previous projects to remove finishes that may have contained hazardousmaterials. All flooring finishes have been removed, some wall hung cabinets, and some plumbing and electrical fixtures have beenremoved. The suite is currently not occupied.Project Purpose:• Minor Interior Demolitions and Salvage of Medical Outpatient’s Clinic furnishings to include:• Sinks and associated Plumbing fixtures and support systems.• Lighting fixtures and Power Circuits from an existing electrical subpanel.• Minor removal of wood-framed, non-bearing walls and ceilings as indicated.• Provision of new interior framing, new patient transaction window, new doors, new finishes and plumbing, mechanical and electricalimprovements to provide a space suitable for use as an outpatient clinic and ambulatory health care clinic. This project includesimprovements to the entry, circulation systems and restrooms in keeping with specifications required to conform to the Americans withDisabilities Act.
PREVAILING WAGE
Questions: Chris PerezEmail: [email protected]
MAND 5/28 @ 9am- Main Lobby @ Hospital
19-01772
0
3:00 PM6/20/19
Addenda:ENROUTE - HAZEL HAWKINS MEMORIAL HOSPITAL TENANT IMPROVEMENTS
Prebid Conf:
Hazel Hawkins Hospital Administration 831-636-2673 831-636-2697
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
San Luis Obispo County
Bidders:
Plan Issuer:
Cayucos
Project consists of: Excavating and Grading; Concrete; Concrete - ICF; Concrete Flatwork; Concrete Demolition; Masonry; Lumber;Structural Steel; Framing Labor; Siding Labor; Finish Carpentry; Finish Cleanup; Exterior Stucco; Drywall; Cabinets; Millwork: Railings;Windows and Patio Doors; Roofing; HVAC/Sheetmetal; Electrical; Security Alarm; Plumbing; Gutters; Fire Sprinklers; Painting; Tile andSurface Coverings; Insulation; Landscaping; Pool.
Questions: Erich Schaefer (805) 235-0545 or [email protected]
19-01594
0
5:00 PM5/20/19
Addenda:RFP - CRAWLEY RESIDENCE (SUB-BIDS ONLY)
Schaefer Construction [email protected] 805-235-0545 000-000-0000
Flooring Contractor Office: 805-434-2848Templeton Floors Inc.
Bidders:
Plan Issuer:
San Luis Obispo
The project includes new and modified facilities at the San Luis Obispo Water Resource Recovery Facility and is designed to meetnew discharge permit requirements, increase capacity to meet future flows and loads under dry and wet weather conditions, replaceaging infrastructure, maximize recycled water production and incorporate interactive features and public amenities. The project willmodify existing process facilities, add new process facilities, and provide a new building campus for Public Utilities staff and the public.
MAND 3/26 @ 1pm- 25 Prado Road, San Luis Obispo
19-01643
10
2:00 PM5/20/19
Addenda:CONSTRUCTION OF THE WATER RESOURCE RECOVERY FACILITY PROJECT (WRRF)
91620
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
Air & Vapor Barrier Contractor Fax: 000-000-0000Office: 310-796-9000Advanced Geosolutions
General Contractor Fax: 760-930-1276Office: 760-931-0555Coombs Hopkins Co
General Contractor Fax: 707-439-7301Office: 707-439-7300Kiewit Infrastructure West Co
General Contractor Fax: 661-324-3900Office: 661-324-3000Klassen Corporation
General Contractor Fax: 951-520-2684Office: 480-763-2778Pcl Construction, Inc.
General Contractor Fax: 000-000-0000Office: 805-226-9600Shore-Tek Inc
General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction
General Contractor Fax: 661-387-1620Office: 661-387-1600W.M. Lyles Co.
General Contractor Office: 805-457-8833Water Systems Consulting, Inc.
General Contractor Fax: 000-000-0000Office: 310-830-3636Xylem Inc
Bidders:
Plan Issuer:
San Luis Obispo $91,000,000
Science and Agriculture Teaching and Research Complex - Trade Packages - Steel, Roofing, Fireproofing, Flooring, Glazing, Lab,Food, Landscape, Doors, Caulking, Millwork, Painting, Telecom.CONTRACTORS MUST BE PRE-QUALIFIED WITH GILBANE BUILDING COMPANY TO PARTICIPATE IN THE BIDDING PROCESSOF THIS JOB.The Construction Scope includes: Sitework including excavation, shoring, and retaining walls; New Hardscape and Landscape; NewStructure, including concrete foundations, retaining walls, and steel superstructure; New Exterior Envelope, including metal panels,storefront glazing, and GFRC panels; New Interiors, including walls, floors, ceilings, and finishes; New Building Systems.
Plans, Specifications, and Bid Packages Available: 04/30/2019
Questions: Gilbane StaffChris Barry, [email protected] Fears, [email protected] Bird, [email protected]
5/2 @ 11:30am- Cal Poly San Luis Obispo, Building 70, Room 110
19-01441
0
2:00 PM5/21/19
Addenda:SCIENCE AND AGRICULTURE TEACHING AND RESEARCH COMPLEX
MAJ 17-MJ0060
Prebid Conf:
Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566
Flooring Contractor Office: 805-434-2848Templeton Floors Inc.
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Arroyo Grande $74,000
In general, the project consists of the replacement of lifted and/or broken sidewalk and curb/gutter sections and tree removalthroughout the City of Arroyo Grande.
PREVAILING WAGE
5/9 @ 2pm- 1375 Ash Street, Arroyo Grande
19-01478
1
2:00 PM5/21/19
Addenda:2019 CONCRETE REPAIRS
PW 2019-02
Prebid Conf:
City of Arroyo Grande [email protected] 805-473-5444 805-473-5462
General Contractor Fax: 559-671-4004Office: 559-782-6322Advanced Concrete
General Contractor Fax: 805-489-7779Office: 805-489-7779Brough Construction, Inc.
General Contractor Fax: 805-345-3538Office: 805-345-3466Calportland Construction
General Contractor Fax: 661-399-3812Office: 661-218-7030Cen-Cal Construction
General Contractor Fax: 805-462-2435Office: 805-462-2610Central Coast Striping
General Contractor Fax: 805-934-3609Office: 805-934-3606G Sosa Construction, Inc
General Contractor Office: 805-478-5459Garibay Concrete Company
General Contractor Fax: 805-543-2521Office: 805-543-8568R. Burke Construction
General Contractor Fax: 805-938-0762Office: 805-938-0760The J.F. Will Co, Inc
Bidders:
Plan Issuer:
Paso Robles $3,645,066
The Project proposes to replace the low water crossing on Geneseo Road at Huerhuero Creek with a new reinforced concrete bridge.The proposed bridge will be approximately 200 feet long and about 32 feet wide. Additional work includes placing hot mix asphalt,grading, and other such items or detail work not mentioned herein that are required by the Plans, the Standard Specifications,Standard Plans, or Special Provisions.
Bid Contact: JR Beard (805) 781-4073Email: [email protected]
19-01476
0
3:00 PM5/23/19
Addenda:GENESEO ROAD BRIDGE OVER HUERHUERO CREEK
300387
County of San Luis Obispo [email protected] 805-781-4073
Sub-Contractor/SpecialtyContractor
Fax: 707-789-9542Office: 707-778-8316Pacific Coast Drilling Co., Inc.
Bidders:
Plan Issuer:
San Luis Obispo $4,858,687
This project will place a new hot mix asphalt overlay on existing roads in the North County. Work includes cold plane asphalt concreteroad surfaces, placing hot mix asphalt overlay, digout repairs, and other such items or detail work not mentioned herein that arerequired by the Plans, the Standard Specifications, Standard Plans, or Special Provisions.
Bid Contact: JR Beard (805) 781-4073Email: [email protected]
19-01503
0
3:00 PM5/23/19
Addenda:2018-19 ASPHALT OVERLAY VARIOUS NORTH COUNTY ROADS
300613
County of San Luis Obispo [email protected] 805-781-4073
Asphalt /Road / Bridge / HeavyHighway Contractor
Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.
Plan Issuer:
San Luis Obispo $130,000
In general, the project consists of striping, curb painting, and signage maintenance and replacement work with additional associatedminor concrete work in certain circumstances. Work to be issued on an as needed basis.
PREVAILING WAGE
19-01561
1
2:00 PM5/23/19
Addenda:JOB ORDER CONTRACT 2019 - STRIPING, CURB PAINTING, AND SIGNAGE MAINTENANCE
1000019
City of San Luis Obispo 805-781-7200 805-781-7198
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Luis Obispo $150,000
In general, the project consists of tree well maintenance throughout the City on an as needed basis.
PREVAILING WAGE
19-01562
1
2:00 PM5/23/19
Addenda:JOB ORDER CONTRACT 2019 - TREE WELL MAINTENANCE
1000018
City of San Luis Obispo 805-781-7200 805-781-7198
Plan Issuer:
San Luis Obispo $66,200
In general, the project includes the removal and replacement of the existing hardscape leading to the tennis courts at Sinsheimer Park.The existing hardscape materials consist of a PCC sidewalk path and brick entrances to each court. The existing park benches andwater fountain will also be removed and replaced.
PREVAILING WAGE
19-01718
0
2:00 PM5/23/19
Addenda:SINSHEIMER COURT ENTRANCE HARDSCAPE
City of San Luis Obispo 805-781-7200 805-781-7198
NEW
Paso Robles
Sub bids requested: Final Cleanup; Survey; Site Demolition; Earthwork; Site Utilities; Asphalt; Paving Specialties; Fencing; Landscape;Rebar; Concrete; Termite Control; Masonry; Metal Fabrications/Structural Steel; Rough Carpentry; Finish Carpentry; Insulation; MetalRoof/Wall Panels; Roofing; Sheet Metal; Roof Accessories; Doors, Frames, Hardware; Windows/Storefront; Plaster; Gypsum Board;Tile; Acoustical; Flooring/Epoxy Flooring; Painting; Toilet Accessories; Signage; Food Equipment; Fire Sprinklers; Plumbing; HVAC;Electrical; Communications/Fire Alarm.
Questions: [email protected]
19-01701
0
2:00 PM5/28/19
Addenda:SONIC DRIVE IN (SUB-BIDS ONLY)NEW
Plan Issuer:
San Luis Obispo $80,000
In general, the project consists of the replaster of the existing S.L.O. Swim Center Therapy Pool, installation of a new accessiblemechanical lift and all other items shown on the plans and specifications to provide a fully functioning pool.
PREVAILING WAGE
5/21 @ 2pm- site
19-01560
1
2:00 PM5/30/19
Addenda:S.L.O. SWIM CENTER THERAPY POOL REPLASTER
91654
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
Plan Issuer:
Paso Robles
The work is generally described as median, parkway and planter landscape maintenance.
PREVAILING WAGE
5/14 @ 10am- 1000 Spring St, Paso Robles
19-01604
0
2:00 PM5/30/19
Addenda:MEDIAN/PARKWAY LANDSCAPE MAINTENANCE
DPW 19-10
Prebid Conf:
City of Paso Robles 805-237-3861 805-237-3904
Plan Issuer:
Pismo Beach
The work of the Project is defined by the Contract Documents and consists of the removal and replacement of all windows in fourclassroom buildings, rooms 1-16, restrooms, locker rooms and storage room as per specifications.
