BUSHFIRE RECOVERY PLANNING AND BUILDING ASSESSMENT FACT SHEET March 2020

Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

BUSHFIRE RECOVERY PLANNING AND BUILDING ASSESSMENT FACT SHEET

March 2020

Page 2: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

2

BUSHFIRE RECOVERY – PLANNING AND BUILDING ASSESSMENTIn response to the devastating bushfires across South Australia, the Department of Planning, Transport and Infrastructure (the Department) is working closely with the State Planning Commission, the Country Fire Service (CFS), other agencies and affected councils to ensure we support our communities through the process of rebuilding. This fact sheet is designed to help you understand what approvals, if any, are required for:

1. Demolition of buildings2. Temporary installation of shipping and storage containers 3. Temporary accommodation, including the use of caravans4. Building a new house, shed and other structure.

WHAT APPROVALS DO I NEED?

The Department in collaboration with the CFS and other state agencies have implemented measures to streamline assessment processes and provide faster approvals for people looking to repair or build new homes and outbuildings, and has established a Planning and Building Assessment Recovery Unit to guide people through the process from start to finish. Please contact us to take advantage of this free professional advisory service to discuss your specific needs on 1800 752 664.

Planning Approval

If buildings on your land have been destroyed or substantially damaged by bushfire, planning approval IS NOT required (subject to criteria set out in the checklists below) for:

• Demolition unless buildings are state or local heritage listed or in a historic conservation zone • Temporary installation of a shipping or storage container for storage of goods and equipment • Temporary accommodation in the form of a caravan that is not fixed to the land.

Planning approval IS required (subject to meeting criteria set out in the checklists below) for:

• Temporary accommodation in the form of a caravan fixed to the land, or other type of transportable/demountable accommodation, your application will be considered ‘complying development’ and approved within 10 days

• A new house or other building in the same location with the same size, appearance and layout, your application will be considered ‘complying development’ and approved within 10 days. If you are building a new house in a Medium Bushfire Risk Area you will still be considered ‘complying’ provided bushfire requirements in your local council development plan are met

• Any new house located in a High Bushfire Risk Area, regardless of whether you plan to rebuild the same house and/or in the same location

• Any new house or other building where you propose to build in a different location on your land, or it is different in size, appearance or layout.

Building Approval

If buildings on your land have been destroyed or substantially damaged by bushfire, building approval IS NOT required (subject to criteria set out in the checklists below) for:

• Work to fix damage to your house if it is not significant (such as smoke damage)

• Temporary structures to store goods and equipment

• Temporary accommodation in the form of a caravan that is not fixed to the land.

Building approval IS required for all other building work, including:

• Temporary accommodation in the form of a caravan fixed to the land, or other transportable or demountable building or structure

• Building a new house, carport, verandah, shed or pool or other structure

• Renovating or making additions to existing buildings

• Internal alterations involving any structural changes to existing buildings.

Page 3: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

3

REPAIRING OR BUILDING A NEW HOUSE IN BUSHFIRE RISK AREAS

Repairing Your Current House

The effects of fire are not always obvious. If you intend to repair your house it is recommended it be inspected by your council, a building surveyor or engineer to check it is still structurally sound. If you intend on making repairs, depending on the age of your house, you may need to build to a higher standard of bushfire protection. If the damage to your house is significant, you may need a building approval.

Building a New House

Building a new house requires planning and building assessment, and depending on your bushfire risk may mean you need to meet additional requirements. Your council’s development plan identifies whether you are located within a high, medium or general bushfire risk area. You can view these maps at www.maps.sa.gov.au/SAPPA. Bushfire risk area mapping for Cudlee Creek and Kangaroo Island are attached to this fact sheet.

Planning Assessment

Planning takes into account things like siting of your house, clearance from vegetation, access to and from your property and proximity to other activities like farming or industry

• For General or Medium Bushfire Risk Areas if you intend to rebuild the same house in the same location your application will be ‘complying development’ and approved within 10 days provided your house complies with your council’s bushfire hazard requirements.

• For General or Medium Bushfire Risk Areas if you intend to rebuild a substantially different house or in a different location on your land your application will need to be assessed, and again you will need to meet your council’s bushfire hazard requirements.

