Cement
Aggregates and sand
Concrete
Steel
Wood
Block
Roofing materials
Waterproofing products
Waterproofing
bituminous m
embrane
Natural stone
Tiles and marble
Bathroom set w
ithout accessories
Bathroom set w
ith accessories
Sink stainless steel with
mixer-single
False ceiling
Paints
Glass
(PVC) pipes
(uPVC) pipes
Wires for sm
all building
Wires for apartm
ents
Wires for residential
towers
Power cable
Transport equipment
Employm
ent
Diesel
www.scad.aeFor More Information please Visit:
Mar. 2015 /Feb. 2015
Mar. 2015 /Mar. 2014%
%
Building Material Prices
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
Key Points
The average prices of ‘Glass’ increased by 15.3% in March 2015 compared with February 2015. Table (1): Percentage change in the average prices of the glass group during March 2015 compared with February 2015
0.080.080.0Aggregates / Crush 3/4 / m3 / U.A.E.0.075.075.0Aggregates / Ordinary 3/4 / m3 / U.A.E.0.070.070.0Aggregates / Crush 3/8 / m3 / U.A.E.0.070.070.0Aggregates / Ordinary 3/8 / m3 / U.A.E.0.060.060.0Aggregates / Material Sand / m3 / U.A.E.0.045.045.0Sand / White / m3 / U.A.E.0.060.060.0Sand / Black / m3 / U.A.E.
25.050.040.0Sand / Red / m3 / U.A.E.
4.7225.0215.0Concrete Ready Mix / Normal ) neutin 40( / m3/ U.A.E.4.5230.0220.0Concrete Ready Mix / Sulphate Resistance / m3/ U.A.E.
6.73,200.03,000.0Steel / Flat Steel / Ton / Turkey---Steel / Flat Steel / Ton / Dubai
-3.32,900.03,000.0Steel / Beams Steel / Big / Ton / Korea-3.32,900.03,000.0Steel / Beams Steel / Big / Ton / China
---Steel / Beams Steel / Big / Ton / Ukraine3.33,100.03,000.0Steel / Beams Steel / Small / Ton / Korea3.33,100.03,000.0Steel / Beams Steel / Small / Ton / Japan
---Steel / Beams Steel / Small / Ton / Ukraine-7.92,900.03,150.0Steel / Steel Angled / Ton / Korea
--3,150.0Steel / Steel Angled / Ton / China---Steel / Steel Angled / Ton / Turkey
-21.82,052.52,625.0Steel / Bars, 6 - 8 mm / Ton / Turkey-10.32,062.52,300.0Steel / Bars,10-25 mm / Ton / Qatar-10.92,050.02,300.0Steel / Bars,10-25 mm / Ton / U.A.E.-11.32,040.02,300.0Steel / Bars,10-25 mm / Ton / Turkey
-6.72,170.02,325.0Steel / High tensile Steel / Ton / Qatar-7.02,140.02,300.0Steel / High tensile Steel / Ton / Turkey-6.52,150.02,300.0Steel / High tensile Steel / Ton / U.A.E.
-15.759.070.0B.R.C. Mesh / 6 mm )142( / Piece / U.A.E.-8.487.095.0B.R.C. Mesh / 7 mm )193( / Piece / U.A.E.