PREVAILING WAGE
MAND 5/15 @ 9am- site
19-01698
0
2:00 PM6/5/19
Addenda:JUDKINS MIDDLE SCHOOL WINDOW REPLACEMENT
Prebid Conf:
Lucia Mar Unified School District 805-474-3000 805-473-5594
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Paso Robles $900,000
The work shall include but is not limited to construction and testing of a 16-inch diameter ground water supply well all in accordance tothese Specifications and to the satisfaction of the City all as shown on the plans and/or as specified herein.
PREVAILING WAGE
5/21 @ 9am- Corner of Aerotech Center Way and Dry Creek Road, Paso Robles
19-01630
0
2:00 PM6/6/19
Addenda:TARR WELL REPAIR
DPW 18-21
Prebid Conf:
City of Paso Robles 805-237-3861 805-237-3904
Bidders:
Plan Issuer:
Cayucos $128,335
REPLACEMENT OF AN EXISTING BEACH ACCESS STAIRCASE, IMPROVEMENTS TO AN EXISTING PUBLIC PATHWAY, ANDINSTALLATION OF PUBLIC ACCESS AMENITIES INCLUDING ONE STYLIZED BENCH, BIKE RACKS, ACCESS SIGNAGE, ANDASSOCIATED WORK AS SHOWN IN THE PLANS AND AS SPECIFIED IN THE CONTRACT DOCUMENTS.
Bid Contact: JR Beard (805) 781-4073Email: [email protected]
19-01696
0
3:00 PM6/6/19
Addenda:CAYUCOS 1ST STREET BEACH ACCESSWAY - STAIR REPLACEMENT
380005
County of San Luis Obispo [email protected] 805-781-4073
NEW
General Contractor Fax: 805-123-1554Office: 805-400-7305Garrett Thiessen Construction
Plan Issuer:
San Luis Obispo
The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees, on behalf ofCalifornia Polytechnic State University, hereinafter called University, is requesting Technical Proposals from interested and qualifiedDesign-Builders (Respondents) to provide design, preconstruction and design-build construction services for the Fremont HillsideRestoration and Stabilization Project. The Direct Construction Cost Budget is approximately $3,000,000.00
A landslide occurred behind the Fremont dormitory resulting in an evacuation of the building in February 2017. The Project consists ofrepairing and stabilizing the hillside sufficiently to allow students to move back in at a future point in time.
Bid Contact: Chris Overby (805) 756-5133Email: [email protected]
5/23 @ 9am- Cal Poly San Luis Obispo Building 70, Room 110
19-01704
0
3:00 PM6/7/19
Addenda:RFP FOR COLLABORATIVE DESIGN-BUILD SERVICES FOR FREMONT HILLSIDE RESTORATION ANDSTABILIZATION
PJ6103
Prebid Conf:
Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566
NEW
Bidders:
Plan Issuer:
San Miguel $3,500,000
Restoration of the interiors, latrine, HVAC system, electrical & lighting system, plumbing and interior finishes at the California ArmyNational Guard Facility, located at Camp Roberts, CA.
Project Contact: Katherine MilianiEmail: [email protected]
MAND 5/16 @ 12:30pm- Camp Roberts Main Gate, Highway 101, CA
19-01558
0
2:30 PM6/11/19
Addenda:BARRACKS RENOVATION (4312-4319)
12698
Prebid Conf:
State of California Office of the Adjutant General State MilitaryDepartment [email protected]
916-854-3681
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 559-978-1957Coastwide Environmental Tech, Inc.
Flooring Contractor Office: 805-434-2848Templeton Floors Inc.
General Contractor Fax: 530-677-5090Office: 209-406-5891Cnw Construction, Inc.
General Contractor Fax: 805-335-6858Office: 805-458-5252Rdz Contractors
HVAC Contractor Fax: 559-277-4920Office: 559-277-7900Mesa Energy Systems, Inc. (EmcorServices)
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
San Miguel $3,348,000
The Contractor shall furnish all labor, equipment, materials, permits and fees necessary for the renovations of barracks 4302-4309 toinclude, but not limited to, the restoration of the interiors, latrine, HVAC system, electrical & lighting system, plumbing system andinterior finishes at the California Army National Guard Facility, located at Camp Roberts, CA, in accordance with the technicalspecifications and drawings.
Project Contact: Katherine MilianiEmail: [email protected]
MAND 5/16 @ 10am- Main Gate, Camp Roberts Highway 101
19-01711
0
2:00 PM6/11/19
Addenda:BARRACKS RENOVATION 4302-4309 - CAMP ROBERTS
12786
Prebid Conf:
State of California Office of the Adjutant General State MilitaryDepartment [email protected]
916-854-3681
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 559-978-1957Coastwide Environmental Tech, Inc.
Equipment Fax: 661-399-2463Office: 661-440-5471Herc Rentals Prosolutions
General Contractor Fax: 858-369-7971Office: 858-444-1974Silverstrand Construction
HVAC Contractor Fax: 559-277-4920Office: 559-277-7900Mesa Energy Systems, Inc. (EmcorServices)
Bidders:
Plan Issuer:
San Miguel $5,350,000
The Contractor shall furnish all labor, equipment, materials, permits and fees necessary for the renovations of barracks 4212-4219(with bid options for the renovation of barracks 5102, 5103, 5118, and 5119) to include, but not limited to, the restoration of theinteriors, latrine, HVAC system, electrical & lighting system, plumbing and interior finishes at the California Army National GuardFacility, located at Camp Roberts, CA, in accordance with the technical specifications and drawings.
Project Contact: Katherine MilianiEmail: [email protected]
MAND 5/16 @ 1:30pm- Camp Roberts, Main Gate, Highway 101, CA
19-01714
0
3:00 PM6/11/19
Addenda:BARRACKS RENOVATIONS 4212-4219 - CAMP ROBERTS
12791
Prebid Conf:
State of California Office of the Adjutant General State MilitaryDepartment [email protected]
916-854-3681
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 559-978-1957Coastwide Environmental Tech, Inc.
General Contractor Fax: 858-369-7971Office: 858-444-1974Silverstrand Construction
HVAC Contractor Fax: 559-277-4920Office: 559-277-7900Mesa Energy Systems, Inc. (EmcorServices)
Bidders:
Plan Issuer:
San Luis Obispo $10,125,000
The New Animal Services Facility project includes approximately 15,000 to 16,000 square feet of building space, and associated siteimprovements on a 5 acre site including road and utility extensions, livestock pasture, dog walking, and other outdoor spaces. Theproject shall house approximately 65 dogs, 75 to 100 cats, livestock, and other exotic species, and include outdoor spaces for dogkennel runs and exercise areas. The site is located east of 875 Oklahoma Avenue located off HWY 1 north west of the city of San LuisObispo within the County Operational Center. The project will require the extension of Oklahoma Avenue and the utility service maintrunk lines.
Bid Contact: Missy Viles (805) 781-5216Email: [email protected]
19-01472
0
5:00 PM6/18/19
Addenda:NEW ANIMAL SERVICES FACILITY
320088/1516
County of San Luis Obispo [email protected] 805-781-5213 805-781-5212
Electrical Contractor Fax: 805-925-5639Office: 805-922-7777Santa Maria Electric, Inc.
Fencing Office: 661-477-8289Cardoza Fencing
General Contractor Fax: 831-274-2519Office: 831-274-2518Silcon, Inc./Silverie Properties
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Luis Obispo
This is an agreement in which the Contractor shall perform Spent Water Softener Brine Removal, Transportation and DisposalServices at California Men¿s Colony (CMC). The Contractor will be compensated for the services in accordance with the service ratesspecified in Exhibit B-1, Rate Sheet; which shall include all labor, including travel and per diem, materials, non-consumable supplies,transportation, equipment, and every other item of expense necessary to remove and dispose of spent water softener brine from the12,500 gallon above ground brine storage tank for the California Department of Corrections and Rehabilitation (CDCR), CaliforniaMen¿s Colony (CMC), located at Hwy 1 North, San Luis Obispo, CA 93401, hereby referred to as Institution.
Project Contact: Kristine HarrisEmail: [email protected]
6/11 @ 10am
19-01738
0
2:00 PM6/18/19
Addenda:SPENT WATER SOFTENER BRINE REMOVAL, TRANSPORTATION AND DISPOSAL SERVICES
C5608771-D
Prebid Conf:
Department of Corrections & Rehabilitation [email protected] 916-255-6164
NEW
Santa Clara County
Plan Issuer:
Sunnyvale
Provide professional services to prepare a Fire Station Master Plan. The scope of work generally includes: assessment of six existingCity fire station facilities and preparation of a master plan document for the replacement and/or renovation of fire stations and theirrecommended lifecycle throughout the City. Ancillary work includes: construction cost estimating, schedule monitoring, preparation ofreports and recommendations, and project management.
Project Contact For Questions: Nan O'Brien 408-730-7654Email: [email protected]
19-01447
0
3:00 PM5/20/19
Addenda:RFP FOR FIRE STATION MASTER PLAN - CITY OF SUNNYVALE
PR-18-05
City of Sunnyvale DPW 408-730-7403 000-000-0000
Bidders:
Plan Issuer:
Palo Alto
Removal and replacement of the existing synthetic turf field with Bid alternates of the installation of a new all-weather rubber track anda 20' x 20' rubber workout area.
Project Contact For Questions: Peter JensenEmail: [email protected]
Strongly Encouraged 5/7 @ 11AM (Athletic Field)
19-01477
2
3:00 PM5/21/19
Addenda:CUBBERLEY COMMUNITY CENTER SYNTHETIC TURF FIELD REPLACEMENT & TRACK - CITY OFPALO ALTO
175131
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
Asphalt /Road / Bridge / HeavyHighway Contractor
Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.
General Contractor Fax: 510-562-5209Office: 510-632-7676Mcguire & Hester
General Contractor Fax: 510-526-0990Office: 510-526-3424Oc Jones & Sons
General Contractor Fax: 408-279-2281Office: 408-279-2277Robert A Bothman
Bidders:
Plan Issuer:
Milpitas
Renovate various park elements including replacement and installation of new picnic areas; shade structure; play equipment andsurface; vehicle and pedestrian pathway; Americans with Disabilities (ADA) accessibility improvements; security lighting; restroomstructure; dog play area; fitness stations; and enhancements to entry points, landscaping, drainage, and park furniture improvements.
Project Contact For Questions: Michael Silveira 408-586-3303
MAND 5/2 @ 2PM & 5/8 @ 10AM
19-01487
1
2:00 PM5/21/19
Addenda:CREIGHTON PARK RENOVATION - CITY OF MILPITAS
5109
Prebid Conf:
City of Milpitas - DPW 408-586-3300
General Contractor Office: 415-254-8253Agbayani Construction Corp
General Contractor Office: 415-254-8253Agbayani Construction Corp
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.
