Building The World
Com
pany
Pro
file
2
TABLES OF CONTENTS
Company Details 3
About Us 4
Our Philosophy 5
Products & Services 6
Management Profiles 10
Our Team 11
Costing System 12
Projects-Finished & Ongoing 13
Company Documents 22
Jatavaky Pvt Ltd is a proud member of SMEAZ
3Building The World
COmpANy dETAiLS
CONTACT dETAiLS A: Office B5, Hurtmall, 1st Floor, Corner Chinhoyi & Kwame Nkurumah AveC : 0773 900 682, 0774 267 293T: 04-750693 E: [email protected]: www.jatavaky.co.zw
BANKiNg dETAils Name of Bank: FBCAccount Name: Jatavaky (Pvt) LtdBranch : Nelson MandelaAccount Number: 6115364540135Account type: Current
• Tax Compliant- BP No. 0200168361• Registered with NssA- ssR No. 0199830X• PAYE Compliant• Registered with the state Procurement Board• Vendor number 712972• Registered with the Ministry of Public Works
4
Jatavaky (Pvt) Ltd which is a Zimbabwean owned consulting engineering firm headquartered in Harare. Jatavaky specializes in assisting clients in the development of infrastructure storm water control, environmental, commercial, residential and recreational needs. Company experience includes projects for public sector,
private sector, shopping centers, commercial and residential complexes.Jatavaky (Pvt) Ltd is a member of Construction Industry Federation of Zimbabwe (CIFOZ). Jatavaky (Pvt) Ltd is also a proud member of Small and Medium Enterprises Association of Zimbabwe
ABOuT uS
5Building The World
OUR MiSSiON
To ensure the longevity of our company through repeat and referral business achieved by customer
satisfaction in all areas including timeliness, attention to detail and service-minded attitudes.
OUR ViSiON
• We intent to provide our customers with the best structural and civil experience from beginning to the end, with sma.
• To excel in the consistent provision of professional quality services in engineering coupled with reliable allied services backup.
OUR CORE VALUES
• Professionalism• Reliability• Honesty• Accountability• Consistency• Responsiveness
Our phiLOSOphy
6Building The World
iNTROdUCTiON
At our soul in our daily practice, we are a service company. Our vast suite of capabilities allows us to interact with one another, involve experts at every level, include our clients’ and improve each project we touch. A place is not merely a structure. It is a living, breathing element that resides in a larger environment and must exist in a community and improve the experience of those who use it-as well as those who never will. Below is a brief description of our services.
ARCHiTECTURE
The heart and soul of what we provide. Our comprehensive architectural services include conceptual and schematic design, development and construction documentation, assisting with contractor bidding and/or negotiating and construction contract administration. Architecture embodies all we touch as we are a combination of artists and tacticians, imagining, coordinating and creating iconic places
PlANNiNg ANd dEVElOPMENT
We combine global reach with a tremendous local touch. Our commitment to our communities allows us to effectively navigate local regulatory approval processes from platting subdivisions to zoning and permitting. We also handle issues of site analysis, access, circulation, parking, urban design, local development guidelines and place making.
Bill OF QUANTiTiEs
We begin each relationship using listening as our most powerful tool. Using your goals, objectives and space requirements, we come up with efficient solutions laid out in the form of BOQs. Our ability to understand your unique needs and apply our expertise to enhance your vision is second to none.
prOduCTS & SErViCES
7Building The World
PROJECT MANAgEMENT
We are taskmasters at every level. The fears of most clients stem from lack of transparency, slipping time frames and rising budgets. Our business as project managers is to offer technical expertise that contributes to stream lined on-time and within the budget projects. Our business includes design quality management reviews and consultant coordination, budget management, monthly reporting, design scheduling and cash flow forecasting and trending. All results, No surprises.
sTRUCTURAl ENgiNEERiNg
We stretch the design boundaries daily, but always with a practical guide. Our highly experienced in-house team of structural engineers consistently communicates with the architectural team to ensure structural considerations are incorporated into designs from day one. This close corporation translates into buildings that simply work.