• For High Bushfire Risk Areas all new houses will be assessed, and your Bushfire Attack Level (BAL - refer below) assessment will ensure your new house is built to mitigate against fire risk in accordance with your council’s bushfire hazard requirements as well as meet the Building Rules.

Bushfire Attack Level (BAL) If you live in a High Bushfire Risk Area you will need a Bushfire Attack Level Assessment (BAL) to help you make decisions about siting your home and how you construct it. The South Australian Government has committed funding to undertake BAL assessments At No Cost To The Applicant for properties in High Bushfire Risk Areas where a house has been destroyed or substantially damaged by bushfire.

Once you have a BAL assessment, the Planning and Building Assessment Recovery Unit will work with you to make the best possible decisions in relation to siting, access and other bushfire measures for your new house. Siting your house in the safest location on your land will significantly speed up your assessment. If you choose to locate in a risky area on your land, CFS advice will be provided to assess the safety of your chosen location.

Importantly, your BAL will also assist your designer or builder to understand additional construction measures you may need for approval under Building Rules. The requirements of Minister’s Specification SA78 Additional Requirements in Designated Bushfire Prone Areas, will need to be considered.If you live in a General or Medium Bushfire Risk Area a BAL assessment is NOT REQUIRED, although you are still required to comply with your council’s bushfire hazard requirements.

Page 4: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

4

Building Assessment

Once your designer or builder has completed your plans, building approval can be sought from either your council or a private certifier that you engage. Your council or the certifier will assess your new house against the Building Rules to ensure it has been designed to the necessary standard, including bushfire protection requirements.

PLANNING AND BUILDING ASSESSMENT COSTS

Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 or more. In addition, a BAL assessment can take time, and would ordinarily cost around $500 depending on where you live.

Given the challenging financial circumstances that South Australian affected by bushfires are facing, the Government and councils are offering concessions, and as set out previously is offering assistance in relation to undertaking BAL assessments on behalf of people whose houses have been destroyed or substantially damaged by bushfire. To find out if concessions are available to you for a bushfire reconstruction project, please contact the Planning and Building Assessment Recovery Unit or your local council.

KEY CONTACTS If you require support or advice please contact the following organisations which are there to assist you with your building and planning applications:

Planning and Building Assessment Recovery Unit (DPTI)Level 5, 50 Flinders Street Adelaide SA 5000Phone: 08 7109 7060 Email: [email protected]

SA Country Fire Service Level 7, 60 Waymouth Street Adelaide SA 5000Phone: (08) 8115 3300

Minister’s Specification

SA 78 Additional requirements in designated bushfire prone areas

May 2011

Page 5: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

5

Bushfire Recovery Centres

The Department also understands a range of design, planning, building and environmental services are being offered free of charge to support South Australia’s bushfire recovery. It is recommended you get in touch with your local Bushfire Recovery Centre for further information about how you can access these services:

• Cudlee Creek – dhs.sa.gov.au/services/disaster-recovery/cudleecreek

• Kangaroo Island – dhs.sa.gov.au/services/disaster-recovery/kangaroo-island-fire-recovery

• Yorketown – dhs.sa.gov.au/services/disaster-recovery/yorketown

• Keilira – dhs.sa.gov.au/services/disaster-recovery/keilira-fire-recovery

Image by Brett Nutter

Page 6: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

6

For demolition of buildings affected by bushfire, you do not require planning or building approval (except where it is a state or local heritage place listed under the Development Act 1993 and the Heritage Act 1993 or is within a Historic Conservation Zone or Policy Area). It is recommended you follow the checklist below:

Demolition Checklist

DEMOLITION CRITERIA

• All demolition work is undertaken in a manner which minimises risk to people on site.

• You engage a qualified tradesperson if demolition work is beyond your capabilities, particularly if significant structural demolition work is required.

• If hazardous materials (e.g. asbestos) are encountered then licensed SafeWork SA contractors are to be engaged.

Provided it is not Local or State Heritagelisted or within a Historic Conservation Zone

Please refer to the checklists below which will help you make an application for planning and/or building approval where required. Providing the right information up front will speed up your assessment.

