Burmeister & Wain Energy A/S

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A · DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Your partner for

steam power -

Burmeister & Wain Energy A/S

Presentation of BWE

Multi fuel boilers in power plants- May 2013

Page 2: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

• Danish company founded in 1843

• First steam boiler supplied in 1852

• First Benson once-through boiler in 1952

• World record - above 47% in efficiency for a coal

fired utility boiler in 1999

• Part of the Italian STF S.p.A. Group since 2002

• Contract for Porto Tolle 3x660 MW USC

History of BWE

• Ultra supercritical boilers (Multifuel)

• Biomass boilers

• Air pre heaters and gas-gas heaters

• Rehabilitation, fuel conversion and service of

boiler

Products

Page 3: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

STF Headquarter

and workshop

TOTAL AREA: 160,000 m2

MANUFACTURING AREA: 32,000 m2

Magenta - Milan

ITALY

ENERGY INDIA

Chennai

INDIA

Lyngby

DENMARK

BURMEISTER & WAIN ENERGY A/S

Company structure

Page 4: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

1950 19701960 19901980 20202000 2010

30

32

34

36

38

40

42

44

46

48

52

50

54

56

58

60

%

Net Efficiency (LHV)

Commissioning Year

Esbjerg 3Nordjyllandsværket

Avedøre 2

Fynsv. 7

“250 MW”

Studstrup 3/4Ensted 3

Line of Steel

Line of Super Alloys

Efficiency Increase in Denmark

Efficiency

future > 700 °C

Danish technology for power station always ahead in the

search for efficiency

Page 5: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Fuel flexibility

• In addition to the increase of efficiency, the Danish power industry had to

face the issues related to fuel flexibility

• The energy model of Denmark had to adapt to the primary energy market in

order to:

– Be independent from large sources of primary energy that may “capture” the

power industry

– Adapt to new possibility of sources of cheap primary energy

– Follow the trend of demand for cleaner technology and renewable energy

– Be load flexible in order to maximise the use of wind energy

– Combine all the above points

Page 6: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Fuel flexibility

Be independent from large sources of primary energy that may

“capture” the power industry

Page 7: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Fuel flexibility

Adapt to new possibility of sources of cheap primary energy

Avedøre Power

Station Unit 2

Page 8: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Fuel flexibility

Follow the trend of demand for cleaner technology and renewable

energy

Avedøre Power

Station Unit 2

Page 9: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Composition of Fuels in

District Heating Production

Page 10: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Avedøre Power Station Unit 2

BWE Solutions for co-firing

Co-firing into an existing power station

Page 11: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Avedøre II (2001)

Client: DONG Energy A/S (Denmark)

CHP - 485 MWe & 545 MJ/s heat (1067 t/h steam)

Tangential firing

USC Tower boiler

HP 305 bar & 582°C

Avedøre II (2001) / DONG Energy A/S

CHP / 485 MWe & 545 MJ/s heat

Page 12: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Multi fuel concept

• Avedøre Power Station unit 2

design:

• 100% on coal

• 100% on natural gas

• 100% on heavy fuel oil (HFO)

• 70% on biomass (wood pellets)

• USC combined with

2 x 50MW gas turbine

Increased output 150MWe

Total plant efficiency 51%

HRSG FW-preheater

Bio

Boiler

(straw)

USC

boiler

(gas/oil/

wood)

Gas-turbine

Steam turbine

Plant concept by DONG Energy, visited by delegations during COP15

Page 13: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

• Multi-fuel unit:

• 800 MJ/s USC boiler supplied by BWE for gas, oil, coal or wood pellets (70%)

• 105 MJ/s straw-fired biomass boiler

• 2*50 MWe gas turbines

• Connected to the Copenhagen area district heating system

• 570 MWe for power

• 545 MJ/s & 485 MWe

Avedøre II (2001) / DONG Energy A/S

CHP / 485 MWe & 545 MJ/s heat

Page 14: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Herning Power Station

BWE Solutions for co-firing

Repowering of an existing power station

Page 15: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Herning Power Station (1982)

Client: DONG Energy A/S (Denmark)

CHP - 89 MWe & 174 MJ/s heat

425 t/h of steam (equivalent to

approx 125 MWe in case of full electricity

conversion)