CiVil WORKs ANd EARTH MOViNg EQUiPMENT
Transport infrastructure - roads, railway tracks and stations, ports and airports, and even the most basic rural facilities - all require maintenance, sometimes known as ‘conservation’.Maintenance ensures that the asset continues to function as designed or intended, and meet the required quality standards throughout its anticipated lifetime. It can also extend the life of the asset beyond the original ‘design life. Timely road maintenance is important because it sustains the quality and safety of the road in a condition close to the original design, and minimizes the road user costs. It is also cheaper to regularly maintain a road in whole life cost terms, than to endure an ongoing cycle of un-managed deterioration and reconstruction.
prOduCTS & SErViCES
8
prOduCTS & SErViCES
We provide hiring services of the following earthmoving machinery
ExCAvATOR
TIPER CONCRETE MIxER
FRONT LOAdER
TANkERGRAdER
CULTvERT
ROAd SURFACING v-dRAINAGE
GRAvELLING
GRAdINGPNEUMATIC COMPACTION
9
Our prOduCTS & SErViCES
We provide hiring services of the following earthmoving machinery
10
mANAgEmENT prOFiLE
He holder of Higher National diploma (HNd) in Civil and Structural Engineering, Harare Polytechnic. James has more than 10 years experience in Construction and Structural Consultancy Industry. James is currently studying B.Tech in Construction Engineering by NUST University
JAMEs TAURAi VAKAi
ElizABETH VAKAi
CHARlEs MUTANgA
TATENdA ALLEN MUJURU
diRECTOR (NON-EXECUTiVE)
OPERATiONs MANAgER
ARCHiTECTURE
MANAgiNg diRECTOR
She holds the following qualifications: diploma in Foundation for Business Studies, 2007; BSc Honors degree in Banking and Finance, Bindura University of Science and Technology, 2015. Elizabeth is also a certified Anti-Money Laundering Specialist, International Association of Financial Management, 2013.
ThE TEAm
Charles (BSc Civil and Structural Engineering UZ, ZIE) is a Civil is a Structural Engineer
by profession. He has vast experience in the design, tender adjudication, Contract
Administration of civil and structural engineering works. The civil engineering works he
has been involved in are sewage treatment and disposal works, water treatment works,
water and sewer reticulation, roadworks and storm water drainage and also structural
works. He is a Corporate Member of the Zimbabwe Institution of Engineers.
Tatenda has more than 3 years experience in construction and structural consultancy
industry. He holds the following qualification: National Diploma in Architectural
Technology, Bulawayo polytechnic, 2014. He is doing Higher National Diploma with Harare
polytechnic.
11
ThE TEAm
viola has more than 5years’ experience in Construction and Quantity Surveying Consultancy Industry. She holds the following qualification: National diploma in Quantity Surveying, Bulawayo Polytechnic, 2012. She is currently doing Higher National diploma (HNd) with Harare Polytechnic.
MAXATU ViOlA QUANTiTY sURVEYOR
TRUsT CHiRigA
Trust has more than 6 years’ experience in Financial Services and Financial Consultancy Industry. He holds the following qualification: B.Com Accounting Honours degree, MidlandsState University, 2012. Advanced in diploma in Accounting and Business (ACCA) 2014.
ACCONTANT
CAlEB MHlANgA
Caleb has more than 10 years’ experience in Construction Industry. He holds a Class One Bricklayer Certificate.
SiTE SUPERViSOR
Jatavaky Construction Team
12
COSTiNg SySTEm
gUARANTEE
A one year guarantee is given for all new structures. A one month guarantee is given for all repairs made hence the recommendations made after each job must be adhered to or risk to violet warranty terms. Ignorance of recommendations will result in warranty being canceled. A one year warranty is given for installation of new parts and components.Please Note: Electrical components and parts carry no warranty.
COsTiNg
We do not charge a fixed amount, we quote for a specific job hence if a client requires a yearly service which requires a permanent presence on site, then a fixed charge will have to be agreed on depending on the type of job to be done and manpower required per month.
MARK UP
1. For supply of hardware and machinery, a markup of 25%is charged. Transport will be charged using current Automobile Association of Zimbabwe (AAZ) rates.
2. For labor we charge a flat figure of $40 per hour or 38% of material cost, whichever is great.3. For structural drawings we charge $2 per square meter of floor area.
IMPORTANT:We require 60% deposit for fix and supply contracts as well as a written order before commencement of work. For labour only we require 40% down payment and a written order before commencement of work. Payment must be made within 21 days from date of commissioning of work or preferably earlier.
