Upload
selcuk
View
218
Download
0
Embed Size (px)
Citation preview
8/19/2019 Building Modern DATACENTER
1/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.1
8/19/2019 Building Modern DATACENTER
2/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.2
Building the ModernData Center
Serdar SayarSistem Satış Direktörü, Orta Asya & Türkiye
8/19/2019 Building Modern DATACENTER
3/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.3
The Safe Harbor
The following is intended to outline our general product diis intended for information purposes only, and may not beincorporated into any contract. It is not a commitment to dmaterial, code, or functionality, and should not be relied umaking purchasing decisions. The development, release,of any features or functionality described for Oracle’s prodremains at the sole discretion of Oracle.
8/19/2019 Building Modern DATACENTER
4/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.4
Data E
1840s
Telegraph
1920s
Radio
1870s
Telephone
1940s
Television
1980s
PersonalComputer
Accelerated Innovation Broadened Impact
Evolution inContentCommerce,Communication, and
1970s
Fax
Internet Age
8/19/2019 Building Modern DATACENTER
5/36Copyright © 2013, Oracle and/or its affiliates. All rights reserved.5
DemandSpeed of Impact
1991
Launch ofWorld Wide Web
The Network Era
Pace of Innovation
Breakthroughs inCommerceCommunication, and
140 Million Tweets
per Day – 1 Billionper Week
Zero to
660 Million Usersin 7 Years
Sma
100ShippedLast
20% of US Transactions
Done via AlternativePayments
$27 Billion Per Quarterin Payment Volume Projected toin Reve40 BillionPages Indexed
Accounts for 20% of
U.S. Internet Trafficfrom 8-10pm
2 BilliViewed
Content
8/19/2019 Building Modern DATACENTER
6/36Copyright © 2013, Oracle and/or its affiliates. All rights reserved.6
InstantlyAvailable Services
WhereverThey Are
AcceleratingCustomer Expectations
Explosion of DataVolume and Types
TransactionOverload
AcceleratingInformation Growth
Today’s Realities...
Unpreand Rap
AcceBusiness
EcoInterde
8/19/2019 Building Modern DATACENTER
7/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.7
Source: “IT Metrics: IT Spending and Staffing Report, 2012”, Gartner Research, 2012
… Can Lead to Missed Opportunities
25%50%RUNTHE BUSINESS
25%TRANSFORMTHE BUSINESS
GROWTHE BUSINESSGROWTHE BUSINESS
21%63%RUNTHE BUSINESS
16%TRANSFORMTHE BUSINESS
8/19/2019 Building Modern DATACENTER
8/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.8
Designing the Right Data Center Infras
Requires an Understanding of YOUR Requirements
What is the problem or opportunity
Service level requirements – Service response times – Service availability (incl. DR) – Security and compliance – Budgetary requirements
Future growth plans
Existing infrastructure considerations
– OS and processor architectures
– System and storage architectures – Database and application versioning – Packaged or custom apps – Hardware/software interdependencies
Consolidation considerations
– Physical and organizational scope – Virtualization requirements
Procurement model considerations
How WWhat
Project time
Resources
ROI payba
8/19/2019 Building Modern DATACENTER
9/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.9
Case Study:Partnering with Oracleto Design a ModernData Center
8/19/2019 Building Modern DATACENTER
10/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.10
Global Financial Services Company
Customer’s Existing Environment
50+ locations for Oracle database 9,000+ Oracle databases
~3,400 total DB servers
6PB storage (3 PB usable)
Sufficient DB Licenses for future growth
Growth rates:
5% YOY compute 30% YOY storage
Run and maintain and engineering cost ~6
8/19/2019 Building Modern DATACENTER
11/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.11
Build Capital
“Create trust so that our clients arehappy to entrust their money to us”
Cost Management
“Keep costs under control, so thatwe deliver best service efficiently”
Risk Management “Accurately assess all risks in the
bank so we can be successful forthe long term”
CIO
Business Enablement
Manage risk across the bank
Not conducive to supporting service goals of the busines
Manage Cost
EOSL assets are costly to su
Less efficient and complex aOracle/SPARC combinations
Infrastructure Risk
2008 financial services crisisminimal capital investment o
71% percent of server asset
CEO
Customer RequirementsCore Priorities
8/19/2019 Building Modern DATACENTER
12/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.12
Priva
Migrate fr“consume
Implemen Ideal Stat
owned camanagedprovided Current
Oracle Estate
Two-Year Migration Factory
Multi-Party Commitment (Customer, Oracle,Run/Maintain & Migration Partners)
Joint architecture development Prioritize migration by risk, economies of scale
Implement a policy, SLA and metric drivenecosystem
Evolve to Cloud
Roadmap to Database as a Service
Oracle Vision for Transformation
