Busbar Protection.ppt

Embed Size (px)

Citation preview

  • 7/31/2019 Busbar Protection.ppt

    1/32

    A MINI-PROJECT REPORTON

    BUSBAR PROTECTIONIs submitted to

    JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR,

    ANANTAPUR

    Under the guidance ofMr. SHAIK MOHAMMED RAFI, M.E ,

    Assistant Professor,Department of E.E.E.,

    SIDDHARTHA INSTITUTE OF SCIENCE & TECHNOLOGY,PUTTUR.(An ISO 9001:2000 Certificate Institution)

    (Approved by A.I.C.T.E. New Delhi & Affiliated to J.N.T.U.A., Anantapur)01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    2/32

    OBJECTIVE :

    o BUSBAR faults are rare but if theyoccur there can be interruption of

    supply, considerable damage and loss

    to the equipment, property and people

    working around.

    o Hence busbar protection must be fast

    in operation, stable and reliable.

    o This project deals with busbararrangements, protection schemes

    used in 220KV substation

    RENIGUNTA.01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    3/32

    BUSBARS :

    Conductors to which a number ofcircuits are connected.

    The material used should have low

    resistivity,higher softening temperature,

    good mechanical properties and low

    cost.

    Supported on post or strain Insulators.

    The flexible bus is held at higher levelabove the various sub-station

    Equipment.

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    4/32

    BUSBAR ARRANGEMENTS :

    SINGLE BUSBAR :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    5/32

    WITH SECTIONALIZING BREAKER :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    6/32

    DOUBLE MAIN BUS &TRANSFER BUS SYSTEM :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    7/32

    DOUBLE BUS WITHSECTIONALIZE SYSTEM :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    8/32

    ONE AND A HALF BREAKERARRANGEMENT :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    9/32

    MESH ARRANGEMENT :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    10/32

    Busbar faults are generally single line to ground faults,

    phase to phase faults

    The main causes for a fault in a busbar :Failure of support insulator resulting in earth fault.

    Flashover across support insulator during over voltages.

    Heavily polluted insulator causing flashover.Failure of connected equipment to the busbar.

    Various environmental conditions.

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    11/32

  • 7/31/2019 Busbar Protection.ppt

    12/32

    Depending upon the rating of the machine, its

    location, relative importance, probability of faults

    and abnormal conditions etc., each power system

    component is covered by a protective zone.

    Differential protection

    High impedance protection

    Low impedance protection

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    13/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    14/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    15/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    16/32

    SATURATION CURVE :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    17/32

    The problem of

    CT saturation

    is eliminated at

    its source by

    air-core CTs

    called linearcouplers.

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    18/32

    LBB: Local Breaker Backup Relay.

    BFR: Breaker Failure Relay.

    CBF: Circuit Breaker Failure Relay.

    LOCAL BREAKER BACKUP PROTECTION

    Remote back-up

    Local back-up

    Relay back-up

    Breaker back-up

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    19/32

    MAINPROTECTIONOPERATED

    YES

    YES

    TRIPMAIN

    BREAKER

    INITIATEBFR

    WAIT FORFAULT

    CLEARENCE

    AND

    FAULTCLEARED

    YES

    NO

    RESETBREAKERFAILURESCHEME

    TRIPBACK-UP/Adjacent

    BREAKERS

    RETRIP

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    20/32

    BUSBAR PROTECTION SCHEME AT220KV SUBSTATION RENIGUNTA :

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    21/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    22/32

    S.no Particulars Ratio available Ratio AdoptedFor Buabar

    1 220KV manubolufeeders 1&2

    800/1-1-1-1-1A 800/1-1A2

    220KV mahadeva

    mangalam feeders 1&2 800/1-1-1-1-1A 800/1-1A3 220KV c.k.palli 800/1-1-1-1-1A 800/1-1A4 220Kv koduru feeder 800/1-1-1-1-1A 800/1-1A5 220KV bus coupler 800/1-1-1-1-1A 800/1-1A6 HV breakers of

    100MVA, 220/132KV

    transformers 1, 2 &3

    300/1-0.66-.375-.375-1A 300/0.375-0.375A7 Bus-1 C.T 800/1-1-1-1-1A 800/1A8 Bus-2 C.T 800/1-1-1-1-1A 800/1A

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    23/32

    The existing PBDCC scheme at 220 KV SS Reniguntamainly comprises of 3 panels.