13
prOjECTS- FiNiShEd & ONgOiNg
PROJECT: BELLyWOOd PRIMARy SCHOOL
CLIENT MR dOUGLAS
CONTACT +263 718776162/+263 773897931
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
14
PROJECT: NyABIRA SERvICE STATION
CLIENT: TRUST MAkUSHA
CONTACT: 0773 466 202
STATUS: COMPLETE
dUTy: dESIGN ANd CONSTRUCTION
prOjECTS- FiNiShEd & ONgOiNg
15
prOjECTS- FiNiShEd & ONgOiNg
PROJECT: MARyMOUNT TEACHERS’ COLLEGE
CLIENT: THE PRINCIPAL
CONTACT 020 64734
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
16
prOjECTS- FiNiShEd & ONgOiNg
PROJECT: JUNIOR kNIGHTS PRIvATE SCHOOL
CLIENT: MRS TSIkWA
CONTACT 0772 278 270
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
17
prOjECTS- FiNiShEd & ONgOiNg
PROJECT : ZAOGA WESTGATE dISTRICT
CLIENT JAMES MAGARIRO
CONTACT: 0779 625 015
STATUS: INCOMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
18
PROJECT: MASUkA CHRISTIAN HIGH
CLIENT: MR. MASUkA
CONTACT 0772 764 094
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
prOjECTS- FiNiShEd & ONgOiNg
19
prOjECTS- FiNiShEd & ONgOiNg
PROJECT: MASUkA CHRISTIAN HIGH
CLIENT: MR. MASUkA
CONTACT 0772 764 094
STATUS: COMPLETE
dUTy: dESIGN ANd CONSTRUCTION
20
PROJECT: WASHINGTON HILLS
CLIENT: THE dIRECTOR
CONTACT 0773 025 655
STATUS: COMPLETE
dUTy: dESIGN ANd CONSTRUCTION
prOjECTS- FiNiShEd & ONgOiNg
21
prOjECTS- FiNiShEd & ONgOiNg
PROJECT: CORNWAy BASkETBALL ANd TENNIS COURTS CONSTRUCTION
CLIENT: THE SECRETARy
CONTACT 0772 764 094
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
22
PROJECT: kUTAMA/ MANJENJE COMMUNITy RESOURCE CENTRE
CLIENT: THE MANAGER- MR. REvAI
CONTACT 0736 387 996
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
prOjECTS- FiNiShEd & ONgOiNg
23
PROJECT: MASUkA HIGH SCHOOL
CLIENT: THE dIRECTOR
CONTACT 0772 764 094
STATUS: COMPLETEd
dUTy: dESIGN ANd CONSTRUCTION
prOjECTS- FiNiShEd & ONgOiNg
24Building The World
prOjECTS- FiNiShEd & ONgOiNg
MAPONgA REsidENCE ARCHiTECTURAl dEsigNs
GSPublisherVersion 0.0.100.100
F
W
135°
135°
B
B
LOUNGE
Tiles
(±0.000)
W.I.C
Tiles
(±0.000)
PASSAGE
Tiles
(±0.000)
VERANDAH
Tiles
(±0.075)
BEDROOM 2
Carpet
(±0.000) BEDROOM 1
Carpet
(±0.000)
PANTRY
Tiles
(±0.000)
ENSUITE
Tiles
(±0.000)
DOUBLE LOCK UP
GARAGE
Grano
(±0.150)
DINING
Tiles
(±0.000)
KITCHEN
Tiles
(±0.000)
SCULLERY
Tiles
(±0.000)
MASTER
BEDROOM
Carpet
(±0.000)
VERANDAH
Tiles
(±0.075)
VERANDAH
Tiles
(±0.075)
VERANDAH
Tiles
(±0.075)
BEDROOM 3
Carpet
(±0.000)
BEDROOM 4
Carpet
(±0.000)
ENSUITE
Tiles
(±0.000)
ENSUITE
Tiles
(±0.000)
BATH
Tiles
(±0.000)
TO
ILE
T
Tile
s
(±0.0
00)
abab
abab
abab
abab
ab
ab
ab
ab
ab
ab
ab ab
ab ab
ab ab
ab ab ab ab