General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
General Contractor Fax: 408-925-0240Office: 408-925-0220Lewis & Tibbitts Inc.
General Contractor Fax: 408-925-0240Office: 408-925-0220Lewis & Tibbitts Inc.
General Contractor Fax: 714-935-1199Office: 714-939-6600Marina Landscape, Inc.
General Contractor Fax: 714-935-1199Office: 714-939-6600Marina Landscape, Inc.
General Contractor Fax: 510-782-6078Office: 510-782-6065Suarez & Munoz Construction
General Contractor Fax: 510-782-6078Office: 510-782-6065Suarez & Munoz Construction
Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc
Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc
Supplier Fax: 707-538-3826Office: 707-538-3800Ross Recreation Equipment Co., Inc.
Supplier Fax: 707-538-3826Office: 707-538-3800Ross Recreation Equipment Co., Inc.
Bidders:
Plan Issuer:
San Jose
Renovation of the Student Store and the Attendance Office at Gunderson High School including installation of new roll up doors;demolition and reconstruction of interior walls; limited furnishings and other enhancements for ADA regulations.
Project Contact For Questions: Jenny Choi, Van Pelt 707-315-3918Email: [email protected]
MAND 4/30 @ 3PM & 5/1 @ 11AM (Required to sign in @ Admin Building)
19-01548
1
2:30 PM5/21/19
Addenda:GUNDERSON CHIPS STUDENT SERVICES IMPROVEMENTS - SAN JOSE UNIFIED SCHOOL DISTRICT(SJUSD)
81133/3066C
Prebid Conf:
SJUSD-San Jose Unified School District 408-535-6071
General Contractor Fax: 415-358-5769Office: 415-756-0945Alex Kushner General Contractor
General Contractor Fax: 000-000-0000Office: 408-650-6753Bp-Pak, Inc.
General Contractor Fax: 510-323-2528Office: 510-812-3466Tse Construction
General Contractor Fax: 650-938-1533Office: 650-938-0600Venezia Construction, Inc.
Plan Issuer:
Santa Clara County
Enter into a one-year contract with options to renew four additional one-year contracts with a qualified contractor to monitor, test andinspect fire alarm systems for all sites and devices operated by Cupertino Union School District.
Project Contact For Questions: Brian SlaughterEmail: [email protected]
Hard copies available for review at Santa Clara Builders Exchange
MAND 5/9 @ 10AM (Louis E. Stocklmeir ES, 592 Dunholme Way, Sunnyvale)
19-01574
1
1:00 PM5/21/19
Addenda:RFP FIRE ALARM MONITORING, INSPECTION & TESTING SERVICES - CUPERTINO UNION SCHOOLDISTRICT
RFP 19-B06-01
Prebid Conf:
Cupertino Union School District 408-252-3000 408-343-2802
Bidders:
Plan Issuer:
Palo Alto
Repair and Resurfacing of tennis courts at Rinconada Park
Project Contact For Questions: Lam DoEmail: [email protected]
Strongly Encouraged 5/7 @ 10AM
19-01595
2
3:00 PM5/21/19
Addenda:RINCONADA PARK TENNIS COURT RECONSTRUCTION - CITY OF PALO ALTO
175329
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
General Contractor Fax: 510-723-0288Office: 510-723-0280American Asphalt Repair & Resurfacing
General Contractor Fax: 408-924-0308Office: 650-948-3274Saviano Co., Inc.
General Contractor Fax: 000-000-0000Office: 408-896-9334Terramark Contractors
General Contractor Fax: 415-282-1603Office: 415-282-1602Vintage Contractors
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Milpitas
* Roof removal and replacement for Russell Building 400 & Pomeroy Multi-Use Building.* Roof Coating application on existing roofs of Russell Buildings 200 and 700.* Roof coating application to portables at both schools.
Project Contact For Questions: Alan Burnett 650-224-2484Email: [email protected]
3/28 @ 9:30AM (Russell MS, 1500 Escuela Parkway, Milpitas)
19-01744
1
10:00 AM5/21/19
Addenda:ROOFING PROJECT POMEROY ELEMENTARY SCHOOL & RUSSELL MIDDLE SCHOOL - MILPITASUNIFIED SCHOOL DISTRICT
Prebid Conf:
Milpitas Unified School District 408-635-2600
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 707-584-1911Office: 707-326-3128Cve Contracting Group, Inc. Dba CentralValley Environmental, Northbay Division
Roofing Contractor Fax: 510-477-9786Office: 510-477-9380Alcal Roofing
Bidders:
Plan Issuer:
Cupertino
*** Lathrop Construction is Negotiated Contractor ***
Demo and abatement trades only.
19-01763
1
2:00 PM5/21/19
Addenda:HOMESTEAD HIGH SCHOOL GUIDANCE & STUDENT SERVICES BUILDING DEMO & ABATEMENTONLY (REQUEST FOR SUB BIDS)
Lathrop Construction Assoc. 707-746-8000 707-746-8080
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Bidders:
Plan Issuer:
Milpitas $4,000,000 $4,700,000
Skate park facility shall include demolition, clearing, removal of debris and other work necessary to prepare site for constructionimprovements. Concession/Restroom building includes demo and replace of existing building with CMU restroom.
Project Contact For Questions: Julie Waldron 408-586-3314Email: [email protected]
MAND 5/9 @ 10AM & 5/13 @ 2PM
19-01601
2
10:00 AM5/22/19
Addenda:MILPITAS SKATE PARK & CONCESSION/RESTROOM BUILDING - CITY OF MILPITAS
5111, 3424, & 6133 to
Prebid Conf:
City of Milpitas - DPW 408-586-3300
Excavation/SiteWork/Irrigation/Drainage/Landscape
Fax: 408-220-9916Office: 408-220-9916Terramark General EngineeringContractors Inc
Excavation/SiteWork/Irrigation/Drainage/Landscape
Fax: 408-220-9916Office: 408-220-9916Terramark General EngineeringContractors Inc
General Contractor Fax: 209-835-9554Office: 209-835-9956Goodland Construction
General Contractor Fax: 209-835-9554Office: 209-835-9956Goodland Construction
General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.
General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.
General Contractor Fax: 650-685-2491Office: 650-685-2490Omni Construction Services Inc
General Contractor Fax: 650-685-2491Office: 650-685-2490Omni Construction Services Inc
General Contractor Fax: 626-821-9314Office: 626-260-2849Saboo Inc.
General Contractor Fax: 626-821-9314Office: 626-260-2849Saboo Inc.
General Contractor Fax: 000-000-0000Office: 415-819-7925Westcal Design And Build, Inc.
General Contractor Fax: 000-000-0000Office: 415-819-7925Westcal Design And Build, Inc.
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Invited General Contractor Fax: 510-782-6078Office: 510-782-6065Suarez & Munoz Construction
Invited General Contractor Fax: 510-782-6078Office: 510-782-6065Suarez & Munoz Construction
Landscape Architect Fax: 408-985-7260Office: 408-985-7200Verde Design, Inc.
Landscape Architect Fax: 408-985-7260Office: 408-985-7200Verde Design, Inc.
Plan Issuer:
San Jose
Fencing project
19-01675
0
1:00 PM5/22/19
Addenda:ANDERSON ELEMENTARY SCHOOL FIELD FENCING - MORELAND SCHOOL DISTRICT
Greystone West Company 707-933-0624 707-996-8390
Plan Issuer:
Campbell
Modernization of buildings A & G with associated utilities.
5/14 @ 10AM
19-01776
0
2:30 PM5/22/19
Addenda:CAMPBELL SCHOOL OF INNOVATION MODERNIZATION- PHASE1B- CAMPBELL UNION SCHOOLDISTRICT REBID
Prebid Conf:
Aedis Architects 408-300-5160
NEW
Bidders:
Plan Issuer:
San Jose $180,000
Waste management and disposal of demolition of former San Jose foundry.
Project Contact For Questions: Payman Ebrahimi 408-535-8443Email: [email protected]
MAND 5/15 @ 10AM
19-01596
3
3:00 PM5/23/19
Addenda:9205-PHASE 2 OLD FOUNDRY DEMOLITION ST. JOHN STREET - CITY OF SAN JOSE
9205
Prebid Conf:
City of San Jose - DPW 408-535-8300
Asbestos Abatement /Hazardous Materials Contract
Fax: 510-654-8447Office: 510-654-8441Asbestos Management Group OfCalifornia
General Contractor Fax: 209-629-8837Office: 925-586-3317Cve Demolition, Inc.
Bidders:
Plan Issuer:
Sunnyvale
Site work, improvements of existing hardcourts, and installation of a new all-inclusive playground and rubber surface at PonderosaElementary School.
MAND 5/14 & 5/21 @ 11AM
19-01623
1
1:00 PM5/23/19
Addenda:PONDEROSA ELEMENTARY SCHOOL ALL-INCLUSIVE PLAYGROUND - SANTA CLARA UNIFIEDSCHOOL DISTRICT
#1075
Prebid Conf:
Santa Clara Unified School Dist. 408-423-2000
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
Bidders:
Plan Issuer:
Palo Alto
Install baserock
Project Contact For Questions: Jose Hernandez Guerrero
MAND 5/13 @ 9AM (Landfill Maint Yard, 2380 Embarcadero Rd., Palo Alto)
19-01661
2
3:00 PM5/23/19
Addenda:RFQ LATP, ITT & LANDFILL BASE ROCK PROJECT - CITY OF PALO ALTO
175268
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
Asphalt /Road / Bridge / HeavyHighway Contractor
Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.
Excavation/SiteWork/Irrigation/Drainage/Landscape
Fax: 408-220-9916Office: 408-220-9916Terramark General EngineeringContractors Inc
General Contractor Fax: 510-724-1254Office: 510-495-7020Hm Construction Inc
General Contractor Fax: 000-000-0000Office: 650-380-8242Towbar Equipment Company
Sub-Contractor/SpecialtyContractor
Fax: 408-848-8778Office: 408-848-8700Mckim Corporation
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Los Gatos
The first phase of the project will include removal of existing thermoplastic striping, removal and salvage or relocation of signs andposts or placement of new signs and/or posts, and placement of the new paint striping. The second phase of the project will be afterfour (4) months of phase I and will include removal of all of the new improvements placed with the first phase, including but not limitedto striping, signs and posts, followed by a slurry seal in the location of the pilot project and installation of the original striping inthermoplastic on N. Santa Cruz Avenue between Bachman Avenue and Elm Street.
19-01668
0
2:00 PM5/23/19
Addenda:ONE-WAY DOWNTOWN STREET PILOT - TOWN OF LOS GATOS
#18-813-0234
Prints Charles Reprographics 408-240-3330
Plan Issuer:
Palo Alto
To demo / deconstructed and remove a 1924 3 bedroom 1 bath 1388 sqft home with a detached garage of 250sqft and all other siteimprovements . All debris to be removed or recycled from site. All utilities wet and dry to be capped and marked for future use.Clearand grub all vegetation from site.
