Updated: 11/3/2016 The Galleria Houston, TX The Galleria III project is a redevelopment of the old Saks Fifth Avenue store. The Mall common area will open to the public in Mid-December 2016 and will provide Shoppers with direct access from The Galleria Mall operating center, through the expansion wing construction zone, to the new Saks Fifth Avenue store. As such, the Landlord has established the following instructions to assist all Tenant’s and their contractors with the General Condi tions and Site Access requirements that will be implemented for the successful construction and timely opening of all Tenant spaces. This bulletin is intended to provide all Tenant’s and their Contractors with information that should be incorporated in the Tenant’s construction documents for their individual spaces. This bulletin is part of the Mall Criteria for the center and Tenant General Contractors will be expected to comply with all information contained herein. As part of this bulletin the Landlord has also provided a series of Site Access Drawings for use by all Tenants, Contractors & Consultants working on the project. Tenants shall carefully analyze the logistical information provided in this bulletin relative to their intended project schedule(s) in order to meet the Mall Grand Opening. The goal is for all Tenants to be prudent in their scheduling decisions and leave plenty of time for construction and store set up for a successful Grand Opening. Please keep in mind that based upon the site access information provided here and handling capacity of the truck dock and freight elevator; receiving goods and hauling trash could take longer than normally anticipated and may also be required to be performed after hours. All Tenant General Contractors, Subs & Consultants will be required to conduct themselves in a manner consistent with an operating shopping center. Sound and odor restrictions will be in place and will be strictly enforced. Movement of materials, trash, and construction personnel shall be strictly prohibited from the public common area unless otherwise outlined below or approved on site by the Landlord’s representative. This bulletin references other portions of the Mall Criteria. Tenants, Consultants and Contractors are therefore reminded to reference those documents to ensure the successful completion of the project. Loading Dock Level (Basement) The lower level loading dock will serve as the primary point of access of materials delivery for most tenants. The loading dock level contains a freight elevator that connects to levels 1 and 2, Landlord serviced dumpsters, and temporary toilets. Delivery vehicles will enter the loading dock via the truck tunnel entrance to the west on Sage Road. A Dock Master will be on site to schedule deliveries and control the area. All movement of materials and trash must be scheduled in advance with the Dock Master. Bulletin - Site Access The Galleria III

Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

Updated: 11/3/2016

The Galleria Houston, TX

The Galleria III project is a redevelopment of the old Saks Fifth Avenue store. The Mall common area will open to the public in Mid-December 2016 and will provide Shoppers with direct access from The Galleria Mall operating center, through the expansion wing construction zone, to the new Saks Fifth Avenue store. As such, the Landlord has established the following instructions to assist all Tenant’s and their contractors with the General Conditions and Site Access requirements that will be implemented for the successful construction and timely opening of all Tenant spaces. This bulletin is intended to provide all Tenant’s and their Contractors with information that should be incorporated in the Tenant’s construction documents for their individual spaces. This bulletin is part of the Mall Criteria for the center and Tenant General Contractors will be expected to comply with all information contained herein. As part of this bulletin the Landlord has also provided a series of Site Access Drawings for use by all Tenants, Contractors & Consultants working on the project. Tenants shall carefully analyze the logistical information provided in this bulletin relative to their intended project schedule(s) in order to meet the Mall Grand Opening. The goal is for all Tenants to be prudent in their scheduling decisions and leave plenty of time for construction and store set up for a successful Grand Opening. Please keep in mind that based upon the site access information provided here and handling capacity of the truck dock and freight elevator; receiving goods and hauling trash could take longer than normally anticipated and may also be required to be performed after hours. All Tenant General Contractors, Subs & Consultants will be required to conduct themselves in a manner consistent with an operating shopping center. Sound and odor restrictions will be in place and will be strictly enforced. Movement of materials, trash, and construction personnel shall be strictly prohibited from the public common area unless otherwise outlined below or approved on site by the Landlord’s representative. This bulletin references other portions of the Mall Criteria. Tenants, Consultants and Contractors are therefore reminded to reference those documents to ensure the successful completion of the project. Loading Dock Level (Basement) The lower level loading dock will serve as the primary point of access of materials delivery for most tenants. The loading dock level contains a freight elevator that connects to levels 1 and 2, Landlord serviced dumpsters, and temporary toilets. Delivery vehicles will enter the loading dock via the truck tunnel entrance to the west on Sage Road. A Dock Master will be on site to schedule deliveries and control the area. All movement of materials and trash must be scheduled in advance with the Dock Master.