    CT Switching panel

    Busbar protection panel

    Auxiliary relay panel

    The full form ofPBDCC/PBDCB is as follows:

    P- Protection

    B- BusbarD- Differential principle

    C- Check zone

    B/C- No additional function/additional function (bus

    supervision relay)01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    24/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    25/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    26/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    27/32

    S.no Particulars Ratio available Ratio AdoptedFor Buabar

    1 220KV manubolufeeders 1&2

    800/1-1-1-1-1A 800/1-1A

    2 220KV mahadevamangalam feeders 1&2 800/1-1-1-1-1A 800/1-1A

    3 220KV c.k.palli 800/1-1-1-1-1A 800/1-1A4 220Kv koduru feeder 800/1-1-1-1-1A 800/1-1A5 220KV bus coupler 800/1-1-1-1-1A 800/1-1A6 HV breakers of 100MVA,

    220/132KV

    transformers 1, 2 &3

    300/1-0.66-.375-.375-1A300/0.375-0.375A

    7 Bus-1 C.T 800/1-1-1-1-1A 800/1A8

    Bus-2 C.T

    800/1-1-1-1-1A 800/1A01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    28/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    29/32

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    30/32

    Busbar has a great importance in the power system and

    its protection is essential for smooth stabilised and saferoperation of the network.

    In this project,a basic understanding of bus arrangements

    and types of busbar protection schemes and the studyextended to BUSBAR PROTECTION IN 220KV SS

    RENIGUNTA.

    The busbar arrangement used in 220KV SS RENIGUNTAis double bus arrangement. Even we made some relays

    testing related to busbar protection i.e. bus supervision

    relay test and differential relay test.

    01/08/2011 Dept. of EEE,SISTK

  • 7/31/2019 Busbar Protection.ppt

    31/32

    A course in Power systems - J.B.GUPTA

    Switch Gear Protection and Power System - SUNIL S. RAOTechnical Reference Book - APTRANSCO

    Power Systems Protection and Switchgear

    - BADRI RAM ,D. N. VISHWAKARMA

    www.electricity-today.com/et/Novdec96/busbar.html

    www.ee.iitb.ac.in/~npsc2008/NPSC_CD/Data/Oral/CIC2/p110.html

    www.abb.com/product/us/9AAC30301050.aspx

    www.fecime.org/referencias/npag/chap15-232-253.html01/08/2011 Dept. of EEE,SISTK

    http://www.electricity-today.com/et/Novdec96/busbar.htmlhttp://www.ee.iitb.ac.in/~npsc2008/NPSC_CD/Data/Oral/CIC2/p110.htmlhttp://www.abb.com/product/us/9AAC30301050.aspxhttp://www.abb.com/product/us/9AAC30301050.aspxhttp://www.abb.com/product/us/9AAC30301050.aspxhttp://www.ee.iitb.ac.in/~npsc2008/NPSC_CD/Data/Oral/CIC2/p110.htmlhttp://www.ee.iitb.ac.in/~npsc2008/NPSC_CD/Data/Oral/CIC2/p110.htmlhttp://www.electricity-today.com/et/Novdec96/busbar.htmlhttp://www.electricity-today.com/et/Novdec96/busbar.htmlhttp://www.electricity-today.com/et/Novdec96/busbar.htmlhttp://www.electricity-today.com/et/Novdec96/busbar.html
  • 7/31/2019 Busbar Protection.ppt

    32/32