Page 7: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

7

The siting and installation of a shipping or storage container for use on bushfire affected properties will not require planning or building approval up until 1 January 2022, subject to the criteria below:

Temporary Installation of a Shipping / Storage Container Checklist

SHIPPING / STORAGE CONTAINER CRITERIA

• The container is for use by the owners of land on which a building has been destroyed or significantly damaged by a bush fire, and

• Has a maximum height of 3m measured from ground level, and

• Has a maximum length of 12.5m, and Has a maximum width of 2.5m.

NOTES

• If a person wishes to keep the shipping or storage container on their land beyond 1 January 2022, council approval will be required.

• You should be aware of any easements over your land, as you may need approval from the easement beneficiary to undertake any works within an easement.

On land where a previously existing dwelling has been destroyed or substantially damaged by bush�re.

Subject to meeting above criteria

K.T. POP

SHIPPING

K.T. POP

SHIPPING

INSTALLATION OF SHIPPING/STORAGE CONTAINER

Page 8: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

8

People whose homes have been damaged or destroyed in a bushfire can live in a caravan on their land without planning or building approval up until 1 January 2022, subject to the criteria below:

Temporary Caravan Accommodation Checklist

• The caravan is fitted with a working smoke alarm and a fire extinguisher NOTES

• A caravan becomes a building where it is fixed to the land. If you propose to fix your caravan to the land at any time, council approval will be required.

• If you intend to live in the caravan beyond 1 January 2022, council approval will be required.

• You should be aware of any easements over your land, as you may need approval from the easement beneficiary to undertake any works within an easement.

• You should be aware of any public and environmental health requirements under the Local Government Act, and contact your council accordingly.

On land where a previously existing dwelling has been destroyed or substantially damaged by bush�re.

Subject to meeting above criteria

CARAVAN

CARAVAN CRITERIA

• A caravan will not provide safe shelter in the event of a bushfire. Persons intending to occupy a caravan must have a bushfire survival plan which includes leaving early on days of heightened fire danger, or when there is a bushfire in the area.

You must have a bushfire survival plan

Page 9: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

9

Temporary Accommodation including demountable and transportable buildings on bushfire affected properties will require planning and building approvals. Temporary Accommodation which meets the criteria and information requirements set out below will be ‘complying development’ and approved within 10 days:

Temporary Accommodation Checklist

TEMPORARY ACCOMMODATION PLANNING CRITERIA

• Details of the temporary accommodation provided on a site plan showing:

• the location of the accommodation

• property boundaries (include dimensions)

• the location of other buildings and structures

• the location of existing trees and vegetation

• the location of access points.

• The building is to be used as accommodation by the owner of the land

• Notification is provided to the council of the intent to seek approval for a new dwelling

• The temporary accommodation is removed before 1 January 2022, or until a replacement dwelling is occupied – whichever comes first

• The temporary accommodation is a minimum of 20 metres from any remaining or regenerating vegetation (on the land or adjoining land) and the clearance area is maintained at all times.

TEMPORARY ACCOMMODATION BUILDING CRITERIA

• Meets the provisions of the National Construction Code (NCC) for a habitable building in relation to footings and structural support, weatherproofing, and facilities including a laundry, kitchen, toilet and bathroom

• Is fitted with a working smoke alarm and fire extinguisher

• Includes a 2,000 litre dedicated fire-fighting water supply with a domestic tap fitting where the site is connected to mains water, or a 5,000 litre dedicated fire-fighting water supply with a domestic tap fitting in other cases

• Waste water is disposed of through, or connected to, an approved waste water system, SA Water sewer or council community waste water system.

NOTES• If you intend to live in the temporary accommodation beyond 1 January 2022, council approval

will be required.

• You should be aware of any easements over your land, as you may need approval from the easement beneficiary to undertake any works within an easement.

• You should be aware of any public and environmental health requirements under the Local Government Act, and contact your council accordingly.

You must have a bushfire survival plan

• Temporary accommodation will not provide safe shelter in the event of a bushfire. Persons intending to occupy a caravan on their land must have a bushfire survival plan which includes leaving early on days of heightened fire danger, or when there is a bushfire in the area.

Page 10: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

10

On land where a previously existing dwelling has been destroyed or substantially damaged by bush�re.