Bulletin - Site Access

The Galleria III

Page 2: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

Updated: 11/3/2016

The Galleria Houston, TX

All Tenants are required to utilize the Landlord serviced dumpsters and temporary toilets as outlined in the Preconstruction Drawing; there is no space available for additional or individual services. Level 1 Tenants Access (Ground Level) Northwest tenants will take deliveries at grade in the north parking lot. Trucks must have lift gates or ramps. Deliveries shall be coordinated around day-to-day construction activities in the parking lot and this portion of the building. Trash will be hauled to the loading dock via the Northeast freight elevator. Northeast tenants will use the Northeast freight elevator and loading dock for deliveries and trash. South tenants will use the Southeast freight elevator and loading dock between 10:00 PM and 6:00 AM only. Carts will pass through an outdoor public walkway and must have inflated rubber tires to protect the common area floor finish. Clean up after use of the public area is required. Level 2 Tenants Access North tenants will use the Northeast freight elevator and loading dock for deliveries and trash. South tenants will use the Northeast freight elevator and loading dock for deliveries and trash between 10:00 PM and 6:00 AM only. The path of travel crosses the mall common area and may not be used during Mall business hours. Parking Designated Contractor parking is in the Purple Garage adjacent to the job site and is accessed from the south on Alabama Street. See the Site Access Drawing for parking and building access routes for all Construction personnel. Mall Parking garages provide 24-hour security for the protection of all Mall customers, employees and Construction personnel. Construction personnel found parking outside of the designated areas will be subject to fines and/or towing of the vehicle by Mall Security. Barricade Plan Because the Mall Common area will be open to the public prior to Tenant’s starting construction, the Tenant Storefront Barricade(s) will be installed, maintained, and removed by the Landlord at the Tenant’s expense. The Barricade(s) will not have doors and construction materials may not be delivered/ received through the barricade. All deliveries, trash removal, and Construction personnel must pass through the rear of the space. Materials, trash, and Construction personnel are strictly prohibited from the Mall common area. The Landlord acknowledges that some Tenants may have fixtures that are too large to be brought through rear corridors and doors. In instances where that situation may occur, the Tenant’s General Contractor shall contact the on-site Field Tenant Coordinator to determine an alternate solution that will work for all concerned.

Page 3: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

FRONT

UP

UP

7.1 7.2 7.3 8 8.1 9 10 11 12 13 15 16

Q

D

E

E.1

F

F.1

G

G.1

H

R

7654 13.2

ELEV M.R. OFFICE

(E) RECEIVINGAREA

(E) TRUCKDOCK

(E) CENTRALPLANT

. .9

A61.01

C.1

8' - 0"

1' -

0 3

/4"

26' -

0 3

/4"

4' -

7 1

/4"

CLR

14' - 10 3/4" 14' - 10 5/8"

3A10.00

. .

4A10.00

. .

N-NA40.07

. .

N-NA40.07

. .

M-MA40.06

. .

M-MA40.06

. .

IF07IF07IF07

1' - 3" 7' - 6" 10' - 4 1/2" 7' - 10 1/2" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"

13' - 5 3/8" 16' - 6 5/8"

(E) STORMDRAINAGE

[No Slope][No Slope]

[No Slope]

UP

S-800000-0

S-800000-0

S-800000-0

1' -

0 3

/4"

26' -

0 3

/4"

4' -

7 1

/4"

CLR

(E)TRANSFORMER

ROOM

(E) PULLROOM

(E) STAIR 4

ST4

(E) FREIGHTELEVATOR

UP

E103

E.2

. .4

A61.01

FE

FE

FE

FE

FE

FE

FE UP

UP UP

TRANSFORMER

SLAB EDGE

30' -

0"

30' -

0"

30' -

0"

30' -

0"

1' -

6"

7' -

3"

22' -

9"

28' -

0"

2' -

0"

26' -

0"

4' -

0"

30' -

0"

ST4A

005

006

007

008

EXISTING STAIRAND RAILS TOREMAIN

009

001

002

NEW COLUMN

NEW COLUMN

60' - 0"

6” DEEP CONCRETEHOUSEKEEPING PAD. EXTEND6” AROUND SWITCHBOARD.SEE ELECTRICAL

PROVIDE SEALER AT ALLEXISTING CONCRETEFLOORS, TYP.