Wall firing & bottom grate

Drum boiler – 115 bar & 525°C

Herning Power Station(1982) / DONG Energy A/S

CHP / 89 MWe & 174 MJ/s heat

Page 16: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Herning Power station (1982) / DONG Energy A/S

CHP / 89 MWe & 174 MJ/s heat

1982 Coal/Oil 2002 Biomass/Gas/Oil

2009 Biomass

2000 Gas/Oil

4 x 2 coal/oil burners

The original boiler design

was operated for 20 years

4 x 2 gas/oil burners

The first retrofit included 8

new WR oil and gas

burners

3 x 2 gas/oil burners

The retrofit enables about

45% load on biomass

1 x 2 gas/oil burners

2 x 2 gas/oil/wood dust burners

1 x vibration grate for wood

chips

biomass load up to 90%

1 x vibration grate for wood

chips

Page 17: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Amager Power Station Unit 1

BWE Solutions for co-firing

New build for multi-fuel

Page 18: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

HP2

Screen

RH2

HP1.3 HP1.2

HP1.1

ECO2

ECO1

3 mills

OFA OFA

OFA

ESP

FD

APH

4 x 3

burners

deSOx

deNOx

RH1.2

RH1.1

PA

fans

Amager I (2009)

Client: Vattenfall A/S (Denmark)

CHP - 71 MWe & 250 MJ/s heat (500 t/h

steam ≈ equivalent to 150 MWe)

Front-wall fired

Fitted into existing building

HP part 185 bar & 540°C

PA

cooler

HP2

Screen

RH2

HP1.3 HP1.2

HP1.1

ECO2

ECO1

3 mills

OFA OFA

OFA

ESP

FD

APH

4 x 3

burners

deSOx

deNOx

RH1.2

RH1.1

PA

fans

Amager I (2009) / Vattenfall A/S

CHP / 71 MWe & 250 MJ/s heat

Page 19: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Amager I (2009) / Vattenfall A/S

CHP / 71 MWe & 250 MJ/s heat

Boiler design:

• Increased pitch super heater banks

• Austenitic steel 1st pass

(due to straw pellets)

• ECO out of boiler envelope

Combustion system design:

• 100% on coal (350 MJ/s, two levels)

• 100% on heavy fuel oil (HFO)

• 100% on wood pellets

(350 MJ/s, three levels)

• 90% straw pellets

Reduced flue gas temperature by PA coolers

Page 20: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Porto Tolle: Co-combustion

Coal fired USC 3 x 660 MW:

• Injection through centre tube in the PF burner

• 5% wood chips (33 MWe)

• 5% RDF (Refuse Derived Fuel from waste)

coal biomass/rdf

Page 21: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Hazira: multi fuel boiler

for a steel mill complex

Essar steel mill complex BWE has awarded a contract for the supply of two

drum type boilers for power and steam production for the Hazira steel mill

complex (Gujarat-India) .

• The two Drum Boilers are designed to fire a number of different fuels.

• Main fuels are COREX Gas and COREX Coal besides a variety of other

coal types.

• The boilers are, however, also capable of firing:

• COREX Coal Fines,

• Corex Coal Dust,

• HFO and LDO.

Page 22: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

Ultra Super Critical Boiler Technology

for the power industry

Worlds highest efficiency

decrease of CO2

use less fuel per produced MWh

BWE Hybrid Multi Fuel concept

Coal, oil, gas and biomass used on the same boiler

individually or simultaneously

Fast reaction time on power demand

BWE boiler very fast ramp-up time (5% / Min)

Page 23: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

- Efficient hybrid power production

- Use of local biomass

- Potential local earnings

Build new plants (small or large) using BWE hybrid- or

biomass-concept using proven technology

Retrofit and upgrade old plants by using BAT

Use the multi fuel concept in new builds and

retrofits

(Same boiler can use coal, gas,

oil and biomass)

What BWE can offer to Russian market?

Page 24: Burmeister & Wain Energy A/S

Group

Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]

What BWE is doing/could do in the russian market?

•Cooperation with local boiler manufacturers for new technology

introduction for high efficiency power boilers

•Cooperation with Russian utilities for conversion of old power

plants to multi fuel technology

BWE has started development of cooperation with Russian

companies but so far developments or contracts have been

achieved.