ab ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab ab ab ab ab ab ab ab ab
rc b
eam
over
to e
ngin
eer's d
esig
n
tub
whb
wc shwr
ste
p d
ow
n
tub
whb
whb
whb
whb
wc
wc
wc
wc shwr
tub
step down
step down
step down
step down
step down
rc beam over to engineer's design
rc beam over to engineer's design
rc beam over to engineer's design
rc b
eam
over
to e
ngin
eer's d
esig
n rc b
eam
rc b
eam
rc b
eam
rc b
eam
rc b
eam
rc b
eam
rc beam
rc beam
rc beam
PATIO
Tiles
(±0.075)
b.i.c
b.i.c
b.i.cb
.i.c
b.i.c
b.i.c
b.i.c
b.i.c
b.i.c
b.i.c
b.i.c
b.i.c
b.i.cw
hb
fld
fld
rolle
r up d
oor
fld
fld
rolle
r up d
oor
step down
i.e
PA
SS
AG
E
Tile
s
(±0.0
00)
gg
svp
100mm dia PVC pipe to beused @ 1:40 fall to main septic
rw
100mm dia PVC pipe to be used @ 1:40 fall to main septicrw
i.e i.e i.e i.e
i.e
i.e
rw
rwi.e
i.e
i.e
i.e
rw
100m
m d
ia P
VC
pip
e to b
e u
sed @
1:4
0 f
all
to m
ain
septic
100mm dia PVC pipe to be used @ 1:40 fall to main septic
FLOOR PLAN
SCALE 1:100Area 351 m2
W3 W3
W4
W6
W1
W1
W2
W7
W7
W8
W8
W8 W8
W9
W2
W2W1W2W2 W5
D1
D2
D3
i.e
ste
p d
ow
n
garage walls to reachunderside of roof
garage walls to reachunderside of roof
rc b
eam
over
to e
ngin
eer's d
esig
n
1hr fireresistantdoor
230mm pre castround columnsthroughout
230m
m p
re c
ast
round c
olu
mns
thro
ughout
230mm pre castround columnsthroughout
230mm pre castround columnsthroughout
230mm pre castround columnsthroughout
230mm pre castround columnsthroughout
230mm pre castround columnsthroughout
230mm pre castround columnsthroughout
W4
W1
25
prOjECTS- FiNiShEd & ONgOiNg
GS
Publis
herV
ers
ion 0
.1.1
00.1
00
1 2 3 4 5 6 7 8 9
10
11
12
13
14
15
16
17
18
1 2 3 4 5 6 7 8 9
10
11
12
13
14
15
16
17
18
A4A4
A4A4
900mm
high dwarf
wall
900mm
high dwarf
wall
decking
stepdown
shwr
laun
dry
c. tiles
din
ing
c. tiles
bed
roo
m 5
c. tiles
entran
ceh
allc. tiles
meals
c. tiles
kitchen
c. tiles
family ro
om
c. tiles
pan
try
f i t t i n g s
f i t t i n g s
f i t t i n g s
f i t t i n g s
f i t t i n g s
passag
ec. tiles
deckin
g
po
rchgrano
460x460mm
b/pier
460x460mm
b/pier
460x460mm
b/pier
460x460mm
b/pier
po
rchpaquet
85mm
stepdown
rc beam to engineer`s details
rc beam to engineer`s details
deckin
g
fireplace
knook900m
m high
dwarf w
all
rc beam to engineer`s detailsrc beam over
breakfast knook
step down
g
rw
ie svpg
GR
OU
ND
FL
OO
R P
LA
N S
CA
LE
1:100F
LO
OR
AR
EA
- 287sqm
460x460mm
b/pier
beam to engineer`s details
wc
c. tiles wc
whb
85mm
stepdown
1hr fireresistantdoor
do
ub
le lock u
pg
arage
grano
walls to reach underside of roof
walls to reach underside of roof