8/19/2019 Building Modern DATACENTER
13/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.13
Leveraging automationfor routine requests
Self Service
Prto g
Allowing consumptionbased billing
Usage Based
And not tied to anyinfrastructure asset
SLA Driven
At infrastructure layerout of the box
High Availability
Implementation Goals
Hardware Exadata
ODA
T4
Oracle Database-as-a-Service (DBaaS)
Software DB Lifecycle Mgmt
Cloud Mgmt
Services Architectu
OEM integ
Migration f
Consul
8/19/2019 Building Modern DATACENTER
14/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.14
Current and Future State
50+ Locations for Oracle Database
9,000+ Oracle databases
~3,400 total servers
3 PB usable storage data
Non-Production to be reduced by 50%
Sufficient DB Licenses for future growth
Growth Rates:− 5% YOY compute
− 30% YOY storage
Run and maintain and engineeringcost ~60M
Projected Benef
50% reduction in database
30% reduction in Oracle da
21x reduction in server
17x reduction in production s
42x reduction in Non-Produc
5x reduction in server cores
30% increase in available st Storage growth to remain fla
Reduced 63 configurations
TCO reduced 26% annually
Current State
8/19/2019 Building Modern DATACENTER
15/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.15
Current: DB/OS Deployment
Current and Future State
OS VM
− Raise Request – Open workflow
− Calculate DB
− Update OS/Data Value
− FID Greened
− Raise SN for VM
− Deploy VM− Post Configuration work
− Update case – Close Workflow
− Notify user
Database – 13 Steps
Projected: DBaaS Dep
No VM Request
Submit internal Workflow – 2
− Choose Service Template (smalarge DB)
− Choose Zone (test, stage, UAT
− Submit after approval by manainternal system
RAC and Non RAC
Security/CMDB Setup Autom
48 HRS 22 STEPS 15 MIN 3 STEP
8/19/2019 Building Modern DATACENTER
16/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.16
Oracle’s Integrated Platforms and StorSetting the Foundation for Effective Data Center Transform
Superior Performance and Scale
Built-in RAS and Security
Integrated, No-cost Virtualization
Unified Management Console
Oracle Platinum Support andOracle Platinum Services
8/19/2019 Building Modern DATACENTER
17/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.17
Oracle’s Engineered Systems PortfolioLeadership in the Converged Infrastructure Market
Exalogic
Database Appliance Exalytics
Big DataAppliance
SuperClusterExadata OCom
8/19/2019 Building Modern DATACENTER
18/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.18
Transform Wait Timeto Work Time (OLTP)
Transform OvernightRequests to On-Demand
Services (Batch)
Oracle Apps Run Best on Oracle SysteEnabling Business Processes Transformation
8/19/2019 Building Modern DATACENTER
19/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.19
Cognizant
Company Overview
Leading provider of information technologyand business process outsourcing service
800+ global customers spanning every ma
Employees: 175,000 Revenues: US$6.1 b
Company Overview
Challenges
PeopleSoft running on IBM was having difto meet user demands
Response times for applications were incr
IT maintenance burden, in terms of time a
Fast Growing Business and Technology Service Provider
8/19/2019 Building Modern DATACENTER
20/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.20
Oracle Runs Best on OracleConsolidates Infrastructure, Supports 2x Larger User Base
Replaced multiple Web, applicatioand batch servers with Oracle Exa
Supports a user base that is twice67% fewer application and Web selegacy, IBM environment
Accelerated message processing
Cut weekly maintenance window fto less than two hours
Results
EXALOGIC
8/19/2019 Building Modern DATACENTER
21/36
8/19/2019 Building Modern DATACENTER
22/36
8/19/2019 Building Modern DATACENTER
23/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.23
Royal Group
A conglomerate of 60 large and medium-sthe United Arab Emirates
Industry: Industrial manufacturing, financiaentertainment, professional services, who
Company Overview
Challenges
Deploy a comprehensive ERP platform accompanies
Eliminate duplicate data and establish a sgroup level for enterprise wide visibility
Provide management with detailed and acthe group’s financial and operational posit
United Arab Emirates Conglomerate Upgrades ERP Syste
8/19/2019 Building Modern DATACENTER
24/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.24
Oracle Runs Best on OracleOracle E-Business Suite Deployed Across 48 Companies
Challenges
Deployed the solution in 48 compatwo-and-a-half years
Reduced the time to prepare manaby 50%, enabling faster decision-m
Cut the time to process the monththree months to one
Results
SPARC SERVERS
O l ’ A li i E i d S
8/19/2019 Building Modern DATACENTER
25/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.25
Oracle’s Application Engineered Storag
Databases and Appsare Storage-Aware
Storage SyDatabase and
SOME CAN INTEGRATE.
