38
‘BIM Use in Social Housing with Westminster Council’ Building Information Modelling (BIM)

Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

‘BIM Use in Social Housing with Westminster Council’

Building Information Modelling (BIM)

Page 2: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Presenting todayPatrick KingAssociate Director & Head of BIM Technologies

Agenda

• Introduction

• Implementing BIM for Councils

• BIM Pilot Project

• Conclusion

Page 3: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Introduction

Page 4: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

4

Public

Participation

Consultation &

Research

Project Management,

Cost Consultancy,

Building Surveying

and Principal

Designer Services

Architecture

Masterplanning

Urban Design

Energy &

Sustainability

Consultancy

Group Overview

Page 5: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

5

Award Winning Designs

Page 6: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

6

Page 7: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

7

Office in London & Glasgow

Page 8: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

8

Our Team

Page 9: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

9

Three Year Process:

All projects delivered using BIM processes & modelling

techniques.

1. Training & Support from the Top Down

• ALL Directors have completed the BRE BIM

Level 2 Essentials Course

2. Upskilling ALL staff

• Over 90% are Revit Certified Professionals

• All Staff receive 4 hours per month of BIM &

Revit training

• All Senior Staff to complete BIM Essentials

• ECD YouTube & Vimeo channel for Staff

training

3. Modelling Tools

• Revit • Navisworks • Cato • Dynamo • AutoCAD

4. ECD Standards & Validation Procedures

• Development of ECD Standards, Methods &

Procedures Documents & Modelling Templates

• Validation of Models using DynamoBIM for

Office/BS Standards and BIM LOD/LOI

compliance

• Validation of Models using Navisworks for

Coordination

Page 10: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Implementing BIM for Councils

Page 11: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Three new priorities for Westminster City Council.

BUILDING HOMES AND CELEBRATINGNEIGHBOURHOODS.

GREENER CITY

SMART

COUNCIL

Page 12: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

BIM Implementation on Pilot Projects

STAGE 3

Work stream

• Pilot Project Review

• User Group Workshop

• Client Training

• Document Development

• KPI Assessment

1

2

3

4

5

STAGE 1

Work stream

• Implementation plan

• Capability Assessment

• User Group setup

• Workshops

• Document creation

• Procurement & Legal Documents

STAGE 2

Work stream

• Procurement of Pilot Project

• Team Capability Assessment

• Project Set Up & Workshops

• Client Document review & feedback

• KPI Assessment

STAGE 4

Work stream

• Pilot Project Review (Design Team)

• User Group Workshops

• Smart City Review & Strategy

• Document creation

• Procurement & Legal Review

• KPI Assessment

STAGE 5

• Pilot Project Deliver Review

• User Group Workshop Review

• Capability Assessment of WCC

• Workshops

• Document Review & Signoff

• Procurement & Legal Review

• Business case of BIM Review

SMP Document Creation

Westminster City Council BIM Business Case

Lessons Learned

Smart City Approach

Page 13: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

BIM Assessment

Page 14: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

BIM Workshop Group

ProcurementBIM

Finance

Asset

Management

Project

Managers

Policy Legal

Page 15: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed
Page 16: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed
Page 17: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

(OIR)

EIR)

(AIR)

Page 18: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

(OIR)

EIR)

(AIR)

BIM Business Case

Page 19: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

WCC Project Implementation Documents

Page 20: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

BIM Pilot Project

Page 21: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Ashbridge Street

Proposed development on this site to deliver 26

new affordable homes.

Design principles• Create a gateway to the neighbourhood and kick-off the

masterplan's aim to make a greener neighbourhood

• Public realm enhancements to Ashmill Street and

courtyard behind existing building

• Building height of new development should have

appropriate relationship with neighbouring buildings

• Hybrid green/blue or brown roofs

Existing situationBT repeater station

Homes• 26 new homes

• 4-5 storey building

Page 22: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Client Suppliers Submission

Page 23: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

RIBA Stage 1&2

BIM Pilot Project

Page 24: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

(OIR)

RIBA Stage 1 BIM Kick-off Meeting

Page 25: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed
Page 26: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

RIBA Stage 1&2

Design Model

QS Cost Model Client

Page 27: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

RIBA Stage 3&4

BIM Pilot Project

Page 28: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

(OIR)

RIBA Stage 3&4 BIM Kick-off Meeting

Page 29: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed
Page 30: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

(OIR)

TIDP Programme

Page 31: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Information Exchange Process

Design Team Models

Page 32: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

S1.P1

File Naming Convention1564_ECD_00_XX_M3_A_PROPOSED_S1.P1

Suitability

Shared

S1 Issued for co-ordination

S2 Issued for information

S3 Issued for internal

review and comment

S4 Issued for construction

approval

S5 Issued for manufacture

S6 Issued for PIM

authorization (Information

Exchanges 1-3)

S7 Issued for AIM

authorization (Information

Exchange 6)

D1 Issued for costing

D2 Issued for tender

D3 Issued for contractor

design

D4 Issued for

manufacture/procurement

Page 33: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Validation Process

Design Model

QS Cost Model Client

Information Checks for

Costing (LOI)

Checker for Asset

Information (AIR)

Page 34: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Design Coordination & Clash Validation

Client Model Review

Coordination Meeting

Page 35: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

BIM Pilot Project Delivery

Gateway/Approval

2D Information Delivery BIM Model Delivery

Page 36: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Conclusion

Page 37: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

BIM Pilot Project Lesson Learned

(OIR)The building is Data- Based

Information model

01

02

03

04

05

BIM

Change in design team workflow

Strong understanding of what is

required (PAS1192,EIR & BEP)

Stakeholder engagement in using the model

Sharing knowledge and training the team

Faster and better quality of information delivered

Page 38: Building Information Modelling (BIM) · All projects delivered using BIM processes & modelling techniques. 1. Training & Support from the Top Down • ALL Directors have completed

Thank youECD Architects Ltd

Studio 3, Blue Lion Place, 237 Long Lane, London

SE1 4PU

T: 020 7939 7500 www.ecda.co.uk

https://twitter.com/BIM_ECD