PROJECT :
DESIGN CONCEPT FOR BUS DEPOTSILVASSA, U.T. DADAR & NAGAR HAVELI.
OWNER :DADAR NAGAR HAVELI PLANNING & DEVELOPMENT AUTHORITY 1st floor, New Collectorate building, Right wing, 66kva road, village Amli, Silvassa, U.T. of Dadra & Nagar Haveli.
Architect:SHANKAR SARKAR7/8 LAXMI BLDG, SAMATH NAGAR, MAJAS ROAD, JOGESHWARI-EAST, MUMBAI : 400 060.
2/7/2015
AR. SHANKAR SARKAR 2
SITE STUDY PRESENT SCHENARIO
• Existing use of plot is for bus depot.
• Ground floor structures made up of R.C.C. frames.
• Located in the heart of city.• Present users around bus depot:
North : Road & petrol pumpSouth : Commercial buildingEast : Residential userWest : Road for access
SUPERIMPOSED GOOGLE IMAGE
2/7/2015
AR. SHANKAR SARKAR 3
EXISTING PHOTOGRAPH OF DEPOT & SURROUNDING
2/7/2015
PHOTOGRAPH OF DEPOT
PHOTOGRAPH OF REAR SIDE OF DEPOT
PHOTOGRAPH OPPOSITE DEPOT COMPLEX ENTRANCE
AR. SHANKAR SARKAR 4
SITE STUDY & DESIGN PARAMETERS
• Topography of site is flat & plain.• Plot area as per documents provided for
design : 11,100 S.M.• Plot area as per survey plan : 8,911 S.M.• 10% Physical : 891.10 S.M.• Net Plot area : 8,019.90 S.M.• Perm. FSI on minimum plot area : 2.00• Permissible BUA : 16,039.80 S.M. • Ground coverage : 2970 S.M.
SUPERIMPOSED PLAN
2/7/2015
AR. SHANKAR SARKAR 5
• Entrance to bus & passanger planned seperatly.
• Handicapped access provided.• Taxi stand & auto stand provided
on road so that they donot interact with buses & visitors vehicles.
• Two wheeler & cycle stands provided.
TRAFFIC STUDY & DESIGN PARAMETER
2/7/2015
AR. SHANKAR SARKAR 6
• Segregation of passenger & staff area.
• Minimum interaction between staff & passenger.
• Parking bay and parking of bus shares same driveway.
CONCEPT DIAGRAM
2/7/2015
CONCEPT
AR. SHANKAR SARKAR 7
PARKING
GROUND FLOOR PLAN LAYOUT
2/7/2015
DRIVEWAY
BUS ENT.
BUS EXITBUS B
AY
WAITI
NG
WAITI
NGOFFICE
WAITINGLOUNGE
TOILET
VIPWAIT.
RESTA
URANT
CAR PARKING
DROP FORPASSENGER
AR. SHANKAR SARKAR 8
GROUND FLOOR PLAN OF MAIN BULDING
2/7/2015
AR. SHANKAR SARKAR 9
FIRST FLOOR PLAN OF MAIN BULDING
2/7/2015
AR. SHANKAR SARKAR 10
TERRACE FLOOR PLAN OF MAIN BULDING
2/7/2015
AR. SHANKAR SARKAR 11
LONGITUDINAL SECTION THRU. ENTIRE SITE
2/7/2015
DROP OFF MAIN BULDINGGR + 1 FLOOR
DRIVEWAY BUS PARKING 10%R.G
BUS BAY
AR. SHANKAR SARKAR 12
VIEW’S OF ENTIRE LAYOUT
2/7/2015
DROP OFFBUS ENT. BUS EXIT
CONCEPTUAL VIEW FROM ROAD WEST SIDE
BUS EXITBUS BAY COVERED
PARKING
STAFF AREA
DOMITORIES @ 1ST FLOOR
CONCEPTUAL VIEW FROM ROAD SOUTH EAST SIDE
TWO WHEELERCYCLE PARKING
CONCEPTUAL VIEW FROM ROAD NORTH EAST SIDE
BUS ENT.BUS BAY
DRIVEWAY
AR. SHANKAR SARKAR 13
VIEW’S OF ENTIRE LAYOUT
2/7/2015
DROP OFF
BUS ENT.
BUS EXIT
CONCEPTUAL VIEW FROM ROAD WEST SIDE
BUS EXIT
BUS BAY
COVERED PARKING
STAFF AREA
DOMITORIES @ 1ST FLOOR
CONCEPTUAL VIEW FROM ROAD SOUTH WEST SIDE
2/7/2015