-11.8104.5118.5B.R.C. Mesh / 8mm )252( / Piece /U.A.E.-14.635.041.0Wire / Binding Wire / Bundle-10Kg / China
2.9880.0855.0White / White Wood / m3 / Chile0.6880.0875.0White / White Wood / m3 /Romania
-11.959.067.0Red Timber / Big / Keruing/ sheet / Malaysia2.075.073.5Red Timber / Big / Merionti/ sheet / Malaysia
--76.0Red Timber / Small / Keruing/ sheet/ Malaysia-3.568.070.5Red Timber / Small / Merionti/ sheet / Malaysia8.230.728.3White Plywood / 4x8x3.6 mm / Sheet/ Indonesia2.639.738.7White Plywood / 4x8x6 mm / Sheet/ Indonesia2.263.061.7White Plywood / 4x8x9 mm / Sheet/ Indonesia6.285.380.3White Plywood / 4x8x12 mm / Sheet/ Indonesia
-0.3116.0116.3White Plywood / 4x8x18 mm / Sheet/ Indonesia8.638.035.0Red Teak Faced Plywood / 3x7x3.6 mm/ Sheet/ Indonesia6.748.045.0Red Teak Faced Plywood / 4x8x3.6 mm / Sheet/ Indonesia
-16.997.7117.5Marine Plywood Humidity Resistance / 12 mm /Sheet/ Indonesia-0.5134.3135.0Marine Plywood Humidity Resistance / 18 mm /Sheet/ Indonesia
6.31,700.01,600.0Hollow / 4” 10x20x40 cm/ Thousand / U.A.E5.61,900.01,800.0Hollow / 6” 15x20x40 cm / Thousand U.A.E 5.02,100.02,000.0Hollow / 8” 20x20x40 cm / Thousand U.A.E4.02,600.02,500.0Solid / 4” 10x20x40 cm/ Thousand / U.A.E3.62,850.02,750.0Solid / 6” 15x20x40 cm / Thousand / U.A.E3.23,200.03,100.0Solid / 8” 20x20x40 cm / ThouSand / U.A.E
---Hourdis Hollow / 20x20x40 cm / Thousand / U.A.E---Clay Tiles / Clay )Pica( / m³ / U.A.E
3.430.029.0Zinc Sheet / Corrugated 8 Feet / Strong / India0.019.019.0Zinc Sheet / Corrugated 8 Feet / Light / India
0.0850.0850.0Bitumen / Oxidized Hot)115/15( primer 180 kg / S . Arabia0.0150.0150.0Bitumen / Oxidized Cold )Primer D 41( 20 liter / S . Arabia
---Bitumen / Waterproofing )D540(/ S . Arabia---Bitumen / Waterproofing )D540M( aggregates / S . Arabia
-30.01,540.02,200.0Bitumen / 60/70 / Ton -32.51,560.02,310.0Bitumen / 50/40 / Ton
---Bitumen / S S barrel / 1 inch / 200 kg---Bitumen / M S 70 barrel / 200 kg---Bitumen / R C 250 barrel / 200 kg
-8.3110.0120.0False Ceiling / Alumin Luxalon / m² / U.A.E16.770.060.0False Ceiling / Gypsum Ceiling)9.5 mm( / m² / U.A.E
0.060.060.0False Ceiling / Gypsum Printing / m² / U.A.E0.065.065.0False Ceiling / CelotexCeiling 60x60 cm- 15 mm / m² / S.Arabian
-4.0120.0125.0False Ceiling / Acoustic Ceiling 30x30 cm / m² / S.Arabian11.1100.090.0False Ceiling / Iron 60x60 , 5 mm / m² / U.A.E
0.025.025.0Terrazzo Tiles / 30x30 cm / m² / U.A.E0.025.025.0Terrazzo Tiles / 25x25 cm / m² / U.A.E0.0137.5137.5 Marble Tiles / Carrara 30*60*2 cm / m² / Italy0.0480.0480.0 Marble Tiles / 40x40x2 cm,White )Bynco B( / m² / Italy0.0250.0250.0 Marble Tiles / Traventino 40x40x2 cm Beige / m² / Italy0.0400.0400.0 Marble Tiles /Arabskato 40x40x2 cm / m² / Italy0.0500.0500.0 Marble Tiles /Garanite Labrador 60x30x2 cm / m² / Italy0.0173.3173.3 Marble Tiles Perlato / Royal 30*60*2 cm / m² / Italy0.0143.3143.3 Marble Tiles Perlato / cecelia 30*60*2 cm / m² / Italy0.022.022.0Ceramic Tiles For Floor / 20x20/ m² /Al Fujaira0.023.023.0Ceramic Tiles For Floor / 20x20/ m² /Ras Al Khaimah