Project Contact For Questions Rodney Batemen 805-835-5233Email: [email protected]
19-01673
0
2:00 PM5/23/19
Addenda:FULTON STREET RESIDENCE (REQUEST FOR SUB BIDS)
Rodney's Estimating [email protected] 805-835-5233 000-000-0000
Bidders:
Plan Issuer:
Palo Alto
Provide preventative maintenance, regulatory compliance services, and routine and emergency repair services for two existingCompressed Natural Gas (CNG) vehicle fueling stations.
Project Contact For Questions: Saira CardozaEmail: [email protected]
19-01683
2
3:00 PM5/23/19
Addenda:RFP FOR PROFESSIONAL SERVICES CNG FUELING STATIONS MAINTENANCE & REPAIR SERVICE -CITY OF PALO ALTO
175252
City of Palo Alto - DPW 650-329-2271
NEW
General Contractor Fax: 805-238-0625Office: 805-238-0624Revolution Cng Inc.
Bidders:
Plan Issuer:
Santa Clara
This project is a tenant improvement of a 828 square foot space.
Project documents were provided to us from Healy Construction Services, Inc. There may be other generals bidding.
19-01730
0
12:00 PM5/23/19
Addenda:L'OCCITANE BOUTIQUE - WESTFIELD VALLEY FAIR MALL (REQUEST FOR SUB BIDS)
Healy Construction Services, Inc. 708-396-0440 000-000-0000
NEW
General Contractor Office: 619-721-1411Andy's Signs And Servcie
Plan Issuer:
Santa Clara County
Removal and installation of thermoplastic striping, resurfacing County roads with Type II micro-surfacing and all work needed tocomplete application.
Project Contact For Questions: Herbert Naraval 408-494-1308Email: [email protected]
Hard copies available for review at Santa Clara Builders Exchange
5/15 @ 10AM (County of Santa Clara, Roads & Airports, Room 103, 101 Skyport Dr., San Jose)
19-01748
0
2:00 PM5/23/19
Addenda:2019 MICRO-SURFACING OF COUNTY ROAD VARIOUS LOCATIONS - COUNTY OF SANTA CLARA
Prebid Conf:
County of Santa Clara Roads & Airports 408-573-2440
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Jose
Pre-qualify Contractor to provide University with maintenance, repair, non-maintenance, and emergency services, on an authorizedbasis.
Project Contact For Questions: Emely Balingit 408-924-1767Email: [email protected]
Optional 5/3 @ 2PM (Facilities Development Operations, 2nd Floor Conference Room)
19-01449
1
3:00 PM5/24/19
Addenda:RFP SAN JOSE STATE UNIVERSITY (SJSU) ROOFING MAINTENANCE
RFP-WR00081796-EB
Prebid Conf:
San Jose State University - SJSU 408-924-2246
Bidders:
Plan Issuer:
San Jose
This project will be for a new Specialty's Cafe interior TI in an existing shell space. The space will be 3,159 SF and trades required butnot limited to are: Demolition, Concrete - Repairs, Finish Carpentry/Millwork, Insulation, Doors/Frames/Hardware, Drywall / MetalFraming, Ceramic Tile, Acoustic Ceiling, FRP, Flooring, Epoxy Floor, Paint, Toilet Accessories, Fire Sprinklers, Plumbing, HVAC ,Electrical and Fire Alarm.
Project documents were provided to us from Eleven Western Builders. There may be other general contractors bidding.
19-01600
2
11:00 AM5/24/19
Addenda:SPECIALTY'S CAFE & BAKERY (REQUEST FOR SUB BIDS)
Eleven Western Builders, Inc. [email protected] 916-408-6950 916-408-6955
General Contractor Fax: 916-408-6955Office: 916-408-6950Eleven Western Builders, Inc.
General Contractor Fax: 916-630-3999Office: 916-630-7200Tilton Pacific Construction
General Contractor Fax: 916-788-4481Office: 916-788-4480Wells Construction, Inc.
Plan Issuer:
Palo Alto
Remove, inspect, rebuild as required and reinstall one or two pumps at the Embarcadero Pump Station.
Project Contact For Questions: Oscar GodinezEmail: [email protected]
MAND 5/14 @ 10:30AM
19-01680
2
2:00 PM5/24/19
Addenda:EMBARCADERO PUMP REHABILITATION - CITY OF PALO ALTO
175176
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
NEW
Plan Issuer:
Santa Clara
Provide and install a prefabricated, fully assembled 60/12 kV 30/40/50 Mega Volt Ampere (MVA) Power Transformer, in support ofSilicon Valley Power, the City’s electric utility.
Project Contact For Questions: Jamil (Jay) ColemanEmail: [email protected]
19-01752
0
3:00 PM5/24/19
Addenda:RFB 60/12 KV 30/40/50 MVA POWER TRANSFORMER - CITY OF SANTA CLARA
RFB 18-19-42
City of Santa Clara - Silicon Valley Power 408-615-6604
NEW
Bidders:
Plan Issuer:
San Jose $780,000
Leigh High School: Repair of existing cracks as required, install new acrylic surface, install new nets and posts.Del Mar High School: Remove existing asphalt and fencing between courts. Install new asphalt, acrylic surface, fencing betweencourts, nets and posts.Westmont High School: Remove existing asphalt and fencing between.
Project Contact For Questions: Dale Grogan 408-371-0960 xt 2053Email: [email protected]
3/22 @ 8:30AM (Westmont HS, 4805 Westmont Ave, Campbell) @ 9:30AM (Leigh HS, 5210 Leigh Ave., San Jose) @10:00AM (Del Mar HS,1224 Del Mar Ave, San Jose)
19-00814
3
2:00 PM5/28/19
Addenda:TENNIS COURTS RESURFACE & REPAIR LEIGH, DEL MAR, WESTMONT HIGH SCHOOLS - CAMPBELLUNION HIGH SCHOOL DISTRICT
218-980020-000
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
Consultant Fax: 888-840-5935Office: 916-930-6000Verux, Inc.
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Excavation/SiteWork/Irrigation/Drainage/Landscape
Fax: 408-220-9916Office: 408-220-9916Terramark General EngineeringContractors Inc
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
General Contractor Fax: 408-286-2488Office: 408-286-9101Silicon Valley Paving Inc.
General Contractor Fax: 415-282-1603Office: 415-282-1602Vintage Contractors, Inc.
Bidders:
Plan Issuer:
Palo Alto
Repair and Resurfacing of 3 existing tennis courts and installation of 2 new pickleball courts.
Project Contact For Questions: Lam DoEmail: [email protected]
Strongly Encouraged 5/14 @ 10AM (Near tennis courts)
19-01479
0
3:00 PM5/28/19
Addenda:MITCHELL PARK TENNIS COURT RENOVATIONS & PICKLEBALL COURTS ADDITION - CITY OF PALOALTO
175327
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
General Contractor Fax: 408-220-9916Office: 408-220-9916Terramark General EngineeringContractors Inc
Bidders:
Plan Issuer:
San Jose
Minor earth grading and the construction of a 5’ wide by approximately 112’ long concrete ramp complete with pipe handrails.
Project Contact For Questions: Ubaldo Perez 408-355-2231Email: [email protected]
5/14 @ 10AM
19-01572
2
3:00 PM5/28/19
Addenda:HELLYER COUNTY PARK ADA RAMP - COUNTY OF SANTA CLARA
#ITB-FAF-FY19-0262
Prebid Conf:
County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
General Contractor Fax: 925-862-0905Office: 408-442-4286Tri-Valley Excavating
Bidders:
Plan Issuer:
San Jose
Site Work for Installation of New Modular Classrooms at De Vargas Elementary School.
Project Contact For Questions: Brian SlaughterEmail: [email protected]
MAND 5/14 @ 9AM
19-01575
0
1:00 PM5/28/19
Addenda:SITE WORK FOR INSTALLATION OF NEW MODULAR CLASSROOMS AT DE VARGAS ELEMENTARYSCHOOL - CUPERTINO UNION SCHOOL DISTRICT
19-IBO8-25
Prebid Conf:
Cupertino Union School District 408-252-3000 408-343-2802
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
General Contractor Fax: 000-000-0000Office: 510-674-2613Pmk Contractors
Bidders:
Plan Issuer:
Santa Clara County
Provide demolition and debris removal services for Lysons Property, a 60-acre site located within the Monte Bello Open SpacePreserve and the Stevens Canyon Ranch Property, a 238.15-acre site located within the Saratoga Gap Open Space Preserve. Thescope of work includes remediation of hazardous materials, demolition and removal of all above structures, clean up and removal ofdebris piles, water tanks, and surface, piping, and minor grading for drainage and erosion control.
MAND 5/14 @ 10AM (RSVP to Luke Mulhall at 650-691-1200 or [email protected] by 3:00 p.m. on May 13,2019 to receive directions to the meeting location and notice of any weather delays or changes.)
19-01591
0
11:00 AM5/28/19
Addenda:LYSONS PROPERTY DEMOLITION MONTE BELLO & SARATOGA GAP OPEN SPACE PRESERVE -MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
Prebid Conf:
Midpeninsula Regional Open Space Dist 650-691-1200
Asbestos Abatement /Hazardous Materials Contract
Fax: 510-654-8447Office: 510-654-8441Asbestos Management Group OfCalifornia
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
General Contractor Fax: 209-629-8837Office: 925-586-3317Cve Demolition, Inc.
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
San Jose $2,100,000 $2,600,000
1.Compliance with Stream Maintenance Program (SMP-2) Permits and installation of Best Management Practices (BMP’s)2. Photographic/video documentation, pre construction survey photos and videos;3.Site, noise and vibration monitoring4.Traffic control for the project upon approval by the Cities of Campbell, San Jose, Palo Alto, and County of Santa Clara Roads andAirports Department if needed;5.Clearing and grubbing within the project limits, including the removal of vegetation, and other miscellaneous items;6.Control of water; including dewatering system, pumps, force mains, and proper diversion of upstream drainage and channel flows;proper handling and disposal of groundwater flows that are byproducts of the required construction;water quality monitoring per theSMP-2 permit requirements; proper handling and diversion of storm drain runoff from outfalls;7.Potholing and Identifying utilities’ vertical and horizontal locations;8.Establishment and maintenance of construction staging areas;9.Cleaning of weep holes at San Tomas Aquino Creek;10.Spot repair concrete at San Tomas Aquino Creek
MAND 5/9 @ 10AM (Starbird Circle parking lot)
19-01486
1
2:00 PM5/29/19
Addenda:SAN TOMAS AQUINO CREEK EROSION REPAIR FROM USGS GAGE NEAR WILLIAMS ROAD TOVIRGINIA AVE & BARRON CREEK CONCRETE REPAIR AT BRYANT STREET - SCVWD
C0647 to
Prebid Conf:
SCVWD- Santa Clara Valley Water [email protected]
408-630-3088 408-979-5831
General Contractor Fax: 415-285-5005Office: 415-285-5000Anvil Builders, Inc.
General Contractor Fax: 818-700-0307Office: 818-700-0304Bosco Constructors, Inc.
General Contractor Fax: 925-210-2158Office: 925-210-2150Engineered Soil Repairs Inc
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
General Contractor Fax: 408-925-0240Office: 408-925-0220Lewis & Tibbitts Inc.