GENERAL TEMPORARY ACCOMMODATION

Subject to meeting complying criteria

Subject to meeting complying criteria

Page 11: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

11

The following information is required for Planning Assessment:

Three copies of the following:

• Site plan (see below for additional advice)

• Additional plans (see below for additional advice).

Site Plan A site plan must include the location of the development, and

• Be a minimum scale of 1:500 and have a north point

• Show all property or site boundaries (include dimensions) Show the location, size and nature of existing and proposed structures (including fences and retaining walls), other land uses and easements

• Show the location of existing trees and vegetation to be retained or removed

• Identify the key topographical features (e.g. creek line, drainage line, slope of the land, direction of flow of stormwater, flood plains)

• Where appropriate, identify the location of access points, adjoining roads, footpaths, kerbs and side-entry pits, on-site parking, access arrangements for emergency vehicles, and line of sight for access to public roads

• Identify existing dams or bores

• Location and details of effluent disposal (e.g. septic tank) if not connected to services

• Location of any excavation, earthworks and embankments for the proposed development.

Additional Plans and Details

• Provide scaled external elevations of your building

• Provide internal floor plans

• Bushfire Attack Level (BAL) if you propose to build a new house in a High Bushfire Risk Area.

NOTES The SA CFS through the Planning and Building Assessment Recovery Unit will undertake the BAL assessment on your behalf at no cost.

New Dwellings and Structures Checklist

New Dwellings and Structures to be built in bushfire affected areas will require planning and building approval although these may differ if the replacement building is in the same location with the same layout and appearance, or if the replacement building is built in a different location or is different in size, appearance or layout. There are also different requirements depending on the level of bushfire risk.

Are you replacing your house or buildings ‘like for like’?

If you propose to rebuild ‘like for like’ – namely the same house or building in the same location and you are in a General or Medium Bushfire Risk Area, your application may be complying development. You will need to:

• Confirm the current location of previous buildings prior to damage from bushfire. This can be shown using an aerial photograph

• Confirm the size and appearance of the new building is similar in size and appearance to the previous building prior to damage incurred by bushfire. This can be shown using previous drawings, plans and photographs

• Confirm the water supply you have on your premises for firefighting purposes.

NEW DWELLINGS AND STRUCTURES CRITERIA

Page 12: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

12

The following information is required for Building Assessment:

• Identification of any trees that might affect the building or structure, both on the site and adjacent to the site (where relevant)

• Details of services and infrastructure (e.g. sewer lines near footings, stormwater disposal)

• Details of any significant excavation angle of batter-cut or fill

• The position, height and engineering details (if required) of any retaining walls

• A roof, wall and floor layout of any buildings, including dimensions and calculations

• Wall and roof bracing details

• Engineer’s footing construction report

• Details of construction materials (internal and external) and design (including heights and ceiling levels)

• Specifications and schedules of work to be undertaken

• The location of smoke detectors

• Wet area details

• Provision of sanitary facilities. NOTES This checklist sets out the general information requirements for the majority of planning and building applications. You are encouraged to see advice from your local council, private building certifier or the Planning and Building Assessment Recovery Unit at DPTI, in relation to your particular property and development, especially for a new house.

NEW DWELLINGS & STRUCTURES (In General or Medium Bush�re Risk Areas)

Up to date bush�re construction

Complying development will be granted approval within 10 days

Same style houseSame place on blockIn Medium Risk Area subject to bush�re risk requirements

NEW DWELLINGS & STRUCTURES

Up to date bush�re construction

Merit assessment and criteria

In High Bush�re Risk Area Di�erent style of house Di�erent place on block

DPTI and CFS will undertake BAL assessment at no cost.May require referral to CFS for further assessment.

