Upload
alfred-gulliford
View
216
Download
2
Tags:
Embed Size (px)
Citation preview
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley School District
District Feasibility Study
Community Dialog June 22, 2004
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Agenda
1. Introduction2. Secondary school discussion
• Presentation on secondary school issues• Table discussion on secondary school issues• Summary of table discussions
3. Elementary School Discussion• Presentation on Elementary school issues• Table discussion on Elementary school issues• Summary of table discussions
4. Closing
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Study Parameters and Direction
1. Evaluate the followings items at the High School / Middle school
• Indoor athletic facilities• Auditorium• Lower level of middle school
2. Evaluate Elementary Facilities
3. Make Recommendations
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Tasks Completed to Date
1. Evaluated facilities (June 9 and June 12, 2003)
2. Questionnaires and discussion with district faculty and staff (June 13, 2003)
3. Board workshop (September 11, 2003)4. Developed options5. Draft of study delivered to district
(November 7, 2003)6. Board Workshop (February 23,2004)
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Enrollment Evaluation (PDE projections 2002 enrollments)
Year K 1-5 6-8 9-12 total
2003 - 2204 112 827 564 716 2219
2004 – 2005 115 774 537 742 2168
2005 – 2006 127 742 530 728 2127
2006 – 2007 128 713 518 737 2096
2007 – 2008 125 700 497 717 2039
2008 – 2009 123 689 490 675 1977
2009 – 2010 120 702 441 680 1943
2010 – 2011 118 709 411 651 1889
2011 – 2012 115 689 401 629 1843
2012 – 2013 113 683 421 590 1807
Note: These projections do not include the effects of the Propel charter school
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Main Issues1. Gymnasium
• Provide additional gymnasium space• Renovate existing gymnasium and locker rooms• Provide storage and concession stand
2. Auditorium• Replace seating, lighting system, stage curtain
3. Middle school • Provide additional classrooms in lower level
Steel Valley High School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Gymnasium Option 1• Construct new
gymnasium
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Gymnasium Option 2• Renovate existing
pool into gymnasium
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Renovate existing Gym and Locker rooms
• Replace and level floor• Replace Bleachers• Rearrange lockers for
proper supervision• Repair cracks• Improve ventilation• Provide second exit from
gym
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
• Provide storage and concession stand
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Auditorium
Replace seating, Lighting system, Stage curtain, Rigging
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Middle school • Provide additional classrooms in lower
level
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley High School
Secondary School Table Discussion1. Gymnasium
• Provide additional gymnasium space• Renovate existing gymnasium and
locker rooms• Provide storage and concession
stand
2. Auditorium• Replace seating, lighting system, stage curtain
3. Middle school • Provide additional classrooms in lower level
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Elementary Program
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
1. Minimal renovations to all 3 schools based on priorities on building evaluation forms.
2. Renovations required to receive reimbursement from PDE
3. Renovations and additions to Woodlawn for district wide K-5, Convert Franklin into Administrative center
4. Demolish Woodlawn, construct new district wide K-5 school, Convert Franklin into Administrative center.
5. Renovate Woodlawn to replace Park, replace Barrett for K-5, Convert Franklin int administrative center.
Options
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Option 1 Priority levels• Level 1 - items that must be done in order to
meet current building codes• Level 2 - items that are recommended to do
to enhance the learning environment• Level 3 – items that need to be completed
and will be less expensive to do as a part of a larger construction project
Options
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Primary Center
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary SchoolOption 1Priority 1
• Repair cracks, reinforce foundation walls and ventilate crawl space• Repoint masonry• Replace doors• Provide ADA Signage• Correct ADA deficiencies for toilet partitions and toilet accessories• Repair steam leaks• Repair lining of chimney• Install backflow preventer• Abandon and repair emergency battery packs or replace generator
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary SchoolOption 1Priority 2
• Repair or replace flagpole• Replace exterior doors and frames• Adequate casework in classrooms and storage• EWC’s to be provided at an appropriate height• Install second boiler• Investigate ventilation dampers/perform steam
trap maintenance• Repair fixture leaks• Replace lighting
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary SchoolOption 1Priority 2
• Provide exterior lighting• Replace toilets and urinals• Provide appropriate site lighting• Provide permanent housing for district admin to remove
trailers• Provide Location inside of classrooms for student badges• Provide extended day Kindergarten and library• Separate district admin and classrooms
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary SchoolOption 1Priority 3
• Replace windows• Replace vinyl tile• Convert to a hydronic system• Install DDC controls• Replace piping system and fixtures• Install sprinkler system• Provide new electrical service entrance• Update copper electrical distribution• Replace phone system• Replace PA system• Provide lightning protection• Replace security system• Move office to current library location to monitor entry
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary SchoolOption 2
Renovate building to receive Reimbursement• Move school functions out of administrative wing• Additions to enable removal of trailers• Provide library
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary School
Kindergarten Wing
CR CR
Library
Block Access From Admin to Elementary
District Admin Entry
District Admin Wing
School Entry
School Admin
Addition
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Franklin Elementary School• Option 3 ,4, and 5 Convert to Administrative
CenterPossible rental space – daycare – office etc.