General Contractor Fax: 510-562-5209Office: 510-632-7676Mcguire & Hester
General Contractor Fax: 510-674-2662Office: 510-674-2611Pmk Contractors
Supplier Fax: 925-679-2839Office: 925-204-4080Rain For Rent
Plan Issuer:
Mountain View
Miscellaneous improvements and fall protection to an existing Center for the Performing Arts MainStage system to meet OccupationalSafety and Health Administration (OSHA) requirements. The work includes selective demolition, new steel ladders, intermediate rails,new fall protection system, and minor carpentry.
Project Contact For Questions:Fred Fallah 650-903-6528Email: [email protected]
MAND 5/16 @ 2PM (Center For Performing Arts)
19-01536
0
2:00 PM5/30/19
Addenda:CPA MAINSTAGE CATWALK & BALCONY RAIL FALL PROTECTION - CITY OF MOUNTAIN VIEW
18-40
Prebid Conf:
City of Mountain View, DPW 650-903-6311
Bidders:
Plan Issuer:
Palo Alto $8,000,000
Addition of four new science classrooms with preparation areas. Tenant improvements within the existing building envelope and newcovered walkways. The project will include underground utility work, site work, asphalt, concrete, cabinetry, steel, mechanical,plumbing, fire protection, electrical, data, and fire alarm systems.
Project Contact For Questions: Rishi TupeEmail: [email protected]
MAND 5/14 @ 11AM
19-01537
4
2:00 PM5/30/19
Addenda:PALO ALTO HIGH SCHOOL SCIENCE ADDITION & ALTERATION - PALO ALTO UNIFIED SCHOOLDISTRICT
PSA-19
Prebid Conf:
Palo Alto Unified School District- PAUSD 650-329-3927
Electrical Contractor Fax: 408-434-6615Office: 408-434-6601Elco Electric
Fire Alarm/Security Contractor Fax: 916-563-1755Office: 916-910-8212Universal Security & Fire, Inc.
General Contractor Fax: 925-568-2525Office: 925-568-2200Sausal Corporation
Professional Services Office: 530-388-0579Foothill Consultants
Roofing Contractor Fax: 510-477-9786Office: 510-477-9380Alcal Roofing
Roofing Contractor Fax: 628-444-3612Office: 628-444-3610San Francisco Roofing Services, Inc.
Steel ContractorGamma Rebar, Inc.
Sub-Contractor/SpecialtyContractor
Fax: 408-727-7051Office: 925-449-6999Mission City Rebar Inc.
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Jose $575,540
Replacement of the damaged access hatch covers at four locations.
Project Contact For Questions: Ricardo Rubio-Benitez 408-793-4104
MAND 5/16 @ 10AM (Sanitary Structure on E. Younger St & N. 5th St., San Jose)
19-01686
0
3:00 PM5/30/19
Addenda:#8775-SANITARY STRUCTURE COVER REPAIRS II - CITY OF SAN JOSE
#8775
Prebid Conf:
City of San Jose - DPW 408-535-8300
NEW
Plan Issuer:
Los Altos
Provide construction management services for the demolition.
Project Contact For Questions: Aida Fairman 650-947-2603Email: [email protected]
19-01712
0
4:00 PM5/30/19
Addenda:RFP CONSTRUCTION MANAGEMENT SERVICES LOS ALTOS COMMUNITY CENTER REDEVELOPMENT
CF-01002
City of Los Altos - Engineering 650-947-2780
NEW
Bidders:
Plan Issuer:
Sunnyvale
This project will be for a new Specialty's Cafe interior TI in an existing shell space. The space will be 2,480 SF and trades required butnot limited to are: Demolition - Saw Cut, Concrete - Repairs, Finish Carpentry/Millwork, Insulation, Doors/Frames/Hardware, Drywall /Metal Framing, Ceramic Tile, Acoustic Ceiling, FRP, Flooring, Epoxy Floor, Paint, Toilet Accessories, Fixture Install, Fire Sprinklers,Plumbing, HVAC , Electrical and Fire Alarm.
Project documents were provided to us from Eleven Western Builders. There may be other generals bidding.
19-01747
0
11:00 AM5/30/19
Addenda:SPECIALTIES CAFE & BAKERY (REQUEST FOR SUB BIDS)
Eleven Western Builders, Inc. 760-796-6346 760-796-6358
NEW
General Contractor Fax: 760-796-6358Office: 760-796-6346Eleven Western Builders, Inc.
Plan Issuer:
San Jose $105,000
This multi-prime project bundles four (4) separate Bid Packages; Bid Package 1, 2, 3, 4. Bid Package #1 - Student Services Center -Flooring includes demolition, removal and disposal of existing base and carpet, minor repair and preparation of subsurface (concrete),provide and install new base and carpet. Installation of new carpet will interface with existing finish materials in the Student ServicesWelcome Center, Counselling Center, and corridor. Installation will include a raised floor with “carpet clips”
Project Contact For Questions: Cindy Giesing - 408-270-6487Email: [email protected]
5/21 @ 10AM (Gilbane-Cordoba Office Trailer, Conference Room 1, EVC Campus)
19-01756
0
2:00 PM5/30/19
Addenda:EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES CENTER BP 1 FLOORING
X2016.0017
Prebid Conf:
San Jose Evergreen Community College District, Cindy Giesing 408-270-6487
NEW
Plan Issuer:
San Jose $90,000
This multi-prime project bundles four (4) separate Bid Packages; Bid Package 1, 2, 3, 4. Bid Package #2 - Student Services Center -Painting scope of work: Prepare all surfaces (drywall walls and ceilings, concrete) to be painted. Patch drywall walls and ceilings. Paintwalls, handrails, door frames, trim, and columns in the Student Services Welcome and Counselling Centers. Protection of all adjacentsurfaces and materials is required. A portion of the work will need to be conducted on raised floor system. The capacity of the raisedfloor is unknown; no man-lifts or scaffolding can be used on the raised floor.
Project Contact For Questions: Cindy Giesing - 408-270-6487Email: [email protected]
5/21 @ 10AM (Gilbane-Cordoba Office Trailer, Conference Room 1, EVC Campus)
19-01758
0
2:00 PM5/30/19
Addenda:EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES CENTER BP 2 PAINTING
X2016.0017
Prebid Conf:
San Jose Evergreen Community College District, Cindy Giesing 408-270-6487
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
San Jose $33,000
This multi-prime project bundles four (4) separate Bid Packages; Bid Package 1, 2, 3, 4. Bid Package #3 Lighting Scope of Work:Remove and replace pendant lighting fixtures in the Student Services Center, in accordance with the contract documents and withinindustry standard. Remove existing 2’ x 2’ light fixture lamps and replace with LED lamps. Contractor to provide a mock up installationof each (2) light fixture for owner/architect review. Contractor also to provide support services for on-site electrical services in supportof furniture andequipment relocation efforts.
Project Contact For Questions: Cindy Giesing - 408-270-6487Email: [email protected]
5/21 @ 10AM (Gilbane-Cordoba Office Trailer, Conference Room 1, EVC Campus)
19-01759
0
2:00 PM5/30/19
Addenda:EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES CENTER BP 3 LIGHTING
X2016.0017
Prebid Conf:
San Jose Evergreen Community College District, Cindy Giesing 408-270-6487
NEW
Electrical Contractor Office: 408-910-9329Elecco, Llc
Plan Issuer:
San Jose $100,000
This multi-prime project bundles four (4) separate Bid Packages; Bid Package 1, 2, 3, 4. Bid package #4 includes providing installationof temporary facilities, dust control, temporary filters, selective demolition, provide professional moving services to move and protectfurniture and equipment, remove and protect artwork, displays, signage, and bulletin boards, provide nightly cleaning, protectingexisting furniture and fixtures in place, and final cleaning. Furnish and install activities for the general trade package include, but arenot limited to, window film, logos on glass partitions, roller window shades, temporary and permanent signage, bulletin boards, and anew art display.
Project Contact For Questions: Cindy Giesing - 408-270-6487Email: [email protected]
5/21 @ 10AM (Gilbane-Cordoba Office Trailer, Conference Room 1, EVC Campus)
19-01760
0
2:00 PM5/30/19
Addenda:EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES CENTER BP 4 GENERAL TRADES
X2016.0017
Prebid Conf:
San Jose Evergreen Community College District, Cindy Giesing 408-270-6487
NEW
Bidders:
Plan Issuer:
Los Altos
Complete the project in the particular locations, of the forms, sizes and dimensions and of the materials and to the lines and gradesand at the elevations.
None
19-01563
3
2:00 PM6/4/19
Addenda:CIPP CORROSION REHABILITATION - CITY OF LOS ALTOS
WW0100519
Prebid Conf:
City of Los Altos - Engineering 650-947-2780
General Contractor Fax: 000-000-0000Office: 415-559-2841C2r Engineering, Inc.
Plan Issuer:
Santa Clara County
Preventative maintenance, unscheduled repairs, and load bank testing for all VTA emergency generators.
Project Contact For Questions David L. MontenegroEmail: [email protected]
5/22 @ 10AM (SCVTA, 3331 N. Frist St., Bldg A, San Jose)
19-01693
0
2:00 PM6/5/19
Addenda:REBID PREVENTATIVE MAINTENANCE, REPAIR & TESTING VTA EMERGENCY GENERATOR - SCVTA
M19056
Prebid Conf:
SCVTA -Santa Clara Valley Transportation Authority 408-321-7189
NEW
Name Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Mountain View $3,100,000 $3,400,000
Replacement of HDPE and steel piping, fittings, concrete structure, and appurtenances, ventilation systems, access hatches, sluicegate, and hydraulic operator; installation of conduit and conductor, including trenching and backfill, check valve limit switches,ultrasonic level sensor, control panel, various electric improvements for ventilation and electric room, and wetwell conduit penetrationseals; relocation of existing water services; perform temporary shoring for open excavation, startup, testing, and commissioning for allelectrical, mechanical, and piping system, site restoration, temporary sewer bypas.
Project Contact For Questions: Tina TsengEmail: [email protected]
Strongly Encouraged 5/16 @ 10:30AM (Municipal Operation Center, 231 North Whisman Rd., Mtn View)
19-01732
0
2:00 PM6/5/19
Addenda:IMMEDIATE REPAIRS TO SEWAGE PUMP STATION - CITY OF MOUNTAIN VIEW
17-48 to
Prebid Conf:
City of Mountain View, DPW 650-903-6311
NEW
Sub-Contractor/SpecialtyContractor
Fax: 415-508-1801Office: 415-508-1800Bay Line Cutting & Coring, Inc.
Sub-Contractor/SpecialtyContractor
Fax: 415-508-1801Office: 415-508-1800Bay Line Cutting & Coring, Inc.
Plan Issuer:
Santa Clara County
Cultivar tree removal, invasive species treatment, mitigation basin installation, installation of tree shelters, and reporting.