Medium or general bush�re risk area - no CFS referral

(In High Bush�re Risk Areas)

NEW DWELLINGS AND STRUCTURES CRITERIA

Page 13: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

13 Wes

t Bay

Han

son

Bay

INVE

STIG

ATO

R S

TRAI

T

Cap

e Bo

rda

Mau

pertu

isBa

y

Cap

e de

Cou

die

Seal

BayC

ape

Cas

sini

Cap

e G

anth

eaum

e

Snug

Cov

e

Wes

tern

Riv

er C

ove

Vivo

nne

Bay

Roc

ky R

iver

Parn

dana

CAPE

BO

RDA

DE M

OLE

RIV

ER

CYG

NET

RIVE

R

MAC

GIL

LIVR

AY

CASS

INI

KOHI

NOO

R

FLIN

DERS

CHAS

E

GO

SSE

KARA

TTA

STUN

'SAI

LBO

OM

MID

DLE

RIVE

R

DUNC

AN

SEDD

ON

STO

KES

BAY

NEW

LAND

SEAL

BAY

BIRC

HMO

RE

MEN

ZIES

WIS

ANG

ER

WES

TERN

RIV

ER

VIVO

NNE

BAY

KANG

ARO

OIS

LAND

PLAY

FORD

HIG

HWAY

PLAY

FORD

HIG

HWAY

BIRCHMOREROAD

SEAL BAY ROAD

CAPEDUCOUEDICROAD

SOUT

HC

OA

STRO

AD

SOUT

HCO

AST

ROAD

WESTENDHIGHWAY

Crabbs Road

Gum

Cre

ek R

oad

Rowl

and

Hill H

ighw

ay

Bark

Hut R

oad

Sprin

gs R

oad

Wes t Bay Road

South

Coas

tRoa

d

North

CoastRo

ad

Nort h

Coas

t Roa

d

Stokes Bay Road

John

cock

Road

CoopersRoad

Harriet Road

Mount Taylor Road

Pi

oneerB en

dRo

ad

Gap Road

Cape

Bord

aRo

ad

Timber Creek Road

Seag

ers

Road

Ahwans Road

GregorsRoad

Gosse

Ritchie

Road

WestBayTrack

Snug Cove Road

East

Wes

tOne

High

way

Colm

ansRoad

WoodsRoad

Western River Road

Prat

ts R

oad

Berry

man

sRoa

d

Church Road

Tin

HutR

oad

Turkey Lane

Jump Off Road

MaysRoad

MargriesRoad

Shackle Road

Mount Stockdale Road

East

Wes

t Two

High

way

Ran

geRoad

Baxt

e rs

R oa d

East

Wes

tTwo

High

way

Miller Road

Hickmans Road

Ravine Road

Mchughs Road

Mcbride Road

04.

5km

Prod

uced

by

Dep

artm

ent o

f Pla

nnin

g,Tr

ansp

ort a

nd In

frast

ruct

ure.

Info

rmat

ion

deriv

ed fr

om v

alua

tion

data

has

been

sup

plie

d by

DTF

and

is c

urre

nt to

30 J

une

2019

. Top

ogra

phic

dat

a su

pplie

dby

DEW

, DPT

I and

Geo

scie

nce

Aust

ralia

.

PLN

ID: 5

857

© G

over

nmen

t of S

outh

Aus

tralia

202

0.No

par

t of t

his

docu

men

t may

be

repr

oduc

ed, s

tore

d in

a

retri

eval

sys

tem

, or t

rans

mitt

ed in

any

form

, or b

y an

y m

eans

, with

out t

he p

rior w

ritte

n pe

rmis

sion

of th

e pu

blis

her,

Depa

rtmen

t of P

lann

ing,

Tra

nspo

rt an

d In

frast

ruct

ure.

Whi

le e

very

reas

onab

le e

ffort

has

been

mad

e to

ens

ure

that

this

doc

umen

t is

corre

ct a

t the

tim

e tim

e of

pub

licat

ion,

th

e St

ate

of S

outh

Aus

tralia

and

its

agen

cies,

in

stru

men

taliti

es, e

mpl

oyee

s an

d co

ntra

ctor

s di

scla

im a

ny

and

all li

abilit

y to

any

per

son

in re

spec

t to

anyt

hing

or t

he

cons

eque

nce

of a

nyth

ing

done

or o

mitt

ed to

be

done

in

relia

nce

upon

the

whol

e or

any

par

t of t

his

docu

men

t.

