©all rights reserved. Confidential, disclosure to third parties of this information is not permitted The world of PMA…. General: What is a PMA Why PMA’s How does it work for operators/MRO Market Insight & Trends: PMA market Dynamics & trends Benefits using PMA vs OEM Challenges for PMA suppliers But first……

But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

The world of PMA….

General:

❑ What is a PMA

❑ Why PMA’s

❑ How does it work for operators/MRO

Market Insight & Trends:

❑ PMA market Dynamics & trends

❑ Benefits using PMA vs OEM

❑ Challenges for PMA suppliers

But first……

Page 2: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

About Belgraver aircraft interiors

Page 3: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

Rich history of Belgraver

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

1956 Maiden steps in aviation – first curtain business with KLM

1956 Start of seat cover overhaul and seat cover deliveries

1956 Start of dry cleaning activities ( Benelux customers only)

1963 Start of plastic production

1976 Start of foams and arm caps manufacturing

1986 New facility of Belgraver in The Netherlands - Naarden

2001 Opening of Belgraver Manufacturing facility UAE- Dubai

Page 4: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

Facts & Figures

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

- Currently more than 140 aviation customers globally

- More than 23,000 SKU’s

- Manufacturing locations in The Netherlands & Dubai

- Sales office in The Netherlands

- 100+ full time employees

- 60+ years of Aerospace experience (3rd generation)

- Core activities:- Plastics

- Textiles/Leather

- Repair / Modification

- Dry Cleaning ( Benelux only)

- Special Products

Page 5: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Certification

Page 6: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Plastics

Page 7: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Plastics

Page 8: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Repair/ Modification

Page 9: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

ARM CAPSfoam and leather covered

Page 10: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

❑ Modelling of seat covers, both new and existing design lines

❑ Seat cover production

❑ Maintenance and repair of seat covers

UPHOLSTERYseat covers

Page 11: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

INFLIGHT BAGS

Page 12: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

BABY BASSINET

Page 13: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Capabilities

- Seat Parts

- Curtains

- Cabin dividers

- Repair activities

- Baby Bassinets

- Magazine racks

- Carpet cutting

- Inflight Bags - Demo Bags

- Extension Bags

- Life Vest Pouches

- Document Holders

- Cockpit seat covers

- Dry Cleaning Services

Page 14: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

What is a PMA ? ( Parts Manufacturer Approval)

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

a PMA is a combined design and production approval

by the EASA/FAA for replacement parts for type-certificated

aircraft, engines, and propellers.

All replacement and modification parts must have a PMA.

Note: PMA is US / EPA is European

Exceptions:

- One time only products ( no need for a PMA)

- Existing Approval Holders (the OEMs) don’t need a PMA.

- Aircraft owners and operators may produce parts for

installation on their own aircraft ( need to comply with

airworthiness standards).

- Industrial Standard parts

- Parts produced under a TSO

Page 15: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

A PMA is classified as:

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Critical

Important

Not Critical

Most PMA parts are neither critical nor important

Only minor changes or improvements from the original OEM are

allowed in a PMA design. Significant changes require a

Supplemental Type Certificate.

Page 16: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

Starting a PMA program

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Its essential that Senior Management drives your PMA program

if it is going to be successful and to maximize the savings.

Using PMA’s requires resources and support from:

- Supply

- Engineering/ Technical Services

- Purchasing

- Quality assurance.

Page 17: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

The important role of engineering

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

As being an airline you are legally responsible for keeping

maintenance records. The engineering organization is

responsible for defining the content of the aircraft. So every part

on the aircraft must be shown as “approved for installation or

Repair”.

To do when using PMA parts:

- IPC must be revised ( interchangeability with OEM parts must

be documented).

- Installation documents must be revised to specify the use of

PMA parts.

Page 18: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

Quality Assurance

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Quality assurance is very common in aviation. Airlines

continuously send inspectors to audit the quality systems of

suppliers. PMA suppliers are no different than any other

supplier. No special training is required to verify the quality

system of a PMA supplier.

Page 19: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Global Part Market ( Operators/ MRO)

$110.9B

PMA The PMA market is currently ~ 0,6B

Market size

Page 20: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

$ 164

$

42

$ 70

$ 151

$ 143 $

32

$

16

$

66

Page 21: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Benefits of using PMA parts versus OEM

equivalents.

Lower Costs Quick availability Increased reliability

Page 22: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Regulations and acceptance

North America

- FAA declared PMA parts as

safe as OEM parts in 2008

- FAA and many countries

accept standards of airworthiness

through Bilaterial Agreement

( BASA)

Europe

- EASA PART 21 allows non

critical OEM licensed PMA

parts to be used in all EU

countries in 2007

- Also allows use of critical

PMA parts from non

licensed manufcaturers

but only after testing and

approval

South America

- Some countries allow use of certain

PMA parts but market is very small.

- Argentina, Brasil and Mexico

current only South American

countries with FAA BASA for PMA

Middle East & Africa

- ME in general facilitate FAA BASA

regulations.

- Africa: some countries allow use

of certain PMA parts but no clear

guidance

Asia

- Japan, Korea,

Malaysia,Singapore,

Taiwan have signed

BSA.

- Chinese Civil

Aviation Auth

beginning to slowly

accept PMA

Page 23: But first…… - NAG · 1956 Start of dry cleaning activities ( Benelux customers only) 1963 Start of plastic production 1976 Start of foams and arm caps manufacturing 1986 New facility

©all rights reserved. Confidential, disclosure to third parties of this information is not permitted

Challenges of PMA ( Cabin Parts)

- More pressure from the OEM to capture the aftermarket.

- Market is very fragmented

- Leasing companies still have difficulties accepting PMA

parts

- Design of new seats do have less loose parts

- Increased competition ( Asia)

- Increasing EASA reguirements are a massive impact on

overhead costs for manufactureres ( OEM/PMA)