Project Contact For Questions: Coty Sifuentes-WintersEmail: [email protected]
MAND 5/22 @ 10AM (Reservations required; Contact Jasmine Leong @ 650-691-1200 no later than 5/21 @ 12PM)
19-01530
1
11:00 AM6/6/19
Addenda:RFB BEAR CREEK REDWOODS TREE MITIGATION SITE INSTALLMENT - MIDPENINSULA REGIONALOPEN SPACE DISTRICT
1904-008
Prebid Conf:
Midpeninsula Regional Open Space Dist 650-691-1200
Plan Issuer:
Sunnyvale
Provide professional services for design and preparation of bid documents and construction support for the Plaza del Sol Phase IIproject.
Project Contact For Questions: Jeremy Leung 408-730-7632Email: [email protected]
19-01579
0
3:00 PM6/6/19
Addenda:RFP PROFESSIONAL DESIGN SERVICES FOR PLAZA DEL SOL PHASE II- CITY OF SUNNYVALE
F19-176
City of Sunnyvale DPW 408-730-7403 000-000-0000
Plan Issuer:
Santa Clara County
Perform ongoing variety of individual Projects, consisting of specific construction tasks, at different locations throughout the County.This Contract is for construction work and related services to be performed within a designated area of the County.
Project Contact For Questions: Kim Huynh 408-993-4532Email: [email protected].
MAND 5/24 @ 9AM (County of Santa Clara, FAF Department, 1555 Berger Dr., Bldg #3, San Jose)
19-01734
0
2:00 PM6/6/19
Addenda:JOB ORDER CONTRACT (JOC-FAF-2019-01) COUNTY OF SANTA CLARA
JOC-FAF-2019-01
Prebid Conf:
County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895
NEW
Plan Issuer:
Santa Clara County
Perform ongoing variety of individual Projects, consisting of specific construction tasks, at different locations throughout the County.This Contract is for construction work and related services to be performed within a designated area of the County.
Project Contact For Questions: Kim Huynh 408-993-4532Email: [email protected].
MAND 5/24 @ 9AM (County of Santa Clara, FAF Department, 1555 Berger Dr., Bldg #3, San Jose)
19-01735
0
2:00 PM6/6/19
Addenda:JOB ORDER CONTRACT (JOC-FAF-2019-02) COUNTY OF SANTA CLARA
JOC-FAF-2019-02
Prebid Conf:
County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895
NEW
Name Bid Date Time Contract # EstimateLocationOPR#
Gilroy
Provide professional services for design, preparation of construction.
Project Contact For Questions: Julie BehzadEmail: [email protected]
19-01709
0
2:00 PM6/7/19
Addenda:RFP PROFESSIONAL SERVICES POTABLE WATER WELL NUMBER 9 (MCCARTHY WELL)- CITY OFGILROY
19-RFP-PW-420
NEW
Plan Issuer:
Palo Alto
Installation of physical barrier posts (Bollard) for the protection and safeguard of the City owned gas meters and their associatedapparatus at various locations throughout the city.
Project Contact For Questions: Diamond PerkinsEmail: [email protected]
5/21 @ 10AM (City of Palo Alto, MSC, 3201 E. Bayshore Road, Palo Alto)
19-01770
0
3:00 PM6/11/19
Addenda:BOLLARD PROJECT FOR UTILITIES GAS SAFETY PROGRAM- CITY OF PALO ALTO
174836
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
NEW
Bidders:
Plan Issuer:
San Jose $1,800,000
Demolition, clearing and grubbing, earthwork and grading, storm drainage, rigid and flexible paving, irrigation, landscaping, exercisearea with resilient surfacing, natural turf field, stage, shade structures, security lighting, fencing, and miscellaneous site amenities.
Project Contact: Chris Mastrodicasa 408-535-8416
19-00769
5
3:00 PM6/13/19
Addenda:8469-TAMIEN PARK PHASE II - CITY OF SAN JOSE (REBID)- CANCEL
8469
City of San Jose - DPW 408-535-8300
Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric And Engineering
General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc
General Contractor Fax: 510-792-1728Office: 510-792-1727Redgwick Construction Company
Steel Contractor Fax: 510-236-5621Office: 510-233-3485Bay Area Welding & Maintenance
Sub-Contractor/SpecialtyContractor
Fax: 559-575-8244Office: 559-260-4699California Commercial Fence
Supplier Fax: 707-538-3826Office: 707-538-3800Ross Recreation Equipment Co., Inc.
Supplier Fax: 209-551-3736Office: 209-495-7579West Coast Sand & Gravel
Plan Issuer:
Sunnyvale
Perform the Baylands Park Condition Assessment Study (“Study” or “Project”), a comprehensive condition study to evaluate existingtimber structures at Baylands Park. The scope of work generally includes: information gathering, evaluating existing conditions,recommendations for renovations or replacement of the wooden structures and/or components such as foundations, fasteners, decks,benches, edge curbs, and railings.
Project Contact For Questions Nan O'Brien 408-730-7654Email: [email protected]
19-01775
0
3:00 PM6/13/19
Addenda:RFP FOR BAYLANDS PARK CONDITION ASSESSMENT STUDY PROJECT- CITY OF SUNNYVALE
PR-18-01
City of Sunnyvale DPW 408-730-7403 000-000-0000
NEW
Plan Issuer:
Saratoga
Provide audio visual package.
Project Contact For Questions: Sandy LottEmail: [email protected]
MAND 5/16 @ 10AM (Facilities Building, General Services Office- 1st Floor)
19-01628
0
11:00 AM6/14/19
Addenda:PLANETARIUM AUDIO VISUAL PACKAGE WEST VALLEY COLLEGE
#CA12-1819
Prebid Conf:
West Valley College 408-741-2187
Name Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Jose
VTA is now soliciting Statements of Qualifications (SOQ) from bidders (Bidders) with construction expertise in removing propane-fueledstandby generators and installing single diesel-fueled generators. This Request for Pre-Qualification of Bidders is intended to solicitinformation in the form of a Pre-Qualification Questionnaire and qualification statements.
Project Contact For Questions: Ehab Azab 408-321-5835Email: [email protected]
19-01515
2
1:00 PM6/18/19
Addenda:REQUEST FOR PRE-QUALIFICATION OF BIDDERS CERONE DIVISION EMERGENCY GENERATORREPLACEMENT- SCVTA
C19010
SCVTA -Santa Clara Valley Transportation Authority 408-321-7189
Bidders:
Plan Issuer:
San Jose $43,000,000
Improve and upgrade facilities.
Project Contact For Questions: Tina Pham 408-635-2099
MAND 5/20 @ 1PM & 5/22 @ 9AM (SJ-Santa Clara Regional Wastewater Facility, 4245 Zanker Rd., San Jose)
19-01687
3
3:00 PM6/20/19
Addenda:#7731-NITRIFICATION CLARIFIER REHABILITATION PHASE 1 - CITY OF SAN JOSE
7731
Prebid Conf:
City of San Jose - DPW 408-535-8300
NEW
General Contractor Fax: 925-447-0962Office: 925-447-0292Gse Construction Co. Inc.
General Contractor Fax: 707-439-7301Office: 707-439-7300Kiewit Infrastructure West Co
General Contractor Fax: 510-632-0761Office: 510-632-3173Monterey Mechanical Co.
General Contractor Fax: 510-237-2435Office: 510-234-0926Overaa Construction
General Contractor Fax: 510-777-5099Office: 707-759-6858Shimmick Construction Co., Inc.
General Contractor Fax: 925-935-1700Office: 925-627-1700Walsh Construction
Supplier Fax: 925-225-9200Office: 925-225-1900Misco
Plan Issuer:
Saratoga $370,000
lmprovements to the Ground Floor consist of the following: Demolition, salvaging of furniture and equipment, electrical, HVAC work,propane gas line work, interior work consisting of bathroom and kitchen remodel and amenities, newflooring, windows, doors,cabinetry, lighting, appliances, painting, chimney and fireplace work, porch decking, sanitary, and miscellaneous items.
Project Contact For Questions: Tom Mclauchlan 408-355-2208Email: [email protected]
6/13 @ 10AM
19-01652
2
2:00 PM6/27/19
Addenda:DYER HOUSE RENOVATION SANBORN PARK REBID - COUNTY OF SANTA CLARA
#96103
Prebid Conf:
County of Santa Clara - Parks & Recreation 408-355-2200
Plan Issuer:
Milpitas
Interior rehabilitation and restoration of the historic Alviso Adobe structure.
* Selective restoration and reconstruction of interior wood trim, paneling, and millwork.* Installation of glass viewing panels at the stairs and bathroom.* Installation of power and wiring for new light fixtures and future audio video equipment.* Repairs to exterior site features including stone wall, trash enclosure, asphalt concrete pathway and driveway.
MAND 5/9 @ 2PM; 5/13 @ 10AM; 6/6 @ 10AM & 6/11 @ 2PM
19-01774
1
10:00 AM6/27/19
Addenda:ALVISO ADOBE RENOVATION, PHASE 5-INTERIOR RESTORATION - CITY OF MILPITAS
5055
Prebid Conf:
City of Milpitas - DPW 408-586-3300
NEW
Name Bid Date Time Contract # EstimateLocationOPR#
Santa Cruz County
Bidders:
Plan Issuer:
Watsonville $655,000
Replacing 1,900 linear feet of 6-inch sewer pipe with 8-inch diameter PVC sewer pipe, removing and replacing three manholes,installing two new manholes, locating all active sewer laterals and reconnecting them to new sanitary sewer, and reconstruct paving torestore roadway.
Project Contact: Danielle GreenEmail: [email protected]
19-01553
0
3:00 PM5/21/19
Addenda:ROACHE ROAD SANITARY SEWER REPLACEMENT
SS-18-09
City of Watsonville 831-768-3115 831-763-4065
General Contractor Fax: 000-000-0000Office: 925-989-1453Apb General Engineering
General Contractor Fax: 415-897-1409Office: 415-897-6958Bay Pacific Pipeline, Inc.
General Contractor Fax: 510-266-1543Office: 510-782-5335California Trenchless, Inc.
General Contractor Fax: 000-000-0000Office: 559-310-8706Garney Construction
General Contractor Fax: 000-000-0000Office: 510-815-4505Glosage Engineering Inc.
General Contractor Fax: 408-365-9548Office: 408-574-1400Graniterock
General Contractor Fax: 408-977-1659Office: 408-977-1655Pacific Underground Construction
Bidders:
Plan Issuer:
Santa Cruz $300,000
Remove all siding in areas shown for West elevation of AL Residence Building and the East elevation of BL Building. Replaceunderlayment and supply and install new siding, cedar corner trim and architectural sheet metal. All windows and doors to get newhead and pan flashings, prime and paint to match. Alternates will be bid for other building elevations.
Project Contact: Arthur WellersdickEmail: [email protected]
MAND 5/14 @ 3pm- Barn G, Conference Rm 151H
19-01578
1
3:00 PM5/22/19
Addenda:RACHEL CARSON COLLEGE - SIDING REPLACEMENT AL & BL RESIDENCE HALLS
5303-048
Prebid Conf:
UCSC Physical Planning & Construction 831-459-2366 831-459-5540
Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
General Contractor Fax: 000-000-0000Office: 916-549-6259Jpb Designs, Inc.