roller up doorroller up door
rc beam over rc beam over
stepdown
85mm stepdown
b . i . c
stepdown
abab
ab
abababab ab
abab
abab
ababab
abab
ab ab ab
abab
abab
abab
abab
abab
W5
W1
D1
D2
W8
W8
W7
W2
W2W2
D1
D1
W4W4
W4W5
W3
W3
W3
W9W9
W9
W9
100mm
dia PV
C pipe to be used @
1:40 fall to main septic tank
paquet
paquet
paquet
ieie
ie
linen
fldab
abab
abab
abab
abab
abab
abab
abab
abab
abab
ab
abababab
abab
abab
ab ab
abab
abab
abab
abab
abab ab
abab ab
wc
D2
W4
W4
W8
W8
W8
W8
W8
W4
W4
W4
W4W4
W4
W4
W4
W3
W3
W3
W6
W6
W4 W4
W4
460x460mm
b/pier
master
bed
roo
mcarpet
terrace
c. tiles
lob
by
FIR
ST
FL
OO
R P
LA
N S
CA
LE
1:100F
LO
OR
AR
EA
- 202 sqm
85mm stepdown
wc
c. tiles
whb whb
shwr
tub
c. tiles
ensu
ite
b . i . c
b . i . c
wc
activityareac. tiles
85mm
stepdown
terracec. tiles
bed
roo
m 3
carpet
b . i . c
b . i . c
l i n e n
b . i . c deskdesk
bed
roo
m 2
carpet
b . i . c
whb
tub
shwr
l i n e n
b . i . c desk
lob
by
c. tiles
l i n e n
c. tiles
wc wc
f i t t i n g s
c. tiles
bath
b . i . c
lob
by
c. tiles
bed
roo
m 4
carpetshw
r
D2
ARCHiTECTURAl dEsigNs
26Building The World
prOjECTS- FiNiShEd & ONgOiNg
MUTANgAdURA REsidENCE
GS
Publis
herV
ers
ion 0
.0.1
00.1
00
WD
R
F
135°
KK
gsvp
i.e
i.e
i.em
.h
100mm dia PVC pipe to be used @ 1:40 fall to septic
rw
100m
m d
ia P
VC
pip
e to b
e u
sed @
1:4
0 f
all
to s
eptic
rw
gg
svp
i.e
g
fam
ily
lou
ng
etile
s
ba
th
tile
s
kit
ch
en
tile
s
scu
llery
tile
s
tile
s
din
ing
bed
ro
om
3tile
s
bed
ro
om
2tile
s
tile
s
maste
r
bed
ro
om
bed
ro
om
4tile
s
c.
tile
s
do
ub
le l
oc
k
up
garag
e
tilespassage
i.e
g
tile
s
pan
try
tile
s
w/c
w/c
whb
shw
r
w/c
whb
shw
r
tub
tub
tub
shw
r
veran
dah
tile
s
w/c
whb
w/c
whb
tile
sen
su
ite
tile
sen
su
ite
tile
s
w.i
.c
i.e
tile
s
sto
rero
om
tile
s
gym
gsvp
i.e
100mm dia PVC pipe to be used @ 1:40 fall to septic
rwi.e
m.h
i.e
tileslobby
svp
i.e
i.e
i.e
FL
OO
R P
LA
N
SC
ALE
1:1
00
Are
a=
314m
2
en
try
tile
s
garage walls to reachunderside of roof
rolle
r up d
oor
1hr
fire
resis
tant
door
gara
ge w
alls
to r
each
unders
ide o
f ro
of
rolle
r up d
oor
R.C
beam
over
to e
ng.
desig
n
R.C
beam
over
to e
ng.
desig
n
R.C beam
R.C beam
R.C
beam
R.C
beam
R.C beam
R.C
beam
i.e
R.C
beam
R.C beam
W1
D1
85m
m s
tepdow
n
85mm stepdown
85m
mste
pdow
n
345*2
30
brick p
ier
345*2
30
brick p
ier
345*2
30
brick p
ier
345*2
30
brick p
ier
345*2
30
brick p
ier
breeze blockbreeze block
W1W1W2W3
W3W4
W6 W7W8
W3
W4
W4 W5 W5W6W6
W4
W4
W5
w/c
tub
whb
R.C
beam
85m
mste
pdow
n
85m
mste
pdow
n
tile
s
stu
dy
fittin
gs
fittin
gs
b.i.c
b . i . c
b . i . cb . i . c
linen
b .
i .
c
b .
i .