25.050.040.0Ceramic Tiles For Floor / 20x20/ m² /Spain25.075.060.0Ceramic Tiles For Floor / 20x20/ m² /Italy
---Ceramic Tiles For Floor Granneti / 7+10+20+109 / m² / Ras Al Khaimah
-120.0-Ceramic Tiles For Floor Granneti / 100*100 / m² / China-29.0-Ceramic Tiles For Wall / 40*25 / m² / Ras Al Khaimah
8.725.023.0Ceramic Tiles For Wall Granneti / 20 × 20 cm / m² / Ras Al Khaimah0.033.333.3Ceramic Tiles For Wall Granneti / 30 × 30 cm / m² / Ras Al Khaimah0.034.034.0Ceramic Tiles For Wall Granneti /40 × 40 cm / m² / Ras Al Khaimah0.025.025.0Porcelain white tiles / 40*40 / m² / Ras Al Khaimah
---Porcelain white tiles / 40*40 / m² / Spain0.023.023.0Porcelain white tiles / 20*30 / m² / Al Fujaira-1.465.065.9Porcelain white tiles /20*30 / m² / Spain9.1120.0110.0Porcelain color tiles /10*10 / m² / Spain0.060.060.0Porcelain color tiles / 25*20 / m² / Spain
-8.38.39.0PVC Pipes / 1/2” / 6m /U.A.E0.011.611.6PVC Pipes / 3/4” / 6m /U.A.E3.816.515.9PVC Pipes / 1” / 6m /U.A.E
-4.929.030.5PVC Pipes / 1,5 « / 6m /U.A.E7.543.040.0PVC Pipes / 2 « / 6m /U.A.E2.562.561.0PVC Pipes / 2,5 « / 6m /U.A.E
-5.281.586.0PVC Pipes / 3 « / 6m /U.A.E
-8.761.667.4uPVC Pipe/ 110mm /PN-10/6 m-8.7131.7144.2uPVC Pipe/ 160mm/ PN-10/6m-8.7204.1223.4uPVC Pipe/ 200mm/ PN-10/6m-8.71,263.61,383.4uPVC Pipe /1500mm /PN-10/6m
0.060.060.0Paints / Jollofex normal emulsion / dram/ U.A.E-8.355.060.0Paints / Durosan matt emulsion /Gallon /U.A.E
-11.875.085.0Mamorex Paint / Fenomastic plastic emulsion /Gallon /U.A.E25.075.060.0Mamorex Paint / Bangalac glos /Gallon /U.A.E
-10.0180.0200.0Mamorex Paint / Heavy tex with arbl / dram/ U.A.E-21.7180.0230.0Mamorex Paint / Heavy tex w/o Marbl clips / dram / U.A.E
-7.0285,320.0306,710.0CU 11kv, 3*24 mm²-6.2332,080.0354,210.0CU 33kv, 3*24 mm²-6.2557,260.0594,380.0CU 132kv, 1*800 mm²
March 2015
Prices of Building Materials
Sulphate Resistance /Al- Etihad /Ton/ U.A.E. 300.0 320.0 6.7Sulphate Resistance /Emirates /Ton/ U.A.E. - - -Portland Cement / Al- Etihad / Ton / U.A.E. 260.0 280.0 7.7White Cement / Ras Al Khaimah / Ton / U.A.E. 700.0 700.0 0.0Lime / Oman / Ton / Oman 1,250.0 - -Gypsum / Oman / Ton / Oman 442.0 442.0 0.0
Cement
Block
Sanitary Ware
Bathroom Set without Accessories-3.1975.01,006.3Bathroom White Set / Orient /Set / Ras Al Khaimah-1.41,640.51,663.0Bathroom White Set /Prime / Set / Ras Al Khaimah 0.22,584.02,578.0Bathroom White Set /Star/ Set / Ras Al Khaimah
-3.1991.71,023.0Bathroom Colored Set /Liwa / Set / Ras Al Khaimah-3.6904.3938.3Bathroom Colored Set / Flora / Set / Ras Al Khaimah-2.01,888.01,927.0Bathroom Colored Set / Venees / Set / Ras Al Khaimah