SAC

FS A

rea

Burn

t Kan

garo

o Is

land

Bush

fire

Prot

ectio

n Ar

eas

Hig

h Bu

shfir

e R

isk

Med

ium

Bus

hfire

Ris

k

Gen

eral

Bus

hfire

Ris

k

Loca

l gov

ernm

ent b

ound

ary

Subu

rbs

Parc

el C

adas

tre

Built

-up

area

Mai

n ro

ad

Oth

er ro

ad

Maj

or to

wns

Oth

er to

wns

and

loca

litie

s

KANG

ARO

O IS

LAND

BUSHFIRE RISK MAPPING

Page 14: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more

14

Woo

dsid

eH

arro

gate

Lobe

thal

Mou

nt T

orre

ns

Cud

lee

Cre

ek

Gum

erac

haIn

glew

ood

Bird

woo

d

Cha

rlest

on

Tung

killo

Bruk

unga

Balh

anna

h

Oak

bank

Inve

rbra

ckie

ING

LEW

OO

D

KENT

ON

VALL

EY

NAIR

NE

GUM

ERAC

HA

HARR

OG

ATE

BIRD

WO

OD

HOUG

HTO

N

BASK

ET R

ANG

E

HAY

VALL

EY

CHAR

LEST

ON

MO

UNT

TORR

ENS

ROCK

LEIG

H

VERD

UN

LENS

WO

OD

BALH

ANNA

H

CUDL

EE C

REEK

OAK

BANK

BRUK

UNG

A

MO

UNT

GEO

RGE

BRID

GEW

ATER

CARE

YG

ULLY

WO

ODS

IDE

MIL

LBRO

OK

HAHN

DORF

CAST

AMBU

L

CHER

RYVI

LLE

PARA

COM

BE

MO

NTAC

UTE

TUNG

KILL

O

FORE

STRA

NGE

CHAI

N O

FPO

NDS

LOBE

THAL

MUR

RAY

BRID

GE

MID

MUR

RAY

MO

UNT

BARK

ER

ADEL

AIDE

HILL

S

CUDLEECREEKROAD

ONKAPARINGAVALLEYROAD

MOUN

TBA

RKE R ROAD

GRE

ENHI

LLRO

AD

NAIRNE

ROAD

LOBE

THA

LRO

AD

D

EVI

ATIONROAD

ONKA

PARI

NGA

VALL

EYRO

AD

ONKAPARIN

GAVA

LLEY

ROAD

MAINSTREET

TERL

INGA

ROA

D

BIRD

IN H

AND

ROAD

PYRITES ROAD

SHAN

NON

STRE

ET

BEAUMONTROAD

TI

PPETTROAD

GORGEROAD

CA R EY GULLY ROAD

JUNCTION ROAD

VICTORIA

STRE

ET

TORR

ENSVALL

EYRO

AD

WOODSIDE ROAD

KENTONVALLEYROAD

PARACOMBE ROAD

MO

UNT

TORR

ENS

ROAD

GUM

FLAT

RO

AD

MAIL ROAD

MON

TA CUTE ROAD

SOUT

HEA

STER

NFR

EEW

AY

TANAHME

RAHR O

AD

MIL

ITA

RYRO

AD

PFEIFF

ER ROAD

HARROGATEROAD

RAND

ELL

ROAD

TO

RREN

SHI

LLRO

AD

Onka

pari n

gaRo

ad

Naug

hton

s Ro

ad

Brinkworth Road

BurdettsRoad

MillRoad

MawsonRoad

SnakeGullyRoad

Jones Road

Ranns RoadSo

uth

HarrogateRoad

Milit

ary

R oad

Knot

tsHi

ll

Road

JonesRoa

d

KurlaRoa

d

Bank

s Road

Gre

ville

a

Way

Holland s

Cree

kRo

ad

Map

ping

a Ro

ad

Eckermann Road

Blac

kHe

ath

Road

Black Heath Road

Berry Hill Road

Para

com

be R

oad

Hewle

ttsRo

ad

Ridge Road

Pik eS

treet

Vickers

Road

Grivell

Roa

d

Plum

mers

Roa

d

Teak

lesRo

ad

New

man

Roa

d

Blac

khil

lRoa

d

Retre

atVa

lley

Road

Jaca

randa

Drive

Pym

Roa

d

Blooming

daleRoad

Tier

s Roa

d

Swamp Road

Ridge Road

WattsRo

ad

Chambe

rsRo

ad

FirstAven

ue

Magpie Castle Road East

HurstRo

ad

KumnickHillRoad

Nether

HillR

oad

Oronte

