BURNER MANAGEMENT SYSTEM
R.R.Patel
To ensure safe operation of combustion in heaters, furnaces, boilers, kilns, ovens, etc. To maintain safe operation during start up, operation & shutdown
ObjectivesObjectives
System block diagramSystem block diagram
BMSPLC
ESD PLC
DCS
A general purpose PLC IEC 61131
A Safety PLC QMR / TMR TUV approved
LocalPanel
In PIBIn Field
FD FAN
PT
Fuel gas
Local control panel Ignition push buttons , lamp indications Ignition devices Pilot and main flame detectors Solenoids operated shutdown valves with proximity switches for open & close indications Pressure, Temperature, flow transmitters BMS & ESD PLC in PIB
Components of BMSComponents of BMS
PILOT GASPTBMS +ESD
BMS
FUEL GASPTBMS +ESD
BMS
NITROGEN
Double block & bleed valve arrangementDouble block & bleed valve arrangement
FUEL OIL
PTBMS +ESD
BMS
ESD
Double Block valve arrangementDouble Block valve arrangement
Double block valves & vent valves for pilot & fuel gas
For fuel oil, double block valves on supply header & single block valve on return header
First block valve has two SOVs, one is controlled by ESD PLC and the other by BMS PLC
Solenoid valve controlled by ESD has manual reset
Second block valve & vent valve have one SOV each controlled by BMS PLC
Salient Features of BMS DesignSalient Features of BMS Design
Proximity switches for open and close indications on shutdown valves
2oo2 voting in ESD PLC, two transmitters for each trip input
Ionisation rods for the detection of pilot flame IR scanners for the detection of main flame 2 nos. of hand isolation valves for each fuel line to
the burners
Salient Features of BMS DesignSalient Features of BMS Design
NFPA 85 – Boiler & combustion Control Systems Hazards Code API 556 – Instrumentation & Controls for Fired Heaters and Steam Generators ANSI/ISA S84.01 Application of Safety Instrumented Systems for the Process Industries IEC 61508
Standards followed …Standards followed …
Safety PLCSafety PLC
Fail safe I/O circuits with built in diagnostics CPU with built in diagnostics for memory, CPU operation, watch dog timer and all communication systems QMR /TMR architecture IEC 61508 - SIL 2 Diverse architecture to avoid common cause failure - processor, software, logic family TUV approved
HeaterHeater shutdownshutdown logic in ESD PLClogic in ESD PLC Total Shutdown (Pilot Gas, Fuel Gas & Fuel Oil ):
1. Pilot Gas Pressure Very Low2. ESD Push Button in control room / Field
Fuel Gas Shutdown :1. Fuel gas Pressure Very Low2. Fire box Pressure Very High3. Flue gas Temp at APH inlet Very High 4. Combustion Air Flow Very Low5. Heater pass Flow Very Low6. Other process conditions, if any
Fuel Oil Shutdown :1. Fuel oil Pressure Very Low2. Steam/Fuel oil Differential Pressure Very Low3. Fire box Pressure Very High4. Flue gas Temp at APH inlet Very High 5. Combustion Air Flow Very Low6. Heater pass Flow Very Low7. Other process conditions, if any
Shut off of both main fuel (gas & oil) or pilot burners in any one pass will shutdown main fuel in all the passes (Applicable for coker unit)
Heater shutdown logic in ESD PLCHeater shutdown logic in ESD PLC
Troubleshooting GuidelinesTroubleshooting Guidelines a) 1ST OUT Sequence on DCS graphics
Trip signal from ESD Change of close or open indication
Proximity switch failure SOV loop failure
b) SOE (sequence of event) in ESD
During normal heater running, Vent valve can get opened 1) by ESD signal 2) Solenoid loop failureBlock valve can get closed
1) by ESD signal 2) Loss of close indication of vent valve 3) Pilot voting logic – if not overridden
4) Main flame failure 5) SOV loop failure
Pushbuttons on BMS Local PanelPushbuttons on BMS Local Panel
1. System Start2. Purge Start3. Pilot Start (for each firing zone)4. Fuel Gas Start (for each firing zone)5. Fuel Oil Start (for each firing zone)6. Heater in Operation7. BMS Reset8. Lamp Test
9. Emergency shutdown (Applicable for coker)
Lamps on BMS Local PanelLamps on BMS Local Panel
1. Pilot Gas Pressurisation Failed 2. Fuel Gas Pressurisation Failed3. Leak Test in Progress (Flashing) / Complete (Steady) 4. Pilot Gas Leak Test Failed 5. Fuel Gas Leak Test Failed 6. Ready for Purge
7. Purging in Progress (Flashing) / Complete (Steady)8. Pilot Gas valve discrepancy / energised 9. Fuel Gas valve discrepancy / energised 10. Fuel Oil valve discrepancy / energised 11. Heater in Operation12. Flame ON for each pilot detector & IR scanner
Startup PermissiveStartup Permissive
