Instrumentation with Field Bus Technology:

Building Foundation to Meet Future Building Foundation to Meet Future ChallengesChallengesChallengesChallenges

Field Bus: A Way Forward>>>>

Device Management

Conventional System Fieldbus Control System

Plant Operation & C t l Device Management

Diagnostics Server& Control

Automatic Alarm Notification from Device

BENEFIT FORM FIELD BUSNew Technology to achieve high quality, low cost and expendibilty

PIDAI

AOAI

Control OutputMV

Intelligent Device

Optimize operation by improving control model precisionImprove process safety / stability by more process information

Diag Full Digital Communication

more process information Predictive maintenance based on device diagnose dataAcquire field information to improve

bilit

Slide No. 2

process capability

Field Bus: A Way Forward>>>>

Why Why Field busField bus ??Why Why Field busField bus ??yyyy

Wh t i ?Wh t i ?Wh t i ?Wh t i ?What gain ?What gain ?What gain ?What gain ?

Slide No. 3

Field Bus: A Way Forward>>>>

The Business Perspective The Business Perspective –– How can we How can we survive in the competitive world………..survive in the competitive world………..

Reliable Project Documentation

survive in the competitive world………..survive in the competitive world………..Fast Commissioning

& Startup Reduce cost of

Increase Return on

poor quality

Capital investment Reduce Maintenance costs

Low Capital Investment Improve predictability

Slide No. 4

ROI ROI –– ImprovementImprovement

Increase ROI

C C

Increase RevenueReduce conversion Costs

Reduce Capital Cost Increase Profitability

Reduced Reduced

Increase Productivity

Increased

Reduction of losses

ReducedProject Capital,

Installation &Commissioning

Cost

Feed stocksEnergy and Utilities

Maintenancewaste

Abnormal Events

YieldConsistency

Equipment CapacityEquip. Efficiency

Unscheduled Downtime& Small stoppages

Low Maintenance time Resources, Reliable

HistoryAbnormal Events History

Field Bus: A Way Forward>>>>

Refineries on FF:Refineries on FF:

2.3 million barrel /day 2.3 million barrel /day NanhiNanhi30,000 FF devices and commissioned in 2005. Field 30,000 FF devices and commissioned in 2005. Field bus foundation used for entire plant automationbus foundation used for entire plant automation

2.3 million barrel /day 2.3 million barrel /day NanhiNanhi30,000 FF devices and commissioned in 2005. Field 30,000 FF devices and commissioned in 2005. Field bus foundation used for entire plant automationbus foundation used for entire plant automationppTENCO Refinery TENCO Refinery RussiaRussia45,000 FF devices and commissioned in 2006. Field 45,000 FF devices and commissioned in 2006. Field bus foundation used for entire plant automationbus foundation used for entire plant automation

ppTENCO Refinery TENCO Refinery RussiaRussia45,000 FF devices and commissioned in 2006. Field 45,000 FF devices and commissioned in 2006. Field bus foundation used for entire plant automationbus foundation used for entire plant automationbus foundation used for entire plant automationbus foundation used for entire plant automationConocoPhilips YERP Refinery ConocoPhilips YERP Refinery Saudi ArabiaSaudi Arabia25,000 FF devices and commissioned in 2006. Field 25,000 FF devices and commissioned in 2006. Field

bus foundation used for entire plant automationbus foundation used for entire plant automationConocoPhilips YERP Refinery ConocoPhilips YERP Refinery Saudi ArabiaSaudi Arabia25,000 FF devices and commissioned in 2006. Field 25,000 FF devices and commissioned in 2006. Field ,,bus foundation used for entire plant automationbus foundation used for entire plant automation

,,bus foundation used for entire plant automationbus foundation used for entire plant automation

Slide No. 6

Field Bus: A Way Forward>>>>

Refineries on FF:Refineries on FF:

Petro Rebigh Petro Rebigh Saudi ArabiaSaudi Arabia30,000 FF devices and commissioned in 2006. 30,000 FF devices and commissioned in 2006. Field bus foundation used for entire plantField bus foundation used for entire plant

Petro Rebigh Petro Rebigh Saudi ArabiaSaudi Arabia30,000 FF devices and commissioned in 2006. 30,000 FF devices and commissioned in 2006. Field bus foundation used for entire plantField bus foundation used for entire plantField bus foundation used for entire plant Field bus foundation used for entire plant automationautomationField bus foundation used for entire plant Field bus foundation used for entire plant automationautomation