s Ave

nue

Oakw

oodRo

ad

Burfo

rds

Hill

Roa

d

Brid

geS t

reet

Jung

fer R

oad

Lee

Roa

d

Jack

sons

Hill

Roa

d

ColdstoreRoad

PittRoad

Shillabeer Road

Martins Road

Oval

Roa d

San

dowRoad

Gra

eber

Roa

d

Harris

Road

Murray Road

Harri

son

Road

Frick Street

Blocke

rsRoa

d

ReddenDrive

St ringy B ar kRoad

CroftRo

ad

Oste

rley Av

enue

Camac Road

Gle

be R

oad

Sprin

ghea

d R

oad

Hoope

rs Stre

et

AmblesideRoad

Collin

sHi

llRo

ad

OstighRoad

Range Road

Ray

mon

ds

Road

John

Stre

et

Pye

Road

Eliza

beth

Stre

et

HarveyRoad

Vall

eyRo

ad

Grasby Road

Wat

ers

Road

Mat

tner

sR

oad

Post

Off

ice

Road

Pain

Road

Burns Road

Burnley Road

Pose

n R

oad

SandyWaterhole

Road

Neudorf Road

Sc hubert

s Road

BadenochRoad

PeacockRoadNorth

Memorial Drive

Gillman Road

Donoghue Road

Murphy

Road

Piney Ridge Road

RHi

cks Road

Lewis Road

Tuck Street

Dudl

eyH

errm

anns

Roa

d

Mclean Road

NicolsRoad

Sheoak

HillR

oad

Wick

s Roa

d

Angas Creek Road

Ti

lmouthRoad

PrairieRoad

Mcv

ittie

s R

oad

Five

BobRoad

Johns

ons Road

Lang

ley

Road

Wilhelm Road

HirthesRoad

WoolshedRoad

DowningRoa

d

Odea Road

Bond

leig

hRo

ad

Bloc

ks R

oad

Pegg

yBu

xton

Road

Myl

kapp

aRo

ad

WesternBranchRoad

Gall Road

Clis

by R

oad

Fire

Stat

ionRo

ad

Boundary

Drive

Heysen Road

Moore

Road

Kayannie Road

King

sRo

ad

Fernhu

rstR

oad

Daniel

s Roa

d

Pra

nkerd

Roa

d

Pipe

line

Trac

k

WarmingtonRun

SmithsRoad

Tuckers Road

GladigauRoad

Pfeiffer R

oad

Hollo

wsRo

ad

S tent

i for

dRo

ad

Merchan

ts

Road

Mur

doch

Hill

Road

C

urtisRo

ad

Col

eman

Roa

d

Darpuna Road

Banksia Road

Ham

mer

Road

Beasley Road

Shar

ps

Road

SizeRoa

d

Rive

rvie

w Ro

ad

Mur

ray

Roa

d

StaffordsRoad

Lihou Road

Wen

zelR

oad

Vos R

oad

Rohrlach

Street

Down

ingRoad

Hobb

Roa

d

HuntersRoad

Look

out Track

Woo

ley

Road

Norto

nR

oad

Kl opsch

Road

Turner Road

Bret

tigR

oad

Lesl

ieRo

ad

Peake Road

Paec

hBr

othe

rsR

oad

Crit chle

yRo

ad

Nitschkes Road

Ra m

sRo

ad

HarrogateRoad

Fox Road

PeacockRoadSouth

Brem

er V

alley

Roa

d

Steer Road

Cya

nide

Roa

d

Schoc

roftRoad

Downe

rs Roa

d

Rang

e Roa

d

Cherry

vill

eRo

ad

SpoehrRoad

FormbyRoad

Ston

eH

utRo

ad

Silve

r Roa

d

Drummond Road

Hanham Road

HarrogateRoad

Kubenk Road

19 Tr a ck

Scho

ol B

us R

oad

South Ridge Road

Whitegum Road

BoundaryRoad

ReservoirRoad

Boun

dary

Farm

Road

Landara

Road

Number Four Road

Wut

tkeRo

ad

Old

Mou

nt R

oad

MagareyRoad

ScottsburnRoad

Parin

ga R

oad

Lenger Road

Mille

rRoa

d

Five Lanes Road