Bathroom Set with Accessories-2.93,300.03,400.0Bathroom Colored Set / Globo/ Set / Italy0.018,000.018,000.0Bathroom Colored Set / Ideal Standred / Set / Italy
Sink Stainless Steel With Mixer-Single---Single Drainer&bowl / ‘”Bland” - 100x60 cm /Set / UK---Single Bowl& Double Drainer / ‘”Bland” - 150x50 cm / Set / UK---Double Bowel&Double Drainer / ‘”Bland” - 200x60 cm / Set / UK
0.0250.0250.0Water Heater )12( Gallons / Chaffotean / Set / S . Arabia0.0290.0290.0Water Heater )16( Gallons / Chaffotean / Set / S . Arabia0.02,800.02,800.0Water Tank Fiberglass / 2000 Gallons / Set/ U.A.E
-6.71,400.01,500.0Water Tank Fiberglass / 1000 Gallons / Set/ U.A.E0.02,150.02,150.0Water Tank Fiberglass / 1500 Gallons / Set/ U.A.E
0.010.6810.68Diesel/ ADNOC / Gallon
0.020,500.020,500.0Truck capacity of 30 m30.014,333.314,333.3Truck capacity of 20 m30.013,000.013,000.0Water tank capacity of 5000 gallons0.026,125.026,125.0Bulldozer d60.033,333.333,333.3Bulldozer d8
---Bulldozer d9-2.526,000.026,666.7Excavator capacity of 330-290 cubic meters0.022,000.022,000.0Cranes 20 tons
--- Asphalt finisher--- Asphalt steel roller
0.018,500.018,500.0 Loader 9660.017,500.017,500.0 Loader 962
-2.717,687.518,187.5 Loader 950 ---Grader GR 01
0.026,000.026,000.0Grader GR 14 g0.012,000.012,000.0JCB Excavator
-11.87.58.5Helper / Hourly rates-13.97.89.0Semi-skilled / Hourly rates-20.08.010.0Carpenter / Hourly rates-20.08.010.0Steel Fixer / Hourly rates-18.813.016.0Electrician / Hourly rates-36.016.025.0Surveyor/ Hourly rates-12.022.025.0Driver / Hourly rates
Employment / with all services
0.053.053.0Electrical wire / Sinjil CORPS / 1.5 mm lap / Ducab /U.A.E-2.480.082.0Electrical wire / Sinjil CORPS / 2.5 mm lap / Ducab /U.A.E-1.5130.0132.0Electrical wire / Sinjil CORPS / 4 mm lap / Ducab /U.A.E-3.1190.0196.0Electrical wire / Sinjil CORPS / 6 mm lap / Ducab /U.A.E
10.552.547.5Glass / 4 mm / m² / S.Arabian16.072.562.5Tinted Glass / 6mm / m² / S.Arabian
---Tinted Glass / 4mm / m² / S.Arabian17.285.072.5Tinted Glass / 6mm / m² / S.Arabian-2.288.090.0Mirror Glass / 4 mm / m² / S.Arabian15.6130.0112.5Mirror Glass / 6 mm / m² / S.Arabian
Increased rate % Decreased rate % Stable rate %
Prices on AED Currency
Change%
Change%
Change%
Change%
Change%
Change%
Aggregates & Sand
Concrete
Steel
Wood
Roofing Materials
Waterproofing Products
Change%
Change%
Change%
Change%
Natural Stone Change%
Tiles and Marble
False ceiling
Change%
Paints
Change%
Change%
Water And Sewage Pipes (PVC)
WiresApartments
Small Building
Residential Towers-27.7125.0173.0Electrical wire / 4 Corps / 120 mm / Oman
-7.6122.0132.0Electrical wire / 4-Cours / 95 mm / Oman-4.4195.0204.0Electrical wire / 4 Corps / 150 mm / Oman
---Electrical wire / 4 Corps / 185 mm / Oman---Electrical wire / 4 Corps / 240 mm / Oman