Field Bus: A Way Forward>>>>

Chevron Refineries under going FF:Chevron Refineries under going FF:

325,000 barrel /day Mississippi 325,000 barrel /day Mississippi 300,000 barrel /day Mississippi 300,000 barrel /day Mississippi 260 000260 000 b l /d C lif ib l /d C lif i

325,000 barrel /day Mississippi 325,000 barrel /day Mississippi 300,000 barrel /day Mississippi 300,000 barrel /day Mississippi 260 000260 000 b l /d C lif ib l /d C lif i260,000 260,000 barrel /day California barrel /day California 225,000 barrel /day 225,000 barrel /day CaliforniaCalifornia45 000 b l /d S lt l k45 000 b l /d S lt l k

260,000 260,000 barrel /day California barrel /day California 225,000 barrel /day 225,000 barrel /day CaliforniaCalifornia45 000 b l /d S lt l k45 000 b l /d S lt l k45,000 barrel /day Salt lake 45,000 barrel /day Salt lake 52,000 barrel /day Canada52,000 barrel /day Canada210 000 barrel /day UK210 000 barrel /day UK

45,000 barrel /day Salt lake 45,000 barrel /day Salt lake 52,000 barrel /day Canada52,000 barrel /day Canada210 000 barrel /day UK210 000 barrel /day UK210,000 barrel /day UK 210,000 barrel /day UK 54,000 barrel /day Hawaii54,000 barrel /day Hawaii112 000 barrel /day South Africa112 000 barrel /day South Africa

210,000 barrel /day UK 210,000 barrel /day UK 54,000 barrel /day Hawaii54,000 barrel /day Hawaii112 000 barrel /day South Africa112 000 barrel /day South Africa112,000 barrel /day South Africa 112,000 barrel /day South Africa 112,000 barrel /day South Africa 112,000 barrel /day South Africa

Field Bus: A Way Forward>>>>Emerson to Digitally Automate China's Largest Integrated Refining/Petrochemical Facility:EPM has been selected to digitally automate the FujianEPM has been selected to digitally automate the FujianRefining and Ethylene Joint Venture Project in Quanzhou City,Fujian Province, China. It is the largest integrated refining and

t h i l j t d t k i Chi P j tpetrochemicals project ever undertaken in China. Projectstartup is expected by 2009. EPM will serve as the Main Instrument and Controls Contractor (MICC) th j t d ill i t ll it Pl tW b Th Pl tW b(MICC) on the project, and will install its PlantWeb. The PlantWeb installation will include eight DeltaV, AMS, safety instrumented system (SIS), fire and gas systems, Rosemount pressure and temperature transmitters, plus Fisher digital valve controllers, all utilizing FOUNDATION fieldbus, HART, OPC and Modbus communication technologies, and delivering information to a real-time database.

Field Bus: A Way Forward>>>>Emerson to Digitally Automate China's Largest Integrated Refining/Petrochemical Facility:The project will expand the existing refinery at Quanzhou FujianThe project will expand the existing refinery at Quanzhou, Fujian Province, from 80,000 barrels per day to 240,000 barrels per day. The upgraded refinery will primarily refine and process sour Arabian

d I dditi t h i l f iliti ill b t t dcrude. In addition, new petrochemical facilities will be constructed, including an 800,000 tons-per-year ethylene steam cracker, an 800,000 tons-per-year polyethylene unit, a 400,000 tons-per-year

l l it d ti l t dpolypropylene unit, and an aromatics complex to produce700,000 tons per year of paraxylene. A 300,000-tons crude berth and associated utilities will also be built.

Field Bus: A Way Forward>>>>Yokogawa awarded for Package Order to Supply Control Systems for Petrochemical Complex in Singapore:Yokogawa has received a package order from Shell EasternYokogawa has received a package order from Shell EasternPetroleum (Pte) Ltd (SEPL) to supply control systems for theShell Eastern Petrochemicals Complex (SEPC) in Singapore.At th SEPC SEPL i t ti t h i l l tAt the SEPC, SEPL is constructing a new petrochemical plantthat will annually produce 800 thousand tons of ethylene and750 thousand tons of mono-ethylene glycol and upgrading an

i ti t l fi ith fi i it f 500existing petroleum refinery with a refining capacity of 500thousand bpd. Yokogawa shall deliver the control systems using the latest FOUNDATION fieldbus technology for these upgrade andexpansion projects by December 2008. The delivered systemswill include the CS 3000, ProSafe-RS, Exaquantum (PIMS)and EJX.