Baldocks Road

Chur

chRo

ad

Hope Watts Road

Bell

Sprin

gsRoa

d

Har

tman

n R

oad

Maid

men

tRoa

d

BasketRangeRoad

The Glen Road

10

Ker

rRoad

DunnRoad

Mue

llers

Roa

d

Wiril

da R

oad

Hiscock

Road

Rockleigh Road

Pfitz

ners

Road

Woodlands Road

Reefton Road

Burto

n R

oad

Rol

land

Roa

d

W

ye

s Road

SchoenthalRoad

1

Mcgormans Road

John

Rol

lond

Roa

d

Mou

ntBe

aver

Fire

track

Buckleys Road

Jury

Road

Her

rman

ns R

oad

PedareParkRoad

Pebb

lyRa

nge

Road

Fendle

rs

Road

Fox Creek Road

Juers Road

Quarr

y Road

Edw

ards H ill

Ro a d

Mas

ons

Road

Collins Road

Marshall Road

Lucas Road

St

ee p

HillRoa

d

Brin

kwor

thRa

ngeR

oad

G Ayres Road

Mon

khou

se R

oad

Hart l

ey

ValeRoad

Hoad QuarryRo

ad

Brice

Drive

Hoad

sWoolsh

edRo

ad

19

Burnbra

eRoa

d

GolfLinksRoad

01.

5km

CUDL

EE C

REEK

Prod

uced

by

Dep

artm

ent o

f Pla

nnin

g,Tr

ansp

ort a

nd In

frast

ruct

ure.

Info

rmat

ion

deriv

ed fr

om v

alua

tion

data

has

been

sup

plie

d by

DTF

and

is c

urre

nt to

30 J

une

2019

. Top

ogra

phic

dat

a su

pplie

dby

DEW

, DPT

I and

Geo

scie

nce

Aust

ralia

.

PLN

ID: 5

857

© G

over

nmen

t of S

outh

Aus

tralia

202

0.N

o pa

rt of

this

doc

umen

t may

be

repr

oduc

ed, s

tore

d in

a

retri

eval

sys

tem

, or t

rans

mitt

ed in

any

form

, or b

y an

y m

eans

, with

out t

he p

rior w

ritte

n pe

rmis

sion

of t

he p

ublis

her,

Dep

artm

ent o

f Pla

nnin

g, T

rans

port

and

Infra

stru

ctur

e.

Whi

le e

very

reas

onab

le e

ffort

has

been

mad

e to

ens

ure

that

this

doc

umen

t is

corre

ct a

t the

tim

e tim

e of

pub

licat

ion,

th

e St

ate

of S

outh

Aus

tralia

and

its

agen

cies

, in

stru

men

talit

ies,

em

ploy

ees

and

cont

ract

ors

disc

laim

any

an

d al

l lia

bilit

y to

any

per

son

in re

spec

t to

anyt

hing

or t

he

cons

eque

nce

of a

nyth

ing

done

or o

mitt

ed to

be

done

in

relia

nce

upon

the

who

le o

r any

par

t of t

his

docu

men

t.

SAC

FS A

rea

Burn

t Cud

lee

Cre

ek

Bush

fire

Prot

ectio

n Ar

eas

Excl

uded

Are

a fro

mBu

shfir

e Pr

otec

tion

Plan

Hig

h Bu

shfir

e R

isk

Med

ium

Bus

hfire

Ris

k

Loca

l gov

ernm

ent b

ound

ary

Subu

rbs

Parc

el C

adas

tre

Built

-up

area

Mai

n ro

ad

Oth

er ro

ad

Maj

or to

wns

Oth

er to

wns

and

loca

litie

s

BUSHFIRE RISK MAPPING

Page 15: Bushfire Recovery Planning and Building Assessment Fact Sheet · Under normal circumstances, fees for planning and building assessment in bushfire risk areas can be $1000 . or more