No shutdown signal from ESD PLC All the block valves in closed & vent valves
are in open condition No Pilot or Main flame is detected No valve discrepancy alarm
Ensure “startup permissive” Press ‘System Start’ Pressurisation - Leak test Depressurisation Purging – (5 furnace volumes in 5
minutes) Pilot Start’ - press pilot ignition PB ‘Fuel Gas Start” - open manual valve
BMS Start up SequenceBMS Start up Sequence
TO BURNER
VENT VALVE
FIRST BLOCK VALVE
SECONDBLOCK VALVE
START PERMISSIVES
1. NO ESD SIGNAL
2. BOTH BLOCK VALVES ARE CLOSED, VENT VALVE IS OPEN
3. ALL PILOT & MAIN FLAMES ARE OFF
4. NO LAMP ON LOCAL PANEL IS FLASHING
SYSTEM START
PRESSURETRANSMITTER
PILOT GAS SYSTEM
TO BURNER
PRESSURETRANSMITTER
NOTE: PRESS SYSTEM START TO INITIATE “LEAK TEST”
TO BURNER
VENT VALVE
FIRST BLOCK VALVE
SECONDBLOCK VALVE
START PERMISSIVES
1. NO ESD SIGNAL
2. BOTH BLOCK VALVES ARE CLOSED, VENT VALVE IS OPEN
3. ALL PILOT & MAIN FLAMES ARE OFF
4. NO LAMP ON LOCAL PANEL IS FLASHING
SYSTEM START
PRESSURETRANSMITTER
PILOT GAS SYSTEM
TO BURNER
PRESSURETRANSMITTER
NOTE: PRESS SYSTEM START TO INITIATE “LEAK TEST”
TO BURNER
LEAK TEST IN PROGRESS
(AFTER 10 SECONDS)PRESSURISATIONFAILED
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
TO BURNER
START PERMISSIVES
1. NO ESD SIGNAL
2. BOTH BLOCK VALVES ARE CLOSED, VENT VALVE IS OPEN
3. ALL PILOT & MAIN FLAMES ARE OFF
4. NO LAMP ON LOCAL PANEL IS FLASHING
SYSTEM START
PRESSURETRANSMITTER
PILOT GAS SYSTEM
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
NOTE: PRESS SYSTEM START TO INITIATE “LEAK TEST”
TO BURNER
> 0.375 kg/cm2
(AFTER 10 SECONDS)PRESSURISATION IS SUCCESSFUL
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
LEAK TEST IN PROGRESS
> 0.3 kg/cm2
(AFTER 20 SECONDS)LEAK TEST IS PASSED
TO BURNER
LEAK TEST IN PROGRESS
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
TO BURNER
> 0.3 kg/cm2
2ND BLOCK VALVE OPENS FOR 8 SEC FOR DEPRESSURISATION
Similar sequence takes place for Fuel Gas also, except that pressurisation test is done with nitrogen, hence instead of 1st block valve, nitrogen valve opens
LEAK TEST IN PROGRESS
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
TO BURNER
LEAK TEST COMPLETEREADY FOR PURGE
FD FAN START
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
TO BURNER
PURGE AIR FLOW > 5 furnace volume in 5 minutes
DCS SENDS PURGE PERMISSIVE TO BMS PLC
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
READY FOR PURGE LEAK TEST COMPLETEPURGE START
TO BURNER
PURGING IN PROGREE
PURGE TIMER FOR 5 MINUTES
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
READY FOR PURGE
TO BURNER
PURGE TIMER FOR 5 MINUTES
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
PURGING COMPLETED
TO BURNER
START PILOTLIGHT UP
AFTER PURGE COMPLETION, OPERATOR HAS 15 MINUTES TIME TO LIGHT UP ANY OF THE PILOTBURNERS, FAILING WHICH WILL RETURN THE SEQUENCE TO PURGE START
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
PURGING COMPLETED
TO BURNER
( 30 MINUTE IGNITION TIMER STARTS. AFTER 30 MINUTES AT LEAST (N-3) OUT OF TOTAL N PILOT BURNERS per zone SHOULD BE LIT (PILOT VOTING LOGIC)
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
TO BURNER
IGNITIONPUSH BUTTONFOR EACHBURNER
PRESS IGNITION PUSH BUTTON ONEAFTER ANOTER TO IGNITE THE PILOT BURNERS
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
ENSURE THAT AT LEAST (N-3) BURNERS ARE LIT WITHIN 30 MINUTES TIME, “N” IS THE TOTAL PILOT BURNERS PER PASS
AFTER 30 MINUTES, IF COUNT OF PILOT LIT DROPS BELOW (N-3), THE PILOT GAS IS SHUTOFF AND START UP SEQUENCE IS RETURNED TO HEATER STOP CONDITION
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE
TO BURNER
START FUEL GASBURNER
AFTER PILOT BURNERS LIGHT UP, FUEL GAS (MAIN) BURNERS CAN BE LIT UP
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE FUEL GAS
PURGING COMPLETED
TO BURNER
THE MANUAL VALVES ARE TO BE OPENED TO ESTABLISH MAIN FLAME
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE FUEL GAS
MAIN FLAME HAS BEEN ESTABLISHED
FG IN
FIRST BLOCK VALVE
SECONDBLOCK VALVE
VENT VALVE FUEL GAS
PTBMS +ESD
BMS
ESD
PURGING COMPLETESTART FUEL OILBURNER
AFTER PILOT BURNERS LIGHT UP, FUEL OIL (MAIN) BURNERS CAN BE LIT UP
FUEL OIL
FUEL OIL
FUEL OIL CIRCUATION FOR 10 MINUTES
PTBMS +ESD
BMS
ESD
FUEL OIL
FUEL OIL CIRCUATION FOR 10 MINUTES COMPLETE
ENSURE ATOMISING STEAM
PTBMS +ESD
BMS
ESD
FUEL OIL
FUEL OIL CIRCUATION FOR 10 MINUTES COMPLETE
ATOMISING STEAM
PTBMS +ESD
BMS
ESD
FUEL OIL
PTBMS +ESD
BMS
ESD
MAIN FLAME HAS BEEN ESTABLISHED