Field Bus: A Way Forward>>>>Yokogawa awarded as main system supplier for ESSAR refinery expansion project:Yokogawa secure the order as Main Automation Contractor &Yokogawa secure the order as Main Automation Contractor & supplier of DCS, ESD and F&G system for Essar refinery expansion from 10.5 to 34 MMTPA. Yokogawa shall deliver the

t l t i th l t t FOUNDATION fi ld b t h lcontrol systems using the latest FOUNDATION field bus technology for this expansion projects by December 2009. The Overall system supply will include the CS 3000 VP, Triconex ESD from Invensys, P S f RS f F&GProSafe-RS for F&G.

Field Bus: A Way Forward>>>>

Honeywell’s 2007 Users Group Americas Symposium:The Honeywell 2007 Users' Group Americas Symposium was held June 10-14th in Phoenix at the Arizona Resort and Spa. A record attendance of over 1,700 people from around the worldparticipated in the event that included a general session on industry innovations and advancements, technology and solutions update sessions, industry break out sessions, and anexposition demonstrating key Honeywell products, solutions, p g y y pand services. Honeywell is also attracting a lot of recognition for their innovative highly integrated POMS and Experion PKS Batch Control System solution for the Pharmaceutical industry. y yIn ARC’s view, the new system comes closest to meeting a full implementation of the ISA 88 batch standard.

Field Bus: A Way Forward>>>>

Honeywell secure $ 4.7 million automation project of cement plant in west Virginia with FF:• Qatar Shell Improves Efficiency of GTL PlantHoneywell was selected by Qatar Shell GTL Ltd. to design and implement the integrated process automation system for the Pearl Gas to Liquids (GTL) plant. This includes installationof the Experion Process Knowledge System (PKS) Release 300, with FOUNDATION fieldbus communication, to tie together all critical subsystems in the plant.With the integrated automation platform, Qatar Shell GTL Ltd.will be able to efficiently control GTL operations from y pproduction at the platforms, to processing at the on-shore plant, to shipping of the finished product.

Field Bus: A Way Forward>>>>

Honeywell Signs MAC Agreement with BP Exploration & Production:Honeywell has signed a six-year agreement with BP Exploration to provide Main Automation Contractor (MAC) services at the oil and gas leader’s new and existing facilities. Honeywell will help BP Exploration & Production (E&P) accelerate production schedules and improve efficiency in these facilities by integrating all levels of plant operations and automating critical processes.g pHoneywell can apply its integrated strategy to each design phase, including front-end engineering development, early operator training and process simulation, advanced control modeling, process p , g, pvalidation and advanced process control. This integrated approach will result in common interfaces across production and business systems for increased safety and efficiency, higher plant availability,

Slide No. 15

systems for increased safety and efficiency, higher plant availability, lower operating expenditures and reduced engineering.

Field Bus: A Way Forward>>>>

INVENSYS IS THE SYSTEM SUUPLIER FOR RELIENCE REFINERY EXPANSION:Invensys is the Main automation contractor and system supplier forupcoming refinery and polypropylene plant. The refinery capacity is doubledto 62.5 MMTPA with current expansion. This is state of art plant with fully

t t d d F d ti Fi ld b t i t f th t l lautomated and Foundation Field bus system in most of the control loops.The plant FF system is commissioned with advance diagnostic module fromMTL. Reliance award Invensys first refinery full automation i.e. DCS,ESD TAS OFFSITES and Field Instruments like Transmitters Based on pastESD,TAS,OFFSITES and Field Instruments like Transmitters. Based on pastexperience having Invensys system in Old refinery , Reliance extend all thefull automation portfolio of Invensys to new refinery. Reliance uses InvensysSolutions like Enterprise Control system, Online Optimization package andSolutions like Enterprise Control system, Online Optimization package andtheir major New project like KGD6 also Invensys solutions are selected.JERP Expansion total Solution are extended in the same system with all newtechnology implemented while maintaining all old Hardware.

Slide No. 16

gy p g

.