PROVIDECONCRETE SEALERTO ALL EXISTINGCONCRETE FLOORS

PROVIDECONCRETE SEALERTO ALL EXISTINGCONCRETE FLOORS

A

A AA

C.05

A

A

B

BB B

10' - 4 3/4" 8' - 6"

7' -

7 3

/4"

1' -

2"

2' - 2"

R.O.

4' - 10"1' - 6"

1RFI 13

NOTE ON GRADES / ELEVATIONS:

BASEMENT: ARCHITECTURAL = 55.0' / CIVIL = 44.67'LEVEL 1 RETAIL: ARCHITECTURAL = 73.0' / CIVIL = 62.67'LEVEL 2 RETAIL: ARCHITECTURAL = 89.0' / CIVIL = 78.67'REFERENCE ELEVATION: ARCHITECTURAL = 100.0' / CIVIL = 89.67'LEVEL 3 RETAIL : ARCHITECTURAL = 110.0' / CIVIL = 99.67'LEVEL 4 PARKING: ARCHITECTURAL = 130.0' / CIVIL = 119.67'

WALL / SYMBOL LEGENDAPPLIES TO DRAWINGS A10.00 - A10.04

NEW RATED WALL CONSTRUCTION. SEE PARTITION SCHEDULE ONSHEET A00.10 FOR ADDITIONAL INFORMATION.

EXISTING COLUMN LOCATION

NEW WALL CONSTRUCTION. SEE PARTITION SCHEDULEFOR ADDITIONAL INFORMATION.

EXISTING CONSTRUCTION TO REMAIN, UNO

NEW SLAB CONSTRUCTION/ INFILL

SEE A00.00 FOR ASSEMBLIES AND FINISHES

LEVEL 1 (+0'-0")73' - 0"

BASEMENT (-18'-0")55' - 0"

9 10 114A10.00

. .

OPENING AT TOP OF WALL FOR TENANT MCCABLE DISTRIBUTION.

FR

T P

LYW

OO

D

8' -

0"

DOUBLE STUDS @ 4'-0"O.C. TO EXTEND TOB/STRUCTURE.BARE STUDS AFTER 8'-0"

A

ELEVATOR PIT (-5'-6")67' - 6"

GH 3A10.00

. .

DOUBLE STUDS @ 4'-0" O.C.TO EXTEND TOB/STRUCTURE.BARE STUDS AFTER 8'-0"

8' -

0"FRT PLYWOOD EACH

SIDE, TYP

A

ELEVATOR PIT (-5'-6")67' - 6"

1468 w

est

9th

st.

#600

cle

ve

lan

d, o

h 4

4113

ka

inc

.co

m

21

6.7

81

.91

44

Sheet Issue Date

Drawn By:

Checked By:

KA/jn:

Sheet D

escription:

Authorized Use:

Sheet #

Phase #

Design Development

Progress

Bidding

Building Permit

Construction

X

X

John G

. B

urk

, R

A #

20576

Expiration: 7/3

1/2

016

KA

, In

c.

Arc

hit

ec

ture

Re

gis

tra

tio

n #

: B

R 9

98

7/1

8/2

016 1

1:2

5:1

9 A

MC

:\U

sers

\kcorn

ett\D

ocum

ents

\13033 -

Base_kcorn

ett.r

vt

GA

LL

ER

IA V

IR

ED

EV

EL

OP

ME

NT

HO

US

TO

N G

ALL

ER

IAH

OU

ST

ON

, TE

XA

S

02 NOV 15

13033

MEC

JGB

A10.00

BA

SE

ME

NT

FL

OO

RP

LA

N (

55.0

')

PR

OJE

CT

NO

RTHPLAN

3/32" = 1'-0"A10.00

1

BASEMENT

15

23

34

6

5

22

PR

OJE

CT

NO

RTHKEY PLAN

N.T.S

AREA OFWORK

SAKSDEPT.STORE

BROWNGARAGE

SECTIONA10.00 1/8" = 1'-0"

A10.00

3

ELECTRICAL SUPPORT WALL ELEVATION 3

SECTIONA10.00 1/8" = 1'-0"

A10.00

4

ELECTRICAL SUPPORT WALL ELEVATION 4

REVISIONS

No. Date Description

A 15 JAN 16 ADDENDUM A/ I.F.C.