OTHERS CAN OPTIMIZE.ONLY ORACLE CAN CO-ENGIN
A li ti E i d St B f
8/19/2019 Building Modern DATACENTER
26/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.26
Application Engineered Storage Benef
OISP HCC
Dynamic andautomatic database-
to-storage tuningd(d
Superior database,data warehousing
compression
Application Engineered Stora
O l ’ A li ti E i d St
8/19/2019 Building Modern DATACENTER
27/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.27
Oracle’s Application Engineered Storage
Axiom
SAN for ApplicationConsolidation
ADAPTABLE & EFFICIENTWITH QUALITY-OF-SERVICE
Oracle ZS3
NAS for HighPerformance Databases
HIGH PERFORMANCEDISK WITH LOW TCO
StorageT
Tape for Deep
HIGHEST SCAL& LOWEST COST
15 L Q L t S t P
8/19/2019 Building Modern DATACENTER
28/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.28
15x Lower Query Latency Supports Pea
“We ensu red 24/7 availabi l i ty fo r bu
onl ine appl icat ions and believe that
perfect infrastructu re for years to co
absolutely rel iable, extremely fast, a
effective .”
– Udo JanßenDepartment Head of Operation OnlineCEWE STIFTUNG & Co. KGaA
Oracle ZFS Storage with SPARC Servers Effortlessly Hand
O l St ith O l E i d
8/19/2019 Building Modern DATACENTER
29/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.29
Oracle Storage with Oracle EngineeredMaximize Data Protection, Test & Development, Flexibility
4x Faster Response
8x More Demand
1.5B Transactions/Day
400% Annual Growth
10x Faster Oracle Database
6TB/Hour Backup
10x Faster
10x L
840TB Orac
Leaders Run Oracle Software on Oracle
8/19/2019 Building Modern DATACENTER
30/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.30
Leaders Run Oracle Software on Oracle
8/19/2019 Building Modern DATACENTER
31/36
8/19/2019 Building Modern DATACENTER
32/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.32
Graphic Section Divider
8/19/2019 Building Modern DATACENTER
33/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.33
Customer Case Study: Ativas
8/19/2019 Building Modern DATACENTER
34/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.34
Customer Case Study: AtivasCloud Architecture for Multi-tenant Hosting Services
10:1Consolidation
3x SoftwareLicenseSavings
ApplicatioCloud
Database Clo
Verizon Wireless Eliminates 15M Paper
8/19/2019 Building Modern DATACENTER
35/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.35
Leading US wireless voice and data provider,serving approximately 87.7 M customers
Employees: More than 82,000
Revenue: US$63.4 billion
Company Overview
Challenges
Create a more positive customer experience and reduce thecompany’s impact on the environment
Drive paperless billing adoption to reduce paper usage and costs
Reduce data center space and energy use
Solutions
Oracle Self-Service E-Billing Oracle Database, Oracle Real Application Clusters
Oracle Active Data Guard, Oracle Solaris
Oracle Automatic Storage Management
Oracle WebLogic Server
Sun Identity Manager
Sun SPARC and Netra servers
Results
Realized an 80% adoptof summary bills
Eliminated 7.5M papereach month
− Saving 1.8 million poundtons of trees, and 20 mi
Saved approximately USin printing and mailing c
One-time US$6M cost s
consolidating database infrastructure
− Reduced datacenter spfor the Verizonwireless.of applications
Verizon Wireless Eliminates 15M PaperBills to Save 1.8 Million Pounds of Paper
4x Faster Billing and 99 999% Availabilit
8/19/2019 Building Modern DATACENTER
36/36
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.36
“Having a platform as robust as OraEnterpr ise servers and Sun ZFS Sto
appl iance ensures that we can grow
date, and enjo y hig h availabi l i ty —en
guarantee excellent customer servic
– Javier Enrique Mariño Navarro Assistant Director of Informatics aTelebucaramanga SA ESP
4x Faster Billing and 99.999% AvailabilitOracle ZFS Storage with SPARC Support Rapid Telecom