Field Bus: A Way Forward>>>>

ABB system and Asset Master: a New Comprehensive Field Device Management and Optimization Solution:g pABB introduced Asset Master, a new software solution that helps user to meet these objectives, as well as providing traditional set-up tools for instrumentation configuration andtraditional set-up tools for instrumentation configuration and calibration.ABB system used state of art plant operation on Profibus DP f hi h i i Fib d ti i Th il d PDP for high precision Fibre production in Thailand, Pan Century malaysia using multiple protocol for information exchange with other systems. g y

Field Bus: A Way Forward>>>>MIS / PIMMIS / PIM

(Existing Plant)(Existing Plant)

ETHERNETNew ExtensionNew Extension

EWSEWSPRM /PRM /HISHIS HISHIS

BUS

HARTHART

EWSEWSAMSAMSHISHIS HISHIS

PROCESS FIELD BUS

Mod BusMod Bus

Optic Optic FibreFibre

TCP IPTCP IP

OmROn

TouchTouch

Device Net Device Net R t I/OR t I/O

Touch Touch PanelsPanels

Remote I / ORemote I / O

Slide No. 18

Remote I/ORemote I/O

Field Bus: A Way Forward>>>>

Level 3

OperationsDriftLevel 2

LoopµPµ

Externalinfluence

ElectronicsDefective

Sensor Drift

Device

Four Four -- Level Level Management Module Management Module “Abnormality Analysis”“Abnormality Analysis”Four Four -- Level Level Management Module Management Module “Abnormality Analysis”“Abnormality Analysis”

Enterprise Enterprise NetworkNetwork

Level 4

Level 3

Abnormality AnalysisAbnormality AnalysisAbnormality AnalysisAbnormality Analysis

CommunicationLevel 2

Level 3

Operations

Communication& NetworkingDrift

Level 2

FF AccessoriesLevel 1A

Loop

µPE t l

FF SensorsLevel 1

Device

Externalinfluence

ElectronicsDefective

Sensor Drift

Maintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital World

Device LevelDevice Level Device Configuration:Device Configuration:

۩ FF Basic-to-LM device wizard“Safe” way to enable/disable y

Backup LASProvides wizard to step

through sequenceInsures BLAS will

work when needed

Maintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital World

Device Level (Sensing):Device Level (Sensing):Device Replacement:Device Replacement:

۩۩ Device Replacement by Operator۩

pp

۩ Replacement from Operator Station or Engineering Station۩ Auto replacement۩ U di d i li۩ Upgrading devices on-line

Maintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital World

Device Level (Final Element):Device Level (Final Element):Asset Measurement & Solutions:Asset Measurement & Solutions:

• Effectiveness for diagnostic– Detecting inner valve failure

Wearing of seat ring• Wearing of seat ring• Sticking the foreign object

– Detecting the failure by vibration• Moving from proper mounting position of positioner by• Moving from proper mounting position of positioner by

vibration.– Accurate analysis (No Human error)– Information available at Control room ( With Problem

D i i )Description)– Stroke repetition– Hysteresis data, Input output deviation

Valve signature– Valve signature – Overshoot / Undershoot stem travel

Input/ Output Deviation

• Basic idea– Alert when the deviation between

input and valve travel exceeds the pthreshold of time and setting deviation.

• Effectiveness for diagnostic– Stem moving degradation indexStem moving degradation index

by slurry or high viscosity fluid.

Input [%Valve tra Deviation Setting deviation]avel [%

]

Input

Threshold of time Alarm

Time

Input Valve travel

Stick-slip Mechanism

•Flue-gas desulfurization unit in a commercial power plantSti k l di t b l t l•Stick slurry disturbs valve travel

•Cleaning is required every two weeks

Stick slip Mechanism

Stick slurry to Guideat dead end

Stick-slip Mechanism

Guide

Uniform Hole

Plug

Stick slurry to GuideAngle Slurry Valve 2B

yat opening

Smart Valve Manager Stick-Slip Monitoring

Speed of index move

Threshold for alarm

Message indication from Valstaff

Maintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital World

Common issue in Electrical wiringCommon issue in Electrical wiring(loose wire strands, water ingress, faulty

Issue with FF:Issue with FF:Plant level Communication:Plant level Communication:

Advance diagnosis

( , g , ydevices, EMC, etc..)Bus topology connects multiple devicesBus topology connects multiple devices

Serial communications signalgmodule One fault can affect several devices

Available tools are for conventional Available tools are for conventional technologytechnology

T l l k bili i liTools lacks ability to visualize Fieldbus related signals

Locating the problem is difficult and time consuming many devices inand time consuming many devices in one loop; interoperability)Field Bus installationField Bus installation

Tools to commission Supervise &Tools to commission, Supervise & trouble shoot (signal distortion)

Maintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital World

۩۩ Identify kind of failure & guidedIdentify kind of failure & guided

Measurement & Online Solutions:Measurement & Online Solutions:Plant level Communication:Plant level Communication:۩۩ Identify kind of failure & guided Identify kind of failure & guided actions actions Grounding, Software, hardware& wiring problemg p۩۩ Highlight Problem with helpHighlight Problem with help۩۩User configure warning & Alarm User configure warning & Alarm alerts before segment failsalerts before segment fails۩۩ Commissioning toolCommissioning tool۩۩ Digital Oscilloscope function Digital Oscilloscope function (Lost telegram)(Lost telegram)۩۩ L f h t t DCS / HMIL f h t t DCS / HMI۩۩ Log of each event at DCS / HMILog of each event at DCS / HMI

Maintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital WorldMaintenance Practices in Digital World

Process Level Diagnosis:Process Level Diagnosis: Vendor’s SolutionsVendor’s Solutions

Impulse line chockingImpulse line chockingpH sensor deterioratedpH sensor deterioratedppCoating on probe of magnetic pickupCoating on probe of magnetic pickupShedder bar not vibrating due to Shedder bar not vibrating due to

internal or external reasonsinternal or external reasonsHigh temperature around the devicesHigh temperature around the devicesControllability problem due to Controllability problem due to

process fluctuationprocess fluctuationI i k bI i k bInappropriate step taken by Inappropriate step taken by

Operator (SP not followed)Operator (SP not followed)

Field Bus: A Way Forward>>>>

Reduction in Terminations 40%Reduction in I/O Cards 60%Reduction in Panel Space 50%R d ti i # T itt ( lti i bl ) 10%Reduction in # Transmitters (multi variable) 10%Reduction in erection hardware 40%Reduction in Installation & commissioning time 50%Reduction in Installation & commissioning time 50%Reduction in Home run wiring 40%Reduction due to remote diagnostics > 50%gReduction in time to add new device 70%Reduction in Calibration time 70%Increase in Device cost 10 %

Field Bus: A Way Forward>>>>

Slide No. 31

Field Bus: A Way Forward>>>>

Loop Level Diagnosis:Loop Level Diagnosis:

Field Bus: A Way Forward>>>>

Slide No. 33

Field Bus: A Way Forward>>>>

DESCRIPTION ANALOG INSTRUMENTS FF DEVICES

Control Valve calibration

3 Hrs. 15 Min

Transmitter calibration 1.5 Hrs. 15 Min

Termination checking 30 min 5 Min

Loop Checking 3 ~ 4 Hrs. 20 Min

Special tool required Yes loop validator ma source From DCS / Hand Held Special tool required for Calibration

Yes, loop validator, ma source, hand tools

From DCS / Hand Held communicator

Device calibration & parameterization

Calibration at Field / workshop On line from HOST (DCS)

i f f l h i l i i CS i llDetection of Defect Mostly physical inspection at different level is required

From DCS Automatically Generated

Maintenance / calibration History

To be entered Manually Automatically captured & stored in DCS

Slide No. 34

Skill up Training No special training Additional Training needed

Why use Foundation Fieldbus?

Lower Total Cost of Ownership (CAPEX + OPEX)Capex (Hardware) Opex (Plant Operations)

Lower Total Cost of Ownership (CAPEX + OPEX)

Less cabling Fast commissioning Fewer I/O ports Reduced downtime - Higher process availability Fewer cabinets More data from the field Fewer transmitters/ Increased margin from automationprocess penetrations Fewer people in the plantOptimum DCS controller Tighter quality, greater safetyLoad by control (PID etc..) Control flexibility In the field Increased standardisation

Asset management

7

Types of Fieldbus Devices That Have Been Registeredg

Mass MeterPressure Differential

Coriolis Mass FlowNuclear Level Gauge

Pressure AbsoluteValve PositionerValve Actuator

Vortex Flow2-wire In Situ O2ConductivityConductivity / Resistivity

Rotary Valve ActuatorRadar LevelMag Flow

Conductivity / ResistivityContinuous Gas AnalyzerGas ChromatographFieldbus to CurrentFi ldb PDigital Valve Controller (on/off)

Digital Valve ControllerpH/ORP

Fieldbus to PressureCurrent to FieldbusRecorderFieldbus Controllerp

pHTemperatureLevel Gauge

Fieldbus ControllerDiscrete I/O

gNote: See www.fieldbus.org for latest listing

Field Bus: A Way Forward>>>>