Building Plan BHCET 2012 13

Embed Size (px)

Citation preview

  • 7/31/2019 Building Plan BHCET 2012 13

    1/4

    Building Plan

    (2012 - 2013)Prepared by Irshad Ahmad

    Academic Incharge, BHCET.

    For

    Brown Hills College of Engineering and Technology(A Minority Institution Established By AL-Falah Charitable Trust)

    Village Dhauj, Faridabad - 121004, Haryana

    Approved by Recognized by

    AICTE, Govt. of INDIA DTE, Govt. of Haryana

    Affiliated toMahrashsi Dayanand University

    Rohtak (Haryana)

    Visit us at: http://www.bhcet.co.in, Mail us at:[email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/31/2019 Building Plan BHCET 2012 13

    2/4

    2 | P a g e

    Brown Hills College of Engineering and TechnologyGround Floor Layout (All Classes, All Labs)

    CENTRAL WORKSHOP EntranceDepartment of Mechanical Engineering

    Main Entrance

    Entrance

    Girls

    Toilet BoysToilet

    CSE 1st

    yr /CSE 3rd

    Yr(Revolving) Class

    Room 107

    Way to 1st

    floorWay to 1st floor

    CIVIL Sec: B, 1st

    Yr Class Room

    105

    CIVIL Sec: A , 1st

    Yr

    Class Room

    104

    AS & H

    Faculty

    Room

    102

    Principal

    Room

    101

    Lawn

    Staff Toilet

    CIVIL 2nd

    Yr /Civil

    3rd

    yr.(Revolving)

    Class Room 106

    Water Cooler

    Seminaror

    ConferenceHall

    108

    Academic

    103

    KOM, DOM, RAC.

    Lab. 110 Recp.

    Foundry & Forging

    ShopOPEN SPACE Entrance

    Sheet Metal

    Shop

    Fitting

    Shop

    Welding

    Shop

    Carpentry

    Shop

    Machine

    ShopS.O.M Lab

    Machine Drawing Lab.

    Engg. Drawing Lab.

    Fluid Machine Lab

    Fluid Mechanics Lab

    EMEC LAB

    ECE Final

    Yr Lab, HT Lab

    Steam Power Lab

    Engg. Mechanics Lab

    ICE lab

    AE Lab

    109 ACC. Office

    A. O. Office

  • 7/31/2019 Building Plan BHCET 2012 13

    3/4

    3 | P a g e

    Brown Hills College of Engineering and TechnologyFirst Floor Layout (All Classes, All Labs)

    S. No. Initial Full-Form Room No

    1. CAD Lab : Computer Aided Drafting Lab. : 2012. CR3 : ECE 1

    stYear & EEE 1

    stYear Class Room : 202

    3. GCR : Girls Common Room : 2034. PHY Lab : Physics 1 & 2 Lab. : 2045. BME Lab : Basics of Mechanical Engineering Lab. : 205

    6. MS Lab : Material Science Lab. : 2057. CR 4 : CSE 4th

    Year/ CSE 2nd

    Year Class Room : 2068. CR 5 : ECE 3

    rdYear/ECE 4

    thYear Class Room : 207

    9. CL, RR : Central Library & Reading Room : 20810. CHY Lab : Chemistry Lab. : 20911. ET Lab : Electrical Technology : 21012. EMECH lab : Electrical Machine Lab. : 21013. FOCP Lab : Fundamental of Computer Programming Lab. : 21114. INT Lab : Internet Lab. : 211

    GirlsToilet BoysToiletF.O.C.P lab.

    Internet Lab.

    211

    Chemistry Lab

    209

    Way to GF floor

    Way to 2nd floor

    Way to GF floor

    Way to 2nd floor

    B.M.E Lab , M& I Lab

    Material Science Lab

    205

    Physics Lab

    204

    Girls

    Common

    Room

    203

    ECE& EEE

    1st

    Yr

    Class Room

    202

    CAD

    Lab

    201

    CSE 4th

    yr /CSE 2nd

    Yr

    (Revolving)Class Room

    206

    Water Cooler

    Electrical Tech. Lab

    Electrical Workshop Lab

    210

    Dark Room

    ECE 3rd

    Yr /ECE 4th

    yr

    (Revolving)

    Class Room207

    CentralLib

    rary

    208

    ReadingRoom

    Book

    StoreRoom

  • 7/31/2019 Building Plan BHCET 2012 13

    4/4

    4 | P a g e

    Brown Hills College of Engineering and TechnologySecond Floor Layout (All Classes, All Labs)

    S. No. Initial Full-Form Room No1. CR 6 : EEE 2

    ndYear Class Room : 301

    2. CR 7 : ECE 2nd

    Year Class Room : 3023. GYM : IT GYM : 3034. CR 8 : ME Sec:A 1

    stYear Class Room: 304

    5. CR 9 : ME 2nd

    Year Class Room : 3056. CR 10 : ME 3

    rdYear/ME Sec B 1

    styear : 306

    7. CR 11 : ME 4th

    Year Class Room : 307

    8. CSE12345 : CSE Lab. 1,2,3&4 : 3089. CSE67889 : CSE Lab. 5,6,7&8 : 30910. CSE10111213 : CSE Lab. 9,10,11&12 : 31011. ECE 123 : ECE Lab. 1,2&3 : 31112. ECE 456 : ECE Lab. 4,5&6 : 31213. ECE 789 : ECE Lab. 7,8,9&10 : 313

    CSE Lab. 1: DAS Lab.CSE Lab. 2: Operating System Lab.CSE Lab. 3: OOPS Lab.CSE Lab. 4: Simulation Lab.CSE Lab. 5: PC Lab.CSE Lab. 6: Computer Graphics Lab.CSE Lab. 7: FCPC lab.

    CSE Lab. 8: Web Development Lab.CSE Lab. 9: DBMS Lab.CSE Lab. 10: ANTC Lab.CSE Lab. 11: Multimedia Lab.

    CSE Lab. 12: RAD Lab.CSE Lab. 13: Final Yr. Lab.ECE Lab. 1: NT Lab.ECE Lab. 2: BOE Lab.ECE Lab. 3: AEC Lab.ECE Lab. 4: DE Lab.ECE Lab. 5: EE Lab.

    ECE Lab. 6: AE Lab.ECE Lab. 7: MicroprocessorLab.ECE Lab. 8: EEMSD Lab.

    ECE Lab. 9: Instrumentation Lab.ECE Lab. 10: CS Lab.ECE Lab. 11, 12, 13: Final Yr Lab GroundFloor Lab. Room No. 106

    GirlsToilet BoysToiletECE 78910

    313

    ECE 123

    311

    Way to 1st floor

    Way to 3rd floor

    Way to 1st floor

    Way to 3rd floor

    ME 2nd

    Yr

    Class Room305

    ME Sec: A 1st

    Yr

    Class Room304

    GYM

    Class 6

    303

    ECE 2nd

    Yr

    Class

    Room302

    EEE 2nd

    Yr

    Class

    Room301

    Water Cooler

    ECE 456

    312

    ComputerLab 308

    ME 4th

    Yr

    Class Room307

    ECE Lab

    309

    ECE Lab

    310

    ME 3rd

    Yr /ME Sec B

    (Revolving) Class

    Room: 306