Bidders:
Plan Issuer:
Davenport $100,000
This project is for licensed contractors with a Type B, General Building Contractor’s license to demolish existing restroom and installprecast vault restroom at Davenport Landing Park in Davenport.
PREVAILING WAGE
Questions: Al Galvan at 831-454-7937
MAND 5/7 @ 10am- site
19-01453
0
2:30 PM5/23/19
Addenda:DAVENPORT LANDING RESTROOM
18C1-010
Prebid Conf:
County of Santa Cruz 831-454-2210 831-454-2710
Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Bidders:
Plan Issuer:
Santa Cruz $151,280
This project involves construction of Midwest Guardrail System with Terminal End systems on La Madrona Drive at Post Miles 1.32and 1.82, including removal of existing AC Dike, minor roadway excavation behind face of guardrail, install shoulder backing behindguardrail as necessary, and construction of new AC Dike.
Project Contact: Tim NguyenEmail: [email protected]
19-01492
0
2:00 PM5/23/19
Addenda:LA MADRONA DRIVE GUARDRAIL
County of Santa Cruz 831-454-2160 831-454-2385
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Name Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Santa Cruz County
Replacement of 16 wall mounted heat pumps across four (4) campuses throughout the school district.
PREVAILING WAGE
MAND 5/16 @ 10am- 325 Marion Ave, Ben Lomond
19-01742
0
10:00 AM5/30/19
Addenda:SLVUSD - WALL MOUNTED HVAC REPLACEMENTS
18-19-05
Prebid Conf:
San Lorenzo Valley Unified School Dist, Facilities 831-336-5193
NEW
Bidders:
Plan Issuer:
Santa Cruz $560,000
Remove all shingles in areas shown for south and north elevations of Apartment Building A laundry room. Replace underlayment andsupply and install new composite shingles, corner trim Red Con Heart and architectural sheet metal. All windows and doors to get newhead and pan flashings. Abatement (see asbestos analysis report in reference material provided with the bidding documents).
Project Contact: Arthur WellersdickEmail: [email protected]
MAND 5/16 @ 10am- UCSC Barn G, Conference Room 151H
19-01720
0
11:00 AM5/31/19
Addenda:OAKES COLLEGE - APARTMENT BUILDING A SIDING REPLACEMENT REBID
3700-066
Prebid Conf:
UCSC Physical Planning & Construction 831-459-2366 831-459-5540
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Bidders:
Plan Issuer:
Watsonville
Over the past several decades, groundwater pumping for agricultural and municipal use has led to an overdraft of the Pajaro ValleyGroundwater Basin, a condition that is expected to worsen with climate changes. The goal of the project is to collect and infiltrate anestimated 350 afy of stormwater runoff to address groundwater overdraft and improve water quality by reducing export of sedimentsand nitrate.The project includes the excavation of up to 45,000 cubic yards of soil to create a 1.3 ac (base elevation sediment basin of 44.5-ft) and3.2 ac recharge basin (base elevation of 38.5-ft and berm elevation of 53-ft). The two basins are connected with a new 36-inchdiameter high-density polyethylene (HDPE) culvert at a 4% slope.Excavated material will be disposed of approximately 1 mile north of the project site.
PREVAILING WAGE
Questions: Erin McCarthy at (831) 464-2950 x 10
MAND 5/23 @ 8:30am- right hand side of Riverside Road, just past the intersection with Carlton Road, Watsonville
19-01640
0
1:00 PM6/5/19
Addenda:KELLY-THOMPSON RECHARGE BASIN
Prebid Conf:
Resource Conservation District of Santa Cruz [email protected]
831-464-2950 831-475-3215
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
General Contractor Fax: 000-000-0000Office: 831-901-0072Teichert Construction
Plan Issuer:
Capitola $874,600
Construction of approximately 2000 lineal feet of new sidewalk, related pedestrian improvements, and driveway approaches, on thenorth side of Park Avenue from McCormick Avenue to Cabrillo Street to facilitate pedestrian access.
19-01694
0
3:00 PM6/5/19
Addenda:PARK AVENUE SIDEWALKS IMPROVEMENTS
City of Capitola [email protected] 831-475-7300 831-479-8879
NEW
Plan Issuer:
Felton
Modify two existing comfort station structures, install leach field system including lift station, install accessible path of travel, parkingspaces, and appurtenances at HENRY COWELL REDWOODS STATE PARK in Santa Cruz County, California.
Project Contact: Merrilee ByrnesEmail: [email protected]
MAND 5/21 @ 11am- site
19-01708
0
2:00 PM6/6/19
Addenda:HENRY COWELL REDWOODS STATE PARK DAY-USE ACCESSIBILITY IMPROVEMENTS
C19E0003
Prebid Conf:
Department of Parks and Recreation [email protected] 916-445-8843 916-445-9027
NEW
Name Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Santa Cruz County
Replacement of 16 wall mounted heat pumps across four (4) campuses throughout the school district.
PREVAILING WAGE
MAND 5/16 @ 10am- 325 Marion Ave, Ben Lomond
19-01742
0
10:00 AM5/30/19
Addenda:SLVUSD - WALL MOUNTED HVAC REPLACEMENTS
18-19-05
Prebid Conf:
San Lorenzo Valley Unified School Dist, Facilities 831-336-5193
NEW
Bidders:
Plan Issuer:
Santa Cruz $560,000
Remove all shingles in areas shown for south and north elevations of Apartment Building A laundry room. Replace underlayment andsupply and install new composite shingles, corner trim Red Con Heart and architectural sheet metal. All windows and doors to get newhead and pan flashings. Abatement (see asbestos analysis report in reference material provided with the bidding documents).
Project Contact: Arthur WellersdickEmail: [email protected]
MAND 5/16 @ 10am- UCSC Barn G, Conference Room 151H
19-01720
0
11:00 AM5/31/19
Addenda:OAKES COLLEGE - APARTMENT BUILDING A SIDING REPLACEMENT REBID
3700-066
Prebid Conf:
UCSC Physical Planning & Construction 831-459-2366 831-459-5540
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Bidders:
Plan Issuer:
Watsonville
Over the past several decades, groundwater pumping for agricultural and municipal use has led to an overdraft of the Pajaro ValleyGroundwater Basin, a condition that is expected to worsen with climate changes. The goal of the project is to collect and infiltrate anestimated 350 afy of stormwater runoff to address groundwater overdraft and improve water quality by reducing export of sedimentsand nitrate.The project includes the excavation of up to 45,000 cubic yards of soil to create a 1.3 ac (base elevation sediment basin of 44.5-ft) and3.2 ac recharge basin (base elevation of 38.5-ft and berm elevation of 53-ft). The two basins are connected with a new 36-inchdiameter high-density polyethylene (HDPE) culvert at a 4% slope.Excavated material will be disposed of approximately 1 mile north of the project site.
PREVAILING WAGE
Questions: Erin McCarthy at (831) 464-2950 x 10
MAND 5/23 @ 8:30am- right hand side of Riverside Road, just past the intersection with Carlton Road, Watsonville
19-01640
0
1:00 PM6/5/19
Addenda:KELLY-THOMPSON RECHARGE BASIN
Prebid Conf:
Resource Conservation District of Santa Cruz [email protected]
831-464-2950 831-475-3215
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
General Contractor Fax: 000-000-0000Office: 831-901-0072Teichert Construction
Plan Issuer:
Capitola $874,600
Construction of approximately 2000 lineal feet of new sidewalk, related pedestrian improvements, and driveway approaches, on thenorth side of Park Avenue from McCormick Avenue to Cabrillo Street to facilitate pedestrian access.
19-01694
0
3:00 PM6/5/19
Addenda:PARK AVENUE SIDEWALKS IMPROVEMENTS
City of Capitola [email protected] 831-475-7300 831-479-8879
NEW
Plan Issuer:
Felton
Modify two existing comfort station structures, install leach field system including lift station, install accessible path of travel, parkingspaces, and appurtenances at HENRY COWELL REDWOODS STATE PARK in Santa Cruz County, California.
Project Contact: Merrilee ByrnesEmail: [email protected]
MAND 5/21 @ 11am- site
19-01708
0
2:00 PM6/6/19
Addenda:HENRY COWELL REDWOODS STATE PARK DAY-USE ACCESSIBILITY IMPROVEMENTS
C19E0003
Prebid Conf:
Department of Parks and Recreation [email protected] 916-445-8843 916-445-9027
NEW
Name Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Santa Cruz $341,000 $375,000
The work to be completed under this Contract consists of furnishing all materials, labor, equipment, fuel and tools required to repairstorm damage to a tank access road in Santa Cruz County, CA. The repairs include constructing a new pin pile retaining wall withdrilled concrete piers, guardrail, asphalt pavement restoration, asphalt dike, and drainage repairs, as shown on the Plans and detailedin the Specifications.
Project Contact: Lewis KayEmail: [email protected]
MAND 5/28 @ 2pm- Entrance to the access road is located off of Glen Canyon Rd, between 580 Glen Canyon Rd and120 Glen Canyon Ct
19-01638
1
2:00 PM6/13/19
Addenda:CARBONERA WATER TANK ACCESS ROAD STORM DAMAGE REPAIR
CWO 2019-003 to
Prebid Conf:
City of Santa Cruz - Water Department 831-420-5220 831-420-5201
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Bidders:
Plan Issuer:
Watsonville
Mobilize, remove and dispose of approx.. 7000 sq. Ft wood shakes and asbestos underlayment paper, cleaned and ready for newasphalt composition roofing.Time schedule : Fall 2019Details: This roof is a 15:12 pitchPlease include permit acquisition and costInclude all necessary environmental and health precautions
Questions may be directed to: Frank Liebscher [email protected]
19-01728
0
5:00 PM6/20/19
Addenda:WATSONVILLE SEVENTH-DAY ADVENTIST CHURCH (INFO ONLY)
Frank Liebscher [email protected] 775-233-7554
NEW
Asbestos Abatement /Hazardous Materials Contract
Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.
Asbestos Abatement /Hazardous Materials Contract
Fax: 000-000-0000Office: 831-334-0125Monterey Environmental Solutions +Services
Delta Ironworks, Inc. is looking for a FT employee that can process the following:
• Payroll • Certified Payroll Reports: Elations, LCP Tracker • Accounts Payable • Experience with QuickBooks and MS Office is required.
15420-A Meridian Rd Prunedale, CA 93907 P.O. Box 10580 Salinas, CA 93912 OFFICE: 831-663-1190
Pre Qual List
Contractors Pre Qualification Notices for the Week of April 1, 2019 The following agencies are now looking for contractors to be pre-qualified for upcoming projects at their public agency. Please read each qualification request as they vary with each agency. Click on the name of the agency as this will provide you with a direct link to their website for more information.