B 04 MAY 16 ADDENDUM C

1 15 JUL 16 BULLETIN 1

Toilet Area

Dumpsters

Tenant deliveriespathways designated inyellow.

LoadingDock 1

LoadingDock 2

LoadingDock 3

FrieghtElevatorfor tenantuse

qpm
Typewritten Text
Truck Tunnel to Sage Road
qpm
Line
Page 4: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

ME

N

WO

ME

N

STAI

RS

TOU

PP

ER

LE

VE

LST

AIR

S TO

UP

PE

R L

EV

EL

ELEV

STORAGE203B

LOA

DIN

G D

OC

K

XFORM

STORAGE203B

WALKWAY

ELEV STAIRSTAIR

ELEVLOBBY

STAI

R

VESTIBULE

VESTIBULE

B27851,508

B28201,393

B28264,142

B28051,421

B27951,160

B27921,988

C25402,498

C25531,986

C25572,303

C25553,029

C25751,940

C25853,658

C25301,588

C25352,395

C25605,861

C25702,414

C25252,899

C25451,879

C25204,489

C25007,028

C2515564C2510

287

26.7

'

24'

10.5

'

17.7'

46.2

'

6.3'

24.6

'

15.5'

12.7'

28.7

5'

13.8'10.5'

34.4

'

15.1'

24.9

'

16.1'

66.9

'

13.8

'

30.3'

16'

39.7

'30

.9'

17'

70.6

'

30.3'

67.1

'

25.3' 9.2'

57.8

'

52.4'

38.8

'

23'

43.5

'

9.9'7'

87.9

'

38.9'

109.

3'

33.9'

21.3

'

25.3

'

74.1'

32.5

'

12.1' 13.7

'25.8'

5.8'

9.4'

26.3'

17'

10'

11.6

'

21.1'

10.3'38.1'

14.8

'

20.3'

20.9

'

26.8'

20.4'

11.4'13.4'

27.5'

89.4

'

33.1'

71.1

'

11.6'19.5'

73.1

'

21.7'39.7'

41.1'

85.7

'

20.9'

7'20.2'

92.7

'

20.1'

30.9'10.8'

25'

13.9'38.9'92

.7'

65'

85.7

'

41.9'7'

24'

85.7

'

40.8'

20.3

'

9.3'

72.3

'

20.5'7'

11'

19.7'7.2'

21.4

'

13.4' 6.8'

21.6' 25'

92.1

'

38.6'

15.3'

15.8'

11.6'

10'

17.4

'

11.9'

8'

11.1'

71.1

'

86.2'

43.1

'

16.6'

17.3

'

7.1'

13.9

'

SEATING 1,509 sf SEATING 1,457 sf

Development Plan

CORP #Modified:

The Galleria5085 Westheimer Rd, Suite 4850

Houston, TX 770567621August 01, 2016 DP44

- Under Construction[TENANT NAME]LEGEND:

#TENANT NAME# - NFR UnitFirst Level

Structural ElementPopout ZoneExpansion Joint

40200

This exhibit is provided for illustrative purposes only, and shall not be deemed to be a warranty,representation or agreement by Landlord that the Center, Common Areas, buildings and/orstores will be as illustrated on this exhibit, or that any tenants which may be referenced on thisexhibit will at any time be occupants of the Center. Landlord reserves the right to modify size,configuration and occupants of the Center at any time.

Freight elevator forsouth tenants.

Corridor access door.

Tenant DeliveryPathways

Northwest tenants willunload at the parkinglot and deliver throughthe northwest corridor.

Tenant deliverypathways for southtenants.

Freight Elevator

Tenant deliveries insouth location arepermitted onlybetween the hours of10pm to 6am.