c
breakfa
st
bookshelf
ababab
abababababababababababab
abab
ab ab ab ab
ab ab ab ab
ab ab ab ab ab ab ab ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab ab
ARCHiTECTURAl dEsigNs
27
prOjECTS- FiNiShEd & ONgOiNg
GSPublisherVersion 0.0.100.100
1
2
3
4
5
6
7 8 9 10 11 12 13 14
15
16
17
18
19
45°
A1A1
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
115mm featurearch over
115mm featurearch over
115mm featurearch over
115mm featurearch over
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
sink
stove
breakfastnook
85mmstepdown
6 panel sliding door
ab
D1ab
ab
ab
ab
ab
ab
ab
abab
ab
ab
ab
ab
ab
abababababab
ab
ab
ababab ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
W2 W2 W4
W4
W4
W6
W1
W1
W7
W7
W4
W5
W5
W2
W2
W2
g
i.e
g
g
i.e
i.e
g
r.w10
0mm
dia P
VC p
ipe to
be us
ed @
1:40
fall t
o sep
tic
r.w100mm dia PVC pipe to be used @ 1:40 fall to septic
r.w10
0mm
dia P
VC p
ipe to
be us
ed @
1:40
fall t
o sep
tic
6 panel alluminium folding door
85mmstepdown
D3
85mmstepdown
1hr f.r.d
roller up doorroller up door
R.C Beam over to engineers design R.C Beam over to engineers designR.C Beam over to engineers design
R.C Beam overto engineers
design
R.C
Beam
over
R.C
Beam
over
R.C
Beam
over
R.C
Beam
over
R.C Beam over
85mmstepdown
R.C
Beam
over
shwr
tubw/c
whb
shwrtub
w/cwhb
whbw/c
cupboards
cupb
oard
s
85mm
stepd
own
4 pan
el sli
ding d
oor
slidin
g doo
r
fldfld
fld
fld
R.C
Beam
over
to en
ginee
rs de
sign
to septictank
D2D4
diningF: Tiles
±0
loungeF: Tiles
±0
bedroom 2F: Tiles
±0
bedroom 3F: Tiles
±0
bedroom 4F: Tiles
±0
gym roomF: Tiles
±0
scullery/laundryF: Tiles
±0
porchF: grano
-85
verandahF: grano
-85
double lock up garageF: grano
-85
bathroomF: Tiles
±0
w/cF: Tiles
±0
pantryF: Tiles
±0
storeroomF: Tiles
±0
porc
hF:
gran
o-8
5
porchF: grano
-85
lobbyF: Tiles
±0
pass
age
F:Til
es±0
passageF: Tiles
±0
entry hallF: Tiles
±0
stairwayF: Tiles
±0
passageF: Tiles
±0
kitchenF: Tiles
±0
w.i.cF: Tiles
±0
ensuiteF: Tiles
±0
b . i . c
b . i
. c
b . i
. c
b . i
. c
linen
linen
1
2
3
4
5
6
7 8 9 10 11 12 13 14
15
16
17
18
19
A1A1
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
460mm dia precastconc column on460*460mm base
upper grillstand
railing to eng.design
railing to eng.design
railing to eng.design
railing to eng.design
railing to eng.design
460mm dia precastconc column on460*460mm base
railing to eng.design
85mmstepdown
6 panel sliding door
D1 85mmstepdown
4 panel sliding door
4 pan
el sli
ding d
oor
85mm
stepd
own
W2
W4
W2W
2W
4W
4W
4W
1
W3 W3
W2W7W2
ab
ab
ab
ab
ab
ab
ab
ab
ab
ab
ababababababab
ab
ab
ab
ab
ab
ab
abab
ab
ab
ab
ab
ab
ab
ab
ab ab ab ab ab abab
ab
ab
ab
ab
ab
ab
ab
abfld
fld
vfld
vfld
shwrtub
w/c
whb
w/c
tub shwr
whb
w/c
shwr tub
whb
W5
R.C Beam over to engineers design R.C Beam over to engineers designR.C Beam over to engineers design
R.C
Beam
over
R.C
Beam
over
R.C
Beam
over
svp svp
D2
D2
Upper loungeF: Tiles
±3,000
stairwayF: Tiles
±3,000
master bedroomF: Tiles
±3,000
balconyF: Tiles
±2,915
balconyF: Tiles
±2,915
ensuiteF: Tiles
±3,000
bathroomF: Tiles
±3,000
lobbyF: Tiles
±3,000
bedroom 6F: Tiles
±3,000
bedroom 5F: Tiles
±3,000
lobb
yF:
Tile
s±3
,000
lobbyF: Tiles
±3,000
pass
age
F:Ti
les
±3,0
00
studyF: Tiles
±3,000
playroomF: Tiles
±3,000
balconyF: Tiles
±2,915
ensuiteF: Tiles
±3,000
w.i.cF: Tiles
±3,000
b . i . c
b . i . clinen
b . i
. c
b . i
. c
GROUND FLOOR LAYOUT FIRST FLOOR LAYOUT398 sqm 332 sqm
wASARiRA RESidENCE ARCHiTECTURAl dEsigNs
28Building The World
ARCHiTECTURAl dEsigNs
ARCHiTECTURAl dEsigNs
29Building The World
ARCHiTECTURAl dEsigNs
30
COmpANy dOCumENTS
31
COmpANy dOCumENTS
Professionalism Reliability Honesty Accountability Consistency Responsiveness