Name of Public Agency Completion Date
Morgan Hill Unified School District Open Ended City of La Mirada Open Ended Salinas Union High School District Open Ended Pleasant Valley Joint Elementary School District Open Ended Santa Rosa City School District Open Ended Contra Costa County Office of Education Open Ended City of San Luis Obispo Open Ended Sonoma County Open Ended Carmel Unified School District Open Ended City of Fremont Open Ended Brentwood Union School District Open Ended Kenwood Elementary School District December 31, 2019 San Ramon Valley Unified School District December 31,2019 Menlo Park City School District Open Ended Monrovia Unified School District Open Ended Alexander Valley Union School District Open Ended City of Daly City Open Ended City of Morgan Hill Open Ended Los Gatos Union High School District Open Ended Santa Clara Unified School District Open Ended Cupertino Union School District Open Ended Cabrillo College December 31, 2019 San Rafael City School District Open Ended Martinez Unified School District Open Ended San Lorenzo Unified School District Open Ended Antelope Valley College District Open Ended San Lorenzo Valley Unified School District Open Ended City of Menlo Park Open Ended Three Valleys Water District Open Ended City of Elk Grove December 31, 2019 Beverly Hills Unified School District Open Ended Town of Windsor Open Ended Berkeley Unified School District Open Ended Santa Cruz Harbor Open Ended Paso Robles Joint Unified School District Open Ended San Lorenzo Unified School District Open Ended Alameda Municipal Power District Open Ended City of Saratoga Open Ended City of Milpitas Open Ended Chabot Las Positas Community College District Open Ended Fremont Union High School District Open Ended Twin Rivers School District Open Ended Pleasanton Unified School District Open Ended Yolo County Office of Education Open Ended Ukiah School District Open Ended City of Cupertino Open Ended
Territory Sales Manager Cell: 805-252-1798 [email protected]
Central Coast Central Valley
9195 El Camino Real Atascadero, CA 93422
Ron Silveira
www.muesinc.com
SERVING MONTEREY COUNTY, SANTA CRUZ & BENITO COUNTY
G R A N I T E R O C K C O N S T R U C T I O N D I V I S I O N
CO
NS
TR
UC
TI
ON
D
IV
IS
IO
N
ALL OF YOUR CONSTRUCTION NEEDS - FROM DRIVEWAYS TO FREEWAYS • Asphalt and Concrete Driveways
• Parking Lots
• Site Work
• Seal Coating and Striping
• Underground Utilities (Water, Sewer, Storm Drain)
• Chip Sealing
• Culverts and Walls
• Golf Cart Path Work
• Concrete Curb and Gutters
• Concrete Flatwork
• Asphalt Grinding
• Subdivision Site Work Development
• Structures
General Engineering Contractor - LIC#22 • For an estimate call 831.768.2789 • Fax 831.768.2701
Shining like a ‘national’ guitar, whether licensed by state or nation the ‘song remains the same’ for our first contractor. With certain ‘reservations’ for making the change, and new business name can be put on ‘hold’ in CA. I did it once and for you, or our last contractor, I can always do it again!.. Q: I am applying for a General Building license in Nevada. I have taken and passed the NASCLA exam, and from what I understand, that will allow me to waive the trade exam in Nevada. I see the form “Request for Verification of Licensure”, however it appears this needs to be completed by another State. As you probably know, NASCLA is a National exam which is not State specific. How do I notify the Nevada Contractor’s Board that I am applying for reciprocity based on my NASCLA test? A: You may verify your passing score by accessing NASCLA’s National Examination Database (NED) to purchase and electronically send your transcript to the Nevada Contractor’s Board. Q: I just recently took over my brother’s construction company because he retired. I became the only Officer and the RMO (Responsible Managing Officer). I want to change the name of the corporation however I don’t want to do it right away. I was thinking I should keep the same business name for a period of time because it is an established name that most of our customers are familiar with. In a couple months, when our customers are more familiar with me being the owner, I want to change the name. How do I go about doing this? I have a name in mind, and I’d like to “lock it down” so it doesn’t get taken in the meantime. Is that possible? A: The California Secretary of State allows you to reserve a business name for a period for 60
days (assuming the business name is available). Once you are ready to change the name, you will need to file a Certificate of Amendment of Articles of Incorporation to change the business name at the Secretary of State level. Once that’s complete, you can notify the CSLB with a Business/Address change form. Q: You recently helped me with obtaining my Sole Proprietor license, which went very smoothly so thank you! About a week ago I submitted an application to become the RME (Responsible Managing Employee) for my company. Someone from the office called the CSLB to check the status of the application and apparently there were some comments about some deficiencies on the paperwork such as missing middle names, etc. The CSLB informed us that a letter went out explaining the corrections that need to be made. When we receive that letter, is this something you can assist with it to ensure there is no further delay in the process? I remember when you helped me, you were able to hand deliver everything to the CSLB…is that still the case? Time is of the essence so any expediting services would be greatly appreciated. A: Yes, we would be happy to assist you, and yes, we still always hand deliver all documents to the CSLB and get date stamped copies. Also a reason we are a first choice in assisting contractors for more than 30 years! While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.
What's In It For You:How the homesphereprogram works:
bundle and earn more
[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll
CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.
TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.
COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.
It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form
•Get access to Single-Familyand Multi-Family Rebates
•Bundle all your rebates intoone monthly check
•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers
Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:
Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!
Earn cash back on each productyou install
Employer Sponsored Options Products you can get through your employer. Enrolling is easy! Your company receives a single, consolidated bill and participating employees have the convenience of payment through payroll deductions. Both Group and Voluntary options are available.
Medical – All CA Carriers & Covered CA MetLife Dental – Group and Voluntary VSP Group Vision Anthem Blue View Voluntary Vision Landmark Chiropractic & Acupuncture MetLife Term Life - Group and Voluntary CADR+ Telemedicine - 24/7 Doctors on Call LifeLock Identity Theft Protection
Colonial Life Optional Benefits Accident Insurance Critical Illness Insurance Short Term Disability Insurance Hospital Confinement Insurance Whole Life with LTC Rider
LegalShield Pre-Paid Legal Services Legal Shield Identity Theft Shield
Build a Better Benefits Package!
Through the California Builders Exchanges (CBX), the Central Coast Builders Association now offers a highly competitive benefits program to our member firms and their employees.
Want More Information?
Go to www.cbxbenefits.com
Or contact our local Benefits Consultant!
Tina Nelson Q&A Insurance Marketing, CA Lic. 0B17048 Cecy Insurance Services, CA Lic. 0802215 (831) 477-1730 [email protected]
Individual Options Valuable products, services and discounts that your employees can get directly from one of our contracted providers because you are a member of the Association.
Health Insurance for Individuals and Families Nationwide Pet Insurance LifeLock Identity Theft Protection MetLife Home & Auto Insurance Working Advantage Employee Perks Program LegalShield Pre-Paid Legal Services LegalShield Identity Theft Shield
Great Voluntary Benefits!
No Minimum Participation Low Rates Consolidated Billing Guarantee Issue Options
CONSTRUCTION ESTIMATING
Material quantity takeoffs for residential/commercial. Foundation,excavation, forms, reinforcing, concrete. Rough and finish carpentry. Lumber lists. Experienced.
Contact email: [email protected]
A&R Corporation, Inc is seeking a Project Manager, Project En-gineer and Superintendents to staff a mul-tifamily apartment project located in Paso Robles. Please send resumes to Neil Mil-
ler at the following email address, [email protected]
Construction Project Manager / Estimator Monterey CA $80,000-$90,000 a year General Contractor specializing in Prevailing Wage Projects seeks experienced Project Manager for California. Must have a minimum of 10 years hands-on abilities to handle the planning, coordination, and control of a project from inception through comple-tion. Strong estimating skills a must. Our projects are fast paced and require immedi-ate response to field personnel and customer requirements. The position will require job walks and client meetings throughout Central and Northern California. In addition to the required experience above, the right candidate will have natural leadership abilities, be able to work independently, and is organized and detail-oriented. It is criti-cal that you have the ability to communicate effectively and appropriately with clients, colleagues and coworkers, as well as the ability to recognize a potential problem and resolve immediately and effectively. Must have experience supervising field staff in-cluding sub-contractors. Responsibilities Include: Bidding and estimating TI projects throughout California, performing prevailing wage projects. Selecting, negotiating and coordinating the work of sub-contractors Adhering to proper administration of construction contracts with knowledge of and the experience with AIA documents Reporting/updating to owners the progress of projects including any changes needed Preparing transmittals, submittals, contracts and daily logs Preparing and processing change orders timely and accurately Supervising and supporting field staff Timely preparing of monthly invoicing for the accounting department Maintaining data and cost of projects Travel will be required Strong verbal and written communication skills Advanced computer skills including MS Project, Word, Excel and Outlook MUST be able to read plans and be willing to work as a Team member to ensure the success and timely completion of all projects Email resume to [email protected] Job Type: Full Time Salary: $80,000-$90,000 & Federal Holidays + 2 weeks of Vacation Experience: Construction: 5 years minimum
Construction Project Management: 5 years minimum
Architectural Photography
Harold Gomes Email:
[email protected] Cell: 831-227-1942
For Sale: DriWater time-release water replacement gel pacs, 100+/- cases, 20/case.
Contact Kim O'Bryan at KCI Environmental, Inc. [email protected] or 805 431-1168.
Safety Tip of the WeekIT'S THE SUDDEN STOP THAT HURTS
Each year, falls result in many serious injuries, and approximately 20% of all falls are fatal. This means that for every five persons involved in a falling accident, one dies. Let's spend the next few minutes talking about where falls occur and what we can do to prevent them. HOUSEKEEPING Good footing is the best way to avoid falls and good housekeeping is the best way to ensure good footing. Scrap lumber; trash; wire; and slippery areas caused by water, grease, or oil can cause falls. LADDERS Taking ladders for granted has caused many falls. Many workers believe that they can use any ladder for any job. To be safe, however, select a ladder that suits the purpose. Be sure it's in good condition and that you place it securely. Keep both hands free for climbing and always face the ladder when going up or down. Don't carry tools with you. SCAFFOLDS A scaffold should be solidly constructed like a permanent structure, even if it will be used for only a short time. Be sure uprights are uniformly spaced, plumb, and set on a good foundation. Use mudsills. Use horizontal or diagonal bracing to give stability. Provide guardrails and toeboards to help prevent falls. Inspect planking before installation. It should be overlapped by a minimum of 12 inches or secured from movement. The planks should extend over the end supports by not less than 6 inches not more than 12 inches. Whenever you're on a single-point or a two-point suspended scaffold, wear your safety gear or equipment. Be sure it's tied to a secure independent life line. FLOOR AND WALL OPENINGS Depending on their size, cover floor openings or protect them with standard guard-rails and toeboards. Also, protect wall openings, except for doorways and stair-ways through which persons could fall. This protection should be substantial and secured to prevent displacement. STAIRWAYS Falls on stairways are caused by running, carrying objects that block your view failure to use handrails, or just not paying attention. Watch your step and concentrate on what you are doing. Remember, it's not the fall that hurts. It's the sudden stop. Safety Recommendations:__________________________________________________________________________________ Job Specific Topics:_______________________________________________________________________________________ M.S.D.S Reviewed:_______________________________________________________________________________________ Attended By: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________