Office of the Superintendent
Remove existing trailers
BusinessOffice
Community UseM.P. Room/FacultyTraining
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary SchoolOption 1Priority 1
• Replace deteriorating concrete and provide handrails for exterior stairs
• Replace exterior doors with aluminum doors • Replace interior doors• Install single electrical service • Abandon and repair emergency battery packs or replace emergency
generator• Replace batteries and repair emergency lighting• Install backflow preventer• Provide site lighting• Provide electronic monitoring devices
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary SchoolOption 1Priority 2
• Install second emergency boiler • Investigate ventilation dampers and perform steam trap
maintenance• Install backflow preventer• Repair fixture leaks• Replace lighting• Provide exterior lighting• Correct relief plenums to comply with code• Replace toilet and urinal fixtures• Relocate buzzers
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary SchoolOption 1Priority 3
• Provide appropriate playground equipment• Provide appropriate landscaping• Replace single pane windows• Remove asbestos tile/replace vinyl flooring/repair & restore
terrazzo flooring• Repaint walls and provide for continuity of materials• Replace base where required• Provide appropriate amount of casework• Replace furnishings• Convert to a hydronic system• Install DDC controls• Replace piping systems and fixtures
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary SchoolOption 1Priority 3
• Install sprinkler systems• Update copper distribution• Replace phone system• Replace PA system• Provide lightning protection• Replace security system
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary SchoolOption 2
Renovate building to receive Reimbursement
Ground
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Park Elementary SchoolOption 2
Renovate building to receive Reimbursement
GroundAddition
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett Elementary
01
02
03
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
04
06
05
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
09
08
07
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
10
11
1312
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
14
15
16
17
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
19
2120
18
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
22 24
23 25
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
26 27
28 29
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
30 31
32 33
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
34 35
36 36a
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
37
39 40
38
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
41
43
42
44
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
45 46
47 48
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
49
51
50 52
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
53
54
55 56
Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett ElementaryOption 1Priority 1
• Pave parking lot• Replace handicapped ramps• Replace curbs where needed• Provide proper drainage for relocatables• Reinforce or replace retaining walls• Replace handrails• Replace fencing
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett ElementaryOption 1Priority 1
• Repair drain pans/test for IAQ problems/clean air handling units and ductwork/perform steam trap maintenance
• Install backflow preventer• Abandon and repair emergency batter packs or replace
emergency generator• Replace batteries and repair emergency lighting• Make repairs a required to meet ADA Codes
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett ElementaryOption 1Priority 2
• Replace exterior metal doors• Install second boiler• Provide chiller room ventilation• Replace chilled water pumps• Insulate hot water storage tank• Repair fixture leaks• Replace service entrance• Replace building lighting• Increase site lighting• Correct relief plenums to comply with code• Replace toilet and urinal fixtures
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett ElementaryOption 1Priority 3
• Remove relocatable classrooms and establish paved lot for parking
• Provide age appropriate play equipment• Provide landscaping as possible• Repair masonry cracks• Replace windows• Replace carpeting and VCT• Replace interior doors• Replace and provide appropriate amount of casework• Convert to a hydronic system• Replace piping and chillers • Install DDC controls
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett ElementaryOption 1Priority 3
• Replace copper piping systems and fixtures• Install sprinkler systems• Update copper distribution• Replace phone system• Replace PA systems• Replace lighting protection• Replace security systems
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett Elementary School - Option 2Renovate building to receive Reimbursement• Remove relocatables and construct addition.
AdditionAddition
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett Elementary School - Option 2Renovate building to receive Reimbursement• Remove relocatables and construct addition.
Addition
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Barrett Elementary School - Option 5
Replace Barrett Elementary
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School – Option 3
Renovate building for district wide grades K-5
CR CR CR CR
CR
CR
CR
CR
CR
CR
CR
STO
Ramp
Gym
Music
Locker
LockerCR CR
Mech
STOArt
Basement
Addition
Existing
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School – Option 3
First Floor
Addition
Existing
Cafeteria CR CR CR CR
CR
CR
CR
CR
CR
KITT
COMP LIBT
CR CR T T
Courtyard
Upper Gym
Auditorium
SGI
Elevator
Admin
Entry
CR CR
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School – Option 3
CR CR CRT T
CR CR CR CRSGI
Second Floor
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School – Option 3
Third Floor
TTCR CR CR
CR CR CR CRSGI
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
New School – Option 4
Construct new building on Woodlawn site for district wide grades K-5.
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
South Butler Primary School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
South Butler Primary School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
South Butler Primary School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
South Butler Primary School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
South Butler Primary School
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School – Option 3
Renovate Woodlawn building for grades K-5 to replace Park
Third Floor
TTCR CR CR
CR CR CR CRSGI
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Woodlawn School – Option 5
Renovate building for grades K-5
Third Floor
TTCR CR CR
CR CR CR CRSGI
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Steel Valley School DistrictElementary School Table Discussion
1. Minimal renovations to all 3 schools based on priorities on building evaluation forms.
2. Renovations required to receive reimbursement from PDE
3. Renovations and additions to Woodlawn for district wide K-5, Convert Franklin into Administrative center
4. Demolish Woodlawn, construct new district wide K-5 school, Convert Franklin into Administrative center.
5. Renovate Woodlawn to replace Park and replace Barrett for K-5, Convert Franklin into Administrative center.
Burt Hill Kosar Rittelmann AssociatesSteel Valley School District
Thank You
To View this presentation go to:
The district’s web site at SVSD.k12.pa.us