-4.223.024.0Electrical wire / 4-Cours / 10 m / Ducab /U.A.E-12.528.032.0Electrical wire / 4-Cours / 16 m / Ducab /U.A.E
-4.542.044.0Electrical wire / 4-Cours / 25 m / Ducab /U.A.E1.858.057.0Electrical wire / 4-Cours / 35 m / Ducab /U.A.E
-6.375.080.0Electrical wire / 4-Cours / 50 m / Ducab /U.A.E1.0106.0105.0Electrical wire / 4-Cours / 70 m / Ducab /U.A.E
-7.425.027.0Electrical wire / 4-Cours / 18 mm / Oman-12.535.040.0Electrical wire / 4 Corps / mm to 25 / Oman-13.545.052.0Electrical wire / 4-Cours / 36 mm / Oman
-8.664.070.0Electrical wire / 4-Cours / 42 mm / Oman-4.194.098.0Electrical wire / 4-Cours / 60 mm / Oman
---Electrical wire / 4-Cours / 77 mm / Oman
Change%
Change%
DieselChange%
Power cable
(uPVC) PipesTransport equipment/monthly
Change%
Change%Change%
Glass Change%
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014 Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
Mar. 2015 Mar. 2014
20.090.075.0Natural Stone/ Width 25 cm. height 3 cm kattran / White - Kattran /m² / Jordan-21.9125.0160.0Natural Stone/ Width 25 cm. height 3 cm kattran / Agloon / m² Jordan
0.0180.0180.0Natural Stone/Width 25 cm. height 3 cm kattran / Ma an/ m² / Jordan
0.0
0.0
-2.9
-19.3
0.0
-0.4
1.9
-6.5
-1.9
-15.3
0.6
-1.8
-2.0
-6.8
0.7
-8.7
15.3
-0.8
4.4
11.2
2.8
-5.5
2.2
2.2
0.0
-1.4
-1.5
-1.5
-2.9
-2.2
-1.7
0.9
-5.9
-2.1
n.a.
n.a.
-2.5
-13.0
0.0
1.7
0.0
4.6
-2.0
0.1
-1.2
-8.0
0.0
4.6
0.0
2.8
1.6
2.8
adstatistics
March 2015
Source: Statistics Centre – Abu Dhabi
This publication provides an analysis of the movement of the average prices of building materials during the month of March 2015 compared with February 2015 and March 2014. The key changes were:
During March 2015 the average prices of the ‘Glass’, ‘Paints’, ‘False ceiling’ and ‘Power cable’ groups increased by 15.3%, 2.8%, 2.2% and 1.9% respectively, compared with February 2015.
During March 2015 the average prices of the ‘Natural stone’ group decreased by 5.9%, ‘Employment’ and ‘Sanitary ware- Bathroom set without accessories’ decreased by 2.9% for each, compared with February 2015.
During March 2015 the average price of the ‘Glass’ group increased by 11.2% and both ‘Concrete’ and ‘Block’ increased by 4.6% compared with March 2014.
During March 2015, the average prices of ‘Employment’, ‘Wires for residential towers’ and ‘Waterproofing products’ decreased by 19.3%, 15.3% and 13.0% respectively, compared with the same period in the previous year.
Table: Percentage change in monthly average prices of building materials for March 2015, compared with February 2015 and March 2014.
%
35
30
25
20
15
10
5
0
12.9
30.6
15.619.7
Gla
ss \
4 m
m \
m²
\ Sau
di A
rabi
a
Tint
ed G
lass
\ 6
mm
\ m
² \ S
audi
Ara
bia
Tint
ed G
lass
\ 4
mm
\ m
² \ S
audi
Ara
bia
Mirr
or G
lass
\ 6
mm
\ m
² \ S
audi
Ara
bia
Gla
ss \
6mm
\ m
² \
Saud
i Ara
bia
Mirr
or G
lass
\ 4
mm
\ m
² \ S
audi
Ara
bia
0.0 0.0