Page 5: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

B38101,890

B38201,311

B37751,055

C35352,728

C3545987

C35501,111

C35602,018

C35752,508

C35802,592

C35401,018

C35702,531

C35255,549

C35551,045

C35655,053

C35006,231

C35159,902

B37803,260

C35431,018

OPEN

B221CSTOR

B220CSTOR

MECH ELEV

OPENOPEN

STOR

OPEN TO BELOW

ELEV STAIR

VESTELEV

STAIR

STAI

R

29.7'

32.3

'

25.3'

76.5

'

24.25'

24.9'

15'

11.6

'

6'

27.3

'

52.4'

50.8

'

24'

50.6'

104.

1'

49.3'

82.4

'

8.3' 12.4'

31.2' 30'

84.4

'

80.3

'

57.6'

84.4

'

60'

23.2'

57.1

'8.

2'

9.4' 12.1

'31.4'

54'

6.2'

24.2

'

8.3'

30.5

'

47.5'

76.8

'

39.2'

46.3

'55'

5.2'

24.2

'

24.4'

30'91

.4'

61.5'

69.8

'

5.7'

18.8

'

5.3'

11.1

'

52.9'

45.2

'

30'

39.8

'46

.6'

22'

46.3

'

22'

46.3

'

22'

6.4'6.4'13.4' 24.4'

24'

43.7

'

46.3

'

21.3' 8.2'

31.1

'

23.2'

38.6'

28.2'

11.6'

10'

17.4

'

11.9'

8.5'

6'

11.1'

46.3

'

97.3'

17.6'

12.3

'

8.2'41.6'

12.3

'

19.5'

48.7

'9'

6'

36.2

'

97.1'

38.9

'

12.3'

36.6

'

12.3'

16'25.8'

18'

- Under Construction[TENANT NAME]LEGEND:

#TENANT NAME# - NFR Unit Development PlanSecond Level

Structural Element

Expansion JointPopout Zone

CORP #Modified:

The Galleria5085 Westheimer Rd, Suite 4850

Houston, TX 770567621August 01, 2016 DP4440200

This exhibit is provided for illustrative purposes only, and shall not be deemed to be a warranty,representation or agreement by Landlord that the Center, Common Areas, buildings and/orstores will be as illustrated on this exhibit, or that any tenants which may be referenced on thisexhibit will at any time be occupants of the Center. Landlord reserves the right to modify size,configuration and occupants of the Center at any time.

Tenant DeliveryPathways.

Freight Elevator

Floor Protection;provided by Beck

Tenant deliveries atthis bridge locationare permitted onlybetween the hours of10pm to 6am.

Deliveries onlyauthorized from10pm-6am.

Kathy Perez
Text Box
Base Building Contractor
Kathy Perez
Line
Kathy Perez
Line
Kathy Perez
Line
Kathy Perez
Rectangle
Page 6: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

TENANT CONTRACTOR PARKING

Page 7: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

TENANT CONTRACTOR PARKING

Page 8: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

TENANT CONTRACTOR PARKING

Page 9: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13

Barricade Height Level 1: 12" 0" Level 2: 14" 0"

qpm
Line
qpm
Line
qpm
Polygonal Line
qpm
Polygonal Line
qpm
Callout
Public paths of travel during mall operating hours.
qpm
Polygonal Line
qpm
Text Box
Note that movement of materials, trash, and people are strictly prohibited from the common area unless otherwise stated. There will be no doors in the barricades. All materials and trash must pass through the rear of the space.
Kathy Perez
Text Box
Barricade Plan Level 1
Page 10: Bulletin - Site Access - Bul… · John G. Burk, RA #20576 Expiration: 7/31/2016 KA, Inc. Architecture Registration #: BR 998 7/18/2016 11:25:19 AM C:\Users\kcornett\Documents\13
qpm
Line
qpm
Line
qpm
Line
qpm
Line
qpm
Line
qpm
Polygonal Line
qpm
Callout
Public paths of travel during mall operating hours.
qpm
Text Box
Note that movement of materials, trash, and people are strictly prohibited from the common area unless otherwise stated. There will be no doors in the barricades. All materials and trash must pass through the rear of the space.
Kathy Perez
Text Box
Barricade Plan Level 2